©2024年、力拓、所有權利保留30損益表:扣除2023年2022年*每年度報告基本扣除綜合銷售收入54,041 54,041 55,554 55,554淨營業成本(不包括單獨披露的項目)(37,052)1,251(35,801)(34,770)(377)(35,147)(35,147)淨減值(費用)/沖銷(936)936-150(150)-處置子公司權益的虧損--(105)105-勘探和評估支出(出售未開發項目權益的淨利潤)(1,230)(1,230)(896(896)營業利潤14,823 2,187 17,010 19,933(422)19,511股權投資税後利潤份額675 6 681 777 777--(202)202-財務項目和税前利潤15,498 2,193 17,691 20,508(220)20,288淨匯兑(虧損)/外部淨債務和集團內餘額收益(251)251-253(253)-不符合對衝會計資格的衍生品虧損(54)54-(424)424-財務收入536 536 179(967)(967)(967)(335)(335)攤銷(977)(977)(1,519)(1,519)財務項目(1,713)305(1,408)(1,846)171(1,675)税前利潤13,785 2,498 16,283 18,662(49)18,613税項(3,832)(890)(4,722)(5,614)1,014(4,600)年度税後利潤9,953 1,608 11,561,048 965 14,013·可歸因於力拓所有者的税前利潤(淨收益)10,058 1,697 12,392 967 13,359(194)656(2)654*重述了比較信息,以反映對“國際會計準則12”“所得税”通過的範圍狹窄的修正案。
©2024年、力拓、所有權利保留32現金流量調節2023現金流量(百萬美元)法定現金流量對賬項目本年度基本現金流量税後利潤/基本EBITDA 9,953 23,892調整用於:·税收3,832·財務項目1,713·權益核算單位的税後利潤份額(675)(1,225)1(1,900)·對權益會計單位投資的税後減值費用---·處置子公司權益的虧損--·減值淨費用936(936)2--·折舊和攤銷5,334.撥備(包括匯兑差異撥備)1,470(1,272)2 198撥備使用率(1,158)(1,158)營運資本變動(926)(926)其他項目(228)373 145綜合業務的現金流量20,251 20,251 EAU 610 610支付的淨利息(612)(612)支付給非控股權益的股息(462)(462)支付的税款(4,627)(4,627)經營活動產生的現金淨額15,160 15,160購買PPE(7,086)出售PPE 9租賃本金支付(426)自由現金流量7,657其他項目法定對賬項目基礎非控股權益的變化債務衍生工具(14)142--已轉移折舊(375)3753--其他項目2,3161(16)145(228)373 145準備金的使用關閉和恢復(777)退休後福利和其他僱員福利(277)其他準備金(104)(1,158)週轉資金庫存變動(422)貿易和其他應收賬款(418)貿易和其他應付款(86)(926)1與財務項目有關,未包括在基礎EBITDA中的EAU的税項、折舊和攤銷|2與未包括在基礎EBITDA中的排除有關|3部分對賬項目包括E&E支出中的折舊和基礎現金流量中未確認的折舊
2024年©,力拓,所有權利保留36鐵礦石財務指標(億美元)2023年比較2024年指導部門收入32.2 4%EBITDA 20.07%利潤率(FOB)3 69%1PP經營活動產生的淨現金14.0-資本支出2.6-12%維持約1.84美元自由現金流11.43基本ROCE 64%3PP平均實現價格1,3(美元/噸)108.4 2%單位成本2,3(美元/噸)21.5-1%21.75-23.5發貨3(公噸,2024年指導2023年2022年2021年2019年皮爾巴拉混合201.5 203.9 202.9 232.7 228.1羅伯谷29.3 25.5 25.2 30.3 27.4 Yandicoogina 53.5 56.9 56.9 57.7 57.1 SP10 47.5 35.4 36.6 9.9 14.8總計323-338 331.8 321.6 321.6 330.6 327.4 1Dry公噸,FOB基礎|2單位成本基於EBITDA中包括的運營成本,不包括特許權使用費(國家和第三方)、運費、折舊、税和利息。2023年實際和2024年指導的單位成本以澳元匯率0.66表示。僅不包括2022年每噸0.4英鎊的新冠肺炎應對成本|3皮爾巴拉。所有其他數字反映了皮爾巴拉的業務、港口貿易和丹皮爾鹽|42023的實際價值,並受到通貨膨脹壓力的影響,如皮爾巴拉2023年10月實地考察報告所示
2022年©2024年,力拓所有權利保留37鐵礦石出貨量第二高的年度基本EBITDA2023年與2022年銷售額增加百萬美元隨着安全生產系統的不斷實施和古代達裏的銘牌柴油價格降低0.74美元/L與0.88美元/L 2022年實現價格(離岸價格)上漲2%美元加強4%基礎EBITDA787價格211交換124能源252通貨膨脹調整EBITDA643數量和組合236澳大利亞基礎EBITDA更高的固定成本效率被維護和系統健康方面的投資抵消增加的工作指標1其他包括非現金成本和勘探評價費用
©2024年,力拓,所有權利保留38鋁財務指標(10億美元)2023年2022年比較部門收入12.3-13%EBITDA2.3-38%利潤率(綜合運營)21%-8pp經營活動產生的淨現金2.0-35%資本支出(不包括EAU)1.3-3%自由現金流0.6-63%基本ROCE 3%-7pp鋁材實現價格1$2,738/t-18%氧化鋁平均價格2美元/t-5%產量(Mt,力拓股份)2024年指導2023年2022 2021 2020 2019年鋁土礦53-56 54.6 54.6 54.3 56.1 55.1氧化鋁7.6-7.5 7.5 7.9 8.0 7.7鋁3.2-3.4 3.3 3.0 3.2 3.2 3.2 LME加全保費(產品和市場)|2Platts Alumina PAX澳大利亞離岸價
©2024年,力拓,所有權利保留39鋁Kitimat恢復滿負荷1澳大利亞和加拿大較低的實現鋁價(同比-18%)和較低的溢價1其他包括非現金成本和勘探和評估費用3,672 2,308 2,282 1,484 2022基礎EBITDA價格166交易所130能源176通脹彈性EBITDA 126卷和混合84現金成本1 2023基礎EBITDA 184美元兑澳元上漲4%,兑加元通脹上升4%澳大利亞和加拿大較高的通脹降低VAP銷售Kitimat恢復滿負荷的比例2023年對2.022億美元
©2024年、力拓、所有權利保留40氧化鋁和鋁生產成本氧化鋁精煉生產現金成本鋁冶煉(鐵水)投入成本(指數價格)上半年2022 H2 2022 H1 2023 H2 2023庫存流動4 FY23年度成本敏感度燒鹼1(美元/噸)675 595 424 369 3-4個月每10美元/噸天然氣1,100萬美元2(美元/Mmbtu)6.03 7.03 2.54 2.79 0-1個月每0.1美元/GJ布倫特原油3(美元/bbl)106.2 93.7 79.7 85.5 N/A每10美元/桶投入成本(指數價格)H1 2022 H2 2022 H1 2023 H2 2023庫存流動8 FY23年度成本敏感度鋁材5(美元/噸)397 328 352 335 1-2個月每10美元/噸石油焦炭6(美元/噸)695 719 631 491 2-3個月每10美元/噸煤焦油7(美元/噸)1,103 1,476 1,386 1,130 1-2個月$200萬每10/t 5.澳大利亞(FOB)6.美國海灣(FOB)7.北美(FOB)8.基於季度標準成本計算(移動平均)1.東北亞中心3.布倫特4.基於季度標準成本計算(移動平均值)32%33%32%34%32%36%31%32%30%31%31%23%22%24%22%24%20%14%13%14%13%13%13%13%FY 2023 H1 2022 H2 2023 H1 2023 H2 2023 100%100%100%100%100%100%100%100%能源苛性鋁土礦轉化率17%17%17%21%20%22%2%2%2%19%20%19%18%18%19%21%19%23%21%23%19%41%42%39%38%37%38%2022財年上半年2022 H2 2022 2%FY 2023 2%H1 2023 2%H2 2023 100%100%100%氧化鋁碳粉材料轉化率
100%©2024年,力拓,所有權利保留41鋁價值鏈2023年實際採礦鋁鑄鋁鋁土礦37.3dmt鋁土礦54.6dmt精煉1氧化鋁8.2公噸氧化鋁1.7公噸非VAP鋁3.3公噸賭場生產32%79%68%21%46%54%RTA部門間第三方銷售1由於昆士蘭鋁業有限公司(QAL)在澳大利亞政府採取制裁措施後啟動了中間環節程序,只要進入階段繼續,我們就已經承擔了100%的產能。根據與QAL的通行費協議,我們正在使用俄鋁20%的運力份額。這一額外產量被排除在我們的生產業績之外,因為QAL仍然由力拓擁有80%的股份,俄羅斯鋁業擁有20%的股份。以上數值表示100%的容量
