圖表99.1
年度信息表
截至2024年12月31日的年度
日期截至2025年3月14日
巴里克黃金公司
海灣街161號,3700套房
安大略省多倫多M5 J 2S1
加拿大
巴里克黃金公司
年度信息表
目錄
技術和商業術語概述 | 4 | |||
報告貨幣、財務和儲備信息 | 10 | |||
前瞻性信息 | 12 | |||
科學和技術信息 | 14 | |||
一般信息 | 15 | |||
組織結構 |
15 | |||
附屬公司 |
16 | |||
感興趣的領域 |
18 | |||
業務總體發展 |
18 | |||
歷史 |
18 | |||
戰略 |
18 | |||
2024年運營業績 |
21 | |||
業務敘述性描述 | 25 | |||
製作與指導 |
25 | |||
可呈報經營分部 |
25 | |||
內華達金礦(61.5%基礎) |
26 | |||
卡林 |
26 | |||
Cortez |
27 | |||
綠松石嶺 |
27 | |||
其他礦山-內華達金礦 |
28 | |||
普韋布洛別霍(60%基礎) |
28 | |||
盧洛-古科託(80%基礎) |
29 | |||
基巴利(45%基礎) |
29 | |||
北馬拉(84%) |
29 | |||
布利安胡魯(84%) |
30 | |||
其他礦山(黃金) |
30 | |||
Lumwana |
32 | |||
其他礦山(銅礦) |
32 | |||
不可避免地被提取並與礦石一起出現的礦石 因此,回收的品位低於原計劃開採的品位。 |
32 | |||
多雷 |
46 | |||
未精煉的金條和銀條通常含有約90%的貴金屬,將進一步精煉 幾乎純淨的金屬。 |
47 | |||
漂移 |
47 | |||
一種水平巷道,通常在礦體內或礦體旁挖掘,平行於礦石的長尺寸排列。 |
47 | |||
掘進式充填 |
57 |
- i -
一種地下采礦方法,用於平地成礦或地面條件較差的地方。 |
58 | |||
鑽井 |
59 | |||
核心 |
59 | |||
: 用帶有鑽石切割邊緣的中空鑽頭鑽進,以生產用於地質研究和分析的圓柱形岩心。 | 60 | |||
反循環 |
60 | |||
:在雙壁鑽桿內使用旋轉切割鑽頭併產生岩石碎屑的鑽井 而不是核心。空氣或水向下循環到鑽桿內壁和外壁之間的鑽頭。切屑通過鑽桿中心被強迫到表面,並被收集、檢查和化驗。 |
66 | |||
常規旋轉 |
74 | |||
:一種鑽探方法,產生類似於反循環的岩屑,不同的是樣品是 使用單壁鑽桿收集。空氣或水通過鑽桿中心向下循環,將切屑返回鑽桿外部周圍的表面。 |
80 | |||
填充 |
88 | |||
:在現有孔之間鑽更小間距的孔,用於提供更大的 地質細節,並幫助將資源估計升級到儲量估計。 |
96 | |||
退出: |
104 | |||
沿走向或與礦化層位或構造相交的鑽探 |
112 | |||
向下傾斜。 | 120 | |||
探索 |
120 | |||
露天礦 | 124 | |||
完全從地表開採材料的礦井。 | 147 | |||
礦石 | 147 | |||
包含以下內容的材料 金屬或 | 147 | |||
非金屬 | 148 | |||
可以開採和加工有利可圖的礦物。 | 150 | |||
礦體 | 150 | |||
一種足夠大的礦石,它是連續的,可以經濟地開採。 | 152 | |||
氧化礦 | 152 | |||
一些主巖或原始礦化已暴露於氧氣中的礦化岩石,因此礦化程度較高 易於提取的。 | 153 | |||
有資格的人 | 154 | |||
請參閱「科學技術信息」。 | 161 | |||
復墾 |
161 | |||
這一過程是通過 對因採礦活動而受到干擾的土地進行改造,以支持有益的土地利用。回收活動可包括拆除建築物、設備、機械和其他採礦殘留物,關閉尾礦庫。 設施、淋濾墊和其他採礦設施,以及等高線、覆蓋和 |
161 | |||
重新恢復植被 |
162 |
- ii -
廢石和其他受干擾的地區。 |
164 | |||
填海及封閉費填海費用加上其他費用,包括但不限於某些人員費用、保險、財產保有費用,如 稅收、租金和索賠費用,以及與關閉正在運營的礦山相關的社區項目。回收率 |
164 | |||
過程冶金學中的一個術語,表示在礦石加工過程中實際回收的有價值的物質所佔的比例。它是 一般以回收的物質佔礦石中原來所含物質總量的百分比表示。 |
164 | |||
煉油 | 164 | |||
從熔化的金屬中除去雜質的金屬生產的最後階段。耐火材料 | 165 | |||
金屬不能用傳統的氰化物方法回收的礦化材料,沒有任何 | 170 | |||
前置處理。 | 170 | |||
難熔的性質可能是由於金屬的二氧化硅或硫化物包裹,或自然生成的碳或其他成分的存在,降低了黃金的回收率。 | A-1 |
- iii -
烘焙
治療的方法 爲了氧化硫化物和去除其他元素(碳、銻或砷),可通過加熱和空氣或富氧空氣來處理硫化礦石。
豎井
通向地下礦井的垂直通道,用於通風、運送人員、設備、補給和包括礦石在內的材料 和廢石。
戰略資產
巴里克認爲,這項資產有可能在未來帶來巨大的未實現價值。
剝離
刪除 覆蓋在礦體上的覆蓋層或廢石,以備採礦
露天礦
方法:研究方法。尾礦
在經濟和技術上可回收的金屬在加工過程中從礦石中移除後剩餘的材料。
尾礦儲存設施(「TSF」)
爲長期儲存加工後殘留的材料而建造的區域。
一級銅礦資產/項目
每磅儲量爲3.00美元的資產,可能含有500萬噸或更多的銅,以支持至少20 幾年來,年產量至少爲200,000噸,每磅成本處於行業成本曲線的下半部分。一級銅礦資產/項目必須位於具有潛在有機儲量的世界級地質區 增長和長期的地質驅動的增加。
一級黃金資產
每盎司1,400美元儲量的資產,有潛力提供最低
10年期
生命,年度 生產至少500,000盎司黃金,每盎司成本處於行業成本曲線的下半部分。一級黃金資產必須位於具有有機儲量增長和長期潛力的世界級地質區 地質驅動的加成作用。二級黃金資產有潛力提供最低收益的儲備資產
10年期
年產量,年產量 至少250,000盎司黃金和礦山壽命內每盎司的總現金成本處於行業成本曲線的下半部分。
噸 短噸(2000磅或約907公斤)。
公噸
公噸(1,000 公斤或大約2205磅)。
可記錄傷害總頻率(「TRIFR」)TRIFR是一個比率,計算如下:應報告的傷害數量×100萬小時除以總工作小時數。 應報告的傷害包括死亡、損失時間傷害、受限工作傷害和醫療傷害。暗箱操作
- 4 -
掘進式充填
掘進式充填地下采礦的一種方法,向下工作,在工作區上方放置膠結充填物;最適合地面條件較差的地方。供應路線中斷可能導致建築和採礦活動延誤的風險,包括 由於俄羅斯入侵烏克蘭和中東衝突,主要礦業投入品的供應中斷;
戰爭、恐怖主義、破壞和內亂造成損失的風險;
與手工採礦和非法採礦有關的風險;
與巴里克基礎設施、信息技術系統和巴里克的實施有關的風險 技術舉措,包括與網絡安全事件有關的風險,包括計算機病毒、惡意軟體、勒索軟體和其他網絡攻擊或類似信息技術系統故障、延誤和/或中斷所造成的風險;
全球流動性和信貸可獲得性對現金流的時間和資產價值的影響 以預計未來現金流量爲基礎的負債;
通貨膨脹的影響,包括由持續的全球供應鏈中斷和 在俄羅斯入侵烏克蘭和阿根廷特定國家的政治和經濟因素之後,全球能源成本增加;
公司信用評級的不利變化;
與外匯和資本管制有關的風險;
貨幣市場的波動(如加元和澳元、智利、阿根廷和多米尼加披索、 英鎊、秘魯索爾、贊比亞誇查、南非蘭特、坦桑尼亞先令、(西非足協、剛果法郎、巴布亞新幾內亞金納、巴基斯坦盧比和埃及鎊兌美元);美元利率的變化可能會影響
按市值計價未償還衍生工具和浮動利率債務的價值;
持有衍生工具產生的風險(如信用風險、市場流動性風險和按市值計價
風險);與對公司管理層提出的要求有關的風險,管理層執行其 某些司法管轄區的商業戰略和政治風險增加;
不確定巴里克的部分或全部目標投資和項目是否將滿足公司的 資本配置目標和內部門檻比率;最近交易的預期收益是否實現;可能向公司提出或由公司尋求的商機;
公司成功整合收購或完成資產剝離的能力;
巴里克 1983年進入黃金開採行業,是一家領先的國際黃金公司,業務遍及四大洲。公司在加拿大、美國、阿根廷、智利、加拿大、美國、阿根廷、智利、 科特迪瓦、多米尼加共和國、剛果民主共和國、厄瓜多爾、牙買加、馬裏、巴基斯坦、巴布亞新幾內亞、秘魯、沙特阿拉伯、塞內加爾、坦桑尼亞和贊比亞。該公司的主要產品和收入來源是黃金和銅。
在最初的十年裏,巴里克專注於收購和開發北美的物業,特別是公司的 內華達州卡林趨勢上的GoldStrike地產,作爲與紐蒙特公司(紐蒙特)合資交易的一部分,於2019年7月1日入股內華達金礦,巴里克保留61.5%的所有權 利息。
自1994年以來,巴里克還在戰略上向北美以外的地區擴張,包括通過與 蘭德金資源有限公司(「蘭德金」)於2019年1月1日(「合併」)。根據合併,巴里克收購了蘭德黃金的100%已發行和流通股,蘭德黃金是一家上市礦業公司, 擁有非洲四個礦場的所有權權益。
戰略
巴里克的願景是通過尋找、開發和擁有最好的金礦和銅礦,成爲世界上最有價值的黃金和銅礦企業 爲所有利益相關者提供最好的回報和利益。公司的戰略是通過吸引和培養了解並參與價值的世界級人才來作爲企業主運營 在業務鏈條中,誠信行事,孜孜不倦地追求卓越。巴里克專注於通過優化自由現金流、管理風險來創造長期價值併爲其創造回報,從而爲其利益相關者帶來回報 通過與東道國政府和社區合作,將本國的自然資源轉化爲可持續的利益和共同繁榮。公司的目標是通過不斷改進來實現這一目標 資產質量,追求卓越的運營,並保持對可持續盈利的關注。
資產質量
巴里克的目標是通過發展和投資Tier One Gold Assets、Tier One銅業資產/項目組合來實現其願景, 第二級黃金資產和戰略資產,重點是有機增長,以利用公司在世界級地質區的現有足跡。公司正在集中精力尋找、投資和開發 符合巴里克投資標準的資產。一級資本投資的要求內部收益率(IRR)爲15%,調整爲對多種商品有敞口的長期(20年以上)投資的10%回報率 循環。二級黃金資產的投資要求內部收益率爲20%。所有項目都是根據巴里克的投資過濾器進行評估的,這些過濾器包括廣泛的技術、財務、環境、安全、合作伙伴關係和社會 經營許可標準。此外,所有主要項目都要經過同行審查,最後由執行委員會審查,以確認項目在整個組織得到廣泛支持,並查明存在很大差距 這一問題得到了解決,而且對發展決定有適當的信心。
近期投資組合的優先事項包括推進內華達黃金公司的關鍵增長項目 作爲延長礦山壽命項目的一部分,在Pueblo Viejo開發新的Naranjo TSF,以及開始建設Lumwana超級礦坑擴建項目和Reko Diq項目。
巴里克還旨在通過最大化公司戰略銅的長期價值,爲其利益相關者提供回報 目前由Lumwana、Reko Diq、Jabal Sayid、Zaldívar和Norte Abierto組成。巴里克的勘探計劃在高質量的棕地項目、綠地勘探和新興發現之間取得了平衡 有可能通過巴里克的投資過濾。與巴里克專注於擴大其勘探組合一致,該公司正在世界上許多最多產的金礦地區擴大其廣泛的土地頭寸 並向厄瓜多爾和牙買加等新領域擴張,同時還探索和發展巴里克的戰略銅業務。
- 5 -
公司的棕地勘探重點在2024年帶來了顯著的價值,這得益於在 Loulo-Gounkoto綜合體、Kibali、內華達州金礦(Greater Leeville、Robertson、Cortez Hills Under和綠松石嶺)、Fourmirle、Pueblo Viejo和Veladero區。巴里克還發現了在所有地區的勘探潛力 在這些項目的基礎上,湯貢、基巴利、北馬拉、布利揚胡魯、倫瓦納和雷科·迪克的情況進一步好轉。與此同時,巴里克正在繼續評估潛在的第三方項目,這些項目有可能成爲有利可圖的礦山 巴里克的管家身份。
巴里克的投資組合還包括一些未開發的綠地金礦和銅礦, 爲黃金和銅價提供進一步的選擇權和槓桿。這些措施包括
東林·戈爾德、諾特·阿比耶託、阿爾圖拉斯和帕斯誇拉馬。
欲了解有關巴里克的增長項目、勘探計劃和新發現的更多信息,請參閱“資料 特性-Cortez特性「;」材料特性-Carlin複合體「;」材料特性-綠松石山脊複合體「;」材料特性-Pueblo Viejo礦「;」材料特性 -Kibali礦「;」材料特性--Loulo-Gounkoto礦綜合體「;」材料特性--Reko Diq項目「;以及」材料特性--Lumwana“。
此外,公司繼續專注於投資組合的優化,包括銷售
非核心
隨着時間的推移,以一種有紀律的方式管理資產。例如,
2024年,公司完成了多項銷售
非核心
少數股權收益 約9800萬美元。這些交易,加上2019年以來的其他撤資,總共產生了超過19億美元的總收益和價值,並強化了巴里克的維持戰略 集中的一級資產投資組合。有關這些交易的更多信息,請參閱下面的「卓越運營和可持續盈利能力」。巴里克將繼續追求銷售 |
非核心 |
31.10348 |
(2000噸,可歸屬每股份額) |
截至12月31日的12個月 | ||||
Zaldívar(50%) |
盧姆瓦納 |
34.28600 |
賈巴爾·薩伊德(50%) |
可歸屬銅總量 | ||||
巴里克的權益受某些礦山的特許權使用費義務的約束。從2024年開始,公司將推出其 銅產量以公噸爲單位,而不是磅(1噸相當於2,204.6磅)。 |
看見 本年度信息表中的「業務敘述性描述」、合併財務報表附註5「分部信息」和MD&A中有關公司經營分部的進一步信息。看見 《業務敘事性描述-礦產儲量和礦產資源》,了解公司礦產儲量和資源的信息。 |
0.00045 |
備註: |
1本公司位於馬裏的Loulo-Gounkoto綜合設施於2025年1月暫時停工。因此,巴里克已經排除了 Loulo-Gounkoto來自其2025年的生產指導。詳情見「法律訴訟和監管行動--盧洛-貢科託採礦公約爭議」。該公司預計將更新其指導意見,以便在完成後將Loulo-Gounkoto包括在內 關於重新開始運作的時間的確定性更高。 | ||||
對企業的敘事性描述 |
巴里克從事黃金生產和銷售,以及勘探和礦山開發等相關活動。巴里克 該公司還生產大量銅,主要來自其Zaldívar合資企業、Jabal Sayid合資企業及其Lumwana礦,並持有其他權益。除非另有說明,否則巴里克的業務描述, 包括本年度信息表中包含的產品、主要市場、分銷方式、員工和勞動關係,適用於其每個運營部門和巴里克作爲一個整體。 |
0.90718 |
製作和指導 |
在截至2024年12月31日的一年中,巴里克生產了3.911,000,000盎司黃金,適用於 每盎司1,442美元, | ||||
全注 |
維持費用爲每盎司1484美元,現金總費用爲每盎司1065美元。由於Loulo-Gounkoto暫時停止運營,巴里克已排除 Loulo-Gounkoto來自其2025年的生產指導。詳情見「法律訴訟和監管行動--盧洛-貢科託採礦公約爭議」。 |
0.30480 |
巴里克預計一旦更新其指導方針,將Loulo-Gounkoto包括在內 對重新開始運作的時間有更大的確定性。不包括Loulo-Gounkoto,巴里克2025年的黃金產量目前的目標是315萬至350萬盎司,巴里克預計適用於黃金的銷售成本爲 2025年每盎司1,460美元至1,560美元, |
全注 | ||||
假設市場黃金價格爲每盎司2400美元,維持費用爲每盎司1 460美元至1 560美元,現金總費用爲每盎司1 050美元至1 130美元。看見 《前瞻性信息》。巴里克預計普韋布洛·維約、綠松石嶺、波格拉和基巴利將提供更好的同比表現,以及卡林和科爾特斯的穩定交付。在韋拉德羅和鳳凰城,公司 預計2025年產量將低於2024年。 |
在2025年的四個季度,公司的黃金產量預計將 2025年第一季度最低(介於 |
1.60930 |
非gaap |
財務業績衡量標準。以獲得關於 | ||||
全注 |
每盎司的維持成本和總現金成本,請參閱 |
0.40468 |
“非公認會計原則 |
財務措施--每盎司現金總成本, | ||||
全注 |
每盎司的維持成本,每磅的現金成本和全注 |
本年度資料表格第165至166頁的「每磅維持成本」。 |
其他礦場--內華達金礦 |
巴里克在菲尼克斯的61.5%權益按可歸因於黃金的銷售成本計算,生產了約12.7萬盎司黃金 每盎司1687美元,
全注
2024年維持成本爲每盎司1,031美元,總現金成本爲每盎司765美元。
在菲尼克斯,公司預計其在2025年黃金生產中的股權份額將在8500-105萬盎司之間,低於 2024年的產量水平。巴里克預計,2025年可歸因於黃金的銷售成本將在每盎司2,070美元至2,170美元之間,全注維持成本預計爲每盎司1240至1340美元,以及 總現金成本預計在每盎司890美元至970美元之間。預計這三項指標都將高於2024年。
正如之前披露的那樣,長峽谷於2023年底進行了護理和維護,因此巴里克已經停止了 包括2024年第一季度開始的Long Canyon的生產或成本指標。巴里克是內華達號的運營商 金礦合資企業。
“所有賭注全注
預計維持成本將爲 每盎司1,280美元至1,380美元,也與2024年持平,總現金成本爲
預計在每盎司910美元至990美元之間,低於2024年。
- 6 -
“所有賭注每盎司的「維持成本」和「總現金成本」是非gaap
財務業績衡量標準。以獲得關於全注
每盎司的維持成本和總現金成本,請參閱 “非公認會計原則
財務措施--每盎司現金總成本,全注
每盎司的維持成本,每磅的現金成本和
全注
本年度資料表格第165至166頁的「每磅維持成本」。
Loulo-Gounkoto(80%基數)
Barrick在Loulo-Gounkoto的80%權益(就本年度信息表而言,這是一項重大財產,請參閱 Property-Loulo-Gounkoto礦山綜合體“)生產了約57.8萬盎司黃金,銷售成本爲每盎司1,218美元,
全注
維持費用爲1,304美元/人 2024年每盎司和總現金成本爲每盎司828美元,相比之下,按每盎司1 198美元的黃金銷售成本計算,黃金約爲5.47萬盎司,
全注
“非公認會計原則
財務措施--每盎司現金總成本,
全注
每盎司的維持成本,每磅的現金成本和全注本年度資料表格第165至166頁的「每磅維持成本」。
北馬拉(84%的基數)
巴里克在北馬拉84%的權益產生了大約
- 7 -
265,000盎司黃金,按銷售成本計算 到每盎司1,266美元的黃金,
全注
2024年的維持成本爲每盎司1,274美元,總現金成本爲每盎司989美元,相比之下,按2024年的成本計算,黃金的成本約爲2.53億盎司
可歸因於黃金的銷售額爲每盎司1206美元,
全注
2023年維持成本爲每盎司1,335美元,總現金成本爲每盎司944美元。2024年,黃金 最終產量高於指導範圍,反映出與年初的礦山計劃相比,加工的品位更高。所有成本指標都受到較高已實現黃金價格帶來的較高特許權使用費的影響。儘管有這種影響,但所有成本 指標處於指導區間的較低端,反映了產量增加沖淡了更多盎司固定成本的好處。在北馬拉,該公司預計其在2025年黃金生產中的股權份額將在2.3億-2.6億盎司之間, 略低於2024年的產量水平。巴里克預計,2025年,可歸因於黃金的銷售成本將在每盎司1,370美元至1,470美元之間,總現金成本預計將在每盎司1,020美元至1,100美元之間,兩者都更高 超過2024年的水平。巴里克預計全注
維持成本爲每盎司1,400美元至1,500美元,也高於2024年的水平。
“所有賭注
維持成本“及 每盎司的「總現金成本」爲
非gaap
財務業績衡量標準。以獲得關於
全注
每盎司維持成本和總現金成本,請參閱 至
“非公認會計原則財務措施--每盎司現金總成本,全注
每盎司的維持成本,每磅的現金成本和
全注
本年度資料表格第165至166頁的「每磅維持成本」。
Bulyanhulu(84%基數)
巴里克在Bulyanhulu的84%權益生產了約16.8萬盎司黃金,銷售成本可歸因於黃金 每盎司1,509美元,
全注
2024年的維持成本爲每盎司1,420美元,總現金成本爲每盎司1,070美元,相比之下,按可歸因於 黃金價格爲每盎司1,312美元,
全注2023年維持成本爲每盎司1231美元,總現金成本爲每盎司920美元。2024年,黃金產量結束在指導範圍內。所有成本指標都受到以下因素的影響 較高的已實現黃金價格帶來的更高的特許權使用費。此外,由於較高的折舊,每盎司的銷售成本略高於指導範圍。現金總成本和全注
維持費 儘管已實現金價較高,但仍在各自的指導範圍內。
在Bulyanhulu,公司預計其 2025年黃金產量的股權份額將在150-1.8億盎司之間,與2024年的產量水平一致。巴里克預計,2025年,可歸因於黃金的銷售成本將在每盎司1,470美元至1,570美元之間,總計 現金成本預計在每盎司1,010美元至1,090美元之間,均與2024年的水平一致。
全注
維持成本預計爲每盎司1,540美元至1,640美元,高於2024年的水平。
- 8 -
“所有賭注
每盎司的「維持成本」和「總現金成本」是
非gaap
財務業績衡量標準。以獲得關於全注每盎司的維持成本和總現金成本,請參閱
“非公認會計原則
財務措施--每盎司現金總成本, 全注每盎司的維持成本,每磅的現金成本和
全注
本年度資料表格第165至166頁的「每磅維持成本」。
其他礦山(黃金)
巴里克在Veladero礦50%的權益按銷售成本計算生產了約2.52萬盎司黃金 到每盎司1254美元的黃金,
全注
2024年的維持成本爲每盎司1,334美元,總現金成本爲每盎司905美元,相比之下,按銷售成本計算,黃金約爲2.07億盎司 到每盎司1,440美元的黃金,
全注2023年維持成本爲每盎司1,516美元,總現金成本爲每盎司1,011美元。2024年黃金產量高於指導區間,受額外可採儲量推動 1至5期浸出設施已放置的盎司和更高的盎司貢獻。所有成本指標都低於指導範圍,這是由於產量增加,儘管較高已實現黃金的特許權使用費增加了影響 價格。
A 韋拉德羅合資企業的治理、所有權和聯合運營受股東條款的制約。 巴里克與山東之間的協議。Minera Andina del Sol SRL(「MAS」)(以前爲Minera阿根廷Gold SRL)是 2017年3月、2016年9月和2015年9月發生的涉及釋放含金工藝解決方案的運營事件的法律程序的標的。有關這些事項的更多信息,請參閱“法律 事項--法律訴訟和監管行動--維拉德羅--業務事故和相關訴訟“。
- 9 -
全注
維持費用預計在每盎司1770美元至1870美元之間,現金費用總額預計在每盎司1210美元至1290美元之間。預計這三個指標都會更高 超過2024年的水平。
“所有賭注
「維持成本」和「總現金成本」 盎司是43-101非gaap43-101”),財務業績衡量標準。以獲得關於43-101,全注每盎司的維持成本和總現金成本,請參閱 “非公認會計原則43-101財務措施--每盎司現金總成本,
全注43-101每盎司的維持成本,每磅的現金成本和 全注本年度資料表格第165至166頁的「每磅維持成本」。43-101.
盧姆瓦納Lumwana(本年度信息表中的材料屬性,請參閱「材料屬性-Lumwana」) 以每磅2.94美元的銅銷售成本生產了約1.23萬噸銅,全注2024年,維持成本爲每磅3.85美元,C1現金成本爲每磅2.23美元。 在Lumwana,公司預計2025年銅產量將在1.25億噸至1.55億噸之間,略高於 2024年的產量水平。巴里克預計,2025年,可歸因於銅的銷售成本將在每磅2.30美元至2.60美元之間,而C1現金成本預計將在每磅1.60美元至1.90美元之間,均低於2024年的水平。全注維持成本預計在每磅2.80美元至3.10美元之間,也低於2024年的水平。“所有賭注「維持成本」和「現金總額」 每盎司的成本“是
- 10 -
非gaap財務業績衡量標準。以獲得關於全注每盎司的維持成本和總現金成本,請參閱“非公認會計原則
- 11 -
財務措施--每盎司現金總成本,
全注 每盎司的維持成本,每磅的現金成本和 全注本年度資料表格第165至166頁的「每磅維持成本」。 其他 礦場(銅礦)
• | 巴里克在Zaldívar的50%權益在年產約4萬噸銅 銅的銷售成本爲每磅4.09美元, |
• | 全注 |
• | 2024年,維持成本爲每磅3.58美元,C1現金成本爲每磅3.04美元。 |
• | 在Zaldívar,該公司預計其在2025年銅產量中的股權份額將在40-45萬噸之間, 與2024年的產量水平一致。巴里克預計,2025年,可歸因於銅的銷售成本將在每磅3.60美元至3.90美元之間,而C1現金成本預計將在每磅2.70美元至3.00美元之間,均低於2024年 級別。 |
• | 全注 |
• | 維持成本預計爲每磅3.50至3.80美元,與2024年的水平一致。 |
• | 截至 2024年12月31日,巴里克的已探明和可能的黃金總儲量爲8900萬盎司,平均品位爲0.99克/噸,按每盎司1,400美元的金價假設進行估計,但在湯貢和Hemlo露天礦除外。 2024年的礦產儲量是基於每盎司1,650美元的金價假設。與平均品位爲1.65克/噸的7,700萬盎司相比,這一數字有所增加,根據#年末每盎司1,300美元的金價假設估計。 2023年。 |
• | 與去年同期相比,可歸屬儲量增加了1740萬盎司 在2024年之前耗盡460萬盎司。與去年同期相比的變化是由於將Reko Diq資源轉換爲礦產儲量,在完成 可行性研究。值得注意的是,在加入Reko Diq之前,該公司連續第四年以4%的高品級替換年度虧損,進一步延長了Barrick現有業務的壽命。自.以來 |
• | 年終 |
• | 2019年,巴里克已成功替代了公司180%以上的黃金儲備枯竭,增加了近4600萬盎司的可歸屬已探明和可能儲量或 100%基礎上的已探明和可能儲量7700萬盎司(不包括收購和撤資)。 |
• | 金礦 非洲和中東地區的儲量在經歷了年度枯竭後,從2023年的1880萬盎司3.24克/噸增加到2024年的1900萬盎司/噸3.35克/噸。這主要是由Bulyanhulu和Loulo-Gounkoto共同推動的, 高品位Reef 2和Yalea地下礦體的伸展分別與Faraba露天礦的增長相結合。總體而言,這使全球已探明和可能的礦產儲量增加了230萬盎司 地區,在耗盡之前。北馬拉還通過擴大Gokona地下和Gena露天礦,促成了這一強勁成果。在Kibali,KCD地下9000和11000碘正在進行的轉換鑽探取代了98% 正在進行開發,以在2025年建立更多的地下鑽井平台。 |
• | 在北美,持續增長 在年度耗盡之前,各項目增加了154萬盎司黃金,主要來自綠松石嶺、卡林的Leeville Underround和Reona |
• | 縮進在鳳凰城,這是 部分抵消了由CrossRoads和Robertson冶金模型更新推動的Cortez的減少。這導致2024年該地區已探明和可能的礦產儲量爲3000萬盎司,爲2.71克/噸, 由於高等級的增加和減少,等級比去年增加了10%以上 |
• | 低品位 |
• | 在科爾特斯。 |
- 12 -
在加入REKO之前,拉丁美洲和亞太地區取代了2024年區域黃金礦產儲量枯竭的115% Diq.這是由Pueblo Viejo牽頭的,該公司在耗盡之前增加了78萬盎司的可歸因性已探明和可能的礦產儲量,這是由於額外的尾礦存儲設施容量釋放了額外的礦坑設計阻力 在新的Naranjo TSF中。隨着毗鄰West Wall的露天礦連接路削減項目的成功改建,Porgera的可歸屬黃金礦產儲量同比增長22%。 |
• | 黃金資源 |
• | 自.起 2024年12月31日,巴里克的可歸屬測量和指示黃金資源量爲1.8億盎司,平均品位爲1.06g/噸。這與2024年12月31日測量和指示的黃金資源量爲1.8億盎司一致。 截至2023年12月31日的平均品位爲1.06克/噸。截至2024年12月31日,巴里克的歸屬推斷黃金資源量爲410萬盎司,平均品位爲0.9克/噸,而平均品位爲3900萬盎司 品級爲0.8克/噸,截至2023年12月31日。推斷礦產資源量的增加主要歸因於福爾邁爾礦體最南端緊鄰現有礦體的礦產資源的增長 黃金項目。展望2025年,巴里克計劃開始一項 |
• | 預可行性 |
• | 四英里研究,2025年第一季度末鑽探,目標是繼續延長 在完成計劃中的金銀山北部入口門戶的基礎研究的同時,還將沿着Strike向北延伸4英里的礦產資源。目前,巴里克持有Fourmile100%的股份。正如之前披露的那樣,巴里克預計 如果在完成鑽探和必要的可行性工作後滿足某些標準,Fourmirs將向內華達金礦合資企業提供資金。 |
• | 銅 |
• | 截至2024年12月31日,可歸屬已探明和可能的銅礦儲量同比增長22.4%。 在此基礎上,品位上升13%以上,至1800萬噸銅,價格爲0.45%,上年爲560萬噸,價格爲0.39%。這是由於Lumwana超級礦坑擴建和Reko Diq可行性的完成 確認這兩個項目爲一級銅礦資產/項目的研究。Lumwana Super Pit擴建可行性研究爲該項目增加了550萬噸銅儲量,使已探明和可能的銅儲量達到 830萬噸銅,報0.52%。Reko Diq可行性研究將730萬噸銅以0.48%的價格增加到可歸屬銅儲量。這意味着增加了2000多萬噸已探明和可能的 自2023年以來,銅儲量爲100%。可歸屬的已測量和指示的銅礦資源爲2400萬噸,平均品位爲0.39%,另外還有390萬噸,平均品位爲推斷的0.3% 截至2024年12月31日的礦產資源,反映了Lumwana礦產資源的轉換和升級。相比之下,上一年可歸因於測量和指示的銅礦資源量爲2100萬噸,平均品位爲 0.39%,以0.4%的平均品位推斷銅礦資源量710萬噸。 |
• | 假設和方法 |
• | 2024年,所有礦產儲量的估算採用假設金價爲每盎司1,400美元,假設白銀價格爲每盎司20美元。 假設銅價爲每磅3.00美元,長期平均匯率爲1.30加元:1加元,但在湯貢和赫姆洛露天礦,2024年的礦產儲量估計爲每盎司1,650美元;在Zaldívar, 2024年和2023年的礦產儲量是根據安託法加斯塔指南和最新的假設銅價每磅3.80美元計算出來的;紐蒙特公司報告的北艾比爾託的礦產儲量爲每盎司1,200美元黃金,每盎司2.75美元 在應用最新的2023年項目經濟之前,使用不斷上升的運營和資本成本,導致紐蒙特指導黃金每盎司1,600美元,銅每磅4美元,銅的價格爲每盎司1英鎊,銀礦設計爲每盎司22美元 假設礦產儲備大宗商品價格,銀價爲每盎司23.00美元。 |
• | 用於計算儲量的價格假設 2024年的數據與巴里克用於項目經濟評估的數據一致。在確認其每個礦產、項目和運營的年度儲量時,巴里克在每年的12月31日進行儲量測試 以核實來自儲備的未來未貼現現金流爲正。現金流不包括所有沉沒成本,只考慮未來的運營和關閉費用以及任何未來的資本成本。 |
• | 2024年,所有礦產資源的計算方法是假設黃金價格爲每盎司1900美元,假設白銀價格爲每盎司24.00美元 假設銅價爲每磅4.00美元,但以下情況除外:在Zaldívar,根據安託法加斯塔準則估計2024年和2023年的礦產資源,假設銅價分別爲每磅4.40美元和4.20美元; 在Norte Abierto,紐蒙特公司報告的礦產資源在黃金每盎司1,400美元,銅每磅3.25美元,白銀礦殼每盎司20.00美元範圍內,在應用更新的2023年項目經濟之前,使用升級 運營和資本成本導致紐蒙特公司對假定礦產資源商品價格的指引爲黃金每盎司1600美元,銅每磅4.00美元,白銀每盎司23.00美元。巴里克2024年的礦產資源將繼續 在包容性的基礎上報告,包括形成礦產儲量的所有地區。所有露天礦產資源都包含在一個白色外殼中,而所有地下礦產資源都包含在優化的可開採形狀中。 |
• | 2024年的礦產儲量和礦產資源是用金、銅和銀的綜合價值來估計的。相應地,礦物質 報告銅或銀作爲初級產品生產和銷售的所有資產的儲量和礦產資源 |
• | 副產品。 |
• | 巴里克的礦產資源和礦產儲量估計爲 噸、盎司的黃金和白銀以及磅的銅被報告爲第二個有效數字。所有礦產資源都是在包容性的基礎上報告的,包括形成礦產儲量的所有地區,在礦產資源中報告 |
• | 截斷 |
• | 以及相關的商品價格。全 |
• | 黃金(g/t)、銀(g/t)和銅(%)的所有已探明和可能的礦產儲量品位的已測量和指示礦產資源量估計以兩個小數點爲單位。 所有對黃金(g/t)、銀(g/t)和銅(%)品位的推斷礦產資源估算值都以一位小數點爲單位報告。 |
• | 巴里克的儲量和資源已根據定義和最佳實踐估計到2024年12月31日 CIM通過並納入國家文書的指導方針 |
• | (見「技術和業務術語詞彙表」)。多變的 |
• | 截斷年級有 根據礦場、開採方法和儲量中所含礦石的類型而定。礦產資源金屬等級和材料密度已使用適用於每個礦產項目的行業標準方法進行估計, 支持各種市面上可用的挖掘軟體包。對於截斷 |
• | 關於評估儲量時所用的品位,請參閱下文「巴里克礦產儲量和資源表附註」。 巴里克採用了正常的數據核實程序來進行估計。所述礦產資源和儲量背後的採樣、分析和測試數據已由其合資企業巴里克的員工核實 合資夥伴或其合資經營公司,在合格人員和/或獨立合格人員的監督下(見「科學和技術信息」)。覈查程序包括 行業標準的質量控制實踐。採集的用於地質建模和礦產資源評估的鑽探樣本由公司每個物業和項目的地質部門直接監督。全 在建模和資源估計中使用的鑽孔箍、測量和化驗信息在進入全礦數據庫之前由工作人員地質學家手動核實和批准。樣品的製備和分析由以下任一方進行 獨立實驗室或現場實驗室,在這種情況下,使用獨立實驗室來核實結果。在樣品從鑽機運送到實驗室的過程中,採用了確保樣品安全的程序。質量 與每個酒店和項目的鑽探和採樣相關的保證程序、數據驗證和分析協議符合行業認可的質量控制方法。礦產儲量和礦產資源的定期內部審計 進行資源評估過程和程序。巴里克根據National Instrument報告其儲量應加拿大證券監管機構的要求。加拿大的披露標準可能不同於美國1934年《證券交易法》的披露要求,因爲 經修訂(「交易法」)。有關詳細信息,請參閱「報告貨幣、財務和儲備信息」。 |
• | 儘管本公司已仔細編制及核實本年度以下及其他地方提供的礦產儲量數字 作爲信息形式,這些數字是估計數字,部分是基於前瞻性信息和某些假設,不能保證將產生所指示的礦物水平。巴里克對已證實的 可能的儲量可能不得不根據實際生產經驗重新計算。黃金、銅和白銀的市場價格波動,以及生產成本增加或回收率下降等因素,可能會導致目前的情況 已探明和可能的儲量在一個或多個特定地點開發是無利可圖的。有關可能導致實際結果的因素和風險的其他詳細信息,請參閱「風險因素」和「前瞻性信息」。 與下面列出的不同。 |
- 13 -
• | 有關術語的定義,請參閱《技術和業務術語詞彙表 「礦產資源」、「推斷礦產資源」、「指示礦產資源」、「已測量礦產資源」、「礦產儲量」、「可能礦產儲量」和「已探明礦產」。 保留“。 |
• | 黃金和礦產資源儲量 |
• | 截至2024年12月31日的 |
• | 久經考驗 |
• | (克/噸) |
• | 包含 |
• | ozs |
• | (蚊子) |
• | 非洲和中東 |
• | 布利安胡盧表面 |
布利安胡魯地下布利安胡魯(84.00%)總數薩伊德山表面40-F)薩伊德山地下
Jabal Sayid(50.00%)總數
基巴利表面
基巴利地下基巴利(45.00%)總數盧洛-古科託表面
盧洛-古科托地下
- 14 -
Loulo-Gounkoto(80.00%)總數 43-101.北馬拉表面
北馬拉地下
北馬拉(84.00%)總數
通貢表面(89.70%)
非洲和中東總計拉丁美洲和亞太地區北阿比耶託表面(50.00%)波熱拉表面地下波熱拉波熱拉(24.50%)總數普韋布洛別霍表面(60.00%)Reko Diq表面(50.00%)Veladero表面(50.00%)拉丁美洲和亞太地區總計 北美
卡林表面
- 15 -
卡林地下
卡林(61.50%)總數
- 16 -
- 17 -
科爾特斯表面
科爾特斯地下10科爾特斯(61.50%)總數
海姆洛表面
地下海姆洛
海姆洛(100%)總數
菲尼克斯表面(61.50%)
綠松石嶺表面
地下綠松石嶺
綠松石嶺(61.50%)總數
北美總計
合計
- 18 -
請參閱「巴里克礦產儲量和資源表註釋」。
銅礦儲量
截至2024年12月31日
證明 可能
合計
基於應占英鎊公噸(公噸) Cu等級包含Cu(公噸)
公噸
(公噸)
Cu
- 19 -
等級
包含
Cu
• | (公噸) |
• | 公噸 |
• | (公噸)Cu等級 |
• | 包含 |
- 20 -
Cu |
• | (公噸) |
• | 非洲和中東 |
• | 布利安胡盧表面布利安胡魯地下布利安胡魯(84.00%)總數 |
薩伊德山表面
薩伊德山地下Jabal Sayid(50.00%)總數盧姆瓦納表面(100%)
- 21 -
非洲和中東總計拉丁美洲和亞太地區北阿比耶託表面(50.00%)Reko Diq表面(50.00%)薩爾迪瓦表面(50.00%)拉丁美洲和亞太地區總計北美
菲尼克斯表面(61.50%)北美總計合計 請參閱「巴里克礦產儲量和資源表註釋」。 銀礦儲量 截至2024年12月31日證明可能合計 基於應占盎司(克/噸)包含銀(蚊子)非洲和中東布利安胡盧表面布利安胡魯地下布利安胡魯(84.00%)總數非洲和中東總計拉丁美洲和亞太地區北阿比耶託表面(50.00%)普韋布洛別霍表面(60.00%)Veladero表面(50.00%)拉丁美洲和亞太地區總計北美
菲尼克斯表面(61.50%)
北美總計
2023 | ||||||||||
合計1 | 2024 | |||||||||
請參閱「巴里克礦產儲量和資源表註釋」。 |
775 | 868 | ||||||||
黃金礦產資源2 |
444 | 549 | ||||||||
基巴利(45.00%)總數 |
304 | 316 | ||||||||
盧洛-貢科託 |
127 | 123 | ||||||||
表面 |
— | 9 | ||||||||
盧洛-古科托地下 3 |
1,650 | 1,865 | ||||||||
Loulo-Gounkoto(80.00%)總數 |
352 | 335 | ||||||||
北馬拉表面 |
578 | 547 | ||||||||
北馬拉地下 (45%) |
309 | 343 | ||||||||
北馬拉(84.00%)總數 (89.7%) |
148 | 183 | ||||||||
通貢表面(89.70%) |
265 | 253 | ||||||||
非洲和中東總計 |
252 | 207 | ||||||||
拉丁美洲和亞太地區 |
143 | 141 | ||||||||
Alturas表面(100%) |
168 | 180 | ||||||||
北阿比耶託表面(50.00%)4 |
46 | — | ||||||||
帕斯卡喇嘛表面(100%)5 |
3,911 | 4,054 |
- 22 -
1 | 波熱拉表面 |
2 | 地下波熱拉 |
3 | 波熱拉(24.50%)總數 |
4 | 普韋布洛別霍表面(60.00%) |
5 | Reko Diq表面(50.00%) |
Veladero表面(50.00%)
(克/噸) | ||||
包含1 | 2024 | 2023 | ||
ozs |
40 | 41 | ||
(蚊子) |
123 | 118 | ||
包含 |
32 | 32 | ||
ozs |
195 | 191 |
1 | (蚊子) |
公噸
- 23 -
(公噸)
等級
- 24 -
(克/噸)
包含
ozs
(蚊子)北美卡林表面 卡林地下卡林(61.50%)總數科爾特斯表面
科爾特斯地下 磅公噸(公噸)等級包含Cu(公噸)公噸(公噸)等級包含Cu(公噸)含有Cu(公噸)公噸(公噸)等級
包含Cu(公噸)非洲和中東布利安胡盧表面布利安胡魯地下布利安胡魯(84.00%)總數薩伊德山表面薩伊德山地下Jabal Sayid(50.00%)總數盧姆瓦納表面(100%)非洲和中東總計拉丁美洲和亞太地區北阿比耶託表面(50.00%)Reko Diq表面(50.00%)薩爾迪瓦表面(50.00%)拉丁美洲和亞太地區總計
北美
菲尼克斯表面(61.50%)
- 25 -
北美總計
合計
請參閱「巴里克礦產儲量和資源表註釋」。
(克/噸)i-80包含銀(蚊子)含銀(蚊子)公噸(公噸)銀等級(克/噸)包含銀(蚊子)非洲和中東布利安胡盧表面布利安胡魯地下布利安胡魯(84.00%)總數
非洲和中東總計
拉丁美洲和亞太地區截至 截至2024年12月31日,巴里克已在Goldrush項目上花費了4.36億美元的資本,包括勘探下降(100%)。迄今花費的資本,以及剩餘的預期資本 試生產資本(直到2026年開始商業生產),預計將在先前披露的Goldrush項目10億美元的初始資本估計範圍內(100%)。 特許權使用費和稅收管道/十字路口綜合設施的所有生產須繳納約1.3%的冶煉廠總特許權使用費。此外, 管道/十字路口綜合設施某些部分的生產須繳納冶煉廠毛利(根據金價從0.4%遞增至5.0%)和總計5%的淨值特許權使用費。淨值版稅的一部分, 3.75%,也適用於南管道礦藏的黃金銷售。Cortez的所有其他作品,包括Cortez Hills,都是 受冶煉廠總特許權使用費約1.3%的限制。
- 26 -
此外,Cortez 40%的生產需要繳納特許權使用費 從0%到3%,取決於金價,根據交付的黃金總價值,減去以下方面的某些扣減
預先存在版稅。這項特許權使用費是在2008年授予的,但支付義務是 觸發於2022年9月,當時Cortez自2008年1月1日以來生產的黃金總量超過1500萬盎司。關於內華達金礦的形成,巴里克和紐蒙特分別獲得1.5%的冶煉廠淨特許權使用費 他們各自貢獻的財產(包括Cortez財產)。這些「留存特許權使用費」僅在特許權使用費所涉物業的總產量超過公開報告的儲量時支付。 以及截至2018年12月31日的資源。內華達州徵收5%的礦業稅淨收益(「NPT」) 該州所有礦物的價值。這項稅收是根據規定的淨收入公式計算和繳納的,這與賬面收入不同。自2021年7月1日起,內華達州還徵收採礦消費稅 適用於總收益。這是一種階梯稅,最高稅率爲1.1%,其產生的收入直接用於教育。採礦 和處理信息下表彙總了Cortez屬性的某些挖掘和處理信息 這幾個時期表明:止年度2024年12月31日止年度2023年12月31日 噸開採量(2000) 噸礦石加工量(2000)巴里克能否實現其未來的目標和目的,在一定程度上取決於與其 最大限度地減少員工流動率。巴里克主要資本項目的停工或其他勞資關係事件可能會導致項目延誤或成本增加。這些風險在以下司法管轄區更爲嚴重 巴里克的員工隊伍高度加入工會,包括在非洲和拉丁美洲。例如,在合併之前的2018年,蘭德金在科特迪瓦的湯貢礦經歷了一場持續53天的非法勞工行動。一段漫長的時間 巴里克任何物質資產的勞動力中斷都可能對其整體運營產生實質性的不利影響。疾病和 疫情可能會對巴里克的業務造成不利影響
該公司面臨與疾病和流行病相關的風險, 可能會嚴重擾亂運營,並可能對其運營和財務業績產生重大不利影響。例如,在2020年3月,一種新的冠狀病毒株被稱爲
新冠肺炎被宣佈爲 世界衛生組織的全球大流行,對全球經濟產生了重大影響。雖然巴里克的運營沒有受到重大影響,但新冠肺炎包括大流行 金融市場和商品價格的極端波動、經濟活動的放緩,以及全球經濟衰退延長的可能性。減緩任何疾病、流行病或大流行傳播的努力可能會嚴重影響 通過實施政府宣佈的緊急狀態以及旅行禁令、檢疫和自我隔離等限制性措施,巴里克的礦山和項目得以運營和開發。這種情況的時間和持續時間 政府在應對流行病時採取的措施是不確定的,可能會在巴里克開展業務的各個司法管轄區有所不同。如果一個或多個Barrick礦的運營或開發在未來因這些原因而中斷或暫停 或其他類似措施,可能會對巴里克的盈利能力、經營業績、財務狀況和股價產生重大不利影響。此外,如果任何疾病、流行病或大流行對巴里克的業務和財務業績造成不利影響,它 可能還會增加本年度信息表中描述的許多其他風險。例如,中國市場是包括銅在內的全球大宗商品需求的重要來源。經濟增速持續放緩 中國的增長或需求,或其他市場的顯著放緩,可能會對巴里克銅礦生產的銅的價格和/或需求產生不利影響。控制疾病的努力,如 新冠肺炎可能對中國大宗商品價格和需求產生重大影響,並可能對公司的供應鏈或全球經濟產生更廣泛的影響,這可能會產生實質性的不利影響 對巴里克的現金流、收益、經營業績和財務狀況的影響。例如,Pueblo Viejo的工廠擴建和延長礦山壽命項目經歷了後勤挑戰和相關延誤,主要是由於 影響新冠肺炎在全球供應鏈上。
最後,實際和威脅的傳播 全球範圍內的任何疾病,包括商業和社會中斷,都可能對全球經濟和金融市場造成不利影響,導致經濟長期低迷和巴里克股價的波動。在多大程度上 任何疾病、流行病或大流行對商業活動或財務業績的影響,以及任何此類負面影響的持續時間,將取決於未來的事態發展,這些事態發展具有高度的不確定性,巴里克無法預測,包括新的 可能出現的關於這種疾病、流行病或大流行的信息、復發或暴發浪潮的可能性、或任何疾病的任何現有或未來的變種,以及遏制或治療其影響所需的行動,包括 其他。內部控制環境財務報告的內部控制是一個爲財務報告的可靠性提供合理保證的過程。 根據公認的會計原則爲外部目的報告和編制財務報表。披露控制和程序旨在確保公司需要披露的信息 在提交的報告中 與證券監督管理機構的記錄、處理、彙總和及時報告,並積累和傳達給公司的管理層,包括其總裁 以及首席執行官和財務長(視情況而定),以便就所需披露做出及時決定。巴里克已經投入了資源來記錄和分析其披露控制系統和內部控制 財務報告。對於財務報告和財務報表編制的可靠性,無論設計和操作得多麼好,控制系統只能提供合理的保證,而不是絕對的保證。請參閱“內部 對財務報告和披露控制程序的控制“。支持商譽賬面價值的能力和非流動 資產 截至2024年12月31日,巴里克的公允價值 善意約爲31億美元,佔巴里克總資產的7%。善意分配至每個現金產生單位(「現金產生單位」),其中現金產生單位通常代表個別礦產資產。每年都會對善意進行測試 第四季度出現減損。此外,在每個報告期,巴里克會評估是否有跡象表明善意已發生損害,如果有跡象表明,巴里克會在當時測試善意是否存在損害。試驗 聲譽損失涉及將經營分部的可收回金額與其公允價值進行比較。經營分部的賬面值超過其可收回金額的任何部分均會確認產生不良影響。 2006年10月12日,巴里克 國際(巴巴多斯)公司,前身爲巴里克國際銀行公司(BIBC),發行了總計10億美元的票據(BIBC票據),其中包括4億美元2016年到期的5.75%票據和6億美元票據 BIBC(發行人)、Barrick(HMC)礦業公司(「Barrick(HMC)」)(初始共同義務人)、Barrick(母擔保人)和紐約銀行(受託人)根據日期爲同一日期的契約於2036年到期的6.35%票據 (《2006 Indenture》)。2006年的契約規定了與BIBC票據有關的條款和條件,其中包括巴里克的無條件擔保。在同一天,作爲同一交易的一部分,爲此目的而成立的公司ABX金融公司(ABXFC) 於收購BIBC票據時,發行了合共10億美元的票據(「ABXFC票據」),其中包括4億美元於2016年到期的5.75%票據及6億美元於2036年到期的6.35%票據(根據日期爲 ABXFC(發行人)、BIBC、Barrick(HMC)及Barrick(擔保人)及紐約銀行(受託人)於同一日期發行(「ABXFC Indenture」)。2015年10月15日,2016年到期的5.75%票據的未償還本金金額爲 全額償還。ABXFC契約規定了與ABXFC票據有關的條款和條件,其中包括巴里克、BIBC和巴里克(HMC)的無條件擔保。2008年9月11日,巴里克與巴里克黃金金融有限責任公司,巴里克北美金融有限責任公司簽訂了一份契約 和紐約梅隆銀行(「2008 Indenture」)。根據2008年的契約,(I)Barrick Gold Financeco LLC發行了5億美元本金6.125%於2013年到期的債券(「BGFC 2013年債券」),以及 (Ii)Barrick North America Finance LLC發行了5億美元本金6.80%的2018年到期票據(以下簡稱BNAF 2018年票據)和2.5億美元本金7.50%的2038年到期的票據(簡稱BNAF 2038票據),全部於 2008年9月11日。2009年3月19日,巴里克根據2008年的契約發行了總額7.5億美元本金6.95%的2019年到期票據(以下簡稱「BGC 2019票據」)。2013年,在到期時, BGFC 2013年債券的未償還本金已悉數償還。2015年10月28日,根據現金投標要約,償還了BGC 2019年債券本金2.75億美元。2016年3月21日,根據 根據現金投標要約,BNAF 2018年債券本金金額約爲2.27億美元,BGC 2019年債券本金金額約爲1.96億美元。2016年9月26日,傑出的 BNAF 2018年債券的本金已全額償還。2017年6月20日,BGC 2019年債券的未償還本金已全額償還。2008年發行的契約列出了與BNAF 2038債券有關的條款和條件。這個 BNAF 2038票據由巴里克無條件擔保。2009年10月16日,巴里克與 Barrick(PD)Australia Finance Pty Ltd.和紐約梅隆銀行(The Bank Of New York Mellon)(「2009年契約」)。根據2009年的契約,Barrick(PD)Australia Finance Pty Ltd.發行了4億美元本金4.950%的債券,2020年到期( 2039年到期本金爲5.950%的債券(「BPDAF2039年債券」),全部於2009年10月16日到期。2016年3月21日,根據現金投標要約,大約 償還了BPDAF 2020票據本金的1.52億美元。2019年7月15日,BPDAF 2020票據的未償還本金約2.48億美元已全額償還。2009年的假牙契約列出了 與BPDAF 2039票據有關的條款和條件。BPDAF 2039票據由巴里克無條件擔保。2023年,BPDAF 2039年債券本金中約4,300萬美元已根據公開市場償還 回購。2011年6月1日,巴里克與巴里克·諾斯簽訂了一份契約 美國金融有限責任公司(「BNAF」)、花旗銀行(Citibank N.A.)和威爾明頓信託公司(「2011 Indenture」)。根據2011年的Indenture,巴里克和BNAF發行了總計40億美元的債務證券,包括: 分別由巴里克發行的7億美元2014年到期的1.75%債券(下稱「巴里克2014年債券」)和11億美元2016年到期的2.90%債券(「巴里克2016債券」),以及13.5億美元於2021年到期的4.40%債券。 (BNAF 2021年債券)和8.5億美元5.70%債券(BNAF 2041債券),各由BNAF發行。2013年12月16日,巴里克2014年票據的未償還本金於 滿的。2015年9月9日,巴里克2016票據的未償還本金得到全額償付。2016年,根據現金投標要約,BNAF 2021債券本金金額中約7.21億美元得到償還。 2018年7月17日,BNAF 2021票據的未償還本金約6.29億美元已全額償還。BNAF 2041債券由巴里克無條件擔保。2012年4月3日,巴里克根據2011年的Indenture發行了總計20億美元的債務證券,包括 其中12.5億美元的3.85%債券將於2022年到期(簡稱BGC 2022年債券),7.5億美元的5.25%債券將於2042年到期。2015年,在2022年到期的3.85%票據本金金額中,約9.13億美元已根據 現金投標報價。2020年1月31日,BGC 2022債券的未償還本金約3.37億美元已全額償還。2022年,2042年到期的5.25%債券的本金金額約爲3.75億美元 根據公開市場回購和現金投標要約償還。2013年5月2日,巴里克和BNAF發佈了一份彙總 根據2011年Indenture發行的30億美元債務證券,包括6.5億美元2018年到期的2.50%債券和15億美元2023年到期的4.10%債券,以及8.5億美元2043年到期的5.75%債券 BNAF(統稱爲「BNAF票據」)。BNAF票據由巴里克無條件擔保。2013年12月3日,根據現金投標要約,2.50%的本金金額中約3.98億美元 2018年到期的票據已償還。2015年,2018年到期的2.50%債券本金中約1.29億美元和2023年到期的4.10%債券本金中約7.69億美元已根據現金招標償還 出價。2016年3月21日,根據現金投標要約,2018年到期的2.50%票據本金金額中約1,800萬美元已償還。2016年6月24日,到期的2.50%票據的未償還本金金額 2018年已全額償還。2017年9月21日,2023年到期的4.10%票據的未償還本金得到全額償還。
2019年7月1日,巴里克和紐蒙特等公司簽訂了修訂並重述的有限責任公司協議, 列明雙方就內華達金礦(「合營協議」)的權利及義務。根據合資協議,內華達金礦的管理和控制權屬於其管理委員會,目前 由五名成員(和五名候補成員)組成,其中三名由巴里克任命,兩名由紐蒙特公司任命。《合資協議》還設立了諮詢委員會,包括技術委員會、財務委員會和 勘探委員會,來自巴里克和紐蒙特的平等代表。根據合營協議,Barrick獲委任爲初始營運商,負責全面管理,並受董事會監督及指示。
轉讓代理和登記員巴里克的普通股轉讓代理和登記機構是加拿大多倫多多倫多的多倫多TSX信託公司, 安大略省和Equiniti Trust Company,LLC在其紐約布魯克林的主要辦事處。股利政策 2022年2月16日,董事會將季度股息從每股0.09美元提高到0.10美元,增幅爲11% 尊重2021年第四季度(已支付3月中旬2022年),2021年的年化股息總額爲每股0.37美元。
- 27 -
在2022年2月15日的會議上,董事會批准了一項業績 當公司流動性強勁時,提高股東回報的股息政策。除了巴里克的基本股息外,季度業績股息的金額是基於現金金額,淨額 根據下表,在每個季度末巴里克的合併資產負債表上的債務。
性能股利水平門檻水平季度基數分紅12月中旬,)。2024年2月14日,巴里克宣佈2023年第四季度的季度股息爲每股0.10美元,於2024年3月15日支付,年化股息總額爲每股0.40美元 2023年。2024年,巴里克就2024年第一、第二和第三季度支付了每股0.10美元的季度股息 (已繳入六月中旬,9月中旬和12月中旬,)。2025年2月12日,巴里克宣佈每季度 2024年第四季度每股0.10美元的股息,將於2025年3月17日支付,2024年的年化股息總額爲每股0.40美元。宣佈和支付股息由董事會酌情決定,並將取決於公司的財務狀況 業績、現金需求、未來前景、已發行普通股數量及董事會認爲相關的其他因素。股票回購計劃