©2024年,力拓,所有權利保留42銅1平均實現價格為所有單位出售。已實現價格不包括臨時價格調整的影響,臨時價格調整對2023年的收入產生了200萬美元的積極影響(2022年負面影響為1.75億美元)|2肯納科特、OT和埃斯康迪達的單位成本使用C1單位成本計算,其中力拓選擇調整後的運營成本作為適當的成本定義。C1成本是採礦和加工產生的直接成本,加上場地G&A、運費以及變現和銷售成本。任何副產品收入在此階段都計入成本|3精煉銅產量包括肯納科特和奧尤陶勒蓋,基礎是100%,埃斯康迪達基於30%的財務指標(10億美元)2023 2022比較2024指導部門收入6.7-EBITDA 1.9-26%利潤率(產品組運營)42%-7pp經營活動產生的淨現金0.5-64%資本支出2.0+22%自由現金流(1.4)潛在的ROCE 3%-3pp銅實現價格1 390C/lb-3%單位成本2 195C/lb+20%140-160c/lb生產(kt,2024年指導2023年2022年2021年2020年2019年開採銅(綜合基礎)3 660-720 620 607 602 627 675精煉銅230-260 175 209 202 155 260
©2024年,力拓,所有權利保留43奧尤陶勒蓋地下銅礦擴建已步入正軌並完成肯納科特冶煉廠重建肯納科特2022年2,565 2,607 1,904 550 225 2022基礎EBITDA 46價格33交換29能源66通脹折算EBITDA 72卷和混合現金成本其他1 2023基礎EBITDA更高的產量與奧尤陶勒蓋地下坡道部分抵消肯納科特冶煉廠重建和輸送機停運的固定成本效率較低的肯納科特基礎EBITDA 2023與2.022億美元1其他包括非現金成本和勘探與評估費用
1濕公噸|2TZMI 2023年12月氯渣評估,僅不包括UGS|3Diavik。2021年11月17日,力拓在戴維克的權益從60%增至100%。生產和財務反映了這一點,從2021年11月1日©2024年,力拓,所有權利保留44 Minerals財務指標(2023年)2022年比較部門收入5.9-12%EBITDA 1.4-42%利潤率(產品組運營)30%-10便士經營活動產生的淨現金0.5-64%資本支出0.7+10%自由現金流(0.2)-128%基礎ROCE 13%-9便士IOC球團礦價格1美元155/t-19%二氧化鈦礦渣價格2美元/t+4%產量(力拓股份)2024年指導2023 2022 2021 2020 2019年IOC(Mt)9.8-11。5 9.7 10.3 9.7 10.4 10.5硼酸鹽-B_2O_3含量(Kt)~0.5 Mt 495 532 488 480 520二氧化鈦爐渣(Kt)0.9-1.1 Mt 1,111 1,200 1,014 1,120 1,206鑽石3,340 4,651 3,847 3,731 4,031
©2024年,力拓,所有權利保留45種礦產產量下降和具有挑戰性的市場狀況國際奧委會森林火災後固定成本效率低下的影響,以及RTIT 2,419 2,147 1,414 338 149 387 197 2022基礎EBITDA價格97 Exchange 1 Energy 32通脹調整EBITDA數量和混合現金成本其他1 2023基礎EBITDA銷售下降受加拿大魁北克RTIT業務兩座熔爐故障和市場疲軟以及Diavik Low IOC球團礦鑽石銷售下降影響Rincon和其他一次性EBITDA 2023與2.022億美元1其他包括非現金成本和勘探與評估費用1
Guidance©2024力拓,保留所有權利46
©2024年,力拓,所有權利保留47平衡股東的近期回報基本資本支出完整性、替代、脱碳1普通股息2進一步現金回報的迭代週期3令人信服的增長債務管理
©2024年,力拓,保留所有權利48產品組級指導1皮爾巴拉發貨指導仍受天氣影響,市場條件和文化遺產管理|2在100%合併的基礎上包括奧尤陶勒蓋,並繼續反映我們在埃斯孔迪達|3加拿大鐵礦石公司的30%份額|4財年指導基於澳元:0.66美元匯率2024年指導皮爾巴拉鐵礦石發貨量1(100%基礎)323-338噸銅礦開採銅(合併基礎)2精煉銅660-720kt 230-260kt鋁鋁土礦氧化鋁53-56mt-7.9mt 3.2-3.4mt礦物TiO2IOC3球團和精礦B2O3 0.9-1.1Mt 9.8-11.5mt~0.5Mt 2024年皮爾巴拉鐵礦石單位成本指引(美元/噸)4$21.75-23.5銅1(美分/磅)140-160
©2024年,力拓,所有權利保留49個集團層面的財務指導2024年至2026年(每年)資本支出總額集團1~100億美元增長資本至多30億美元維持資本~40億美元,包括皮爾巴拉維持約1.8億美元的替代資本~2至30億美元的脱碳資本~15億美元的累計有效税率~30%的股東回報通過第一個週期力拓股票,包括西芒杜|22023的實際價值,並受到通脹壓力的總回報,如2023年10月皮爾巴拉現場訪問演示文稿所示。
©2024,Rio Tinto,All Rights Reserved 50建模2023財年的EBITDA平均公佈價格/匯率對2023年全年相關EBITDA的影響價格/匯率變動10%鋁-每噸美元2,250 1,016銅-每磅美仙386 507黃金-每金衡盎司美元1,941 62鐵礦石實現價格(離岸價)-美元/幹公噸108.4 2,695澳元兑美元0.66 658加元兑美元0.74 358布倫特原油-美元/桶84 185注:敏感度提供假設每項個別價格或匯率獨立變動對相關EBITDA的估計影響。貨幣和商品價格之間的關係是複雜的,匯率的變動會影響商品價格的變動,反之亦然。匯率敏感度包括對經營成本的影響,但不包括外幣營運資金重估的影響。
©2024 Rio Tinto,保留所有權利51
©2024,Rio Tinto,保留所有權利Simandou項目的三個維度由Simfer礦業公司出資50%(53%力拓,47% CIOH財團2)50%由WCS合資公司出資51%中標財團3 49%寶武1鐵路和港口基礎設施的所有權將在35年運營期後從CTG轉移到幾內亞國家,Simfer在非歧視性基礎上保留訪問權,至少與所有第三方用户相同|2中鋁鐵礦控股(CIOH)聯合體:中鋁75%,寶武20%,中國鐵建2.5%,中國港灣工程公司2.5%| 3 Winning Consortium目前是一個由新加坡公司Winning International Group(50%)、魏橋鋁業(中國宏橋集團的一部分)(50%)和聯合礦業供應集團(名義股權)組成的財團。Rio Tinto出資53%,CIOH Consortium 2 Compagnie du TransGuinéen(CTG)出資47%。 Simfer礦-區塊3和4 WCS礦-區塊1和2 01 02 03所有權15%幾內亞政府42.5% Simfer採礦公司(53%力拓,47% CIOH Consortium 2)42.5% WCS Co.(51%中標財團3,49%寶武)所有權15%幾內亞政府42.5%中標財團3 42.5%寶武所有權15%幾內亞政府85%辛費爾澤西(力拓53%,CIOH財團47% 2)52
Simfer鐵路公司將代表CTG建造:· 70 km Simfer支線· 60 Mtpa轉運船(TSV)港口WCS鐵路公司將代表CTG建造:· 552 km 3的鐵路幹線和WCS支線· 60 Mtpa駁船碼頭一旦基礎設施完成,CTG將擁有並擁有獨立的管理團隊,運營所有港口和鐵路資產,不包括WCS駁船和Simfer TSV CTG股東:Simfer公司42.5%,WCS公司42.5%,幾內亞政府15% ©2024,Rio Tinto,保留所有權利53 WCS和Simfer有各自的範圍來利用專業知識,並降低風險和成本運營期間的結構基礎設施資產將由WCS和Simfer在重點範圍的共同開發安排中提供50/50的資金2。在建設期間,辛費爾將持有34%的WCS實體,負責建設175%的中國鋁業,20%的寶武,2.5%的中國鐵建公司和2.5%的中國港灣工程公司|2A在施工結束時的調整機制將向上/向下填充,以確保50/50相等的花費|3包括一條536公里的主線和一條16公里的支線15%寶武財團Winning Consortium WCS Co.幾內亞政府Compagnie du TransGuinéen(CTG)Rio Tinto Chinalco Consortium 1 Simfer Co. 51% 49% 42.5% 42.5% 47% 53%
©2024年,力拓,所有權利保留54個Simandou礦項目壽命關鍵統計數據1預計Simfer礦和聯合基礎設施的IRR2為低兩位數,通過擁有CTG礦露天礦,1.5Bt礦石儲量,第3區塊僅擁有力拓(45%),中鋁鐵礦石控股公司(40%)幾內亞政府(15%)建設時間~3年2025年第一次投產~30個月資本支出(礦山和TSV)51億美元(100%基準);27億美元RT股份3生產能力60 Mtpa產品規格正在進行雙粉塵產品規格測試-用於高爐和直接進料:~65.3%鐵和低雜質礦山壽命26年運營成本(LOM4)$10/wmt(礦門)Simfer礦山O v e RV ie w O p e ra ti on 1參見關於Simandou礦石儲量分類和報告的支持參考資料,以及支持幻燈片3財務信息的生產目標|2實際税後報告的IRR為11-13%。根據Wood Mackenzie和CRU對鐵礦石(65%品位)的平均定價,以及DR產品的溢價|3到2023年底,力拓花費了5億美元(力拓的份額)來推進關鍵路徑工程。力拓從2024年1月1日起剩餘的資本投資份額預計為57億美元|4如果按實際價值計算,|5會計處理仍需全面審查最終交易協議,評估代表我們在運營期間的當前預期可持續資本支出(LOM4)1美元/重量會計處理5 Simfer Jersey(力拓擁有53%股份)擁有礦山85%的股份(完全合併)C o n S Tru c ti範圍雙軌、多用户鐵路和轉運港口所有權Simfer(42.5%),WCS(42.5%)幾內亞政府(15%)建設時間~30個月鐵路和港口調試:簽約後約30-42個月WCS鐵路和港口資本支出投資:名義上30億美元(Simfer,100%基準);16億美元RT股份3 Simfer Infro港口和鐵路支線:名義價值35億美元(Simfer,100%基礎);19億美元RT股份3容量120 Mtpa(其中50%為Simfer使用)特許權期限35年,以支付投資償還運營成本(LOM4)鐵路:8美元/wmt;港口:7美元/wmt Simfer/CTG基礎設施運營和租賃,支持資本支出(Lom4)2美元/wmt會計處理5 Simfer Jersey(力拓擁有53%股份)擁有42.5%的基礎設施(預計將按比例整合)C on n S tr c ti on n