在2022年2月15日的會議上,董事會批准了2022年回購計劃,規定回購UP 在隨後的12個月內,將公司已發行普通股的價值增加到10億美元。巴里克在2022年根據2022年的回購計劃回購了4.24億美元的股票。因此,總共有16億美元的現金被 2022年通過股息和股票回購返還給股東,超過了2021年創紀錄的14億美元的分配。
在2023年2月14日的會議上,董事會終止了2022年回購計劃,並授權了2023年回購 計劃在未來12個月內購買巴里克銀行最多10億美元的已發行普通股。巴里克沒有根據2023年回購計劃購買任何股票。董事會在2024年2月13日的會議上批准了2024年股份回購計劃,回購最多 未來12個月巴里克的已發行普通股價值10億美元。巴里克的2023年回購計劃因新計劃而終止。巴里克 回購28.675股百萬股普通股
2024年,根據2024年股票回購計劃,購買約4.98億美元。在2025年2月11日的會議上,董事會批准了2025年股份回購計劃,回購最多 未來12個月巴里克的已發行普通股價值10億美元。巴里克的2024年回購計劃因新計劃而終止。可以購買的普通股的實際數量(如果有)以及任何此類購買的時間將由巴里克決定 基於一系列因素,包括公司的財務業績、現金流的可用性,以及對現金的其他用途的考慮,包括資本投資機會、股東回報和債務減少。 2025年回購計劃並不責成公司收購任何特定數量的普通股,2025年回購計劃可由公司酌情決定隨時暫停或終止。
公司的董事和高級人員
截至2025年3月10日,巴里克的董事和高管作爲一個集團直接或間接實益擁有或行使 控制或指示12,966,429股普通股,約佔巴里克已發行普通股的0.77%。本公司的董事·2021年11月至今的 董事克里斯托弗·L·科爾曼(56歲)倫敦,聯合王國本文作者爲中國銀行業務部集團負責人 也是羅斯柴爾德律師事務所的全球合夥人。他在金融服務領域擁有超過25年的經驗,包括企業和私人客戶銀行業務和項目融資。自2023年3月以來,科爾曼先生一直擔任 約翰爸爸國際公司的董事會主席,他於2012年以獨立的董事身份加入該公司。從2008年到合併完成,他擔任非執行蘭德金的董事, 包括AS非執行董事會主席、治理和提名委員會主席、薪酬委員會成員。李·科爾曼先生長期以來一直參與 全球採礦業。他是海峽群島羅斯柴爾德國際銀行的董事長,並在1989年加入的羅斯柴爾德國際銀行集團的其他一些董事會和委員會任職。從2001年到2008年, 科爾曼先生是一位非執行中非招商銀行的董事。科爾曼先生擁有倫敦政治經濟學院的本科學位。
巴里克董事會詳情:
·2019年1月至今的 董事伊塞拉·科斯坦蒂尼(53歲)布宜諾斯艾利斯,阿根廷科斯坦蒂尼女士是私人持股資產管理公司Grupo Financiero GST的首席執行官。她有超過25年的經驗, 他曾擔任阿根廷國家航空公司首席執行官兼首席執行官總裁,以及通用汽車公司的總裁和董事、阿根廷、巴拉圭和烏拉圭通用汽車公司的總經理。 科斯坦蒂尼女士也是阿根廷汽車工業協會的昔日總裁。她被彭博社L列入了拉丁美洲最具影響力的500位領導人名單,並被 《財富》雜誌被評爲美國以外50位最有權勢的商界女性之一。她最近出版了一本關於領導力的書《Un Líder en Vos》,並擔任CIPPEC(Centro de Implementación de Políticas)董事會成員 阿根廷智庫Públicas para Equida y el crecimiento),也是南方大學戰略理事會的成員。她擁有Pontifafa的社交傳播和廣告學士學位 巴西巴拉那大學的Católica do Paraná大學,以及芝加哥洛約拉大學昆蘭商學院的營銷和國際商業MBA學位。Costantini女士也是Barrick‘s International的成員 顧問委員會。巴里克董事會詳情:·2022年11月至今的 董事
姓名(年齡)和直轄市 的聯合主席世界 她是世界銀行董事會性別問題工作組的成員,是提高婦女地位的堅定倡導者,也是多樣性和包容性的倡導者。她有35年的經驗,在國際上擔任過各種高級領導職位。 他曾擔任非洲開發銀行(AfDB)辦公廳主任等機構成員,也曾在非洲美洲人協會(AAI)和非洲青年成就協會(JA)的董事會任職。Kabagambe女士擁有 美國加州大學聖地亞哥分校(UCSD),哥倫比亞大學國際與公共事務學院和喬治華盛頓大學公共政策碩士學位,並從 哈佛大學商學院、約翰·F·肯尼迪政府學院以及克蘭菲爾德管理學院。
- 28 -
巴里克董事會詳情:· 董事(自2020年11月起)姓名(年齡)和直轄市 的住宅過去5年的主要職業安德魯·J·奎恩(71)卡爾馬森郡的蘭博伊迪,聯合王國奎因先生是礦業投資部的負責人 在2011年退休之前,他在加拿大帝國商業銀行工作了15年,負責歐洲和非洲的銀行業務。從2011年到2018年,他擔任非執行蘭德金的董事,包括在角色中 董事高級獨立董事,薪酬委員會主席,審計委員會成員。自2016年以來,Quinn先生一直擔任非執行倫敦金銀市場的董事 協會,國際貿易協會,監督
非處方藥
黃金和白銀交易市場。他有近50年的工作經驗 採礦業,包括英美資源集團、格林布希錫業和《礦業雜誌》。在1996年加入加拿大帝國商業銀行之前,他在James Capel Investment&Co.Limited(後來的匯豐投資)工作了12年 銀行業)。Quinn先生擁有加的夫大學礦產開採(採礦工程)本科學位。巴里克董事會詳情:巴里克董事會詳情:· 自2024年擔任董事長,2014年至2024年擔任執行主席,董事自2月起擔任 2012年克里斯托博士是董事的一名董事兼羅克韋爾鑽石公司(Rockwell Diamond Inc.)的高管。作爲一名 由於其南非運營子公司的臨時清算程序,RDI無法完成並提交其截至2018年2月28日的年度經審計財務報表、相應的管理層討論和 由於資金限制和南非子公司臨時清算過程的結果不確定,在規定的最後期限前提供分析和適用的證書。因此,安大略省證券委員會 於2018年7月5日發佈了針對RDI的停止交易令。停止交易令被安大略省證券委員會撤銷,自2020年12月23日起生效,隨後RDI的股票在JSE Limited恢復交易。 符號RDI。由於合併和私有化交易於2021年4月16日完成,RDI的股票
已被除牌 來自JSE Limited和安大略省
證監會發佈命令,確認RDI已不再是加拿大的申報發行人。
布里斯托博士也是中途資源國際公司(Midway Resources International)的董事成員,以及中途資源國際公司(Midway Resources International)五家全資擁有的 子公司,包括Zarara石油天然氣有限公司(以下簡稱Zarara)。MRI及其子公司,包括Zarara,都是私營公司。Zarara於2020年11月進入破產管理,MRI於3月進入破產管理 2021年。經過重組程序,開曼群島大法院於2022年10月26日發佈了完成解散核磁共振的最終命令,毛里求斯最高法院發佈了完成解散的最終命令。 薩拉拉,2024年11月26日。公司管治與董事會委員會巴里克目前的公司治理政策和做法符合加拿大證券法的要求。 巴里克的政策和做法還考慮到了多倫多證券交易所的規則和紐約證券交易所採用的公司治理標準(即紐約證券交易所標準),儘管大多數 作爲一家加拿大公司,紐約證券交易所的標準並不直接適用於巴里克。巴里克的公司治理實踐與適用於美國公司的紐約證券交易所標準之間的一個顯著差異總結如下:《紐約證券交易所標準》第303A.08節要求股東批准所有的股權補償計劃和材料 修訂版。根據紐約證券交易所標準,股權補償計劃的定義包括規定交付新發行的證券的計劃,以及依賴發行公司在市場上重新獲得的證券進行 重新分配給員工和董事的目的。相比之下,多倫多證券交易所規則只要求股東批准基於證券的補償安排,這些安排涉及新發行的股票的交付 證券或其特定修正案。因此,巴里克不會尋求股東批准股權補償計劃和修訂,除非它們涉及新發行的證券或構成多倫多證券交易所規定的特定修訂 交易規則。ESG提名委員會
ESG提名委員會由Brian L.Greenspun(主席)、Christopher L.Coleman、J.Brett Harvey、Anne N. 卡巴甘貝和洛雷託·席爾瓦。審計與風險委員會審計與風險委員會由Loreto Silva(主席)、Helen Cai、J.Brett Harvey、Anne N.Kabagambe和Andrew J. 奎恩。薪酬委員會賠償委員會由伊塞拉·科斯坦蒂尼(主席)、海倫·蔡、克里斯托弗·科爾曼、布萊恩·L·格林斯潘和J·佈雷特組成。 哈維。國際諮詢委員會兼任國際諮詢委員會成員的董事會成員是約翰·L·桑頓、伊塞拉·科斯坦蒂尼和馬克 布里斯托。本公司的行政人員除上文所述的Mark Bristow外,以下是本公司截至2025年3月10日的高管。姓名(年齡)和自治市居住辦公室過去5年的主要職業年普帕克·巴哈明(54)
馬里蘭州貝塞斯達
美國 總法律顧問總法律顧問; 2022年4月之前,副總法律顧問; 2020年2月之前,Norton Rose Fulbright合夥人格蘭特·貝林格(44)
- 29 -
豪登約翰內斯堡南非集團可持續發展主管
集團可持續發展主管; 2019年1月之前,Digby Wells Environmental國際運營總監塞巴斯蒂安·博克(46)西開普省斯泰倫博斯南非非洲和中東首席運營官非洲和中東首席運營官; 2022年7月之前,非洲和中東高級副總裁、財務長 東; 2019年1月之前,任任蘭德戈爾德資源有限公司財務總經理預先審批 管理核數師獨立性的政策、專業標準和證券法規。 外聘審計員服務費普華永道會計師事務所是巴里克合併財務報表的核數師。以下普華永道 截至2024年和2023年12月31日止年度,巴里克因向巴里克提供專業服務而產生的LLP費用: 費用(金額以百萬計)審計費9.7美元 9.9美元
審計相關費用
0.2美元 0.3美元 稅費0.2美元 0.4美元 所有其他費用0.0美元
0.0美元 總10.1美元 每盎司的維持成本,每磅的現金成本和全注每磅的維持成本每盎司現金總成本和全注每盎司的維持成本是非gaap根據WGC(一個市場開發組織)發佈的定義計算的財務指標 黃金行業由世界各地的黃金開採公司組成並由其提供資金,包括巴里克黃金公司)。WGC不是一個監管組織。管理層使用這些措施來監控巴里克黃金開採業務的業績 以及其產生正現金流的能力,無論是在個人網站的基礎上,還是在整個公司的基礎上。現金總成本 從巴里克黃金生產相關的銷售成本開始,剔除折舊,非控股銷售成本的利息,包括副產品
學分。
全注維持費從現金總成本開始,包括維持性資本支出、維持性租賃、一般和行政費用、礦場勘探和評估費用。 對目前的礦山計劃和復墾成本進行累加和攤銷。這些額外費用反映了維持目前生產水平的支出。本公司相信其使用的總現金成本和全注持續成本將幫助分析師、投資者和巴里克的其他利益相關者了解與生產黃金相關的成本,了解黃金開採的經濟學,評估 巴里克的經營業績,以及它從當前業務和整個公司基礎上產生自由現金流的能力。由於該行業的資本密集型性質,以及這些物品的使用壽命較長 折舊後,根據國際財務報告準則計算的淨收益與礦山產生的自由現金流之間可能存在重大的時間差,因此公司認爲這些措施是有用的
非gaap
- 30 -
經營指標和補充其國際財務報告準則的披露。這些衡量標準並不能代表巴里克銀行的所有現金支出,因爲它們不包括所得稅支付、利息成本或股息 付款。這些措施不包括折舊或攤銷。
每磅的維持成本與黃金相似全注維持成本指標和管理層利用這一點更好地評估銅的成本 製作。本公司相信,這項措施可讓投資者更好地了解其銅礦的經營業績,因爲這項措施反映了爲生產銅而產生的所有持續開支。 全注
每磅的維持成本包括C1現金成本、持續資本支出、持續租賃、一般和行政成本、礦場勘探和評估成本、特許權使用費和生產成本。 稅金、回收成本的增加、攤銷和對存貨的減記至可變現淨值。更多細節 包括對這些數據進行詳細的協調非gaap
財務指標與其最直接可比的GAAP指標通過參考併入,並在頁面上提供 提交給SEDAR+(www.sedarplus.ca)和埃德加(www.sec.gov)的MD&A。已實現價格
已實現的價格是非gaap不包括在銷售額中的財務指標:
處理和提煉費用;以及累積 迎頭趕上
巴里克流媒體相關收入的調整 安排好了。巴里克認爲,這爲投資者和分析師提供了一種更準確的衡量標準 與市場黃金價格進行比較,並評估公司的黃金銷售業績。出於這些原因,管理層認爲,這一衡量標準更準確地反映了公司過去的業績,是更好的指標 它在未來幾個時期的預期表現。已實現的價格措施旨在提供更多信息,而不是 在《國際財務報告準則》下有任何標準化的定義,不應孤立地或作爲
根據「國際財務報告準則」編制的業績衡量標準。這一衡量標準不一定表示根據《國際財務報告準則》確定的銷售額。其他公司可能會以不同的方式計算這一指標。進一步的細節,包括這一點的詳細對賬非gaap
ITS的財務措施 最直接可比的GAAP指標通過引用併入,並在SEDAR+(www.sedarplus.ca)和EDGAR(www.sec.gov)上提交的MD&A第75頁中提供。調整後淨收益和調整後每股淨收益調整後的淨收益是非gaap從淨額中排除以下項目的財務措施 收益:與無形資產、商譽、財產、廠房和設備以及投資有關的減值費用(沖銷); 收購/處置損益;外幣折算損益;重大稅收調整;其他不能反映巴里剋核心採礦業務基本經營業績的項目;以及 稅務影響及非控股
- 31 -
上述項目的利息。
管理層在內部使用這一衡量標準來評估公司的基本經營業績 報告所述期間,並協助規劃和預測未來的經營成果。管理層認爲,調整後的淨收益是衡量公司業績的有用指標,因爲減值費用, 收購/處置損益及重大稅項調整並不反映其核心採礦業務的基本經營表現,亦不一定預示未來的經營業績。此外,外幣 折算損益不一定反映報告所列期間的基本經營業績。稅收效應和非控股調整項目的利息也是 被排除在外,以對帳巴里克在
稅後基數,與淨收益一致。如前所述,巴里克將這一措施用於內部目的。管理層的內部預算和預測以及公衆指導不會 反映公司調整的項目類型。因此,調整後淨收益的列報使投資者和分析師能夠通過以下方式更好地了解巴里剋核心採礦業務的基本經營業績 管理層的眼睛。管理層根據對業績指標的內部評估定期評估調整後淨收益的組成部分,這些指標對評估巴里克業務部門的運營業績很有用 並回顧了非gaap採礦業分析師和其他礦業公司使用的財務指標。調整後的淨收益僅用於提供補充信息,在《國際財務報告準則》和 不應孤立地加以考慮,或將其作爲根據《國際財務報告準則》編制的業績衡量標準的替代品。這些衡量標準不一定表示根據《國際財務報告準則》確定的營業利潤或業務現金流。其他 企業可能會以不同的方式計算這些指標。進一步的細節,包括這一點的詳細對賬非gaap財務指標與其最直接可比GAAP指標通過參考併入,並在各頁上提供在SEDAR+上提交的MD&A的 Www.sedarplus.ca和埃德加網站www.sec.gov。自由現金流 自由現金流是非gaap從淨現金中減去資本支出的財務指標 由經營活動提供。管理層認爲,這是一個有用的指標,表明巴里克有能力在不依賴額外借款或使用現有現金的情況下運營。自由現金流量僅用於提供補充信息,在《國際財務報告準則》中沒有任何標準定義,應 不能孤立地考慮,也不能替代根據國際財務報告準則編制的業績衡量標準。這一衡量標準不一定表示根據《國際財務報告準則》確定的營業利潤或業務現金流。其他公司可能 以不同的方式計算此度量。
進一步的細節,包括這一點的詳細對賬
非gaap財務指標與其最直接可比的GAAP指標通過引用併入,並在提交給SEDAR+(www.sedarplus.ca)和EDGAR(www.sec.gov)的MD&A文件第60頁上提供。 資本支出
資本支出分爲礦場持續性資本支出或項目資本支出,具體取決於 支出的性質。礦場持續資本支出是支持實施當前採礦計劃所需的資本支出。項目資本支出是指新項目和重大、離散項目的資本支出 現有業務的項目旨在通過提高產量或延長礦山壽命來增加淨現值。管理層認爲,這是資本支出目的的有用指標,這一區別是對 計算全注每盎司的維持成本。
對資本支出進行分類是 本報告的目的只是提供補充信息,在《國際財務報告準則》中沒有任何標準化的定義,不應孤立地加以考慮或作爲根據《國際財務報告準則》編制的業績衡量標準的替代品。其他公司可能 以不同的方式計算這些衡量標準。進一步的細節,包括這一點的詳細對賬 非gaap
財務指標與其最直接可比GAAP指標通過參考併入,並在各頁上提供在SEDAR+上提交的MD&A的 Www.sedarplus.ca和埃德加網站www.sec.gov。EBITDA、調整後的EBITDA、歸屬EBITDA、歸屬EBITDA利潤率和淨值 槓桿
EBITDA是一種非gaap財務指標,從淨值中排除以下項目 收益:所得稅費用;財務成本;財務收入;以及折舊。管理層認爲,EBITDA是公司通過產生運營現金產生流動資金能力的一個有價值的指標 爲營運資金需求、償債義務和資本支出提供資金的流動。管理層將EBITDA用於此目的。EBITDA也經常被投資者和分析師用於估值目的,即EBITDA乘以 因素或「EBITDA倍數」,基於EBITDA和市場價值之間的觀察或推斷關係,以確定一家公司的大致企業總價值。調整後的EBITDA剔除減值費用的影響;收購/處置 損益;外幣折算損益;以及其他費用調整。巴里克還剔除了所得稅支出、財務成本、財務收入和折舊的影響,這些影響發生在其權益法入賬投資中。 歸屬EBITDA進一步刪除了非控股利息部分。本公司認爲這些項目與其調整後淨收益中包括的調整項目有更大程度的一致性 除調整這些金額以消除對財務成本/收入、所得稅支出和/或折舊的任何影響外,這些金額不影響EBITDA。該公司相信這一補充信息將有助於 分析師、投資者和巴里克的其他利益相關者,通過將這些金額排除在計算之外,更好地了解其從其應占業務(包括權益法投資)中產生流動性的能力 財務報表反映巴里剋核心採礦業務的表現,並不一定反映所列期的基本經營業績。此外,它還與公司提出前瞻性指導的方式保持一致 生產黃金盎司和銅磅。可歸屬EBITDA利潤率的計算方式爲可歸屬EBITDA除以收入-AS 調整過了。該公司相信,這一比率將有助於分析師、投資者和巴里克的其他利益相關者更好地了解收入與EBITDA或營業利潤之間的關係。
EBITDA、調整後的EBITDA、應占EBITDA、EBITDA利潤率和淨槓桿率旨在向投資者提供更多信息 國際財務報告準則「沒有任何國際財務報告準則下的標準定義,不應孤立地考慮或作爲根據」國際財務報告準則“編制的業績衡量標準的替代品。EBITDA、調整後的EBITDA和可歸屬EBITDA不包括 融資活動和稅收的現金成本的影響以及運營營運資金餘額變化的影響,因此不一定表明運營利潤或運營現金流是根據國際財務報告準則確定的。 其他公司可能會以不同的方式計算EBITDA、調整後的EBITDA、應占EBITDA、EBITDA利潤率和淨槓桿率。
進一步 詳細信息,包括詳細的對賬
非gaap
- 32 -
財務指標與其最直接可比GAAP指標通過參考併入,並在各頁上提供 提交給SEDAR+(www.sedarplus.ca)和埃德加(www.sec.gov)的MD&A。專家的利益
公司的獨立核數師是普華永道會計師事務所,他們發佈了一份 獨立核數師於2025年2月11日就本公司於2024年12月31日及2023年12月31日的綜合財務報表及截至該日止各年度的綜合財務報表及有效性所提交的報告 截至2024年12月31日的公司財務報告內部控制情況。普華永道會計師事務所表示,根據相關規則和相關規定,他們對本公司是獨立的。 由加拿大相關專業團體規定的解釋,包括註冊會計師職業行爲準則和任何適用的立法或法規,以及美國美國證券交易委員會和上市公司會計監督規則 關於核數師獨立性的董事會(PCAOB)。
附加信息 其他資料,包括董事及高級人員的薪酬及負債、 公司的證券和根據股權補償計劃授權發行的證券將包含在公司的管理信息通告和委託書中,預計日期爲2025年3月28日。此外,還增加了 財務資料載於公司2024年年報、公司綜合財務報表(根據國際財務報告準則編制)及管理層對年內財務及經營業績的討論及分析。 截至2024年12月31日的年度(根據《國際財務報告準則》編制),其中每一份都可以從SEDAR+(www.sedarplus.ca)和EDGAR(www.sec.gov)獲得電子版本。欲了解有關巴里克公司的更多信息,請登錄SEDAR+網站:www.sedarplus.ca。 埃德加在www.sec.gov上。安排「A」審計委員會和風險委員會任務目的 董事會審計與風險委員會(以下簡稱「委員會」)的宗旨 (「董事會」)協助董事會監督:(A)財務報告程序以及公司財務報表和其他相關公開披露的質量、透明度和完整性;(B) 公司對財務報告的內部控制;(C)公司遵守與財務報表和財務報告相關的法律和法規要求的情況;(D)外聘審計員的 資格和獨立性;(E)內部審計職能和外部審計員的履行情況;(F)公司對企業風險的管理以及監測和監督的政策和標準的執行情況 降低該等風險;及(G)改善公司的財務結構及投資及財務風險管理計劃。
委員會的職能是監督。委員會成員並非本公司的全職僱員。 公司管理層負責根據適用的會計準則和適用的法律法規編制公司的財務報表。公司的外部核數師負責 根據適用的審計準則和法律法規對公司的財務報表進行審計或審查(如適用)。
委員會的職責
委員會的職責包括:外聘審計員保留及終止,及/或就以下事項向董事會及股東提出建議 保留或終止外部審計公司,每季度進行一次審查,並對公司的財務報表進行年度審計;
- 33 -
告知外聘核數師,它最終要向董事會和委員會負責 股東代表;
獲得和審查由外聘審計員準備的年度報告,該報告描述:公司的內部質量 控制程序;在過去五年內,公司最近一次內部質量控制審查或同行審查,或政府或專業當局的任何詢問或調查提出的任何實質性問題; 關於事務所進行的一項或多項獨立審計,以及爲處理任何此類問題而採取的任何步驟;
評估外聘核數師的獨立性和任何潛在的利益衝突以及(評估 核數師的獨立性)外聘核數師與本公司之間的所有關係,包括取得及審閱由外聘核數師擬備的描述外聘核數師與本公司之間所有關係的年度報告 公司;
覈准或建議審計委員會覈准所有審計聘用費和條款以及所有
非審計
外聘審計員在聘用開始前的聘用情況;
與外聘審計員一起審查季度審查和年度審計的計劃和範圍; 制定關於僱用外聘核數師的現任或前任僱員的僱用政策; 財務報告審查、討論並建議董事會覈准年度經審計的財務報表及有關 管理層在向證券監管機構備案並交付給股東之前,對財務和經營結果進行討論和分析;審查並與外聘審計員討論其審查和審計的結果、出現的任何問題和 管理層的反應,包括對外聘審計員的活動範圍或所要求的信息的任何限制,以及與管理層的任何重大分歧,並解決任何爭議;
- 34 -
審查、討論和批准或建議董事會批准季度財務報表和 季度管理層在向證券監管機構備案並交付給股東之前,對財務和經營業績進行討論和分析;
與管理層和外部核數師一起審查和討論公司的關鍵會計政策和 做法、重大替代會計處理、重大會計和報告判斷、外聘審計員與管理層之間的重大書面溝通(包括管理層代表信函和任何時間表 未調整的差異)和審計或審查導致的重大調整;43-101審查並與管理層討論公司的收益新聞稿,以及財務類型 提供給分析師和評級機構的信息和收益指引(如果有的話);審查和討論委員會可能作出的包含財務信息的其他相關公開披露 認爲必要或適當的;檢討及與管理層討論與本公司公開披露有關的披露管制 財務信息,包括從財務報表中提取或派生的信息,並定期評估這些程序的充分性;財務報告的內部控制與管理層、外聘審計員和內部審計負責人審查和討論 公司對財務報告的內部控制,包括審查和討論內部控制設計或操作中的任何重大缺陷,以及涉及管理層或其他方面的任何欺詐,無論是否重大 在公司財務報告內部控制中發揮重要作用的員工;
討論公司在風險評估(包括欺詐風險)、風險管理和 公司的主要財務風險和財務報告風險,所有這些都與財務報告的內部控制有關,以及管理層採取了哪些步驟來監測和控制這些風險;43-101,與管理層一起審查和討論公司的商業行爲和道德準則以及反欺詐計劃 以及爲監測和強制執行合規而採取的行動;
爲以下方面制定程序:
接收、保留和處理有關會計、內部控制或審計事項的投訴;以及
- 35 -
公司員工對可疑會計問題的保密、匿名提交的意見, 內部控制或審計事項;1,2,3,5,11,13,14,15 | ||||||||||||||||||||||||||||||||||||||||
內部審計 | 與管理層、外聘審計員和內部審計負責人審查和討論職責和 公司內部審計職能的有效性,包括審查內部審計任務、獨立性、組織結構、內部審計計劃和資源的充分性,定期收到內部審計報告和 定期私下會見內部審計負責人; | 事先批准內部審計負責人的留任和解聘; | 企業風險 | |||||||||||||||||||||||||||||||||||||
審閱: | 公司與企業風險管理相關的流程;
公司與企業風險有關的總體戰略,包括財務、監管、戰略和 經營風險; |
公司的風險承受能力及其與公司戰略計劃的一致性;以及
設計和實施政策和標準,規定監測和促進合規性 符合法律和法規的要求; |
應董事會的要求,審查任何戰略決定或風險敞口的風險影響並提供諮詢意見 公司開展業務的國家和主要市場,以確保它們符合公司的整體風險承受能力; 審查公司與風險和風險管理有關的公開披露材料;
根據需要與公司各部門代表和/或外部顧問舉行會議,討論 公司面臨的風險和公司的風險管理活動; |
財務事項
檢討公司財務計劃所依據的政策,以確保其充足及穩妥地提供 公司的運營計劃和資本計劃; |
審查公司的債務和股權結構;
(Aa) |
審查擬議的主要融資活動; (Bb)
審查公司擬進行的重大收購的融資方式; |
審查任何重大債務或股權發行的預付款、贖回、收購或失敗;
(Dd) |
授權進行投資的政策或程序,並審查 公司的現金餘額;以及
(g/t) |
Contained ozs
(Moz) |
|||||||||||||||||||||||||||||||
AFRICA AND MIDDLE EAST |
||||||||||||||||||||||||||||||||||||||||
Bulyanhulu surface |
0.0053 | 3.74 | 0.00064 | — | — | — | 0.0053 | 3.74 | 0.00064 | |||||||||||||||||||||||||||||||
Bulyanhulu underground |
0.61 | 7.06 | 0.14 | 16 | 6.96 | 3.6 | 17 | 6.96 | 3.8 | |||||||||||||||||||||||||||||||
Bulyanhulu (84.00%) total |
0.62 | 7.03 | 0.14 | 16 | 6.96 | 3.6 | 17 | 6.96 | 3.8 | |||||||||||||||||||||||||||||||
Jabal Sayid surface |
0.14 | 0.66 | 0.0030 | — | — | — | 0.14 | 0.66 | 0.0030 | |||||||||||||||||||||||||||||||
Jabal Sayid underground |
8.7 | 0.32 | 0.089 | 4.5 | 0.46 | 0.066 | 13 | 0.37 | 0.16 | |||||||||||||||||||||||||||||||
Jabal Sayid (50.00%) total |
8.8 | 0.32 | 0.092 | 4.5 | 0.46 | 0.066 | 13 | 0.37 | 0.16 | |||||||||||||||||||||||||||||||
Kibali surface |
6.4 | 2.00 | 0.41 | 17 | 2.17 | 1.2 | 24 | 2.13 | 1.6 | |||||||||||||||||||||||||||||||
Kibali underground |
7.0 | 4.45 | 1.0 | 16 | 3.74 | 1.9 | 23 | 3.96 | 2.9 | |||||||||||||||||||||||||||||||
Kibali (45.00%) total |
13 | 3.28 | 1.4 | 33 | 2.93 | 3.2 | 47 | 3.03 | 4.6 | |||||||||||||||||||||||||||||||
Loulo-Gounkoto surface 4 |
11 | 2.43 | 0.83 | 15 | 3.30 | 1.6 | 26 | 2.95 | 2.5 | |||||||||||||||||||||||||||||||
Loulo-Gounkoto underground 4 |
7.6 | 5.13 | 1.3 | 23 | 4.82 | 3.6 | 31 | 4.90 | 4.9 | |||||||||||||||||||||||||||||||
Loulo-Gounkoto (80.00%) total 4 |
18 | 3.56 | 2.1 | 39 | 4.22 | 5.2 | 57 | 4.00 | 7.3 | |||||||||||||||||||||||||||||||
North Mara surface |
5.3 | 3.90 | 0.66 | 25 | 1.51 | 1.2 | 30 | 1.92 | 1.9 | |||||||||||||||||||||||||||||||
North Mara underground |
2.0 | 3.37 | 0.22 | 5.9 | 4.43 | 0.84 | 7.9 | 4.16 | 1.1 | |||||||||||||||||||||||||||||||
North Mara (84.00%) total |
7.3 | 3.75 | 0.88 | 31 | 2.07 | 2.0 | 38 | 2.4 | 2.9 | |||||||||||||||||||||||||||||||
Tongon surface (89.70%) |
3.2 | 2.10 | 0.21 | 4.8 | 2.63 | 0.40 | 8.0 | 2.41 | 0.62 | |||||||||||||||||||||||||||||||
AFRICA AND MIDDLE EAST TOTAL |
52 | 2.91 | 4.8 | 130 | 3.52 | 15 | 180 | 3.35 | 19 | |||||||||||||||||||||||||||||||
LATIN AMERICA AND ASIA PACIFIC |
||||||||||||||||||||||||||||||||||||||||
Norte Abierto surface (50.00%) |
110 | 0.65 | 2.4 | 480 | 0.59 | 9.2 | 600 | 0.60 | 12 | |||||||||||||||||||||||||||||||
Porgera surface |
0.11 | 2.07 | 0.0076 | 7.2 | 2.88 | 0.67 | 7.3 | 2.87 | 0.68 | |||||||||||||||||||||||||||||||
Porgera underground |