©2024年、力拓、保留所有權利55個税收設置將在合作伙伴之間提供可持續的利益共享關鍵税收設置Simfer礦山Simandou基礎設施管理框架Simfer公約經雙方協議修訂WCS港口和鐵路公約經共同開發協議修訂公司税年度1-8:15%年9+:30%年1-17:15%年18+:25%出口礦業税3.5%N/A轉運特許權使用費N/A$0.50/噸特許權使用費可被其他税收部分抵消4(隨着時間的推移減少5)當地發展貢獻0.25%營業額2 n/a股息預扣税n/a 1-17年:0%18+:5%關聯方貸款n/a利息預扣税10%第三方貸款關税5.6%運營期間用於採礦過程的進口關税31%登記/行政徵税和項目運營期間所需進口關税5.6%FOB價值。用於當地鋼鐵生產的產品的0%|2 Simfer SA在扣除與港口和鐵路基礎設施相關的服務費用後的年營業額|3受影響的進口示例包括工廠、設備、車輛、燃料等。還需要支付上限為10萬美元的註冊税。對經營採礦基礎設施以及港口和鐵路的直接涉及的進口免税|4利息預扣税和公司税|5可能的抵銷總額:第1-10年0.40美元/噸;11-15年0.35美元/噸;16-30年0.34美元/噸-0.20美元/噸;第31年+0.20美元/噸|6受影響的進口示例包括材料、機械、某些燃料等。不包括精華油/汽油(相反,應徵收20%的關税)
©2024年,力拓,所有權利保留56西芒杜2023年實際支出摘要100%基礎,百萬美元支出-已發生/應計基礎1(869)計入損益表的支出(23財年新聞稿第36頁)(539)資本支出(330)現金資本支出(23財年新聞稿第37頁)(266)截至2022年12月的營業資產(23財年新聞稿第37頁)(22)減值沖銷(2023年年度報告第180頁)239資本支出330遞延税金201其他(營運資本,(10)截至2023年12月的營運資產(23財年新聞稿第37頁)738減值準備:與幾內亞政府及其他合資夥伴簽署共同開發西芒杜鐵礦石項目基礎設施的主要協議後,觸發減值準備的金額已於2015年按應計制增加資本(100%)完全減值。我們從2023年第四季度開始對Simandou的符合條件的支出進行資本化(100%)以現金為基礎的資本增加主要與勘探和評估遞延税項主要與減值沖銷有關1 2023年產生的8.69億美元是幻燈片16中概述的Simandou項目116億美元總資本預算的一部分。
脱碳©2024年力拓,保留所有權利57
©2024年,力拓,保留所有權利58我們與同行的排放不同於我們的同行~80%來自加工金屬和礦產2023範圍1和2排放32.6公噸二氧化碳2022:32.7公噸二氧化碳(經收購調整)鋁陽極回收PacOps氧化鋁加工礦物加工併網加工(冰島,南非,阿曼)離網採礦點可再生能源皮爾巴拉其他柴油過渡L a nd m a a g e m e n n t 26%8.4噸CO_2e 15%4.8噸CO_2e 21%6.8噸CO_2e 18%5.8噸CO_2e 14%4.5噸CO_2e 6%2.0噸CO_2e 1%0.3噸CO_2e加工開採,散裝其他
©2024年,力拓,保留所有權利59我們的項目承諾正在兑現對減排項目的承諾2噸二氧化碳權益基礎邊際減排成本3美元/噸二氧化碳19
©2024年,力拓,所有權利今天保留了60項負責任的投資,併為未來的脱碳項目管道(Mt CO2e,股權基礎)批准/執行中的可執行試點規模與政府合作概念驗證-200-100 100 200 300 400 500 M A C 1(美元/噸)RBM PPA BlueSmeling™Pot OT REC 1Mt二氧化碳減排Boyne重新為商業交易提供動力行業突破皮爾巴拉可再生能源H2焙燒試點可再生能源柴油過渡礦物加工氧化鋁加工PacOps再生鋁節點其他6+1上行的KUC可再生柴油穩健評估方法·我們通向2030年的道路建立在已定義項目的基礎上,並在不同的未來情景中進行價值評估·項目通過管道使用減排成本和進度考慮重新供電·與澳大利亞不斷髮展的能源市場合作,以實現行業競爭力和競爭力低碳能源解決方案研發重點·我們一半的排放將需要技術突破來開發可行的解決方案·我們繼續投資於我們的行業領先地位,以解決難以減少加工性排放的問題1MAC=邊際減排成本
商業交易©2024年,力拓,所有權利保留61 2023年脱碳進展ELYSIS™無碳鋁陽極轉型恢復太平洋業務·低碳能源解決方案與關鍵利益相關者一起進步,降低基本負荷能源需求·在卡塔爾煉油廠試行雙消化電動車隊開發和試驗·皮爾巴拉電池電動拖車試點可再生能源·承諾可再生能源並獲得澳大利亞、南非和蒙古的證書·Yindjibarndi能源公司合作伙伴關係--在博龍(2023年)和肯尼科特(2024年)用可再生柴油取代化石柴油消費RTIT BlueSmeling™工廠示範Yarwun氫氣分解
©2024年,力拓,所有權利保留62途徑到2030年的目標根據我們的脱碳計劃34.5 10 20 30 40 2030 2030正在建設的預測承諾2030年太平洋石油公司電力26%2018年基線淨移動其他電力15%2030目標(50%)柴油14%2025目標(15%)分鐘。程序6%氧化鋁工藝熱量18%鋁陽極21%2023年實際2022-2023年在建/開發的承諾2024-2030年管道PacOps為其他所需的電力重新供電2有機增長其他電力11%柴油24%程序12%氧化鋁工藝。15%32.6 1.7 17.3鋁陽極36%-50%最終進度取決於競爭解決方案Mt CO2E權益基礎1 1由於範圍2方法的變化而重新排放。數據代表範圍1和2的排放總量和直接減排項目|2“其他所需的”將根據減排項目的交付、增長、關閉和資產變化隨着時間的推移而變化
商業交易轉型©2024年,力拓,所有權利保留63路線圖至淨零Mt CO2E股權基礎1電力減排假設商業解決方案(購電協議、可再生能源證書)在合同條款簽訂或實施的替代減排項目結束時滾動|2鋁陽極減排在整個2020年代以線性下降的形式示意顯示,將確定ELYSISTM部署時間|3高質量補償包括我們基於自然的項目的法規遵從性和自願補償|4使用假定的資產壽命延長要求的基線排放量延長到2040年後需要·工業規模ELYSIS™·零碳固定·全車隊電氣化·氫氣焙燒·BlueSmeling™-10-5 0 5 10 15 20 25 30 35 40 2018 2030 2040 20502022可再生能源1柴油過渡礦物加工氧化鋁加工PacOps再生KUC可再生柴油RBM PPA QAL雙重消化BSL再供電行業突破鋁陽極2基於自然的解決方案3我們仍致力於實現2030年的目標,即不脱碳隨着我們的澳大利亞鋁資產重新獲得動力,在證明能力的推動下實現淨零,以及難以減少的工藝的擴大技術突破,我們相信基於自然的解決方案在應對氣候變化和自然損失方面發揮了作用,皮爾巴拉可再生柴油氧化鋁加工電氣化全球可再生能源普及率Tomago重新供電OT可再生能源ELYSISTM
©2024年,力拓,所有權利保留64條脱碳投資途徑繼續發展脱碳管道(Mt CO2e,股權基礎)批准/執行中的可執行試點規模與政府概念驗證合作-300-200-100 0 200 300 400 500 600 M A C(美元/噸)商業解決方案(OPEX)資本解決方案1 Mt減排資本分配由NPV/MAC推動,執行就緒性,資產實力更多地使用商業解決方案和合作夥伴關係正在放寬本十年的資本支出要求預計2030年後主要機隊電氣化總資本支出指導修訂為5-6bn1,2 RBM PPA BlueSmeling™Pilot OT REC KUC可再生柴油Boyne Repowering Pilbara可再生能源H2分解1不包括資本化的自願抵消成本和基於合規的抵消成本(例如澳大利亞保障機制ACCUS),估計至2030年約為10億美元。由於項目資金不符合會計資本化標準,力拓基於自然的解決方案是運營成本|2不包括與早期研發和研究基於自然的解決方案相關的損益表成本·與我們運營區域相關的開發~5%-%1資本解決方案·現場可再生能源·氧化鋁工藝熱·可再生柴油~25-30%~90%2023-2030年資本支出%2030 CO2E減排%商業解決方案·PPA、VPPA、REC·生物燃料~65-70%~10%
©2024年,力拓,保留所有權利65投資以降低碳立法風險並減少運營資本解決方案2商業解決方案2立法規定的碳懲罰避免淨自由現金流增量碳節約2°C全球碳情景3淨自由現金流年度平均淨運營成本(百萬美元)來自脱碳計劃1税前3-5%內部收益率,實際10-13%税前實際淨運營成本1年平均淨運營成本反映2024-2039年期間的平均成本節約/增量成本,認識到項目交付的時間差異和基礎現金流的可變性|2資本解決方案與具有大規模前期資本投資的投資組合項目相關。商業解決方案與通過合同機制交付的項目相關|3採用力拓的競爭領導力情景建模·碳定價的影響力越來越大·~我們50%的排放現在處於立法碳處罰的範圍內·2023年的成本並不重要,但隨着過渡性安排的展開,將產生更大的影響·不確定的未來碳定價為脱碳資產提供了更高的回報,降低了成本波動性·化石燃料佔運營成本的16%·脱碳提供了一個機會,以長期穩定取代這種波動性