0.69 | 6.42 | 0.14 | 3.2 | 6.48 | 0.66 | 3.9 | 6.47 | 0.81 | |||||||||||||||||||||||||||||||
Porgera (24.50%) total |
0.81 | 5.80 | 0.15 | 10 | 3.98 | 1.3 | 11.0 | 4.11 | 1.5 | |||||||||||||||||||||||||||||||
Pueblo Viejo surface (60.00%) |
48 | 2.27 | 3.5 | 130 | 2.06 | 8.8 | 180 | 2.11 | 12 | |||||||||||||||||||||||||||||||
Reko Diq surface (50.00%) |
— | — | — | 1,400 | 0.28 | 13 | 1,400 | 0.28 | 13 | |||||||||||||||||||||||||||||||
Veladero surface (50.00%) |
24 | 0.66 | 0.51 | 49 | 0.68 | 1.1 | 73 | 0.67 | 1.6 | |||||||||||||||||||||||||||||||
LATIN AMERICA AND ASIA PACIFIC TOTAL |
190 | 1.09 | 6.6 | 2,100 | 0.49 | 33 | 2300 | 0.54 | 40 | |||||||||||||||||||||||||||||||
NORTH AMERICA |
||||||||||||||||||||||||||||||||||||||||
Carlin surface |
4.1 | 1.60 | 0.21 | 58 | 2.39 | 4.4 | 62 | 2.33 | 4.6 | |||||||||||||||||||||||||||||||
Carlin underground |
0.050 | 6.17 | 0.010 | 20 | 7.69 | 4.8 | 20 | 7.69 | 4.8 | |||||||||||||||||||||||||||||||
Carlin (61.50%) total |
4.1 | 1.66 | 0.22 | 77 | 3.73 | 9.3 | 82 | 3.62 | 9.5 | |||||||||||||||||||||||||||||||
Cortez surface |
1.0 | 2.78 | 0.090 | 63 | 1.02 | 2.1 | 64 | 1.05 | 2.2 | |||||||||||||||||||||||||||||||
Cortez underground |
— | — | — | 28 | 6.78 | 6.1 | 28 | 6.78 | 6.1 | |||||||||||||||||||||||||||||||
Cortez (61.50%) total |
1.0 | 2.78 | 0.090 | 91 | 2.79 | 8.2 | 92 | 2.79 | 8.3 | |||||||||||||||||||||||||||||||
Hemlo surface |
— | — | — | 25 | 0.93 | 0.75 | 25 | 0.93 | 0.75 | |||||||||||||||||||||||||||||||
Hemlo underground |
0.29 | 3.84 | 0.036 | 6.2 | 4.30 | 0.86 | 6.5 | 4.28 | 0.90 | |||||||||||||||||||||||||||||||
Hemlo (100%) total |
0.29 | 3.84 | 0.036 | 31 | 1.60 | 1.6 | 32 | 1.62 | 1.6 | |||||||||||||||||||||||||||||||
Phoenix surface (61.50%) |
5.2 | 0.64 | 0.11 | 87 | 0.63 | 1.8 | 92 | 0.63 | 1.9 | |||||||||||||||||||||||||||||||
Turquoise Ridge surface |
16 | 2.26 | 1.2 | 11 | 1.92 | 0.66 | 27 | 2.12 | 1.8 | |||||||||||||||||||||||||||||||
Turquoise Ridge underground |
6.3 | 11.32 | 2.3 | 16 | 9.48 | 4.8 | 22 | 10.00 | 7.1 | |||||||||||||||||||||||||||||||
Turquoise Ridge (61.50%) total |
22 | 4.82 | 3.4 | 27 | 6.42 | 5.5 | 49 | 5.69 | 8.9 | |||||||||||||||||||||||||||||||
NORTH AMERICA TOTAL |
33 | 3.69 | 3.9 | 310 | 2.61 | 26 | 350 | 2.71 | 30 | |||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||
TOTAL |
270 | 1.75 | 15 | 2,500 | 0.90 | 74 | 2,800 | 0.99 | 89 |
See 「Notes to the Barrick Mineral Reserves and Resources Tables」.
- 36 -
Copper Mineral Reserves1,2,3,5,11,12,14,15,16 | ||||||||||||||||||||||||||||||||||||||||
As at December 31, 2024 | PROVEN | PROBABLE | TOTAL | |||||||||||||||||||||||||||||||||||||
Based on attributable pounds | Tonnes
(Mt) |
Cu
(%) |
Contained Cu
(Mt) |
Tonnes
(Mt) |
Cu
(%) |
Contained Cu
(Mt) |
Tonnes
(Mt) |
Cu
(%) |
Contained Cu
(Mt) |
|||||||||||||||||||||||||||||||
AFRICA AND MIDDLE EAST |
||||||||||||||||||||||||||||||||||||||||
Bulyanhulu surface |
0.0053 | 0.38 | 0.000020 | — | — | — | 0.0053 | 0.38 | 0.000020 | |||||||||||||||||||||||||||||||
Bulyanhulu underground |
0.61 | 0.41 | 0.0025 | 16 | 0.35 | 0.057 | 17 | 0.35 | 0.060 | |||||||||||||||||||||||||||||||
Bulyanhulu (84.00%) total |
0.62 | 0.41 | 0.0025 | 16 | 0.35 | 0.057 | 17 | 0.35 | 0.060 | |||||||||||||||||||||||||||||||
Jabal Sayid surface |
0.14 | 2.68 | 0.0037 | — | — | — | 0.14 | 2.68 | 0.0037 | |||||||||||||||||||||||||||||||
Jabal Sayid underground |
8.7 | 2.12 | 0.18 | 4.5 | 2.16 | 0.097 | 13 | 2.14 | 0.28 | |||||||||||||||||||||||||||||||
Jabal Sayid (50.00%) total |
8.8 | 2.13 | 0.19 | 4.5 | 2.16 | 0.097 | 13 | 2.14 | 0.28 | |||||||||||||||||||||||||||||||
Lumwana surface (100%) |
140 | 0.49 | 0.68 | 1,500 | 0.53 | 7.6 | 1,600 | 0.52 | 8.3 | |||||||||||||||||||||||||||||||
AFRICA AND MIDDLE EAST TOTAL |
150 | 0.59 | 0.87 | 1,500 | 0.53 | 2.7 | 1,600 | 0.54 | 8.7 | |||||||||||||||||||||||||||||||
LATIN AMERICA AND ASIA PACIFIC |
||||||||||||||||||||||||||||||||||||||||
Norte Abierto surface (50.00%) |
110 | 0.19 | 0.22 | 480 | 0.23 | 1.1 | 600 | 0.22 | 1.3 | |||||||||||||||||||||||||||||||
Reko Diq surface (50.00%) |
— | — | — | 1,500 | 0.48 | 7.3 | 1,500 | 0.48 | 7.3 | |||||||||||||||||||||||||||||||
Zaldívar surface (50.00%) |
110 | 0.44 | 0.48 | 66 | 0.41 | 0.27 | 180 | 0.43 | 0.75 | |||||||||||||||||||||||||||||||
LATIN AMERICA AND ASIA PACIFIC TOTAL |
220 | 0.31 | 0.70 | 2,100 | 0.42 | 8.6 | 2,300 | 0.41 | 9.4 | |||||||||||||||||||||||||||||||
NORTH AMERICA |
||||||||||||||||||||||||||||||||||||||||
Phoenix surface (61.50%) |
6.9 | 0.16 | 0.011 | 110 | 0.18 | 0.20 | 120 | 0.18 | 0.21 | |||||||||||||||||||||||||||||||
NORTH AMERICA TOTAL |
6.9 | 0.16 | 0.011 | 110 | 0.18 | 0.20 | 120 | 0.18 | 0.21 | |||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||
TOTAL |
380 | 0.42 | 1.6 | 3,600 | 0.46 | 17 | 4,000 | 0.45 | 18 |
See 「Notes to the Barrick Mineral Reserves and Resources Tables」.
- 37 -
Silver Mineral Reserves1,2,3,5,11,15 | ||||||||||||||||||||||||||||||||||||||||
As at December 31, 2024 | PROVEN | PROBABLE | TOTAL | |||||||||||||||||||||||||||||||||||||
Based on attributable ounces | Tonnes
(Mt) |
Ag
(g/t) |
Contained Ag
(Moz) |
Tonnes
(Mt) |
Ag
(g/t) |
Contained Ag
(Moz) |
Tonnes
(Mt) |
Ag
(g/t) |
Contained Ag
(Moz) |
|||||||||||||||||||||||||||||||
AFRICA AND MIDDLE EAST |
||||||||||||||||||||||||||||||||||||||||
Bulyanhulu surface |
0.0053 | 7.29 | 0.0012 | — | — | — | 0.0053 | 7.29 | 0.0012 | |||||||||||||||||||||||||||||||
Bulyanhulu underground |
0.61 | 6.98 | 0.14 | 16 | 5.51 | 2.9 | 17 | 5.56 | 3.0 | |||||||||||||||||||||||||||||||
Bulyanhulu (84.00%) total |
0.62 | 6.98 | 0.14 | 16 | 5.51 | 2.9 | 17 | 5.56 | 3.0 | |||||||||||||||||||||||||||||||
AFRICA AND MIDDLE EAST TOTAL |
0.62 | 6.98 | 0.14 | 16 | 5.51 | 2.9 | 17 | 5.56 | 3.0 | |||||||||||||||||||||||||||||||
LATIN AMERICA AND ASIA PACIFIC |
||||||||||||||||||||||||||||||||||||||||
Norte Abierto surface (50.00%) |
110 | 1.91 | 7.0 | 480 | 1.43 | 22 | 600 | 1.52 | 29 | |||||||||||||||||||||||||||||||
Pueblo Viejo surface (60.00%) |
48 | 12.44 | 19 | 130 | 12.69 | 54 | 180 | 12.62 | 73 | |||||||||||||||||||||||||||||||
Veladero surface (50.00%) |
24 | 12.92 | 10.0 | 49 | 13.96 | 22 | 73 | 13.62 | 32 | |||||||||||||||||||||||||||||||
LATIN AMERICA AND ASIA PACIFIC TOTAL |
190 | 6.04 | 36 | 670 | 4.6 | 98 | 850 | 4.92 | 130 | |||||||||||||||||||||||||||||||
NORTH AMERICA |
||||||||||||||||||||||||||||||||||||||||
Phoenix surface (61.50%) |
5.2 | 7.87 | 1.3 | 87 | 7.78 | 22 | 92 | 7.78 | 23 | |||||||||||||||||||||||||||||||
NORTH AMERICA TOTAL |
5.2 | 7.87 | 1.3 | 87 | 7.78 | 22 | 92 | 7.78 | 23 | |||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||
TOTAL |
190 | 6.09 | 38 | 770 | 4.98 | 120 | 960 | 5.20 | 160 |
See 「Notes to the Barrick Mineral Reserves and Resources Tables」.
- 38 -
Gold Mineral Resources1,3,5,6,7,8,11,12,15 | ||||||||||||||||||||||||||||||||||||||||||||||||||||
As at December 31, 2024 | MEASURED (M)10 | INDICATED (I)10 | (M) + (I)10 | INFERRED11 | ||||||||||||||||||||||||||||||||||||||||||||||||
Based on attributable ounces |
Tonnes
(Mt) |
Grade
(g/t) |
Contained
(Moz) |
Tonnes
(Mt) |
Grade
(g/t) |
Contained ozs
(Moz) |
Contained
(Moz) |
Tonnes
(Mt) |
Grade
(g/t) |
Contained ozs
(Moz) |
||||||||||||||||||||||||||||||||||||||||||
AFRICA AND MIDDLE EAST |
||||||||||||||||||||||||||||||||||||||||||||||||||||
Bulyanhulu surface |
0.0053 | 3.74 | 0.00064 | — | — | — | 0.00064 | — | — | — | ||||||||||||||||||||||||||||||||||||||||||
Bulyanhulu underground |
2.8 | 7.94 | 0.72 | 28 | 7.16 | 6.5 | 7.2 | 11 | 7.2 | 2.5 | ||||||||||||||||||||||||||||||||||||||||||
Bulyanhulu (84.00%) total |
2.8 | 7.93 | 0.72 | 28 | 7.16 | 6.5 | 7.2 | 11 | 7.2 | 2.5 | ||||||||||||||||||||||||||||||||||||||||||
Jabal Sayid surface |
0.14 | 0.66 | 0.0030 | — | — | — | 0.0030 | — | — | — | ||||||||||||||||||||||||||||||||||||||||||
Jabal Sayid underground |
9.1 | 0.39 | 0.11 | 6.4 | 0.50 | 0.10 | 0.22 | 1.1 | 0.6 | 0.021 | ||||||||||||||||||||||||||||||||||||||||||
Jabal Sayid (50.00%) total |
9.2 | 0.40 | 0.12 | 6.4 | 0.50 | 0.10 | 0.22 | 1.1 | 0.6 | 0.021 | ||||||||||||||||||||||||||||||||||||||||||
Kibali surface |
9.5 | 2.14 | 0.65 | 26 | 2.17 | 1.8 | 2.5 | 8.2 | 2.2 | 0.58 | ||||||||||||||||||||||||||||||||||||||||||
Kibali underground |
11 | 4.43 | 1.5 | 29 | 3.45 | 3.3 | 4.8 | 4.3 | 2.5 | 0.35 | ||||||||||||||||||||||||||||||||||||||||||
Kibali (45.00%) total |
20 | 3.34 | 2.1 | 56 | 2.85 | 5.1 | 7.3 | 12 | 2.3 | 0.93 | ||||||||||||||||||||||||||||||||||||||||||
Loulo-Gounkoto surface 4 |
12 | 2.41 | 0.95 | 19 | 3.34 | 2.1 | 3.0 | 2.8 | 2.4 | 0.22 | ||||||||||||||||||||||||||||||||||||||||||
Loulo-Gounkoto underground 4 |
18 | 4.21 | 2.4 | 38 | 4.22 | 5.1 | 7.6 | 12 | 2.0 | 0.81 | ||||||||||||||||||||||||||||||||||||||||||
Loulo-Gounkoto (80.00%) total 4 |
30 | 3.48 | 3.4 | 57 | 3.93 | 7.2 | 11 | 15 | 2.1 | 1.0 | ||||||||||||||||||||||||||||||||||||||||||
North Mara surface |
7.8 | 3.19 | 0.80 | 36 | 1.60 | 1.9 | 2.7 | 2.0 | 1.6 | 0.10 | ||||||||||||||||||||||||||||||||||||||||||
North Mara underground |
6.8 | 2.17 | 0.48 | 29 | 2.29 | 2.1 | 2.6 | 8.9 | 1.6 | 0.47 | ||||||||||||||||||||||||||||||||||||||||||
North Mara (84.00%) total |
15 | 2.71 | 1.3 | 65 | 1.91 | 4.0 | 5.3 | 11 | 1.6 | 0.57 | ||||||||||||||||||||||||||||||||||||||||||
Tongon surface (89.70%) |
3.8 | 2.24 | 0.28 | 4.8 | 2.71 | 0.42 | 0.70 | 1.5 | 2.3 | 0.11 | ||||||||||||||||||||||||||||||||||||||||||
AFRICA AND MIDDLE EAST TOTAL |
81 | 3.05 | 7.9 | 220 | 3.34 | 23 | 31 | 52 | 3.1 | 5.2 | ||||||||||||||||||||||||||||||||||||||||||
LATIN AMERICA AND ASIA PACIFIC |
||||||||||||||||||||||||||||||||||||||||||||||||||||
Alturas surface (100%) |
— | — | — | 58 | 1.16 | 2.2 | 2.2 | 130 | 0.8 | 3.6 | ||||||||||||||||||||||||||||||||||||||||||
Norte Abierto surface (50.00%) |
190 | 0.63 | 3.9 | 1,100 | 0.53 | 19 | 22 | 370 | 0.4 | 4.4 | ||||||||||||||||||||||||||||||||||||||||||
Pascua Lama surface (100%) |
43 | 1.86 | 2.6 | 390 | 1.49 | 19 | 21 | 15 | 1.7 | 0.86 | ||||||||||||||||||||||||||||||||||||||||||
Porgera surface |
— | — | — | 28 | 2.35 | 2.1 | 2.1 | 17 | 1.7 | 0.94 | ||||||||||||||||||||||||||||||||||||||||||
Porgera underground |
0.74 | 6.87 | 0.16 | 4.0 | 6.42 | 0.82 | 0.98 | 1.9 | 6.4 | 0.38 | ||||||||||||||||||||||||||||||||||||||||||
Porgera (24.50%) total |
0.74 | 6.87 | 0.16 | 32 | 2.86 | 2.9 | 3.1 | 19 | 2.2 | 1.3 | ||||||||||||||||||||||||||||||||||||||||||
Pueblo Viejo surface (60.00%) |
61 | 2.09 | 4.1 | 190 | 1.87 | 11 | 15 | 7.5 | 1.6 | 0.38 | ||||||||||||||||||||||||||||||||||||||||||
Reko Diq surface (50.00%) |
— | — | — | 1,800 | 0.25 | 15 | 15 | 640 | 0.2 | 3.9 | ||||||||||||||||||||||||||||||||||||||||||
Veladero surface (50.00%) |
26 | 0.65 | 0.53 | 85 | 0.65 | 1.8 | 2.3 | 16 | 0.5 | 0.29 | ||||||||||||||||||||||||||||||||||||||||||
LATIN AMERICA AND ASIA PACIFIC TOTAL |
320 | 1.08 | 11 | 3,700 | 0.60 | 70 | 81 | 1,200 | 0.4 | 15 |
See 「Notes to the Barrick Mineral Reserves and Resources Tables」.
- 39 -
Gold Mineral Resources1,3,5,6,7,8,11,12,15 | ||||||||||||||||||||||||||||||||||||||||||||||||||||
As at December 31, 2024 | MEASURED (M)10 | INDICATED (I)10 | (M) + (I)10 | INFERRED11 | ||||||||||||||||||||||||||||||||||||||||||||||||
Based on attributable ounces |
Tonnes
(Mt) |
Grade
(g/t) |
Contained
(Moz) |
Tonnes
(Mt) |
Grade
(g/t) |
Contained
(Moz) |
Contained
(Moz) |
Tonnes
(Mt) |
Grade
(g/t) |
Contained
(Moz) |
||||||||||||||||||||||||||||||||||||||||||
NORTH AMERICA |
||||||||||||||||||||||||||||||||||||||||||||||||||||
Carlin surface |
8.8 | 1.29 | 0.37 | 96 | 2.06 | 6.4 | 6.7 | 29 | 1.3 | 1.2 | ||||||||||||||||||||||||||||||||||||||||||
Carlin underground |
0.086 | 8.55 | 0.024 | 33 | 7.92 | 8.5 | 8.6 | 19 | 7.3 | 4.5 | ||||||||||||||||||||||||||||||||||||||||||
Carlin (61.50%) total |
8.9 | 1.36 | 0.39 | 130 | 3.57 | 15 | 15 | 48 | 3.7 | 5.7 | ||||||||||||||||||||||||||||||||||||||||||
Cortez surface |
1.6 | 2.79 | 0.15 | 100 | 0.97 | 3.2 | 3.3 | 31 | 0.6 | 0.63 | ||||||||||||||||||||||||||||||||||||||||||
Cortez underground |
— | — | — | 39 | 6.30 | 8.0 | 8.0 | 15 | 5.6 | 2.8 | ||||||||||||||||||||||||||||||||||||||||||
Cortez (61.50%) total |
1.6 | 2.79 | 0.150 | 140 | 2.45 | 11 | 11 | 46 | 2.3 | 3.4 | ||||||||||||||||||||||||||||||||||||||||||
Donlin surface (50.00%) |
— | — | — | 270 | 2.24 | 20 | 20 | 46 | 2.0 | 3.0 | ||||||||||||||||||||||||||||||||||||||||||
Fourmile underground (100%) |
— | — | — | 3.6 | 11.76 | 1.4 | 1.4 | 14 | 14.1 | 6.4 | ||||||||||||||||||||||||||||||||||||||||||
Hemlo surface |
— | — | — | 50 | 1.00 | 1.6 | 1.6 | 5.0 | 0.7 | 0.12 | ||||||||||||||||||||||||||||||||||||||||||
Hemlo underground |
3.9 | 4.37 | 0.55 | 10 | 4.04 | 1.3 | 1.8 | 3.5 | 4.5 | 0.50 | ||||||||||||||||||||||||||||||||||||||||||
Hemlo (100%) total |
3.9 | 4.37 | 0.55 | 60 | 1.49 | 2,9 | 3.4 | 8.5 | 2.3 | 0.62 | ||||||||||||||||||||||||||||||||||||||||||
Phoenix surface (61.50%) |
5.2 | 0.64 | 0.11 | 240 | 0.49 | 3.9 | 4.0 | 16 | 0.4 | 0.19 | ||||||||||||||||||||||||||||||||||||||||||
Turquoise Ridge surface |
16 | 2.22 | 1.2 | 29 | 1.69 | 1.6 | 2.7 | 14 | 1.1 | 0.51 | ||||||||||||||||||||||||||||||||||||||||||
Turquoise Ridge underground |
6.6 | 12.01 | 2.5 | 18 | 9.91 | 5.8 | 8.4 | 3.7 | 8.5 | 1.0 | ||||||||||||||||||||||||||||||||||||||||||
Turquoise Ridge (61.50%) total |
23 | 5.02 | 3.7 | 47 | 4.87 | 7.4 | 11 | 18 | 2.6 | 1.5 | ||||||||||||||||||||||||||||||||||||||||||
NORTH AMERICA TOTAL |
43 | 3.58 | 4.9 | 900 | 2.12 | 61 | 66 | 200 | 3.3 | 21 | ||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL |
450 | 1.68 | 24 | 4,800 | 1.01 | 150 | 180 | 1,400 | 0.9 | 41 |
See 「Notes to the Barrick Mineral Reserves and Resources Tables」.