©2024年,力拓,所有權利保留了66,500,000公頃土地,致力於到2025年在全球範圍內提供高度完整性的基於自然的解決方案採購和投資於高質量的基於自然的解決方案項目,以滿足合規要求(例如保障機制)或補充我們的發展組合發展長期合作伙伴關係,為項目提供額外的支持並提供擔保信貸在我們的運營區域開發基於自然的解決方案建立基於自然的解決方案夥伴關係在幾內亞、馬達加斯加和南非發展高完整性項目,目標是到2030年實現100萬噸/年的發展組合-在馬達加斯加推進試點,2024年在幾內亞和南非複製解決自然損失問題,氣候變化和社區挑戰為緊急的自然保護和恢復提供資金產生高質量的碳信用額度,以補充我們的脱碳努力
©2024年,力拓,保留所有權利67價值鏈排放:2023年範圍3(股權基礎)
©2024年,力拓,所有權利保留68個具體的、面向行動的範圍3目標1資金批准和技術可行性|2 First Movers聯盟與前50家排放供應商就減排脱碳作為2024年高排放類別所有新採購的評估標準推動2024年脱碳,促進和分享精煉流程(研發)採購氧化鋁船用鋼支持客户到2035年將高爐的排放量減少20%-30%目標到2030年將IOC的範圍3(7公噸)減少50%20351委員會Biolron™連續試點工廠到2026年交付一個DRI+電熔煉爐試點工廠1完成對皮爾巴拉選礦試點工廠的研究到2026年實現排放強度到2030年減少50%FMC2到2030年承諾到2030年時租船淨零燃料能力的10%改進報告使用實際航程數據2024年95%以上的出貨量
69一套適用於皮爾巴拉礦石的低二氧化碳新技術正在進行中。DR-EAF:直接還原-電弧爐。ESF:電爐©2024年,力拓,版權所有
Explore©2024年力拓,版權所有70
廣泛的合作伙伴網絡©2024年,力拓,所有權利保留71在我們的歷史基礎上建設和促進增長世界級勘探團隊~4億美元每年支出~2.5億美元每年支出450名員工18個國家8種大宗商品>100個在建項目>50%的支出目標是銅礦>70年的研發經驗和數據分析以加速發現強大的技術和研發血統1綠地勘探支出|2超過10年5個關鍵的研發重點領域敏捷性創新諮詢委員會風險投資1.5億美元2
©2024年,力拓,保留所有權利72我們有100多個項目處於不同的成熟階段我們正在籌備中的重點是最有希望的機會銅鑽石鋰礦物鐵礦石鋁土礦鎳多產皮爾巴拉鐵礦26銅礦項目澳大利亞,美國,智利,祕魯,哥倫比亞,塞爾維亞,贊比亞,老撾,安哥拉,巴布亞新幾內亞,哈薩克斯坦,納米比亞1重礦砂項目澳大利亞7鎳項目加拿大,芬蘭,祕魯,巴西,澳大利亞14個鋰項目,加拿大,美國,澳大利亞,智利。巴西。盧旺達,哈薩克斯坦新科佈雷銅礦,智利礦產項目加拿大B ro w n FIELD G Re e n Feld目標測試項目MERIT概念研究銅生成礦物生成鎳生成鋰生成Chiri鑽石,安哥拉Kasiya金紅石,馬拉維德克薩斯州鉀肥,加拿大Kamiesberg HMS,南非鐵礦石項目澳大利亞鐵礦石項目澳大利亞鋰項目美國鋁土礦項目澳大利亞銅礦項目美國鐵礦石目標澳大利亞發現
©2024年,力拓,保留所有權利73我們與Codelco的新合資企業:New evo Cobre世界級銅礦地形;獨特的戰略合作伙伴關係力拓57.74%Codelco在世界第四大銅區(智利阿塔卡馬地區)發現重大斑巖的潛力很大,以前勘探過的金礦,現有的金氧化物資源歷史數據回顧顯示,未被勘探的銅礦資源以及更高的銅礦靶區-正在進行的>440公里的鑽探工作,完成了~7%的銅礦分析。環境基線監測和許可工作開始
NutonTM©2024力拓,保留所有權利74
Yerington Lion CG©2024年,力拓,所有權利保留75 NutonTM A高回收和低佔地技術傑出的銅回收率:CO2e排放高達60%的低用水量>80%的高效尾礦要求無資本強度>40%低仙人掌ASCU Los Azules McEwen Antakori Regulus Johnson Camp Excelsior EsCondida BHP商業演示可行性研究和測試領先的可持續性證書高性能技術:多個應用程序高達85%的原生硫化銅礦體旨在生產世界上佔地面積最低的銅,跨越我們的五個支柱,並延伸到至少一個方面產生積極影響:社會材料陸地水能源與資源持有者合作獲取銅量6合作伙伴關係4國家合作伙伴方法:主要差異化投資組合今天01 02 1將因地點而異,礦石特徵和運營環境。力拓的分析。紐頓的業績1與傳統的精礦/冶煉力拓合資企業
力拓風險投資資產/公司當前投資/協議關鍵條款/Nuton Right約翰遜坎普礦山,AZ Excelsior Mining Inc.(多倫多證交所)期權與合資企業協議示範和部署·測試計劃正在進行·選擇在合資公司中賺取49%,營銷權為葉靈頓,NV獅子銅金礦公司(多倫多證券交易所-V)選項賺取協議進行中第二階段·測試計劃正在進行中·選項賺取最高75%,運營和營銷權仙人掌礦山,亞利桑那州索諾蘭(AZ Arizona Sonoran)(多倫多證券交易所-V)擁有7.2%的ASCU投資者權利協議選項至合資企業協議·測試計劃正在進行中·選擇獲得合資公司高達40%的營銷權(視條件而定)·技術委員會成員Los Azules,阿根廷McEwen銅業(私人)擁有14.5%的McEwen銅礦合作協議·測試計劃正在進行·McEwen銅板成員·Nuton合作委員會代表不滿·2025年2月之前對堆浸技術的獨家經營權Antakori,祕魯Regulus Resources(REG)(多倫多證券交易所-V)擁有16.1%Regulus投資者權利協議·測試計劃正在進行·REG董事會席位,技術委員會代表怨恨的埃斯孔迪達,智利必和必拓/RT/JECO材料測試協議埃斯孔迪達參與協議·Nuton測試計劃正在進行©2024年,力拓,所有權利保留76今天的Nuton投資組合
©2024年、力拓、所有權利保留77個通用首字母縮寫$美元二氧化碳二氧化碳FMC第一輪聯盟Mtpa每年百萬噸RTA力拓鋁業$A澳元二氧化碳當量FOB船上交貨兆瓦級RTIT力拓鐵鈦$C加拿大元CP氯化物級FY全年兆瓦小時RTM力拓海軍陸戰隊每股歐元歐元温室氣體MWP中西部溢價S&P標準普爾ACUS澳大利亞碳信用單位CSP社區和社會表現GJ吉焦耳鎳SPS安全生產系統AIFR所有傷害頻率CTG公司轉產氫氣NPV淨值t噸鋁鋁銅淨值HBI熱壓鐵OT Oyu Tolgoi tCO2噸二氧化碳ASX澳大利亞證券交易所CuEq銅當量IOC加拿大鐵礦石公司P&L損益tCO2噸二氧化碳當量澳元dmt幹公噸IRR內部收益率pA年二氧化鈦二氧化鈦B2O3硼氧化物dmtu幹公噸單位合資企業力拓太平洋業務TSV轉運船bbl一桶DR直接還原公里PNG巴布亞新幾內亞UG地下高爐DRI直接還原鐵當量Kt Kilo噸PP個百分點美國10億Kilo年勘探和評估KPA噸電力採購協議,美元,轉爐,高爐,電爐,電弧爐,KUC,肯納科特,猶他州,銅,PPE工廠。物業及設備增值產品BSL博因冶煉廠有限公司eau股權計入單位L升QAL昆士蘭鋁業有限公司VPPA虛擬電力購買協議BT 10億噸EBITDA息税折舊及攤銷前利潤Li鋰研發研發WCS中標財團C Celcius ESF電動熔煉爐LME倫敦金屬交易所RBM理查德灣礦產濕噸每磅c/lb美分每磅ESG環境、社會和治理M百萬REC可再生能源證書同比資本支出歐盟併購和收購CCRHS右手邊年度至今美國碳捕獲,碳捕獲,環境,社會和治理使用和儲存電動汽車MAC邊際減排成本人民幣CFR成本和運費F預測MACC邊際減排成本曲線ROCE資本回報率中鋁鐵礦石控股集團FAI固定資產投資MMBtu 100萬英熱單位RT力拓CNY人民幣鐵Mt百萬噸RT股份力拓股份定義計算的減排碳價零碳價格下的平均減排邊際成本計算:以零碳價格折現一段時間內所有減排成本之和/一段時間內所有減排的貼現總和按門檻利率貼現用於所有投資決策
©2024, Rio Tinto, All Rights Reserved 58 Our emissions differ from our peers ~80% arise from processing metals and minerals 2023 Scope 1 & 2 emissions 32.6Mt CO2e 2022: 32.7Mt CO2e (adjusted for acquisitions) Aluminium Anodes Repowering PacOps Alumina Processing Minerals Processing On-grid processing (Iceland, South Africa, Oman) Off-grid mining sites Renewable Energy Pilbara Other Diesel Transition L a n d m a n a g e m e n t 26% 8.4Mt CO2e 15% 4.8Mt CO2e 21% 6.8Mt CO2e 18% 5.8Mt CO2e 14% 4.5Mt CO2e 6% 2.0Mt CO2e 1% 0.3Mt CO2e Processing Mining, bulk Other
©2024, Rio Tinto, All Rights Reserved 59 Our project commitments are taking hold Commitments to abatement projects2 tCO2e equity basis Marginal Abatement Cost3 $/t CO2e 19
©2024, Rio Tinto, All Rights Reserved 60 Responsible investment today and a technology focus for the future Decarbonisation project pipeline (Mt CO2e, equity basis) Approved/ in-execution Executable Pilot scalePartnering with government Proof of concept -200 -100 0 100 200 300 400 500 M A C 1 ( $ /t ) RBM PPA BlueSmelting™ pilot OT RECs 1Mt CO2 abatement Boyne repowering Commercial transactions Transformational Industry breakthroughs Pilbara renewables H2 calcination pilot Renewable Energy Diesel Transition Minerals Processing Alumina Processing PacOps Repowering Aluminium Anodes Other 6+1 upside KUC renewable diesel Robust evaluation approach • Our path to 2030 is built on defined projects with value assessed in different future scenarios • Projects progress through pipeline using abatement cost and schedule considerations PacOps repowering • Working with the evolving Australian energy market for an industry-competitive, low-carbon energy solution R&D focus • Half our emissions will require technology breakthroughs to develop viable solutions • We continue to invest in our industry leadership position to address hard to abate processing emissions 1MAC = Marginal Abatement Cost
Commercial transactions ©2024, Rio Tinto, All Rights Reserved 61 2023 decarbonisation progress ELYSIS™ carbon-free aluminium anodes Transformational Repowering Pacific Operations • Low-carbon energy solutions progressing with key stakeholders Reducing baseload energy requirements • Piloting double digestion at QAL refinery Electric fleet development and trials • Pilbara battery-electric haul truck pilots Renewable energy • Committed renewable energy and certificates in Australia, South Africa and Mongolia • Yindjibarndi Energy Corporation partnership Drop-in biofuels • Replace fossil diesel consumption with renewable diesel at Boron (2023) and Kennecott (2024) Industry breakthroughs RTIT BlueSmelting™ demonstration plantYarwun hydrogen calcination
©2024, Rio Tinto, All Rights Reserved 62 Pathway to 2030 target under our decarbonisation programmes 34.5 10 20 30 40 2030 Forecast commitments under construction at 2030 PacOps Electricity 26% 2018 baseline Net movement Other Electricity 15% 2030 target (50%) Diesel 14% 2025 target (15%) Min. Proc. 6% Alumina Process Heat 18% Aluminium Anodes 21% 2023 actual 2022-2023 commitments under construction/ development 2024-2030 pipeline PacOps repowering Other required2 Organic growth Other Elec 11% Diesel 24% Min. Proc. 12% Alumina Proc. 15% 32.6 1.7 17.3 Aluminium Anodes 36% -50% Final schedule dependent on competitive solution Mt CO2e equity basis1 1Restated emissions due to scope 2 methodology changes. Data represents ‘gross’ Scope 1&2 emissions and direct abatement projects | 2‘Other required’ will flex over time based on abatement project delivery, growth, closures and asset changes
Commercial transactions Transformational ©2024, Rio Tinto, All Rights Reserved 63 Roadmap to net zero Mt CO2e equity basis 1Electricity abatement assumes commercial solutions (Power Purchase Agreements, Renewable Energy Certificates) to be rolled over upon conclusion of contract terms or alternative abatement projects implemented | 2Aluminium anodes abatement shown illustratively as linear decline throughout 2040s, timing of ELYSISTM deployment to be defined | 3High quality offsets include regulated compliance and voluntary offsets from our nature-based projects | 4Baseline emissions extended post-2040 using assumed asset life extensions Requires • Industrial scale ELYSIS™ • Zero carbon firming • Full fleet electrification • Hydrogen calcination • BlueSmelting™ -10 -5 0 5 10 15 20 25 30 35 40 2018 2030 2040 20502022 Renewable Energy1 Diesel Transition Minerals Processing Alumina Processing PacOps Repowering KUC renewable diesel RBM PPAs QAL double digestion BSL repowering Industry breakthroughs Aluminium Anodes2 Nature-based Solutions3 Organic growth without decarbonisation4 We remain committed to our 2030 targets, with the repowering of our Australian aluminium assets to play a significant role Trajectory to net zero driven by ability to prove and scale- up technology breakthroughs for hard to abate processes We believe nature-based solutions play a role in addressing climate change and nature loss Pilbara renewable diesel Alumina processing electrification Global renewable energy penetration Tomago repowering OT renewables ELYSISTM