- 40 -
Copper Mineral Resources1,3,5,6,7,8,11,12,15 | ||||||||||||||||||||||||||||||||||||||||||||||||||||
As at December 31, 2024 | MEASURED (M)10 | INDICATED (I)10 | (M) + (I)10 | INFERRED11 | ||||||||||||||||||||||||||||||||||||||||||||||||
Based on attributable pounds |
Tonnes
(Mt) |
Grade
(%) |
Contained
(Mt) |
Tonnes
(Mt) |
Grade
(%) |
Contained
(Mt) |
Contained Cu
(Mt) |
Tonnes
(Mt) |
Grade
(%) |
Contained
(Mt) |
||||||||||||||||||||||||||||||||||||||||||
AFRICA AND MIDDLE EAST |
||||||||||||||||||||||||||||||||||||||||||||||||||||
Bulyanhulu surface |
0.0053 | 0.38 | 0.000020 | — | — | — | 0.000020 | — | — | — | ||||||||||||||||||||||||||||||||||||||||||
Bulyanhulu underground |
2.8 | 0.37 | 0.010 | 28 | 0.36 | 0.10 | 0.11 | 11 | 0.3 | 0.036 | ||||||||||||||||||||||||||||||||||||||||||
Bulyanhulu (84.00%) total |
2.8 | 0.37 | 0.010 | 28 | 0.36 | 0.10 | 0.11 | 11 | 0.3 | 0.036 | ||||||||||||||||||||||||||||||||||||||||||
Jabal Sayid surface |
0.14 | 2.68 | 0.0037 | — | — | — | 0.0037 | — | — | — | ||||||||||||||||||||||||||||||||||||||||||
Jabal Sayid underground |
9.1 | 2.49 | 0.23 | 6.4 | 2.23 | 0.14 | 0.37 | 1.1 | 0.5 | 0.0058 | ||||||||||||||||||||||||||||||||||||||||||
Jabal Sayid (50.00%) total |
9.2 | 2.50 | 0.23 | 6.4 | 2.23 | 0.14 | 0.37 | 1.1 | 0.5 | 0.0058 | ||||||||||||||||||||||||||||||||||||||||||
Lumwana surface (100%) |
170 | 0.45 | 0.77 | 1,800 | 0.50 | 9.2 | 10 | 230 | 0.4 | 0.91 | ||||||||||||||||||||||||||||||||||||||||||
AFRICA AND MIDDLE EAST TOTAL |
190 | 0.55 | 1.0 | 1,900 | 0.51 | 9.4 | 10 | 240 | 0.4 | 0.95 | ||||||||||||||||||||||||||||||||||||||||||
LATIN AMERICA AND ASIA PACIFIC |
||||||||||||||||||||||||||||||||||||||||||||||||||||
Norte Abierto surface (50.00%) |
170 | 0.21 | 0.36 | 1,000 | 0.21 | 2.2 | 2.5 | 360 | 0.2 | 0.66 | ||||||||||||||||||||||||||||||||||||||||||
Reko Diq surface (50.00%) |
— | — | — | 2,000 | 0.43 | 8.4 | 8.4 | 690 | 0.3 | 2.2 | ||||||||||||||||||||||||||||||||||||||||||
Zaldívar surface (50.00%) |
240 | 0.39 | 0.94 | 290 | 0.36 | 1.0 | 2.0 | 150 | 0.3 | 0.048 | ||||||||||||||||||||||||||||||||||||||||||
LATIN AMERICA AND ASIA PACIFIC TOTAL |
410 | 0.31 | 1.3 | 3,300 | 0.35 | 12 | 13 | 1,100 | 0.3 | 3.0 | ||||||||||||||||||||||||||||||||||||||||||
NORTH AMERICA |
||||||||||||||||||||||||||||||||||||||||||||||||||||
Phoenix surface (61.50%) |
6.9 | 0.16 | 0.011 | 300 | 0.17 | 0.51 | 0.52 | 18 | 0.2 | 0.028 | ||||||||||||||||||||||||||||||||||||||||||
NORTH AMERICA TOTAL |
6.9 | 0.16 | 0.011 | 300 | 0.17 | 0.51 | 0.52 | 18 | 0.2 | 0.028 | ||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL |
600 | 0.38 | 2.3 | 5,400 | 0.39 | 22 | 24 | 1,300 | 0.3 | 3.9 |
See 「Notes to the Barrick Mineral Reserves and Resources Tables」.
- 41 -
Silver Mineral Resources1,3,5,6,7,8,11,12,15 | ||||||||||||||||||||||||||||||||||||||||||||||||||||
As at December 31, 2024 | MEASURED (M)10 | INDICATED (I)10 | (M) + (I)10 | INFERRED11 | ||||||||||||||||||||||||||||||||||||||||||||||||
Based on attributable ounces |
Tonnes
(Mt) |
Ag
(g/t) |
Contained
(Moz) |
Tonnes
(Mt) |
Ag Grade
(g/t) |
Contained
(Moz) |
Contained Ag
(Moz) |
Tonnes
(Mt) |
Ag Grade
(g/t) |
Contained
(Moz) |
||||||||||||||||||||||||||||||||||||||||||
AFRICA AND MIDDLE EAST |
||||||||||||||||||||||||||||||||||||||||||||||||||||
Bulyanhulu surface |
0.0053 | 7.29 | 0.0012 | — | — | — | 0.0012 | — | — | — | ||||||||||||||||||||||||||||||||||||||||||
Bulyanhulu underground |
2.8 | 6.87 | 0.62 | 28 | 5.56 | 5.1 | 5.7 | 11 | 5.7 | 2.0 | ||||||||||||||||||||||||||||||||||||||||||
Bulyanhulu (84.00%) total |
2.8 | 6.87 | 0.62 | 28 | 5.56 | 5.1 | 5.7 | 11 | 5.7 | 2.0 | ||||||||||||||||||||||||||||||||||||||||||
AFRICA AND MIDDLE EAST TOTAL |
2.8 | 6.87 | 0.62 | 28 | 5.56 | 5.1 | 5.7 | 11 | 5.7 | 2.0 | ||||||||||||||||||||||||||||||||||||||||||
LATIN AMERICA AND ASIA PACIFIC |
||||||||||||||||||||||||||||||||||||||||||||||||||||
Norte Abierto surface (50.00%) |
190 | 1.62 | 10 | 1,100 | 1.23 | 43 | 53 | 370 | 1.0 | 11 | ||||||||||||||||||||||||||||||||||||||||||
Pascua-Lama surface (100%) |
43 | 57.21 | 79 | 390 | 52.22 | 660 | 740 | 15 | 17.8 | 8.8 | ||||||||||||||||||||||||||||||||||||||||||
Pueblo Viejo surface (60.00%) |
61 | 11.47 | 22 | 190 | 11.22 | 68 | 91 | 7.5 | 6.8 | 1.6 | ||||||||||||||||||||||||||||||||||||||||||
Veladero surface (50.00%) |
26 | 13.08 | 11 | 85 | 13.91 | 38 | 49 | 16 | 15.8 | 8.2 | ||||||||||||||||||||||||||||||||||||||||||
LATIN AMERICA AND ASIA PACIFIC TOTAL |
320 | 11.81 | 120 | 1,700 | 14.36 | 810 | 930 | 410 | 2.3 | 30 | ||||||||||||||||||||||||||||||||||||||||||
NORTH AMERICA |
||||||||||||||||||||||||||||||||||||||||||||||||||||
Phoenix surface (61.50%) |
5.2 | 7.87 | 1.3 | 240 | 6.40 | 50 | 52 | 16 | 4.2 | 2.2 | ||||||||||||||||||||||||||||||||||||||||||
NORTH AMERICA TOTAL |
5.2 | 7.87 | 1.3 | 240 | 6.40 | 50 | 52 | 16 | 4.2 | 2.2 | ||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL |
330 | 11.70 | 120 | 2,000 | 13.28 | 860 | 990 | 440 | 2.4 | 34 |
See 「Notes to the Barrick Mineral Reserves and Resources Tables」.
- 42 -
GLOBAL PROVEN & PROBABLE MINERAL RESERVE RECONCILIATION (gold, Moz) 1,2,3,5,6,8,9,11,12,13,14,15
Global Attributable Contained Metal |
2023 Barrick Total P&P Reserve |
Acquisition/ Disposal |
Depletion (As of Year End) |
Net Conversion |
2024 Barrick Total P&P Mineral Reserve |
|||||||||||||||
Bulyanhulu (84%) |
3.4 | — | (0.18 | ) | 0.51 | 3.8 | ||||||||||||||
Carlin (61.5%) |
9.7 | — | (0.94 | ) | 0.77 | 9.5 | ||||||||||||||
Cortez (61.5%) |
9.0 | — | (0.46 | ) | (0.29 | ) | 8.3 | |||||||||||||
Hemlo (100%) |
1.7 | — | (0.15 | ) | 0.052 | 1.6 | ||||||||||||||
Jabal Sayid (50%) |
0.15 | — | (0.02 | ) | 0.029 | 0.16 | ||||||||||||||
Kibali (45%) |
4.7 | — | (0.37 | ) | 0.28 | 4.6 | ||||||||||||||
Loulo Gounkoto (80%) 4 |
7.2 | — | (0.61 | ) | 0.7 | 7.3 | ||||||||||||||
Norte Abierto (50%) |
12 | — | — | — | 12 | |||||||||||||||
North Mara (84%) |
2.9 | — | (0.28 | ) | 0.3 | 2.9 | ||||||||||||||
Phoenix (61.5%) |
1.9 | — | (0.21 | ) | 0.21 | 1.9 | ||||||||||||||
Porgera (24.5%) |
1.2 | — | (0.047 | ) | 0.31 | 1.5 | ||||||||||||||
Pueblo Viejo (60%) |
12 | — | (0.51 | ) | 0.78 | 12 | ||||||||||||||
Reko Diq (50%) |
— | — | — | 13 | 13 | |||||||||||||||
Tongon (89.7%) |
0.35 | — | (0.19 | ) | 0.046 | 0.62 | ||||||||||||||
Turquoise Ridge (61.5%) |
8.6 | — | (0.23 | ) | 0.56 | 8.9 | ||||||||||||||
Veladero (50%) |
2.0 | — | (0.39 | ) | (0.018 | ) | 1.6 | |||||||||||||
Grand Total |
77 | — | (4.6 | ) | 17 | 89 |
See 「Notes to the Barrick Mineral Reserves and Resources Tables」.
GLOBAL PROVEN & PROBABLE MINERAL RESERVE RECONCILIATION (copper, Mt) 1,2,3,5,7,8,9,12,14,15,16
Global Attributable Contained Metal |
2023 Barrick Total P&P Reserve |
Acquisition/ Disposal |
Depletion (As of Year End) |
Net Conversion |
2024 Barrick Total P&P Reserve |
|||||||||||||||
Bulyanhulu (84%) |
0.063 | — | (0.0025 | ) | (0.0007 | ) | 0.060 | |||||||||||||
Jabal Sayid (50%) |
0.30 | — | (0.038 | ) | 0.018 | 0.28 | ||||||||||||||
Lumwana (100%) |
2.8 | — | (0.19 | ) | 5.5 | 8.3 | ||||||||||||||
Norte Abierto (50%) |
1.3 | — | — | — | 1.3 | |||||||||||||||
Phoenix (61.5%) |
0.23 | — | (0.0099 | ) | (0.008 | ) | 0.21 | |||||||||||||
Reko Diq (50%) |
— | — | — | 7.3 | 7.3 | |||||||||||||||
Zaldívar (50%) |
0.74 | — | (0.096 | ) | (0.11 | ) | 0.75 | |||||||||||||
Grand Total |
5.6 | — | (0.33 | ) | 13 | 18 |
See 「Notes to the Barrick Mineral Reserves and Resources Tables」.
- 43 -
Notes to the Barrick Mineral Reserves and Resources Tables
1. | Mineral reserves and mineral resources have been estimated as at December 31, 2024 (unless otherwise noted) in accordance with National Instrument 43-101 as required by Canadian securities regulatory authorities. For United States reporting purposes, the SEC has adopted amendments to its disclosure rules to modernize the mineral property disclosure requirements for issuers whose securities are registered with the SEC under the Exchange Act. The SEC has adopted amendments to its disclosure rules to modernize the mineral property disclosure requirements for issuers whose securities are registered with the SEC under the Exchange Act (the 「SEC Modernization Rules」) which became effective February 25, 2019 with compliance required for the first fiscal year beginning on or after January 1, 2021. The SEC Modernization Rules replace the historical property disclosure requirements for mining registrants that were included in SEC Industry Guide 7 (「Guide 7」), which was rescinded from and after the required compliance date of the SEC Modernization Rules. As a result of the adoption of the SEC Modernization Rules, the SEC now recognizes estimates of 「measured」, 「indicated」 and 「inferred」 mineral resources. In addition, the SEC has amended its definitions of 「proven mineral reserves」 and 「probable mineral reserves」 to be substantially similar to the corresponding CIM definitions, as required by National Instrument 43-101. Under the MJDS, Barrick is permitted to use its Canadian disclosures, including its reserve and resource disclosures pursuant to National Instrument 43-101, to satisfy certain United States periodic reporting obligations. As a result, Barrick does not report its reserves and resources under the SEC Modernization Rules, and as such, Barrick’s mineral reserve and mineral resource disclosure may not be directly comparable to the disclosures made by domestic United States issuers or non-domestic United States issuers that do not rely on MJDS. U.S. investors should understand that 「inferred」 mineral resources have a great amount of uncertainty as to their existence and great uncertainty as to their economic and legal feasibility. In addition, U.S. investors are cautioned not to assume that any part or all of Barrick’s mineral resources constitute or will be converted into reserves. Mineral resource and mineral reserve estimations have been prepared by employees of Barrick, its joint venture partners or its joint venture operating companies, as applicable, under the supervision of Craig Fiddes, SME-RM, Lead, Resource and Reserve Governance, Nevada Gold Mines; Richard Peattie, MPhil, FAusIMM, Mineral Resources Manager, Africa and Middle East; Peter Jones, MAIG, Manager Resource Geology, Latin America and Asia Pacific; and Simon Bottoms, CGeol, MGeol, FGS, FAusIMM, Mineral Resource Management and Evaluation Executive. For 2024, reserves have been estimated based on an assumed gold price of US$1,400 per ounce, an assumed silver price of US$20.00 per ounce, and an assumed copper price of US$3.00 per pound and long-term average exchange rates of 1.30 CAD/US$, except at Tongon and Hemlo open pit, both where mineral reserves for 2024 were estimated using US$1,650 per ounce, at Zaldívar, where mineral reserves for 2024 were calculated using Antofagasta guidance and an updated assumed copper price of US$3.80 per pound, and at Norte Abierto where mineral reserves are reported by Newmont within a $1,200 per ounce for gold, $2.75 per pound for copper and $22.00 per ounce for silver pit design, before application of updated 2023 project economics using escalated operating and capital costs resulting in Newmont guidance of $1,600 per ounce for gold, $4.00 per pound for copper and $23.00 per ounce for silver for assumed mineral reserve commodity prices. For 2023, reserves have been estimated based on an assumed gold price of US$1,300 per ounce, an assumed silver price of US$18.00 per ounce, and an assumed copper price of US$3.00 per pound and long-term average exchange rates of 1.30 CAD/US$, except at Tongon, where mineral reserves for 2023 were calculated using US$1,500 per ounce, Hemlo, where mineral reserves for 2023 were calculated using US$1,400 per ounce and at Zaldívar, where mineral reserves for 2023 were calculated using Antofagasta guidance and an updated assumed copper price of US$3.50 per pound. Reserve estimates incorporate current and/or expected mine plans and cost levels at each property. Varying cut-off grades have been used depending on the mine and type of ore contained in the reserves. Barrick’s normal data verification procedures have been employed in connection with the calculations. Verification procedures include industry-standard quality control practices. Resources as at December 31, 2024 have been estimated using varying cut-off grades, depending on both the type of mine or project, its maturity and ore types at each property. All figures are presented on an attributable basis to Barrick. |
2. | In confirming the annual reserves for each of the Company’s mineral properties, projects, and operations, Barrick conducts a reserve test on December 31 of each year to verify that the future undiscounted cash flow from reserves is positive. The cash flow ignores all sunk costs and only considers future operating and closure expenses as well as any future capital costs. |
3. | All mineral resource and mineral reserve estimates of tonnes, ounces of gold and silver and tonnes of copper are reported to the second significant digit. |
4. | Mineral resources and mineral reserves for the Loulo-Gounkoto Complex have been estimated under the 1991 Malian Mining Code and the Loulo and Gounkoto Mining Conventions under which the Complex has operated to date. Any update to applicable terms as a result of ongoing engagements with the Government of Mali will be incorporated after a definitive agreement is reached. For additional information see 「Legal Proceedings and Regulatory Actions – Loulo-Gounkoto Mining Conventions Dispute」. |
5. | 2024 polymetallic mineral resources and mineral reserves are estimated using the combined value of gold, copper and silver and accordingly are reported as gold, copper and silver mineral resources and mineral reserves. |
6. | For 2024, mineral resources have been estimated based on an assumed gold price of US$1,900 per ounce, an assumed silver price of US$24.00 per ounce, and an assumed copper price of US$4.00 per pound and long-term average exchange rates of 1.30 CAD/US$, except at Zaldívar, where mineral resources for 2024 were estimated using Antofagasta guidance and an assumed copper price of US$4.40 per pound, and at Norte Abierto, where mineral resources are reported by Newmont within a $1,400 per ounce for gold, $3.25 per pound for copper and $20.00 per ounce for silver pit shell, before application of updated 2023 project economics using escalated operating and capital costs resulting in Newmont guidance of $1,600 per ounce for gold, $4.00 per pound for copper and $23.00 per ounce for silver for assumed mineral resource commodity price. For 2023, mineral resources were estimated based on an assumed gold price of US$1,700 per ounce, an assumed silver price of US$21.00 per ounce, and an assumed copper price of US$4.00 per pound and long-term average exchange rates of 1.30 CAD/US$, except at Zaldívar, where mineral resources for 2023 were calculated using Antofagasta guidance and an assumed copper price of US$4.20. |
7. | Mineral resources are reported on an inclusive basis and include all areas that form mineral reserves, reported at a mineral resource cut-off and associated commodity price. |
8. | Mineral resources which are not mineral reserves do not have demonstrated economic viability. |
9. | All measured and indicated mineral resource estimates of grade and all proven and probable mineral reserve estimates of grade for gold, silver and copper are reported to two decimal places. |
10. | All inferred mineral resource estimates of grade for gold, silver, and copper are reported to one decimal place. |
11. | Grade represents an average, weighted by reference to tonnes of mineralization where several recovery processes apply. |
12. | Ounces or tonnes, as applicable, estimated to be present in the tonnes of mineralization which would be mined and processed. |
- 44 -
13. | Gold mineral reserves as at December 31, 2024 include stockpile material totaling approximately 140 million tonnes, containing approximately 7.9 million ounces. Properties at which stockpile material exceeds 30,000 ounces or represents more than 5% of the reported gold reserves are as follows: |
Stockpiles 1,2 | |||||||||||||||
Property |
|
Tonnes 3 (Mt) |
|
Grade 9 (g/t) |
|
Contained Ounces 3 (Moz) |
|||||||||
Loulo Gounkoto (80%)4 |
6.0 | 1.61 | 0.31 | ||||||||||||
Tongon (89.7%) |
1.0 | 1.52 | 0.050 | ||||||||||||
North Mara (84%) 11 |
11 | 0.98 | 0.34 | ||||||||||||
Phoenix (61.5%) 5 |
5.2 | 0.64 | 0.11 | ||||||||||||
Carlin (61.5%) |
24 | 2.21 | 1.7 | ||||||||||||
Cortez (61.5%) |
1.6 | 2.79 | 0.15 | ||||||||||||
Turquoise Ridge (61.5%) |
16 | 2.26 | 1.2 | ||||||||||||
Pueblo Viejo (60%) 5 |
58 | 2.07 | 3.9 | ||||||||||||
Veladero (50%) 5 |
9.1 | 0.37 | 0.11 |
14. | The metallurgical recovery applicable at each property and the cut-off grades used to determine mineral reserves as at December 31, 2024 are as follows: |
Gold Mine | Metallurgical Recovery (%) |
Cut-off Grade (COG) (g/t) | ||
Kibali (45%) |
75.5 to 91.0 | 0.50 to 2.06 | ||
Loulo Gounkoto (80%) 4 |
77.9 to 93.0 | 0.76 to 2.85 | ||
Tongon (89.7%) |
48.0 to 93.0 | 0.54 to 0.90 | ||
Bulyanhulu (84%) |
87.0 to 94.5 | Revenue COG based on all three metals (Au, Ag and Cu) | ||
North Mara (84%) |
82.2 to 94.5 | 0.63 to 2.36 | ||
Hemlo (100%) |
87.0 to 93.7 | 0.36 to 2.86 | ||
Phoenix (61.5%) |
64.0 to 78.0 Au | Revenue COG based on all three metals (Au, Ag and Cu) | ||
Carlin (61.5%) |
54.7 to 89.4 | 0.27 to 7.18 | ||
Cortez (61.5%) |
35.0 to 91.0 | 0.20 to 5.23 | ||
Turquoise Ridge (61.5%) |
54.3 to 91.0 | 0.15 to 5.81 | ||
Norte Abierto (50%) |
74.4 | Revenue COG based on all three metals (Au, Ag and Cu) | ||
Pueblo Viejo (60%) |
82.6 to 90.0 | Revenue COG based on all three metals (Au, Ag and Cu) | ||
Veladero (50%) |
40.0 to 86.3 | 0.22 to 1.03 | ||
Porgera (24.5%) |
82.6 to 92.9 | 0.67 to 3.20 | ||
Reko Diq (50%) |
44.5 to 80.2 Au | Revenue COG based on Cu and Au | ||
Copper Mine | Metallurgical Recovery (%) |
Cut-off Grade (COG) (%) | ||
Lumwana (100%) |
81.3 to 96.5 | 0.14% to 0.25% | ||
Reko Diq (50%) |
86.7 to 91.0 | Revenue COG based on Cu and Au | ||
Jabal Sayid (50%) |
79.3 to 93.7 | Revenue COG based on all three metals (Au, Ag and Cu) | ||
Phoenix (61.5%) |
40.6 to 73.0 | Revenue COG based on all three metals (Au, Ag and Cu) | ||
Zaldívar (50%) |
12.1 to 83.1 | 0.23% to 0.30% |
15. | Totals may not sum due to rounding. |
16. | Copper mineral reserves as at December 31, 2024 include stockpile material totaling approximately 47 million tonnes containing approximately 0.15 million tonnes of copper. Properties at which stockpile material exceeds 4,500 tonnes of copper or represents more than 5% of the reported copper reserves are as follows: |
Stockpiles 1,2 | |||||||||||||||
Property | |
Tonnes3 (Mt) |
|
Cu Grade 9 (%) |
|
Contained Copper3 (Mt) |
|||||||||
Zaldívar (50%) | 20 | 0.35 | 0.071 |
- 45 -
Marketing and Distribution
Gold
Gold CAN be readily sold on numerous markets throughout the world and it is not difficult to ascertain its market price at any particular time. Benchmark prices are generally based on the London gold market quotations. Gold bullion is held as an asset class for a variety of reasons, including as a store of value and a safeguard against the collapse of paper assets such as stocks, bonds and other financial instruments that are traded in fiat currencies not exchangeable into gold (at a fixed rate) under a 「gold standard」, as a hedge against future inflation and for portfolio diversification. Governments, central banks and other official institutions hold signifiCANt quantities of gold as a component of exchange reserves. Since there are a large number of available gold purchasers, Barrick is not dependent upon the sale of gold to any one customer.
During 2024, the gold price ranged from $1,984 per ounce to an all-time high of $2,790 per ounce. The average market price for the year of $2,386 per ounce represented an all-time annual high and a 23% increase compared to the 2023 annual average of $1,941 per ounce. During the year, the gold price rose strongly and reached all-time high nominal and average prices, as inflation pressures eased and benchmark interest rates were cut, while the global economic outlook remained uncertain and geopolitical conflicts persisted. This occurred despite an increase in the trade-weighted U.S. dollar, underscoring gold’s role as a safe haven investment and store of value. Subsequent to year end, gold has traded at an average price greater than 2024’s record annual average price of $2,386 per ounce, due in part to continued economic uncertainty. For additional information, see Risk Factors – Inflation”, 「Risk Factors – The Company may be affected by global supply chain disruptions」, 「Risk Factors – Global financial conditions」 and “Risk Factors – Potential impact of proposed tariffs on the Company’s business”.
Barrick’s gold is refined to market delivery standards by several refiners throughout the world. The gold is sold to various gold bullion dealers or to refiners at market prices. Certain of Barrick’s operations also produce gold concentrate, which is sold to various smelters. The Company believes that, because of the availability of alternative smelters or refiners, no material adverse effect would result if the Company lost the services of any of its current smelters or refiners.