©2024, Rio Tinto, All Rights Reserved 64 Decarbonisation investment pathways continue to evolve Decarbonisation pipeline (Mt CO2e, equity basis) Approved/ in-execution Executable Pilot scalePartnering with government Proof of concept -300 -200 -100 0 100 200 300 400 500 600 M A C ( $ /t ) Commercial solutions (opex) Capital solutions 1Mt abatement Capital allocation driven by NPV/MAC, execution readiness, asset strength Greater use of commercial solutions and partnerships are easing capex requirements this decade Major fleet electrification expected post-2030 Total capex guidance to 2030 revised to $5-6bn1,2 RBM PPA BlueSmelting™ pilot OT RECs KUC renewable diesel Boyne Repowering Pilbara renewables H2 calcination 1Excludes capitalised voluntary offset costs and compliance based offset costs (e.g. Australian Safeguard mechanism ACCUs), estimated at ~$1bn to 2030. Rio Tinto nature-based solutions are opex as project funding does not meet accounting capitalisation criteria | 2Excludes costs expensed to the income statement associated with early-stage R&D and studies Nature-based solutions • Development connected to our operating regions ~5% -%1 Capital solutions • Onsite renewables • Alumina process heat • Renewable diesel ~25-30% ~90% 2023-2030 capex % 2030 CO2e abatement % Commercial solutions • PPAs, VPPAs, RECs • Biofuels ~65-70% ~10%
©2024, Rio Tinto, All Rights Reserved 65 Investment to de-risk from carbon legislation and reduce opex Capital solutions2 Commercial solutions2 Legislated carbon penalty avoidance Net free cash flow Incremental carbon saving 2°C global carbon scenario3 Net free cash flow Annual average net operating costs ($m) from decarbonisation programme1 3-5% IRR pre-tax, real 10-13% IRR pre-tax, real 1Annual average net operating costs reflect average cost savings / incremental costs over the period 2024-2039, recognising timing differences in delivery of projects and variability in underlying cash flows | 2Capital solutions relate to portfolio projects with large-scale upfront capital investment. Commercial solutions relate to projects delivered through contractual mechanisms | 3Modelled using Rio Tinto’s Competitive Leadership scenario Increasing influence of carbon pricing • ~50% of our emissions are now in scope for legislated carbon penalties • Costs not material in 2023, but will have greater impact as transitionary arrangements unwind • Uncertain future carbon pricing provides enhanced returns for decarbonised assets Reducing cost volatility • Fossil fuels account for ~16% of operating costs • Decarbonisation provides an opportunity to replace this volatility with long term stability
©2024, Rio Tinto, All Rights Reserved 66 500,000+ hectares of land committed to high integrity nature-based solutions globally by 2025 Sourcing and investing in high-quality nature-based solutions projects to meet compliance requirements (e.g. Safeguard Mechanism) or complement our development portfolio Developing long-term partnerships that provide additional support to projects and guarantee credits offtake Developing nature- based solutions in our operating regions Building nature-based solutions partnerships Developing high integrity projects in Guinea, Madagascar and South Africa Aiming for 1 Mtpa development portfolio by 2030 – pilots advanced in Madagascar, opportunities to replicate in Guinea and South Africa in 2024 Addressing nature loss, climate change and community challenges Financing urgent nature protection and restoration Generating high quality carbon credits to complement our decarbonisation efforts
©2024, Rio Tinto, All Rights Reserved 67 Value chain emissions: 2023 Scope 3 (equity basis)
©2024, Rio Tinto, All Rights Reserved 68 Specific, action-oriented Scope 3 targets 1Subject to funding approval and technical feasibility | 2First Movers Coalition Engage with top 50 emitting suppliers on emissions reduction Decarbonisation as evaluation criteria for all new sourcing in high emitting categories in 2024 Advance customer partnerships driving decarbonisation in 2024, advance and share improvements in the refining process (R&D) Procurement Alumina Marine Steel Support customers to reduce emissions from BF 20-30% by 2035 Target a 50% reduction in Scope 3 (7 Mt) from IOC by 20351 Commission Biolron™ Continuous Pilot Plant by 20261 Deliver a DRI + electric smelting furnace pilot plant by 2026 in partnership with a steelmaker1 Finalise study on a beneficiation pilot plant in the Pilbara by 2026 Achieve 50% emissions intensity reduction by 2030 FMC2 pledge of 10% of time charters net zero fuel capability by 2030 Improve reporting – use actual voyage data for 95%+ of shipments in 2024