Product fabrication and bullion investment are two principal sources of gold demand. The introduction of more readily accessible and liquid gold investment vehicles has further facilitated investment in gold. Within the fabrication category, there are a wide variety of end uses, the largest of which is the manufacture of jewelry. Other fabrication purposes include official coins, electronics, miscellaneous industrial and decorative uses, dentistry, medals and medallions.
Copper
Copper is a metal with inherent characteristics of excellent electrical conductivity, heat transfer, and resistance to corrosion. Copper is used principally in telecommunications, power infrastructure, automobiles, construction and consumer durables. Copper is primarily traded on the London Metal Exchange (「LME」), the New York Commodity Exchange and the Shanghai Futures Exchange. The price of copper as reported on these exchanges is influenced by numerous factors, including: (i) the worldwide balance of copper demand and supply; (ii) rates of global economic growth, including in China, which has become the largest consumer of refined copper in the world; (iii) speculative investment positions in copper and copper futures; (iv) the availability and cost of substitute materials; and (v) currency exchange fluctuations, including the relative strength of the U.S. dollar.
The copper market is volatile and cyclical. Over the last 15 years, LME prices per pound have ranged from a low of $1.96 to a high of $5.04, reached in May 2024. During 2024, LME copper prices traded in a range of $3.69 per pound to an all-time high of $5.04 per pound, averaged $4.15 per pound, up 8% from the average of $3.85 per pound in 2023, and closed the year at $3.95 per pound. Copper prices are
- 46 -
significantly influenced by physical demand from emerging markets, especially China. Copper prices in 2024 were impacted by reductions in benchmark interest rates made possible by a moderation of inflation pressures along with continued supply disruptions, tempered by an increase in the trade-weighted U.S. dollar. Subsequent to year end, copper prices have continued to trade within prior year ranges due to a continuation of these trends. For additional information, see “Risk Factors – Diseases and epidemics may adversely impact Barrick’s business”, 「Risk Factors – Inflation」, 「Risk Factors – The Company may be affected by global supply chain disruptions」, 「Risk Factors – Global financial conditions」 and “Risk Factors – Potential impact of proposed tariffs on the Company’s business”.
As at December 31, 2024, the Company had no copper derivative contracts in place. As a result, all of Barrick’s copper production is currently subject to market prices.
At the Zaldívar mine, copper cathode is sold to copper product manufacturers and copper traders, while concentrate is sold to a local smelter in Chile. At the Lumwana mine, copper concentrate is sold to Zambian smelters. At the Jabal Sayid mine, copper concentrate is sold to third party smelters and copper traders. Since there are a large number of available copper cathode and copper concentrate purchasers, Barrick is not dependent upon the sale of copper to any one customer.
Employees and Labor Relations
As at December 31, 2024, excluding contractors, Barrick employed approximately 26,800 employees worldwide, including employees at operations jointly owned and operated by Barrick, substantially all of whom are employed in Canada, the United States, Argentina, Chile, Côte d’Ivoire, the Dominican Republic, the DRC, Mali, Pakistan, Papua New Guinea, Peru, Saudi Arabia, Tanzania, Zambia and the United Arab Emirates, and approximately 27,000 contractors. The number of employees represented by a labor union or covered by collective bargaining agreements at the Company’s operations is approximately 13,400.
Specialized knowledge and experience are required of employees in the mining industry. Barrick has the necessary skilled employees and/or contractors to conduct its operations. Certain Barrick mines may be adversely impacted if increased demands from its employees lead to work stoppages or the Company is unable to retain a sufficient number of qualified employees for such operations (see 「Employee relations」 and 「Competition」 in 「Risk Factors」).
Competition
The Company competes with other mining and exploration companies in connection with the acquisition of mining claims and leases and in connection with the recruitment and retention of highly skilled and experienced employees (see 「Employees and Labor Relations」 above).
There is significant competition for mining claims and leases and, as a result, the Company may be unable to acquire attractive assets on terms it considers acceptable.
Sustainability
Sustainability is entrenched in Barrick’s DNA: the Company’s sustainability strategy is its business plan. Barrick’s approach to sustainability is integrated and holistic; sustainability aspects and impacts do not occur in silos, but rather overlap and interlink, and must be tackled in conjunction with, and in reference to, each other. The Company refers to this approach as Holistic and Integrated Sustainability Management. Although Barrick integrates its sustainability management, Barrick discusses its sustainability strategy within four overarching pillars: (1) respecting human rights; (2) protecting the health and safety of its people and local communities; (3) sharing the benefits of its operations; and (4) managing its impacts on the environment. The heart of Barrick’s sustainability philosophy is a resolute belief that a successful business, and particularly a modern mining company, must deliver value for all stakeholders, and proactively manage its impacts on the environment. That is why Barrick’s sustainability
- 47 -
vision is to create long-term value for all its stakeholders. Barrick does this by integrating environmental, social and economic considerations into all business decisions, and developing Trust-based, two-way partnerships with its host governments and local communities.
The bedrock of Barrick’s sustainability strategy is strong governance. The Company’s most senior management-level body dedicated to sustainability is the Environmental and Social Oversight Committee (「E&S Committee」), which connects site-level ownership of the sustainability strategy with the leadership of the Group. The E&S Committee is chaired by the President and Chief Executive Officer and includes: (1) regional Chief Operating Officers; (2) minesite General Managers; (3) Health, Safety, Environment and Closure Leads; (4) the Group Sustainability Executive; (5) in-house legal counsel; and (6) an independent sustainability consultant in an advisory role. The E&S Committee meets on a quarterly basis to review the Company’s performance across a range of key performance indicators, and to provide independent oversight and review of sustainability management. The E&S Committee meetings also include an environmental and social license to operate focused site visits completed by the independent consultant at one of Barrick’s assets, with a focus on Tier One Assets, on a quarterly basis.
The President and Chief Executive Officer reviews the reports of the E&S Committee with the Board’s Environmental, Social, Governance & Nominating Committee (「ESG & Nominating Committee」) at every quarterly meeting to oversee the policies and Barrick’s performance against key environmental, health and safety and community development metrics. The reports are reviewed to ensure the implementation of the Company’s sustainability policies and to drive performance of its environmental, health and safety, community development and relations, and human rights programs. The quarterly E&S Committee meetings are supplemented by weekly meetings between the Regional Sustainability Leads and the Group Sustainability Executive. These meetings examine the sustainability-related risks and opportunities facing the Company in real time, as well as the progress and issues integrated into weekly Executive Committee review meetings.
Barrick believes the business is where the mine is. For management of sustainability, this means that sustainability is driven at an operational level and the Company’s sustainability strategy is implemented by blending top-down accountability with bottom-up responsibility. Accordingly, Barrick places the day-to-day ownership of sustainability, and the associated risks and opportunities, in the hands of individual sites. In the same way that each site must manage its geological, operational and technical capabilities to meet business objectives, it must also manage and identify programs, metrics, and targets that measure progress and deliver real value for the business and its stakeholders, including host countries and local communities. The Group Sustainability Executive, supported by the Regional Sustainability Leads, provides oversight and direction over this site-level ownership, to ensure alignment with the strategic priorities of the overall business.
Barrick’s Sustainability Scorecard, first introduced in April 2020, sets out what Barrick believes are the sustainability issues most relevant to Barrick’s business and the industry, and aligns with the Company’s sustainability strategy. The Sustainability Scorecard ranks Barrick against its peers and internal metrics across the overarching sustainability pillars: Health and Safety; Social and Economic Development; Human Rights; the Environment; and Governance. Barrick’s performance in these areas is then aggregated by pillar before providing an overall score. The industry-first Sustainability Scorecard transparently discloses to external stakeholders what Barrick views as the most important sustainability metrics in the industry and its performance against them, while also driving internal improvement at a regional and site level. As the Company strives for ongoing strong performance and continuous improvement, the Sustainability Scorecard targets and metrics are updated annually.
Sustainability performance for senior leaders under the Barrick Partnership Plan accounts for a 10% weighting under the annual incentive program and a 20% weighting under Barrick’s Long-Term Company Scorecard linked to the assessment of Barrick’s Sustainability Scorecard. The E&S Committee tracks the Company’s progress against all metrics.
- 48 -
Overall, Barrick has worked diligently to try to improve its numerical score on the Sustainability Scorecard. For 2024, an 『A』 grade was assessed and maintained, following its first 『A』 grade in 2023 since the Scorecard was developed (on a scale where 『A』 represents top performance and 『E』 represents bottom performance). In particular, Barrick continued to make meaningful progress against its safety injury frequency rates, which are at an all-time low. Despite Barrick’s notable progress towards achieving its sustainability vision, the Company did not meet its safety goal to eliminate fatal incidents in 2024 and Barrick is saddened by the three fatalities recorded for the year. Barrick has zero tolerance for fatalities and therefore any fatality is unacceptable and a strong reminder that the Company still has work to do to achieve its goal of a zero harm workplace. The full results of the 2024 Sustainability Scorecard, and updated metrics and targets for 2025, will be disclosed in Barrick’s 2024 Sustainability Report, which is expected to be published in the first half of 2025.
In May 2024, Barrick completed an update to the Company’s undrawn $3.0 billion revolving credit facility, which includes certain sustainability-linked metrics. The sustainability-linked metrics incorporated into the revolving credit facility consist of annual environmental and social performance targets directly influenced by Barrick’s actions, rather than based on external ratings. The performance targets include Scope 1 and Scope 2 GHG intensity, water use efficiency (reuse and recycling rates), and the TRIFR. Barrick may incur positive or negative pricing adjustments on drawn credit spreads and standby fees based on its sustainability performance versus the targets that have been set.
Throughout 2024, Barrick continued to engage in one-on-one meetings with ESG ratings firms, during which Barrick’s sustainability vision, policies, approach, and site-level performance, including Board and management oversight of sustainability matters, and the ratings firms’ identified 『controversies』 were discussed. The intention of the engagements was to provide accurate and up-to-date information to the ESG ratings firms, allowing those ratings firms to make informed decisions with respect to their listed 『controversies』. North Mara and the restart of the Porgera mine were the key focus of the Company’s engagements with the majority of the ESG ratings firms during 2024.
As a member of the International Council on Mining and Metals (「ICMM」) and World Gold Council (「WGC」), Barrick has endorsed and implemented the ICMM’s Mining Principles and WGC’s Responsible Gold Mining Principles (the 「RGMPs」). Barrick’s conformance with these frameworks, collectively referred to by Barrick as the RGMPs+, is self-assessed and subject to independent third party assurance annually. The Company will once again disclose its 2024 performance in the 2024 Sustainability Report, to be published in the first half of 2025. These organizations, along with the Mining Association of Canada’s Towards Sustainable Mining initiative and CopperMark, have commenced with the Consolidated Mining Standards Initiative. Barrick is a member of the Industry Advisory Group and welcomes the work being undertaken to consolidate the global standards landscape.
Social, Community and Economic Development
Barrick regards its host countries and local communities as important partners in its business. The Company understands it is a custodian of a nation’s mineral resources and resolutely believes that the countries and communities in which it operates should benefit from Barrick’s presence. Barrick is committed to contributing to their social and economic development. Barrick’s sustainability policies commit the Company to transparency in its relationships with host communities, government authorities, the public and other key stakeholders. These policies also commit Barrick to conducting its business with integrity through the Company’s absolute opposition to corruption, including requiring its suppliers to operate ethically and responsibly as a condition of doing business with Barrick. The Company’s approach to its relationships with Indigenous partners is no different, and Barrick creates genuine partnerships that aim to build a long-term positive legacy within its host communities.
Barrick’s overarching Sustainable Development Policy and Social Performance Policy sets out the Company’s commitment to social and economic development. Barrick recognizes that the taxes, royalties and dividends it pays provide significant income for the Company’s host countries, as well as help to fund
- 49 -
vital services and infrastructure. The Company’s comprehensive tax policy covers governance, tax risk management, tax planning principles, compliance and relations with tax authorities, as well as transparency and disclosure. Furthermore, Barrick reports all government and tax payments transparently, primarily through the reporting mechanism of the Canadian Extractive Sector Transparency Measures Act. In addition, Barrick publishes annual tax contribution reports detailing the Company’s economic contributions to host governments.
Barrick also prioritizes local hiring. The employment opportunities created by the Company’s presence is one of its largest social and economic contributions to the Company’s host countries and local communities. Barrick works to identify and nurture local talent at every level of its business through a range of skills and formal training. At the end of 2024, approximately 97% of Barrick’s workforce and 76% of senior management were nationals from the Company’s host countries. This is augmented by prioritizing the purchase of goods and services from local communities and host countries.
In addition, Barrick invests in community-LED development initiatives. The Company believes that no one knows the needs of local communities better than the communities themselves. That is why Barrick has established community development committees (「CDCs」) at every operating site. The role of the CDC is to allocate the community investment budget to those projects and initiatives most needed and desired by local stakeholders. Each CDC is elected and made up of a mix of local leaders and community members, as well as representatives from local women and youth groups. In 2024, Barrick invested more than $48 million in local community development projects.
Human Rights
Respect for human rights is one of the key pillars of Barrick’s sustainability vision and strategy. Barrick has zero tolerance for human rights violations wherever it operates. The Company avoids causing or contributing to human rights violations and facilitates access to remedies. This includes the use of a grievance mechanism at each of the Company’s minesites, which allows local communities to formally lodge grievances and Barrick to understand and address community concerns before they escalate. Barrick’s commitment to respect human rights is codified in the Company’s Human Rights Policy and informed by the expectations of the UN Guiding Principles on Business and Human Rights, the Voluntary Principles on Security and Human Rights (「VPSHR」), and the Organization for Economic Co-operation and Development (「OECD」) Guidelines for Multinational Enterprises. Further, Barrick’s commitment to respect human rights is fulfilled on the ground via the Company’s Human Rights Program, the fundamental principles of which include: monitoring and reporting; due diligence; training; and disciplinary action and remedy. Barrick also expects the same standards from its suppliers, and the Company’s Supplier Code of Ethics incorporates human rights provisions.
Responsibility for the oversight and implementation of the Company’s human rights compliance program sits with Barrick’s Group Sustainability Executive, with support from the Senior Vice President Business Assurance, Risk and Business Integrity, and Barrick’s Human Resources Executive.
In 2024, Barrick continued to implement its global human rights compliance program, which is aligned with the UN Guiding Principles on Business and Human Rights. Human rights assessments are conducted at high and medium risk Barrick operations and projects. Higher risk sites or sites where particular concerns are identified are subject to heightened due diligence and are assessed more frequently. During 2024, independent human rights assessments were undertaken at the following sites: North Mara in Tanzania; Lumwana in Zambia; Tongon in Côte d’Ivoire; and Pueblo Viejo in Dominican Republic. Barrick continues to submit and publish its annual reports to the Voluntary Principles Initiative regarding its implementation of the VPSHR Plenary. The 2024 annual report will be published during the course of 2025 and will be made available on the Voluntary Principles Initiative website.
In 2024, Barrick submitted its first annual report required under Canada’s Fighting Against Forced Labour and Child Labour in Supply Chains Act.
- 50 -
Health & Safety
Barrick is committed to the safety, health and well-being of its people, their families and the communities in which Barrick operates. Its safety vision is 「Everyone to go home safe and healthy every day.」 All of the Company’s operational sites are certified to ISO 45001 standards and its approach to health and safety is set out in a series of standards, policy guidelines, operating procedures and systems that are regularly reviewed and assured.
Barrick reports its safety performance weekly to the Executive Committee and quarterly as part of meetings of both the E&S Committee and the ESG & Nominating Committee. The Company’s frequency rates were at an all-time low in 2024. Statistics for 2024 show a 20% improvement in the TRIFR (0.91) compared to 2023. The Company’s LTIFR was 0.12 and dropped by 47% compared to 2023.
Despite these improvements, Barrick’s safety performance in 2024 did not meet its high standards and regrettably the Company recorded three tragic fatalities in 2024, as noted above. Following each of these fatalities, Barrick immediately completed fatality incident investigations and Fatality Prevention Criteria and gap assessments were implemented across the Company. The leading causes of the fatal incidents were related to energy isolation and mobile equipment accidents. These incidents underscore the focus on effective training, particularly task training, and the need to link such training to Barrick’s Fatal Risk Management Program.
A Group Safety Committee was established in 2022 and a 「Journey to Zero」 roadmap was developed and progress continued in its rollout through 2024. This overall progress reflects the Company’s commitment to safety, with key initiatives undertaken such as the roll out of Fatal Risks and Critical Controls, and a shift to near-miss reporting and critical control verifications. Barrick appreciated that more work is required to achieve its goal of zero, including prioritizing safe operating expectations as part of onboarding and ongoing interaction, not just with the Company’s own operated sites, but also with its contractors and business partners.
Environment
The Company’s mining, exploration and development activities are subject to various levels of federal, provincial or state, and local laws and regulations relating to the protection of the environment, including requirements for closure and reclamation of mining properties. Barrick continues to maintain and grow its reputation for environmental excellence.
Barrick has a policy of conducting environmental and closure reviews of its business activities on a regular and scheduled basis to evaluate compliance with applicable laws and regulations, permit and license requirements, company policies and management standards including guidelines and procedures, and adopted codes of practice. Being responsible stewards of the environment by applying the highest standards of environmental management, using natural resources and energy efficiently, recycling and reducing waste as well as working to protect biodiversity, the Company CAN deliver signifiCANt cost savings to its business, reduce future liabilities and help build stronger stakeholder relationships. Environmental matters such as how Barrick uses water, prevents incidents, manages tailings, responds to changing climate, and protects biodiversity are key areas of focus. In addition, all Barrick facilities have staff and systems in place to manage Barrick’s regulatory and permit obligations. The ESG & Nominating Committee oversees Barrick’s policies, programs, and performance relating to the environment.
Barrick’s investment in environmental management systems (「EMS」) is aimed at identifying and implementing controls appropriate to environmental risks identified at each site. The EMS at each site is reviewed annually, and the site general manager and environmental managers are responsible for the implementation and execution of the EMS.
- 51 -
Barrick’s policies and standards conform to international and industry standards. All operational sites are certified to the ISO 14001:2015 standards. The Company had zero Class 1 - High Significance Incidents for the sixth consecutive year since the Merger and two Class 2 - Medium Significance Incidents in 2024.
Each year, Barrick publishes a Sustainability Report that outlines its environmental, health and safety and social responsibility performance for the year, which for 2024, will be published in the first half of 2025. As part of its ongoing commitment to transparency, Barrick is continuing to work towards improving visibility into its environmental and social activities. See 「Narrative Description of the Business – Sustainability」.
See the disclosure under 「Material Properties」 below for details about specific environmental matters applicable to Barrick’s material properties.
Climate Resilience
Climate change, including changes in temperature and precipitation and more frequent severe weather events, could affect the mining industry in a range of possible ways. In addition to the sustained impact on the Company’s host countries and local communities, volatile climatic conditions CAN affect the stability and effectiveness of infrastructure and equipment; potentially impact environmental protection and site closure practices; lead to changes in the regulatory environment, including increased carbon tax regimes; and potentially impact the stability and cost of water and energy supplies, while also resulting in signifiCANt impacts to Barrick’s host communities and their livelihoods. Barrick therefore views climate change as a company, community and global concern. Barrick is acutely aware of the impacts that climate change has on its host communities, and in particular, that developing nations and vulnerable communities are often most exposed to the impacts of climate change. As the world transitions to renewable power, it is imperative that developing nations are not left behind. As a responsible business, Barrick has focused its efforts on building resilience in its host countries and local communities, just as it does for its business.
Barrick’s climate change strategy has three pillars: (1) identify, understand and mitigate the risks associated with climate change; (2) measure and reduce the Company’s GHG emissions across its operations and value chain; and (3) improve the Company’s disclosure on climate change. Action taken on each pillar in 2024 is described below.
Identify, understand and mitigate the risks associated with climate change: The Company continues to take steps to identify and manage risks and build resilience to climate change, as well as to position itself for new opportunities. In 2024, climate change related risk factors continued to be incorporated into Barrick’s formal risk assessment process (for example, consideration is given to the availability of, and access to, water, as well as the impact of increased precipitation, drought, or severe storms on operations, supply routes and infrastructure and local communities near Barrick’s operations). The Company has identified several climate-related risks and opportunities for the business including: physical impacts of climate change, such as an increase in extended-duration extreme precipitation events; an increase in regulations that seek to address climate change; and an increase in global investment in innovation and low-carbon technologies.
The formal risk assessment process includes scenario analysis to assess site-specific climate related risks and opportunities. This work was rolled out to all sites throughout 2024. Barrick discloses its material climate-related risks and opportunities in its annual CDP questionnaire. The CDP graded the 2024 results as an ‘A-’ for Water Security, and maintained a 『B』 grade for Climate Change. These disclosures CAN be found on the CDP website.
Measure and reduce the Company’s impact on climate change: Mining is an energy-intensive business, and Barrick understands the important link between energy use and GHG emissions. By
- 52 -
measuring and effectively managing its energy use, the Company CAN assess opportunities for production and energy efficiencies and reduce its GHG emissions. Barrick already has a clear, scientifically-based emissions-reduction roadmap, which targets at least a 30% reduction in GHG emissions by 2030 against the 2018 baseline of 7,541 kilotonnes carbon dioxide equivalent, with a defined interim reduction target of 15%, while maintaining a steady production profile. The Company’s GHG emissions reduction target is not static and will be updated as Barrick identifies and implements new GHG emissions reduction opportunities. Ultimately, Barrick’s vision is net zero GHG emissions by 2050 achieved primarily through GHG emissions reductions, with some offsets for hard-to-abate emissions. Site-level plans to improve energy efficiency, integrate clean and renewable energy sources, and reduce GHG emissions will also be strengthened. The Company plans to supplement its corporate GHG emissions reduction target with context-based, site-specific GHG emissions reduction targets.
Overall, preliminary GHG emissions (Scope 1 (direct) and Scope 2 (indirect): Location-Based) in 2024, which are subject to change following completion of third-party assurance, were 7,305 kilotonnes carbon dioxide equivalent at operations and projects operated by Barrick (on a 100% basis), representing a 15% reduction from the 2018 baseline. GHG emissions were approximately 5% above 2023 levels. The overall reduction in Barrick’s GHG emissions is due to the steady implementation of the Company’s emissions reduction roadmap projects, including signing Power Purchase Agreements that prioritize renewable energy, switching to low emission fuel sources and tying into grids with renewable energy rather than using onsite diesel power generation. The Company is also working to identify opportunities for further reductions, and will regularly review and update its targets to integrate and reflect opportunities identified and realized. The year-over-year increase in GHG emissions was due to the restart of Porgera, ramp-up of the Pueblo Viejo mine life extension and expansion project, and emissions from the TS Power Plant at Nevada Gold Mines, which underwent maintenance in Spring of 2023 and reduced 2023’s GHG emissions comparatively. The Company will report its 2024 GHG emissions in its 2024 Sustainability Report.
In 2024, Barrick continued to progress its extensive work across its value chain to understand the Company’s Scope 3 (indirect value chain) emissions. Initial work completed in 2022 enabled Barrick to develop a Scope 3 engagement roadmap to be implemented with its suppliers to set meaningful and measurable reduction targets, in line with the commitments made through the ICMM Climate Position Paper. The Company continued to implement this engagement roadmap in 2024. In November 2023, Barrick announced its Scope 3 emissions targets which it developed to promote awareness and action in its value chain and empower those actors to set their own net zero commitments, with short- and medium-term targets. These targets are both quantitative and qualitative and are focused on high emission areas in the Company’s value chain as outlined below, using categories as defined in the GHG Protocol’s Technical Guidance for Calculating Scope 3 Emissions:
• | Goods and Suppliers (Category 1): |
○ | Quantitative Target: 30% emissions reduction of 「Tier 1」 suppliers (those suppliers that collectively account for 5% of Barrick’s total spend in this category) by 2030 against a 2022 Scope 3 base year; |
○ | Qualitative Target: Incorporate 130 of Barrick’s largest suppliers by spend into its annual outreach (this includes Tier 1 suppliers as well as chemical and metal fabricator suppliers) and engagement; and |
○ | 2025 Target: Collect high-quality data for 50% of Tier 1 and chemical and metal fabricator suppliers through engagement, and refine emissions reduction targets by 2025. |
• | Fuel and Energy (Category 3): |
○ | Quantitative Target: 20% reduction against a 2022 Scope 3 base year by 2030; and |
○ | Qualitative Targets: |
◾ | Collaborate towards new technologies to reduce fleet emissions; and |
- 53 -
◾ | Engage with host governments where the Company consumes power from national grids for continued renewable energy incorporation. |
• | Downstream Copper Processing (Category 10): |
○ | Qualitative Target: Outreach and engagement of all downstream customers and smelters; and |
○ | 2025 Target: Set emissions reduction target, covering 75% of copper processing, by 2025. |
The Company does not have direct control over the progress towards, or achievement of, its Scope 3 emissions targets. Achievement of Barrick’s Scope 3 emissions targets will require collaboration with suppliers and customers in its value chain, which are outside of Barrick’s direct control. As a result, the Company’s approach to Scope 3 emissions reductions continues to focus on incentivizing its suppliers to implement and work towards the achievement of their own emissions reduction targets. Barrick cannot ensure the outcome of these efforts or that its Scope 3 emissions targets will ultimately be achieved. See 「Risk Factors – Climate change risks」.
Improve the Company’s disclosure on climate change: As noted above, as part of Barrick’s commitment to improve its disclosure on climate change, the Company completes the annual CDP questionnaires, which makes investor-relevant climate data widely available. In 2024, Barrick maintained a 『B』 grade for Climate Change and improved its Water Security grade from a 『B』 to an ‘A-’.
The Board’s ESG & Nominating Committee is responsible for overseeing Barrick’s policies, programs and performance relating to sustainability and the environment, including climate change. The Audit & Risk Committee assists the Board in overseeing the Group’s management of enterprise risks as well as the implementation of policies and standards for monitoring and mitigating such risks. Climate change is built into the Company’s formal risk management process, outputs of which were regularly reviewed by the Audit & Risk Committee.
Barrick also continues to align its disclosures with the Taskforce on Climate-related Financial Disclosures (「TCFD」). The Company has a strong foundation and Barrick continues to build further resilience to withstand the potential impacts of climate change and leverage potential opportunities as the global economy transitions to a low-carbon future.
Water
Water is a vital and increasingly scarce global resource. Managing and using water responsibly is one of the most critical parts of Barrick’s sustainability strategy. Barrick’s aim is to deliver enough water for the effective operation of the Company’s mines, while at the same time protecting the quality and quantity of water available to host communities and other users in its watersheds. This commitment to responsible water use is codified in Barrick’s Environmental Policy and standalone Water Policy, which require the Company to minimize its use of water, control and manage its impacts on water quality, and engage with stakeholders, including local communities, to maintain sustainable management of water resources for the benefit of all users.
The Company’s operating facilities have been designed to mitigate environmental impacts and Barrick staff work to continually improve its environmental management programs. The operations have processes, procedures, or facilities in place to manage substances that have the potential to be harmful to the environment. To help prevent and control spills and protect water quality, Barrick utilizes multiple levels of spill containment procedures and routine inspection and monitoring of its facilities. Environmental incidents CAN occur despite these precautions. See 「Risk Factors – Environmental, health and safety regulations」 and 「Risk Factors – Water supply, management and availability challenges could impact operations」 for more information about this matter.