69 Work is underway across a suite of new low CO2 technologies suitable for Pilbara ores Notes: BOF: Basic Oxygen Furnace. DR-EAF: Direct Reduction - Electric Arc Furnace. ESF: Electric Smelting Furnace ©2024, Rio Tinto, All Rights Reserved
Exploration ©2024 Rio Tinto, All Rights Reserved 70
Extensive network of partners ©2024, Rio Tinto, All Rights Reserved 71 Building on our history and enabling growth World-class exploration team ~$400m annual spend ~$250m1 annual spend 450 employees 18 countries 8 commodities >100 projects in pipeline >50% of spend targeted at copper >70 years of experience R&D and data analytics to accelerate discovery Strong technology and R&D pedigree 1Greenfield exploration expenditure | 2Over 10 years 5 key focus areas for R&D Venture capital investments for agility Innovation Advisory Committee $150m for Centre for Future Materials2
©2024, Rio Tinto, All Rights Reserved 72 We have more than 100 projects at varying stages of maturity Our pipeline focus is on the most promising opportunities Copper Diamonds Lithium Minerals Iron Ore BauxiteNickel Generative Pilbara Iron Ore 26 Copper projects Australia, USA, Chile, Peru, Colombia, Serbia, Zambia, Laos, Angola, PNG, Kazakhstan, Namibia 1 Heavy Mineral Sands (HMS) project Australia 7 Nickel projects Canada, Finland, Peru, Brazil, Australia 14 Lithium projects Canada, USA, Australia, Chile. Brazil. Rwanda, Kazakhstan Nuevo Cobre Copper, Chile Minerals project Canada B ro w n fi e ld G re e n fi e ld Target Testing Project of Merit Concept Study Copper Generative Minerals Generative Nickel Generative Lithium Generative Chiri Diamonds, Angola Kasiya Rutile, Malawi Texas Potash, Canada Kamiesberg HMS, South Africa Iron Ore projects Australia Iron Ore projects AustraliaLithium project USA Bauxite projects Australia Copper projects USA Iron Ore targets Australia Discovery
©2024, Rio Tinto, All Rights Reserved 73 Our new joint venture with Codelco: Nuevo Cobre World class copper terrain; unique strategic partnership 57.74% Rio Tinto 42.26% Codelco High potential for a significant porphyry discovery in the fourth largest copper district in the world (Atacama region, Chile) Property previously explored for gold, with existing gold oxide resources present Historical data review has indicated underexplored copper resources as well as upside copper targets - delineation work ongoing >440 km of drilling completed with ~7% analysed for copper. Environmental baseline monitoring and permitting commenced
NutonTM ©2024 Rio Tinto, All Rights Reserved 74
Yerington Lion CG ©2024, Rio Tinto, All Rights Reserved 75 NutonTM A high-recovery and low-footprint technology Outstanding copper recovery rates: CO2e emissions up to 60% lower Water consumption >80% more efficient Tailings requirement None Capital intensity >40% lower Cactus ASCU Los Azules McEwen Antakori Regulus Johnson Camp Excelsior Escondida BHP Commercial demonstration Viability study and testing Leading sustainability credentials High-performing technology: Multiple applications up to 85% on primary copper sulphide ore bodies Aim to produce world’s lowest footprint copper across our five pillars, and stretch to have a positive impact in at least one: SocietyMaterialsLandWaterEnergy Partnering with resource holders to access copper volumes 6 Partnerships 4 Countries Partnership approach: Key differentiators Portfolio today 01 02 1Will vary depending from site to site, ore characteristics and operating environment. Rio Tinto analysis. Nuton’s performance1 vs. conventional concentrating/smelting A Rio Tinto venture
A Rio Tinto venture Asset/ company Current investment/agreement Key terms/ Nuton rights Johnson Camp Mine, AZ Excelsior Mining Inc. (TSX) Option to JV Agreement Agreement with full pathway on demonstration and deployment • Testing programme underway • Option to earn up to 49% in JV Co with marketing rights Yerington, NV Lion Copper & Gold Corp (TSX-V) Option to Earn-in Agreement Stage 2 in progress • Testing programme underway • Option to earn up to 75%, with operating and marketing rights Cactus Mine, AZ Arizona Sonoran (ASCU) (TSX-V) Own 7.2% ASCU Investor Rights Agreement Option to JV Agreement • Testing programme underway • Option to earn up to 40% in JV Co with marketing rights (subject to conditions) • Technical Committee member Los Azules, Argentina McEwen Copper (Private) Own 14.5% McEwen Copper Nuton Collaboration Agreement • Testing programme underway • McEwen Copper Board member • Nuton collaboration committee representative • Exclusivity over heap-leach technologies until February 2025 AntaKori, Peru Regulus Resources (REG) (TSX-V) Own 16.1% Regulus Investor Rights Agreement • Testing programme underway • REG Board seat, Technical Committee representative Escondida, Chile BHP/ RT/ JECO Material Testing Agreement Escondida Participation Agreement • Nuton testing programme underway ©2024, Rio Tinto, All Rights Reserved 76 The Nuton portfolio today
©2024, Rio Tinto, All Rights Reserved 77 Common acronyms $ United States dollar CO2 Carbon dioxide FMC First Movers Coalition Mtpa Million tonnes per annum RTA Rio Tinto Aluminium $A Australian dollar CO2e Carbon dioxide equivalent FOB Free On Board MW Megawatt RTIT Rio Tinto Iron and Titanium $C Canadian dollar CP Chloride grade FY Full Year MWh Megawatt hour RTM Rio Tinto Marines € Euro Cps Cents per share GHG Greenhouse gas MWP Midwest premium S&P Standard & Poor’s ACCUs Australian carbon credit units CSP Communities and Social Performance GJ Gigajoules Ni Nickel SPS Safe Production System AIFR All Injury Frequency Rate CTG Compagnie du TransGuinéen H2 Hydrogen NPV Net present value T Tonne Al Aluminium Cu Copper HBI Hot briquetted iron OT Oyu Tolgoi tCO2 Tonne of carbon dioxide ASX Australian Securities Exchange CuEq Copper equivalent IOC Iron Ore Company of Canada P&L Profit and loss tCO2 e Tonne of carbon dioxide equivalent AUD Australian dollar dmt Dry Metric Tonne IRR Internal rate of return Pa Per annum TiO2 Titanium dioxide B2O3 Boric oxide dmtu Dry Metric Tonne Unit JV Joint Venture PacOps Rio Tinto Pacific Operations TSV Transhipment vessel bbl one barrel DR Direct Reduction km kilometre PNG Papua New Guinea UG Underground BF Blast furnace DRI Direct Reduction Iron Kt Kilo tonnes PP Percentage point US United States bn Billion E&E Exploration and Evaluation Ktpa Kilo tonnes per annum PPA Power Purchasing Agreement USD United States dollar BOF Blast Oxygen Furnace EAF Electric Arc Furnace KUC Kennecott Utah Copper PPE Plant. Property & Equipment VAP Value-added product BSL Boyne Smelter Limited EAU Equity accounted unit L Litre QAL Queensland Alumina Limited VPPA Virtual power purchase agreement Bt Billion tonnnes EBITDA Earnings Before Interest, Taxes, Depreciation and Amortisation Li Lithium R&D Research and Development WCS Winning Consortium C Celcius ESF Electric Smelting Furnace LME London Metal Exchange RBM Richards Bay Minerals Wmt Wet metric tonne c/lb US cents per pound ESG Environmental, Social, and Governance M Millions REC Renewable Energy Certificate YoY Year on Year Capex Capital expenditure EU European Union M&A Mergers and Acquisitions RHS Right hand side YTD Year to date CCUS Carbon capture, utilisation and storage EV Electric Vehicle MAC Marginal Abatement Cost RMB Renminbi CFR Cost and freight F Forecast MACC Marginal Abatement Cost Curve ROCE Return on capital employed CIOH Chinalco Iron Ore Holdings Consortium FAI Fixed Asset Investment Mmbtu one million British thermal units RT Rio Tinto CNY Chinese Yuan Renminbi Fe Iron Mt Million tonnes RT Share Rio Tinto share Definitions Calculated abatement carbon price The levelised marginal cost of abatement at a zero carbon price Calculation: Discounted sum of all abatement costs over time at a zero carbon price / Discounted sum of all abated emissions over time Discounted at the hurdle rate RT uses for all investment decisions