- 54 -
The Company also has various programs to re-use and conserve water at its operations. Each mine’s water risks are included in its operational risk register. These risks are then aggregated and incorporated into the corporate risk register. Barrick’s identified water-related risks include: (1) managing excess water in regions with high rainfall; (2) maintaining access to water in arid areas and regions prone to water scarcity; and (3) regulatory risks related to permitting limits as well as municipal and national regulations for water use. In addition, each mine has its own site-specific water management plan, which considers: (1) the different water sources available; (2) the local climate conditions; and (3) the needs of local users and the needs of the mine. This information is supplemented by a range of international frameworks and tools such as the WWF Water Risk Filter to evaluate water risks, particularly those linked to water stress. Understanding the water stress in the regions in which Barrick operates enables it to better understand the risks and manage its water resources through site-specific water balances, which are based on the ICMM’s Water Accounting Framework and aimed at minimizing water withdrawal and maximizing water reuse and recycling within the Company’s operations. For 2024, Barrick’s overall water recycling and reuse rate was 85%, which was above its annual target of 80%.
Certain of the Company’s operating and closed properties handle ore or rock with the potential to leach acidity, metals and dissolved salts (「Acid Rock Drainage Metal Leaching」) and hence potentially impact water quality. Other operating and closed properties lack this potential, but still present the potential for leaching of dissolved salts, such as sulfates or metalloids, by water that might run off of the property (「Neutral Mine Drainage」). The Company has implemented programs to manage the handling of ore and rock to reduce and mitigate the potential for contamination of surface or groundwater by either Acid Rock Drainage Metal Leaching or Neutral Mine Drainage. Such procedures include segregation or submergence of rock with potential for leaching, containment systems for the collection and treatment of drainage and reclamation and closure steps designed to minimize water infiltration and oxygen influx. Where necessary, the Company installs and operates water treatment facilities to manage the quality of water discharged into the environment.
Many of the Company’s gold operating properties use cyanide. Those facilities are designed and constructed to prevent process solutions from being released to surface water or groundwater. Those facilities include leak detection systems and have the ability to collect and treat seepage that may occur. The TSFs are controlled and process ponds are either covered, netted or additional deterrents are used to prevent access. In September 2005, the Company became a signatory to the International Cyanide Management Code (the 「ICM Code」), which is administered by the International Cyanide Management Institute (the 「ICMI」). The ICMI is an independent body that was established by a multi-stakeholder group under the auspices of the United Nations Environmental Programme. The ICM Code establishes operating standards for manufacturers, transporters and mines and provides for third-party certification of facilities’ compliance with the ICM Code. Under the ICM Code, each of the mines that uses cyanide must receive a third-party certification inspection. All of Barrick’s operational mines, with the exception of Kibali, are ICM Code certified. Kibali has developed a plan to become ICM Code certified.
In the United States, under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (「CERCLA」) and its state law equivalents, present or past owners of a property may be held jointly and severally liable for cleanup costs or forced to undertake remedial actions in response to unpermitted releases of hazardous substances at such property, in addition to, among other potential consequences, potential liability to governmental entities for the cost of damages to natural resources, which may be substantial. Barrick’s current or former operations in the United States may be subject to potential liability under CERCLA.
Biodiversity
Biodiversity underpins many of the ecosystem services on which Barrick’s mines and their surrounding communities depend. If improperly managed, mining and exploration activities have the potential to negatively affect biodiversity and ecosystem services. Barrick works to proactively manage its impact on biodiversity and strives to protect the ecosystems in which it operates. Wherever possible,
- 55 -
Barrick aims to achieve a net-neutral biodiversity impact, particularly for ecologically sensitive environments.
The Company achieved its target to develop Biodiversity Action Plans (「BAPs」) for all operational sites by the end of 2021. The BAPs outline Barrick’s strategy to achieve net-neutral impacts and associated management plans and their implementation is continuous.
The Company has made progress in developing conservation and offset projects, including sagebrush and mule habitats in Nevada, forestry conservation in Zambia and its longstanding support at Garamba National Park in the DRC, which saw the reintroduction of white rhino to the park in 2023.
Air Emissions Control
The Company installs air pollution controls on air pollution point sources, such as roaster and autoclave exhaust stacks, that meet or exceed applicable legal standards. Certain of the Company’s operations produce mercury as a by-product of ore processed at those sites. The mercury is captured at each of these sites by specially designed operating equipment and mercury emissions control devices. The Company is committed to the operation of proven technology for controlling sources of mercury emissions. Site-specific management procedures for mercury handling, monitoring, and transportation exist at each of the operations that produce mercury as a by-product.
Further, employees receive training in the safe use and proper management of mercury and other hazardous materials. Consistent with U.S. law, Barrick ceased the export of elemental mercury from U.S. facilities in January 2013. Barrick complies with all applicable regulatory requirements for temporary storage of mercury in the jurisdictions where it operates. The Company has developed general mercury storage guidelines to establish environmentally sound practices for temporary on-site storage, where allowed. The captured mercury from the Company’s Latin American sites is transported to Switzerland, where it is converted to cinnabar and packed into Steel drums for permanent safe storage in a decommissioned area of a former salt mine in Germany. In 2024, Barrick safely transported 200 tonnes of mercury from Veladero in Argentina to Switzerland where the mercury will be stabilized before being disposed of in Germany during the first half of 2025, in compliance with international safety and environmental standards. A new mercury shipment, following the same process, is planned for the first half of 2025.
Tailings & Mine Closure
Consistent with Barrick’s goal to minimize the environmental and social impacts of its projects and operations, the Company develops comprehensive closure and reclamation plans as part of its initial project planning and design. If it acquires a property that lacks a closure plan, Barrick requires preparation of a closure plan. The Company periodically reviews and updates closure plans to account for additional knowledge acquired in respect of a property or for changes in applicable laws or regulations. In addition, the Company is committed to ensuring all Barrick-operated or controlled TSFs meet global best practices for safety and are subject to the Company’s Tailings Management Standard (the 「Standard」), which requires that Barrick locate, design, build, operate and close its TSFs in compliance with all applicable laws and regulations and in conformance with the Global Industry Standard on Tailings Management (「GISTM」). The Company’s TSFs are carefully engineered and regularly inspected, particularly those in regions with high rainfall and seismic activities. The Standard also establishes minimum geotechnical, hydrological, hydrogeological and environmental criteria for Barrick’s TSFs. Barrick-operated joint venture and affiliated companies also follow the Standard.
During 2020, Barrick, as a member of the ICMM, was actively involved in the development of the GISTM, which was developed through a year-and-a-half long review process involving the United Nations Environment Programme, the Principles for Responsible Investment, and the ICMM. On August 4, 2023, the Company disclosed its conformance with the GISTM for all 「Extreme」 and 「Very High」 consequence
- 56 -
facilities on Barrick’s website within the committed disclosure timeframe. All of Barrick’s sites that are classified as 「Extreme」 or 「Very High」 consequence are in conformance with the GISTM. Barrick continues to progress its conformance for lower consequence facilities in accordance with the GISTM. Disclosures for lower consequence facilities will be completed by August 2025, also in accordance with the GISTM.
Barrick currently manages 61 TSFs, of which 18 (30%) are operating and 43 (70%) are closed. A riverine tailings disposal system is used at the Porgera joint venture in PNG as per its environmental licenses. Barrick has developed a tailings reduction roadmap aimed at reducing the volume of autoclave tailings disposed of in the river. This plan is currently at the pre-feasibility level. In 2024, independent reviews of the TSFs were conducted at the Company’s Carlin (Goldstrike and Gold Quarry), Jabal Sayid, North Mara, Loulo-Gounkoto, Kibali, Tongon, Lumwana, Bulyanhulu, Pueblo Viejo, Cortez and Phoenix mines, the proposed Reko Diq TSF site, as well as the Nickel Plate, Bicroft, Mercur, Buzwagi, El Indio and Tambo closure sites.
The Company has estimated future site reclamation and closure obligations, which it believes will meet current regulatory requirements. See Notes 2q and 27 of the Notes to the Consolidated Financial Statements for further information on Barrick’s reclamation and closure obligations as at December 31, 2024.
See the disclosure under 「Material Properties」 below for details about estimated future reclamation and closure costs applicable to Barrick’s material properties.
For more information on Barrick’s sustainability strategy and related initiatives, refer to the Company’s 2024 Sustainability Report that will be published on its website in the first half of 2025. The contents of the 2024 Sustainability Report are not incorporated by reference into this Annual Information Form.
Operations in Emerging Markets: Corporate Governance and Internal Controls
Barrick conducts or participates in mining, exploration and other activities through subsidiaries and/or joint ventures in many countries, including the United States and Canada, and in emerging markets such as Argentina, Chile, Côte d’Ivoire, the DRC, Ecuador, Jamaica, the Dominican Republic, Mali, Pakistan, PNG, Peru, Saudi Arabia, Senegal, Tanzania and Zambia. Barrick has a long history of successfully developing and operating mines in emerging markets and has organizational and governance structures and protocols in place to manage the regulatory, legal, linguistic and cultural challenges and risks associated with having operations in these jurisdictions. For a detailed discussion of the risks associated with operating in emerging markets, see 「Risk Factors – Foreign investments and operations」 on pages 128 to 130 of this Annual Information Form.
Barrick holds its properties and projects in emerging markets indirectly through subsidiaries and/or joint venture entities which are locally incorporated or established for the purposes of compliance with local law. These operating subsidiaries or joint venture entities are in turn held through holding companies incorporated in jurisdictions with well-developed and reliable legal and taxation systems. Such holding companies may: (i) facilitate internal company reorganizations of group companies; (ii) facilitate project financing and commercial transactions, such as the creation of joint ventures; and (iii) in some cases, facilitate dispute resolution processes. Barrick has designed a system of corporate governance, internal controls over financial reporting and disclosure controls and procedures that apply to Barrick and its consolidated subsidiaries and joint ventures. These systems, which are coordinated by the Company’s senior management and overseen by its Board of Directors, are designed to monitor the activities at, and receive timely reports from, Barrick’s operating subsidiaries and joint ventures. In particular, Barrick’s operating structure is composed of three geographic regions – Latin America and Asia Pacific, Africa and Middle East, and North America – each of which is managed by a different regional Chief Operating Officer who reports to the Company’s President and Chief Executive Officer.
- 57 -
The Company has extensive operating experience in several of the emerging markets in which a material property is located – the Dominican Republic, the DRC, Mali and Zambia. Operating in emerging markets exposes the Company to risks and uncertainties that do not exist or are significantly less likely to occur in other jurisdictions such as the United States or Canada. The Company manages and mitigates these risks through a variety of corporate governance mechanisms. For additional information, see 「Risk Factors – Foreign investments and operations」.
Board and Management Experience and Oversight
The Company’s Board includes international business leaders and mining industry professionals with expertise and experience working in most of the jurisdictions in which Barrick now operates. Mark Bristow, a director of Barrick and Barrick’s President and Chief Executive Officer, has extensive experience in discovering, developing and operating mines in Africa, including in the DRC, Mali and Côte d’Ivoire. Barrick’s Board also includes independent directors with experience working or running businesses in emerging markets. For example, Andrew Quinn and Christopher Coleman have considerable knowledge of the mining sector in Africa and globally. Anne N. Kabagambe also has extensive experience doing business in Africa and engaging with governments and the private sector. Ms. Kabagambe has knowledge of the global resource, banking, and education sectors, and speaks English, French and Swahili. Loreto Silva is a legal professional and fluent Spanish speaker, with a deep understanding of Latin American political, regulatory and legal systems. Isela Costantini is also a member of Barrick’s International Advisory Board, is fluent in Spanish and Portuguese, and has over 25 years of international business experience, including in business, government, and regulatory affairs in Latin America. For more information, see 「Directors and Officers of the Company – Directors of the Company」.
Members of Barrick’s Board of Directors and senior officers regularly visit the Company’s operations in both developed and emerging markets. These visits provide Barrick’s directors and officers with the opportunity to familiarize themselves first-hand with Barrick’s global operations, the management teams responsible for overseeing Barrick’s projects, and the specific risks and challenges associated with administering these projects in emerging markets. In particular, Mark Bristow and Graham Shuttleworth, the Company’s Senior Executive Vice President, Chief Financial Officer, as well as other members of Barrick’s senior management team, frequently visit Barrick’s operations in developed and emerging markets and, accordingly, have extensive knowledge of the operations at each of Barrick’s project sites. In addition, Dr. Bristow visits Barrick’s sites before each meeting of the Board of Directors, and each regional Chief Operating Officer visits operations within their regional responsibility at least once a quarter. In 2024, Barrick’s senior management team utilized a mix of both physical site visits and virtual alternatives to engage with local site teams and conduct team effectiveness and strategy sessions. In recent years, the Company’s independent directors have travelled to at least one mine site to monitor operational progress and risks. In October 2024, six of the Company’s independent directors spent three days at the Lumwana mine in Zambia to review the Super Pit Expansion Project and attend the groundbreaking ceremony.
The Board of Directors, through its corporate governance practices, regularly receives management and technical updates, risk assessments and progress reports in connection with its operations in emerging markets, and in so doing, maintains effective oversight of its business and operations. Through these updates, assessments and reports, together with focused director education sessions, the Board of Directors gains familiarity with the operations, laws and risks associated with operations in those jurisdictions. Further, the Board of Directors has access to senior management who work directly with local management and who in turn are familiar with the local laws, business culture and standard practices, have local language proficiency, are experienced in working in the applicable emerging jurisdiction and in dealing with the respective government authorities and have experience and knowledge of the local banking systems and treasury requirements.
- 58 -
Local Presence
It is a cardinal principle of Barrick that the countries and communities in which it operates should share equitably in the benefits created by its operations. Barrick contributes to the social and economic development of the emerging markets in which it operates by, among other things, hiring local employees and investing in community health, education and economic development programs. Working with local employees helps to build Trust and develop relationships with local leaders and governments. Barrick is committed to developing the skills required to integrate its business activities into the communities in which it operates, and draws on the experience and expertise of its local employees and professional advisors (including local legal counsel) to help navigate the regulatory, cultural and legal landscape. In addition, management at each of the mine sites and projects is fluent in the primary language of the jurisdictions in which they operate, and are also proficient in English, enabling them to communicate with local employees, regulators and governments in the local language, and to report to senior management in English.
Barrick strives to deliver long-term benefits to its host countries and communities through open and ongoing stakeholder engagement and a commitment to genuine partnership.
Grant Beringer, Group Sustainability Executive, manages Barrick’s license to operate and local relationships in the Company’s host countries and communities. For additional details, see 「Narrative Description of the Business – Sustainability」 and Barrick’s 2024 Sustainability Report, to be published in the first half of 2025.
Barrick’s preference for employing nationals in the countries where it operates, rather than expatriates, means that Barrick is less dependent upon a workforce traveling to a site on a regular basis from other parts of the globe.
Internal Controls and Cash Management Practices
The Company maintains internal controls over financial reporting with respect to its operations in emerging markets by taking various measures and consistently applying them across its operations. Pursuant to the requirements of National Instrument 52-109 and the U.S. Sarbanes-Oxley Act of 2002, the Company assesses the design and operation of key internal controls over financial reporting on an annual basis at a minimum, following a risk-based approach. The working papers of the tests performed at each of the Company’s locations are reviewed at the corporate office. The control standards utilized in emerging markets do not materially differ from those employed at the Company’s other operations.
Differences in banking systems and controls between Canada and each emerging market in which Barrick operates are addressed by having stringent controls over cash kept in the jurisdiction, especially with respect to access to cash and cash disbursements, establishing appropriate authorization levels, segregating duties in respect of the payments process, and performing and reviewing bank reconciliations on at least a monthly basis.
The Company also has established (or, where the Company is not the operator, has required its partner to establish) practices, protocols and routines for the management and eventual distribution of its excess cash to its foreign owners, which remain subject to local laws and exchange controls.
For additional details, including regarding Board oversight, see 「Internal Control Over Financial Reporting and Disclosure Controls and Procedures」.
- 59 -
MATERIAL PROPERTIES
For the purposes of this Annual Information Form, Barrick has identified its Cortez, Carlin, Turquoise Ridge, Pueblo Viejo, Kibali, Loulo-Gounkoto, the Reko Diq Project, and Lumwana mines and complexes, as material properties. The following is a description of Barrick’s material properties.
Cortez Property
General Information
Project Description
The Cortez property is located 100 kilometers southwest of the town of Elko, Nevada in the Lander and Eureka Counties at elevations ranging from 1,370 meters to 1,675 meters. As of December 31, 2024, Cortez employs approximately 1,700 employees and averages approximately 300 contractors.
As of December 31, 2024, the boundaries of the Cortez operational areas, which include the Cortez Hills, Pipeline/Crossroads, Cortez and Gold Acres complexes, encompassed approximately 22,591 hectares. Current mining activity is primarily focused on the Cortez Hills and Pipeline/Crossroads complexes, located approximately 26 kilometers south and 18 kilometers southwest of the town of Crescent Valley, Nevada, respectively. The property is accessible year-round by paved road from Elko, Nevada.
The property rights controlled by Cortez, either from outright ownership or by lease, consist of 36,173 hectares of unpatented mining claims held subject to the paramount title of the United States of America and 3,234 hectares of patented mining claims and fee mineral and surface land, owned or controlled through various patents issued by the United States of America. These property rights encompass the entire Cortez boundary, not just the operational areas. All unpatented mining claims are renewed on an annual basis and all necessary fees are paid prior to August 31 of each year. All mining leases and subleases are reviewed on a monthly basis and all payments and commitments are paid as required by the specific agreements.
Sufficient surface rights have been obtained for current operations at the property.
History
In 1964, a joint venture was formed to explore the Cortez area. In 1969, the original Cortez mine went into production. From 1969 to 1997, gold ore was sourced from open pits at Cortez, Gold Acres, Horse Canyon and Crescent. In 1991, the Pipeline and South Pipeline deposits were discovered, with development approval received in 1996. In 1998, the Cortez Pediment deposit was discovered, with the Cortez Hills discovery announced in April 2003. The Cortez Hills development was approved by Placer Dome and Kennecott, then joint venturers, in September 2005 and confirmed by Barrick in 2006. Barrick obtained an interest in the Cortez property through its acquisition of Placer Dome in 2006. Barrick consolidated its 100% interest in the property following its purchase of the Kennecott interest in 2008. On July 1, 2019, Barrick’s interest in Cortez was contributed to Nevada Gold Mines, a joint venture with Newmont in which Barrick has a 61.5% interest and is the operator.
Geology
Geological Setting
The Cortez property is situated along the Cortez/Battle Mountain trend. The principal gold deposits and mining operations are located in the southern portion of Crescent Valley, which was formed by basin and range extensional tectonism.
- 60 -
Mineralization
Mineralization is sedimentary rock-hosted and consists of submicron to micrometer-sized gold particles and gold in solid solution in pyrite. Mineralization is disseminated throughout the host rock matrix in zones of silicified, decarbonatized, and/or argillized, silty calcareous rocks. The deposits range in length between 2,000 and 3,350 meters and range in width between 1,000 and 1,200 meters. Mineralization thickness CAN change signifiCANtly, up to 400 meters. Exploration from projects at Robertson and Goldrush suggest that the deposits CAN be in excess of 5,000 meters in length and 900 meters in width.
Mining Operations
Production and Mine Life
Deposits within the Pipeline/Crossroads complex and Cortez Pits are being mined by conventional open pit methods. At the underground operations, two different underground mining methods are used: long-hole open stoping and drift-and-fill.
Based on existing reserves and production capacity, including the Goldrush project discussed in further detail below, the Cortez open pit operation is expected to continue until 2030 and the underground operation until 2043. The planned conversion of existing resources to reserves at Cortez has the potential to extend open pit and underground mining operations to at least 2038 and 2052, respectively.
Processing
The gold-recovery process used at Cortez is determined by considering the grade and metallurgical character of the particular ore: lower grade run-of-mine oxide ore is heap leached at existing facilities; higher-grade non-refractory ore is treated in a conventional mill using cyanidation and the CIL process; and refractory ore is stockpiled on site in designated areas and trucked to the nearby Carlin Complex for processing (see 「Carlin Complex」). Gold recovered from the ore is processed into doré on site and shipped to outside refineries for processing into gold bullion.
There is one active heap leach facility located at the Pipeline complex, with residual leach continuing at a different facility near Cortez Hills. Milling activities at Cortez are conducted at the Pipeline complex, which includes crushing and grinding facilities, CIL circuits, reagent storage areas and a recovery/refining circuit. Plant throughput CAN reach up to 13,607 tonnes per day (15,000 tons per day) depending on the hardness of the ore being processed.
Consumptive water use for mining (open pit and underground) and processing is supplied by the mine dewatering wells. Potable water is sourced from bottled water or existing water supply wells in accordance with applicable Nevada Bureau of Safe Drinking Water standards.
Infrastructure, Permitting and Compliance
Electrical power for the Cortez Complex is obtained from the grid and generated from the Western 102 and TS power plant (which is owned and operated by Nevada Gold Mines) with transmission by NV Energy. Power is purchased on a wholesale basis using dedicated buyers. The load is predicted on an hourly basis and the Western 102 and TS supply is used to balance the load. The Western 102 and TS plant delivers power to Nevada Gold Mines operations at Cortez, Carlin, and Turquoise Ridge.
The current load for the Cortez property has a peak of 45 megawatts. The current transmission line has the capacity for 56 megawatts, and with the addition of capacitors and switching station, the capacity of the line could be increased to 78 megawatts. Additional transmission capacity will be required for any further expansion.
- 61 -
Certain of Barrick’s mineral reserves and operations at Nevada Gold Mines occur on unpatented lode mining claims and mill sites that are on federal lands subject to U.S. federal mining and other U.S. federal and state laws. Changes in such laws, or regulations promulgated under such laws, could affect mine development, expansion, and closure projects. Such changes are frequent and are currently being discussed or at issue before executive and administrative agencies of the U.S. federal government, cases pending in the U.S. federal court system and in proposed legislation in the U.S. Congress. Additionally, Nevada Gold Mines operations are subject to certain land use restrictions administered by state and federal agencies, including the Bureau of Land Management (「BLM」). The BLM manages Greater Sage-Grouse under the existing 2015 Resource Management Plans (「RMPs」). BLM’s and other state and federal agencies’ existing sage grouse management requirements, including the 2015 RMPs, restrict land use activity on certain public lands, including locations where Barrick currently operates or could operate in the future. Barrick continues to monitor the situation and is engaged with the relevant authorities on this matter.
All material permits and rights to conduct existing operations at the Cortez property have been obtained and are in good standing.
Environment
Vegetation is dominated by grass and shrubs. The climate is relatively arid and has little impact on mine operations. Operations are conducted throughout the year.
Current dewatering operations focus on bedrock water management within the Cortez Hills underground and bedrock and alluvial water management within the Pipeline/Crossroads pit area. A portion of the dewatering water is utilized for mining and milling, and a portion is utilized at a local ranch on a seasonal basis for irrigation purposes. The majority is returned to the basin through the rapid infiltration basins located within Crescent Valley, Pine Valley, and Grass Valley.
In 2024, all activities at the Cortez property were, and continue to be, in compliance in all material respects with applicable corporate standards and environmental regulations.
As at December 31, 2024, the recorded amount of estimated future reclamation and closure costs for Cortez that was recorded under IFRS as defined by IAS 37, and that have been updated each reporting period, was $173 million (100% basis) (as described in Note 2q to the Consolidated Financial Statements). Nevada Gold Mines has provided the financial security required by governmental authorities in connection with the reclamation of the mine area.
Exploration and Drilling
The Cortez property has opportunities for both expansion and growth. At the Robertson deposit, where reserves were first declared at year-end 2022, 2024 work included surface mapping and drilling campaigns to improve Barrick’s understanding of mineralization controlling structures, as well as upgrading and converting ounces within the Robertson plan of operations, These programs resulted in further refinement and overall improvement of the geologic model and run of mine recovery assumptions. Improved geological understanding and further exploration success may increase the upside potential at Robertson and potentially extend oxide ore processing at Cortez beyond the current life of mine.
In 2024, growth drilling activities across the Cortez district totaled more than 25,000 meters, excluding the 100% Barrick-owned Fourmile project which is not currently included in the Nevada Gold Mines joint venture with Newmont (Barrick anticipates Fourmile will be incorporated into the Nevada Gold Mines joint venture, at fair market value, if certain criteria are met). Drilling focused on testing the Hanson target at Cortez Hills underground. At Cortez Hills underground, drilling from underground platforms continues to test extensions, with a focus on targeting feeder zones below the mine. Drilling is targeting a series of fault-stacked mineralized rocks, within the Hanson target. Improved geologic understanding has extended
- 62 -
this target up-dip which was successfully tested in 2024. Significant mineralization now extends 300 meters up-dip and confirmation of the structures extends 1,000 meters up-dip.
Goldrush Project
At the Goldrush project, drilling operations continue underground at Goldrush and from surface at Fourmile. The main objectives of this drilling program remain orebody definition, testing of geologic characterization, geotechnical analysis, inferred resource growth and definition of exploration upside.
Nevada Gold Mines has continued test mining and development at Goldrush. The test mining method is longhole open stoping (with cemented backfill), with test processing at either the Gold Quarry and/or Goldstrike roaster facilities located at Nevada Gold Mines’ nearby Carlin Complex.
During 2024, underground development, bulk sampling, test mining, and other exploration continued at Goldrush. Major development fronts included developing levels out to the south and advancing the Red Hill ramp and continuing upper level drill platforms. Activities in 2025 will focus on verifying geological, geotechnical and hydrogeological models developed during the feasibility study.
A Record of Decision was issued to Nevada Gold Mines for the Goldrush project on December 8, 2023. Earthworks began at year end 2023 and continued throughout 2024 to establish access roadways in Horse Canyon and construct dewatering infrastructure. Dewatering wells and conveyance pipelines are currently under construction. The first intake ventilation shaft was constructed and underground fan infrastructure was commissioned to increase ventilation capacity in the mine.
As at December 31, 2024, Barrick has spent $436 million in capital on the Goldrush project, inclusive of the exploration declines (100% basis). The capital spent to date, together with the remaining expected pre-production capital (until commercial production begins in 2026), is anticipated to be within the $1 billion initial capital estimate previously disclosed for the Goldrush project (on a 100% basis).
Royalties and Taxes
All production from the Pipeline/Crossroads complex is subject to a gross smelter return royalty of approximately 1.3%. In addition, production from certain portions of the Pipeline/Crossroads complex is subject to a gross smelter return royalty (graduating from 0.4% to 5.0% based on the price of gold) and a net value royalty totaling 5%. A portion of that net value royalty, 3.75%, also applies to gold sales from the South Pipeline deposit.
All other production by Cortez, including Cortez Hills, is subject to a gross smelter return royalty of approximately 1.3%.
In addition, 40% of production at Cortez is subject to a royalty graduating from 0% to 3%, depending on the gold price, on the gross value of gold delivered, minus certain deductions for pre-existing royalties. This royalty was granted in 2008 but the obligation to pay was triggered in September 2022, when the total amount of gold produced by Cortez since January 1, 2008 exceeded 15 million ounces.
In connection with the formation of Nevada Gold Mines, each of Barrick and Newmont was granted a 1.5% net smelter return royalty over the respective properties they contributed (including the Cortez property). Each of these 「retained royalties」 is only payable once the aggregate production from the properties subject to the royalty exceeds the publicly reported reserves and resources as of December 31, 2018.
The State of Nevada imposes a 5% Net Proceeds of Minerals tax (「NPT」) on the value of all minerals severed in the State. This tax is calculated and paid based on a prescribed net income formula which is different from book income.
- 63 -
Effective July 1, 2021, the State of Nevada also imposes a mining excise tax applied to gross proceeds. This is a tiered tax, with a highest rate of 1.1% and the revenue it generates is directed towards education.
Mining and Processing Information
The following table summarizes certain mining and processing information for the Cortez property for the periods indicated:
Year ended December 31, 20241 |
|
Year ended December 31, 20231 |
| |||||
Tonnes mined (000s) |
67,928 | 70,570 | ||||||
Tonnes of ore processed (000s) |
6,613 | 15,741 | ||||||
Average grade processed (grams per tonne) |
2.30 | 1.37 | ||||||
Ounces of gold produced (000s) |
444 | 549 |
1 | Amounts represent Barrick’s 61.5% share. |
For certain additional financial information, see 「Narrative Description of the Business – Reportable Operating Segments – Nevada Gold Mines (61.5% basis)」.
The most recent technical report on the Cortez property is the technical report entitled 「Technical Report on the Cortez Operations, Lander and Eureka Counties, State of Nevada, U.S.A.」 dated March 18, 2022 and authored by Nevada Gold Mines. This technical report has been filed on SEDAR+ in accordance with National Instrument 43-101.
The diagram on the following page shows the design and layout of the Cortez property.
- 64 -
- 65 -
Carlin Complex
General Information
Project Description
The Carlin Complex consists of several open pit and underground operations. The major operations and advanced projects include Goldstrike Betze-Post open pit, Goldstrike underground (inclusive of the REN underground expansion) South Arturo open pit, and El Nino underground, which were contributed to Nevada Gold Mines by Barrick (collectively, 「Goldstrike」). The Carlin Complex also includes the Carlin North Area (consisting of multiple open pit mines known as Genesis/Tri-Star), Leeville underground (inclusive of the North Leeville expansion), Carlin underground portal mines, Gold Quarry (open pit mine), Rain/Emigrant (open pit mine) and satellite open pit deposits (Perry and Green Lantern) (collectively, the 「Newmont-Contributed Mines」) which were contributed to Nevada Gold Mines by Newmont. The Carlin Complex also consists of various processing facilities, which process the ore from across the Carlin Complex, as well as from Nevada Gold Mines’ other sites and toll ore.
Some of the disclosure in this section references Barrick’s operation of Goldstrike and Newmont’s operation of the Newmont-Contributed Mines (rather than the Carlin Complex in its entirety), either for historical purposes or because the mines are operated differently following the formation of the Nevada Gold Mines joint venture.
The Carlin Complex is in Eureka and Elko Counties, near the towns of Carlin and Elko, Nevada within the high desert of the Basin and Range physiographic providence. The Carlin Complex is located within the Carlin Trend, a 61-kilometer concentration of multiple gold deposits. The mines are spread over the entirety of this 61-kilometer trend, at an elevation range of 1,585 to 2,072 meters above Sea level.
As of December 31, 2024, the Carlin Complex employs approximately 3,400 employees and averages approximately 700 contractors.
As of December 31, 2024, the plan boundaries of the Carlin Complex encompassed more than 22,250 hectares, which include about 12,141 hectares of private land (surface and minerals) owned or controlled by Nevada Gold Mines, and approximately 10,117 hectares owned by the United States government that are administered by the BLM. These rights are owned or controlled through ownership of various forms of patents issued by the United States federal government and by ownership of unpatented mining and mill-site claims held subject to the paramount title of the United States federal government.
The open pits, the underground mines and the beneficiation and processing facilities at the Carlin Complex property are predominantly situated on land owned by Nevada Gold Mines. Primary access to the Carlin Complex is from Elko, Nevada, 46 kilometers west on Interstate I-80 to Carlin, Nevada, which is the closest town to the minesites and is located just off the Interstate. In addition, various alternate access routes use Nevada State Route 766 as well as Elko and Eureka County roads.
The Carlin Complex includes a total of 2,990 unpatented Iode mining claims and mill-site claims and 485 owned patented claims to control the public acreage. Unpatented mining claims are maintained on an annual basis. All mining leases and subleases are reviewed on a monthly basis and all payments and commitments are paid as required by the specific agreements.
Sufficient surface rights have been obtained for current operations at the property.
History
Initial prospecting for the Carlin Complex began in the South Area around Gold Quarry in 1870. By 1935, several small underground and surface mines had produced a few hundred tons of copper, lead,
- 66 -
and barite. In 1925, a gold deposit was developed about 19 kilometers southeast of the Carlin deposit and is known as the Maggie Creek claims. The earliest gold mining activity in the northern part of the Carlin Trend occurred at the Bootstrap and Blue Star mines, prior to the discovery of gold at Goldstrike. At Bootstrap, just northwest of Goldstrike, antimony was discovered in 1918, followed by gold in 1946. Gold was produced at Bootstrap from 1957 to 1960. At Blue Star, immediately south of Goldstrike, gold was identified in 1957 in areas that had been mined for turquoise.
The first discovery of gold at Goldstrike was in 1962 by Atlas Minerals. PanCana Minerals Ltd. (「PanCana」) first mined the property for gold in 1976. In 1978, Western States Minerals Corporation (「WSMC」) became the operator in a 50/50 joint venture with PanCana. Barrick acquired a 50% interest and assumed management of the Goldstrike property on December 31, 1986 with the acquisition of WSMC’s 50% interest in the property. Barrick completed the acquisition of 100% ownership of the property pursuant to a plan of arrangement entered into with PanCana in January 1987.
Continued exploration by soil samples and drilling discovered low-grade gold mineralization at shallow depth until the first deep hole was drilLED in 1986 at Post, discovering the Deep Post deposit. Exploration drilling from 1987 to 1988 LED to the discovery of a number of other deposits similar to Deep Post. These included Betze and Screamer which, together with Deep Post, comprise the Betze-Post deposit. Other discoveries in 1987 and 1988 included Deep Star, Rodeo, Meikle (previously named Purple Vein), South Meikle and Griffin.
Newmont commenced exploration on the Carlin Trend in 1961, investigating the Blue Star mine and Maggie Creek claims. However, as negotiations to acquire the deposits were not successful, Newmont focused on exploring jasperoid outcrops located 4.5 kilometers southeast of Blue Star, subsequently delineating the North Carlin deposit. Mining commenced with an open pit at Carlin in 1965. During the late 1980s, higher grade refractory mineralization was discovered in the north Carlin area. The south area mines, the Gold Quarry and Rain deposits, were discovered in 1980, and an additional 10 deposits were identified by 1988.
On July 1, 2019, Barrick’s interest in Goldstrike and the Newmont-Contributed Mines were contributed to Nevada Gold Mines, a joint venture in which Barrick has a 61.5% interest and is the operator. Goldstrike, together with the Newmont-Contributed Mines, is now the Carlin Complex.
Geology
Geological Setting
Gold deposits at the Carlin Complex are hosted by lower Paleozoic sedimentary rocks that are subdivided into three major packages: an autochthonous shelf to outer shelf carbonate and clastic sequence (eastern assemblage rocks); an allochthonous, predominantly eugeoclinal sequence (western assemblage rocks); and a late Mississippian overlap assemblage.
Early phase contractional thrusts and anticlines form important structural traps across the Carlin Trend. The orientation of mineralized stratigraphy and structures across the entire Carlin Trend correlate with orientations generated by earlier deformational events. These orogenic and tectonic events formed broad amplitude, north-northwest-trending, northerly-plunging anticlines within autochthonous carbonate assemblage rocks that are now preserved in uplifted tectonic windows. All Carlin Complex deposits discovered have been within or adjacent to these windows. Structures on the Carlin Complex record a complex history of contractional and extensional tectonics and later reactivation during successive periods of deformation.
- 67 -
Mineralization
Gold mineralization was emplaced approximately 39 million years ago along favorable stratigraphy and structural features such as faults and folds, and along contacts between sedimentary rocks and the intrusive rocks. Faulting provided major conduits for mineralizing fluids and may also have produced clay alteration that may have acted as a barrier to mineralizing fluids. Also, lithology and alteration contacts act as permeability barriers to fluids causing mineralization to pond along them, particularly where feeder structures intersect these contacts.
Mineralization consists primarily of micrometer-sized gold and sulfides disseminated in zones of siliciclastic and decarbonated calcareous rocks and commonly associated with jasperoids. Mineralization is predominantly oxides, sulfides, or sulfide minerals in carbonaceous rocks, and the ore type determines how it is processed.
Mining Operations
Production and Mine Life
The Carlin Complex facilities are a major process plant for the entire Nevada Gold Mines operations and therefore are expected to operate past the current Carlin Complex life-of-mine plan, which ends in 2045 based on existing reserves.
Open Pit
The Carlin Complex has four major open pit operations including Goldstrike, Gold Quarry, Goldstar (part of the Genesis/Tri-Star pits), and South Arturo (which returned to production in December 2022). All of these are truck and shovel operations. Blasting is required and blast patterns are laid out according to material type, using rock type designations of hard, average, soft or a combination of the three. The pit design varies between 6.1-meter to 12.2-meter (20 to 40 foot) benches. Slopes vary based on location.
The mine equipment fleet will be used throughout the mine life and is shared with the other mines at the Carlin Complex. The number of loading and hauling units allocated to each deposit varies depending on the operational needs from the mine plans. The equipment list also includes the auxiliary equipment needed to support mining and the re-handling of the ore from the stockpile pad into the mill feeders.
In early 2024, geotechnical issues at Gold Quarry LED to a pit wall failure that triggered a redesign of the open pit and resulted in slower mining rates as Nevada Gold Mines works through the historic underground workings. This has also caused Nevada Gold Mines to re-evaluate its mine design for Phase 6 and additional drilling and hydrological engineering is required before mining CAN occur at full production rates. While this work continues, the majority of mining has been redirected to South Arturo.
Underground
The Carlin Complex has three major operating underground mines including Goldstrike underground, Leeville, and the Portal Mines (including Pete Bajo, Exodus, El Nino, and Rita K). All mines utilize drift-and-fill and/or long-hole stoping and are accessed by shaft and/or portals. Ground conditions vary greatly in the different mining areas, from fair to very poor. Poor conditions in some areas are due to increased brecciation and/or alteration of original structures. Oxidation affects rock strengths in some areas and requires corrosion-resistant ground support. Generally low-strength rock conditions and ore geometry are the key factors in method selection and mine design. Once ore is mined, openings are filled with either cemented rock fill, uncemented run of mine waste, or paste fill. Mines are ventilated using ventilation fans located both on surface and underground and mechanical cooling is deployed in Goldstrike underground to manage higher ambient rock temperatures.
- 68 -
Secondary egress is provided through a series of escape raises and declines. In addition, there are refuge chambers strategically located throughout the mine in accordance with Nevada Gold Mine’s refuge policies. The current underground production mobile equipment fleet across the Carlin Complex consists of load-haul-dump units, haul trucks, jumbo drills, longhole drills, and rock bolters. Additionally, there are many function-specific utility vehicles to support the movement of personnel and materials to support mining. The underground mining fleet CAN be shared across the different Nevada Gold Mine operations as needed, per the integrated mine plan.
Processing
The Carlin Complex includes a series of integrated facilities to process ores from multiple open pit and underground sources within the Carlin Complex, as well as ore from other Nevada Gold Mines operations. Plant facilities have the flexibility to treat the mineralization that is typical of the various Carlin-style deposits. Ores are classified based on gold grade, level of oxidation, refractory characteristics (e.g., presence of preg-robbing components in ore) and proximity to processing facilities. An integrated process production plan is used.
The processing operations contained in the Carlin Complex include roasters, autoclaves, and heap leach pads and include: Gold Quarry Concentrator (formerly Mill 5), Gold Quarry Roaster (formerly Mill 6), South Area Leach, North Area Leach, Goldstrike Roaster and Goldstrike Autoclave.
Infrastructure, Permitting and Compliance
Infrastructure at the Carlin Complex has been constructed on an as-needed basis since the 1960s. A considerable amount of infrastructure has been built, including process plants, workshops, tailings, leach and waste facilities; offices, roads and rail connections; power, process and potable water facilities; and communication facilities.
Electrical power is transmitted to the Carlin North Area, Leeville underground, Carlin underground portal mines and Goldstrike by NV Energy. Electrical facilities include multiple main substations (Mill, South Block, and Bazza), several smaller substations throughout the property, and transmission lines. Power to the Gold Quarry and Emigrant mines is provided by transmission line on the Wells Rural Electric Power Company Grid. In October 2005, Barrick commissioned the Western 102 power plant that is located approximately 24 kilometers east of Reno, Nevada. It has the capacity to supply 115 megawatts of electricity to Goldstrike using 14 reciprocating gas-fired engines, and has an additional one-megawatt solar plant. The power plant provides Goldstrike with the flexibility to generate its own power or buy cheaper power from other producers, with the goals of minimizing the cost of power consumed and enhancing the reliability of electricity availability at its mine. In mid-2008, the TS power plant was constructed, which now provides power for the Carlin North Area and other Carlin Complex sites, via NV Energy transmission lines. In February 2020, Barrick announced the planned conversion of the TS power plant to a dual fuel process, allowing the facility to generate power from natural gas. Permitting is complete for the natural gas transmission pipeline and construction is expected to begin in 2026. Required station capacity upgrades at pipeline interconnection points were completed in the fourth quarter of 2024. In addition, in mid-2024, the TS Solar Photovoltaic power plant entered service with the capacity to supply 200 megawatts of electricity and using the same NV Energy transmission lines as the TS power plant to carry energy to the mine sites. See 「Sustainability – Climate Resilience」 for information on the GHG emissions reductions associated with the TS power plant.
Process water at the Carlin Complex is provided through existing well fields. In the Carlin North Area, Leeville underground and Carlin underground portal mines, these well fields have been used historically to provide all of the process water for the mills and heap leach facilities. At Gold Quarry, process water is supplied from the pit dewatering system. At the current dewatering pumping rates, water is diverted to the various processes when needed and any excess dewatering water is discharged to Maggie Creek via a permitted water discharge facility. During irrigation season, some of the discharge water is utilized by the
- 69 -
Nevada Gold Mines-owned Hadley Ranch. At the Carlin North Area, Leeville underground, Carlin underground portal mines and Goldstrike, potable water is provided by permitted water wells and supporting treatment and infrastructure facilities. Potable water at Gold Quarry is provided by three permitted water wells and the related infrastructure. Emigrant has no potable water sources or water treatment facilities.
Water management operations at Goldstrike include a system of dewatering wells, piezometers, water collection and conveyance facilities, water storage, water use, and various management options for discharge of excess water. Barrick is authorized by a discharge permit issued by the Nevada Division of Environmental Protection to discharge water produced by its groundwater pumping operations to groundwater via percolation, infiltration and irrigation.
Certain of Barrick’s mineral reserves and operations at Nevada Gold Mines occur on unpatented lode mining claims and mill sites that are on federal lands subject to U.S. federal mining and other U.S. federal and state laws. See “Cortez Property – Infrastructure, Permitting and Compliance” for additional information.
All material permits and rights to conduct existing operations at the Carlin Complex have been obtained and are in good standing.
Environment
The Carlin Complex is situated in the high desert region of the Basin and Range physiographic province. Precipitation averages 23 to 33 centimeters per year across the Carlin Complex, primarily derived from snow and summer thunderstorms. There are warm summers and generally mild winters; however, overnight freezing conditions are common during winter. The effect of climate on the operations is minimal and operations are possible at the property year-round.
Estimated future reclamation and closure costs at Carlin are reported in Barrick’s financial statements as part of the amounts that were recorded under IFRS, as defined by IAS 37. As at December 31, 2024, the recorded amount of estimated future reclamation and closure costs for Carlin that were recorded under IFRS, as defined by IAS 37, and that have been updated each reporting period was $303 million (100% basis) (as described in Note 2q to the Consolidated Financial Statements). Nevada Gold Mines has provided the financial security required by governmental authorities in connection with the reclamation of the mine area.
In 2024, all activities at the Carlin Complex were, and continue to be, in compliance in all material respects with applicable corporate standards and environmental permits and regulations.
Exploration and Drilling
The Carlin Complex is endowed with several gold deposits and presents opportunities for both resource expansion and new discoveries. Barrick continues to hold its land position and evaluates new opportunities as warranted. At Fallon (previously North Leeville), drilling in 2024 continued from underground platforms as advances have been made for more cost-effective conversion drilling and continue to expand on the resource footprint of Fallon. Additionally, drilling at Miramar continues to close the gap towards Fallow, with high grade results intercepted along the known ore control of the Veld Fault. These ore controls have been modeled far north of the curRENt knowns with potential testing of these Greater Leeville test proposed for 2025. The underground and surface drilling of the Horsham target extended the upper horizon and confirmed continuity at depth. At REN, development continues to improve drill platform access for reserve conversion, with drilling planned for 2025 and 2026.
- 70 -
A total of 8,660 meters of reverse circulation (「RC」) and 32,934 meters of core were drilled across the Carlin Trend in 2024 for mineral resource management growth drilling. Surface geological mapping and prospecting continues peripheral to operations across the Carlin Complex.
Royalties and Taxes
There are numerous royalties that pertain to the active mines within the Carlin Complex. Royalty payments vary each year depending upon actual tonnages mined, and the amount of gold recovered from that mined material. The Goldstrike area has various royalty holders with a maximum overriding net smelter royalty of 4% and net profit interest royalties of between 2.4% and 6% over various parts of the property. With respect to various other Carlin deposits, Nevada Gold Mines pays third-party royalties that vary from 1% to 9% of production.
In connection with the formation of Nevada Gold Mines, each of Barrick and Newmont was granted a 1.5% net smelter return royalty over the respective properties they contributed (including Goldstrike and the Newmont-Contributed Mines). Each of these 「retained royalties」 is only payable once the aggregate production from the properties subject to the royalty exceeds the publicly reported reserves and resources as of December 31, 2018.
The State of Nevada imposes a 5% NPT on the value of all minerals severed in the State. This tax is calculated and paid based on a prescribed net income formula which is different from book income.
Effective July 1, 2021, the State of Nevada also imposes a mining excise tax applied to gross proceeds. This is a tiered tax, with a highest rate of 1.1% and the revenue it generates is directed towards education.
Mining and Processing Information
The following table summarizes certain mining and processing information for the Carlin Complex for the periods indicated:
Year ended December 31, 20241 |
|
Year ended December 31, 20231 | ||||
Tonnes mined (000s) | 61,273 | 71,059 | ||||
Tonnes of ore processed (000s) | 6,657 | 7,256 | ||||
Average grade processed (grams per tonne) |
4.30 | 4.51 | ||||
Ounces of gold produced (000s) | 775 | 868 |
1 | Amounts represent Barrick’s 61.5% share. |
As discussed under 「Mining Operations」, production at Carlin for 2024 was impacted by the pit wall failure that occurred at Gold Quarry in early 2024.
The most recent technical report on the Carlin Complex is the technical report entitled “Technical Report on the Carlin Complex Mines, Eureka and Elko County, Nevada, USA” dated March 14, 2025 and authored by Nevada Gold Mines. This technical report has been filed on SEDAR+ in accordance with National Instrument 43-101.
The diagrams on the following pages show the design and layout of the Carlin Complex.
- 71 -
- 72 -
- 73 -
Turquoise Ridge Complex
General Information
Project Description
Nevada Gold Mines operates the Turquoise Ridge Complex, located in Humboldt County, Nevada. In connection with the formation of Nevada Gold Mines, Barrick’s 75%-owned Turquoise Ridge Mine (25% Newmont) and Newmont’s Twin Creeks Complex were combined as a single operation, now known as the Turquoise Ridge Complex. The combined mining operation is comprised of the Turquoise Ridge Underground, Vista Underground, and Turquoise Ridge Surface (comprised of the Mega and Vista open pits).
The Turquoise Ridge Complex is located in the Potosi Mining District, approximately 40 kilometers northeast of the village of Golconda, Nevada and approximately 64 kilometers northeast of Winnemucca, Nevada. The property is accessible from Golconda by a paved road, followed by an improved gravel road to the mine gates. Turquoise Ridge Underground covers an aggregate area of 2,402 hectares, which consists of 1,145 hectares of unpatented mining and mill-site claims and 1,257 hectares of patented/fee land. Turquoise Ridge Surface covers a total area of 7,925 hectares, of which 4,118 hectares are unpatented mining claims and 3,808 hectares are patented/fee lands. The Fiberline Project area (100% Newmont-owned property) is excluded from the Nevada Gold Mines’ joint venture area and does not encroach on the mineral reserve or mineral resource pit designs. As of December 31, 2024, the Turquoise Ridge Complex had approximately 900 employees and averages approximately 300 contractors.
Turquoise Ridge Underground produces high-grade refractory (carbonaceous/sulphide) gold ore from a long-life underground operation. Turquoise Ridge Underground is currently hoisting 3,000 tonnes of ore per day on average. Vista Underground was a portal and ramp accessed vein-style stoping mine at which existing mineral reserves were exhausted during 2024. Going forward, the Vista Underground operations remain on care and maintenance, and work continues to evaluate targets with potential to add future mineral resources. Turquoise Ridge Surface has currently paused mining in the open pits, while ore from stockpiles is processed.
Turquoise Ridge Surface produces oxide heap leach, oxide mill and sulphide ore. Processing operations at the Turquoise Ridge Complex consist of the Sage Autoclave, Juniper Oxide CIL plant and heap leach pads.
Sufficient surface rights have been obtained for current operations at the Turquoise Ridge property.
History
Mining for copper, lead, and silver first began on the Turquoise Ridge Underground property in 1883. Tungsten was discovered in 1916 and mined sporadically until 1957. Gold was discovered at the present day Getchell minesite in 1933, with Getchell Mine Inc. operating the property from 1934 to 1945. From 1960 to 2009, there was sporadic production at the Getchell mine including underground mining, open pit mining and heap leaching of the dumps.
A deep drilling program began in 1993 in the Turquoise Ridge area. Planning and engineering for a new underground mine was completed in 1995. By mid-1998, a production shaft was completed at a depth of 555 meters below the surface. In February 2000, mining was suspended at the Getchell Main underground mine. Drilling continued on the Turquoise Ridge and North Zone deposits, but due to depressed gold prices, the entire property was shut down in February 2002. Production resumed in
- 74 -
February 2003. Getchell Underground was placed on care and maintenance in April 2008. Full closure of the Getchell Underground mine occurred in the summer of 2009.
Turquoise Ridge Surface (the former Twin Creeks property) was formed in 1993 by the consolidation of the Rabbit Creek Mine and the Chimney Creek Mine. The Chimney Creek orebody was discovered in 1985 by Gold Fields Mining Corporation, while the Rabbit Creek property was discovered by Santa Fe Pacific Gold Corporation in 1987. In May 1997, a predecessor company of Newmont acquired Twin Creeks, which remained wholly-owned by Newmont until the formation of Nevada Gold Mines in 2019. The former Rabbit Creek is located in the south end of the property, including what is now known as Mega Pit.
On July 1, 2019, Barrick’s 75% interest in Turquoise Ridge, together with Newmont’s 25% interest in Turquoise Ridge and its interest in Twin Creeks, were contributed to Nevada Gold Mines. Due to their proximity, as well as geological, operating and processing synergies, the Turquoise Ridge mine and the Twin Creeks mine and processing facilities have been combined for planning and management purposes into a single complex known as the Turquoise Ridge Complex. Barrick is the operator of Nevada Gold Mines.
Geology
Geological Setting
The Turquoise Ridge Complex is situated within the Basin and Range province, near the northeast end of the Osgood Mountains. The Osgood Range is underlain by Cambrian Osgood Mountain Quartzite, Cambrian Preble Formation, Ordovician 「Comus」 Formation and the 「upper plate」 Valmy Formation. These units are unconformably overlain by the Permian Etchart Formation (Antler Peak Equivalent) of the Roberts Mountains overlap assemblage, and by the Triassic Golconda allochthon. These uppermost units form a belt of outcrops flanking the western and northern sides of the Osgood Range. All of these units are intruded upon by two generations of felsic intrusive rocks – a set of 114 Ma dacite dikes and sills at Turquoise Ridge Underground and Turquoise Ridge Surface and the 92 Ma Osgood Stock and temporally related dikes and sills. To date, no Eocene intrusive rocks have been identified at the Getchell, Turquoise Ridge Surface or Pinson camps.
Mineralization
Mineralization of the Turquoise Ridge Underground deposit generally consists of disseminated, micron-sized gold occurring in arsenic-rich rims forming on pyrite, chiefly within decalcified, carbonaceous rocks. All gold bearing zones at Turquoise Ridge Underground are located in proximity to granodiorite dykes that splay from the Osgood stock. Mining and exploration activities at Turquoise Ridge Underground are centered on limestone and mudstone horizons adjacent to these dykes.
Mineralization at Turquoise Ridge Surface is localized in decalcified carbonates, but CAN occur less frequently in argillized and sulphidized basalt. Silicification is common in Comus Formation sediments immediately adjacent to basaltic contacts with generally lower gold grades. At Vista Underground, mineralization is largely confined to the Trench Fault shear zone within a basalt host.
Mining Operations
Production and Mine Life
Turquoise Ridge Underground is accessed via three shafts and a system of internal ramps and utilizes underhand drift-and-fill and longhole stoping mining methods with cemented aggregate backfill. Vista Underground consists of two portals and a system of underground ramps accessing a steeply dipping mineralized zone where narrow-vein longitudinal stoping takes place. Vista
- 75 -
Underground has been developed to access the vein in multiple horizons with two main barrier pillars to be mined on retreat. Turquoise Ridge Surface operates the Vista and Mega open pits, as well as providing ore rehandle and surface project work at Turquoise Ridge Underground. Turquoise Ridge Surface uses conventional open pit mining methods including drilling, blasting, loading, and hauling.
Nevada Gold Mines has prepared a life of mine production schedule based on processing facilities and current mineral reserves for the two operations (Turquoise Ridge Underground and Turquoise Ridge Surface) with production planned into 2049. The current planned minimum production rates for Turquoise Ridge Underground are approximately 3,000 tonnes of ore per day on average, and approximately 52,000 tonnes mined per day for the period of 2027 to 2032 at Turquoise Ridge Surface.
Processing
In the current life of mine plan, refractory ore from the Turquoise Ridge Complex is processed at the Sage autoclave while non-refractory ore is processed at the Juniper oxide mill or stacked on heap leach pads. All processing facilities are located at Turquoise Ridge Surface on the legacy Twin Creeks property. The previous toll milling agreement in place between Barrick and Newmont was terminated in connection with the formation of Nevada Gold Mines in 2019.
Infrastructure, Permitting and Compliance
Material existing infrastructure at Turquoise Ridge Underground includes a tailings facility, a mobile equipment mining fleet, an underground dewatering facility, a 120-kilovolt electrical power line connection to the grid and a water treatment plant.
Material existing infrastructure at Turquoise Ridge Surface includes three active waste dumps, tailings facilities, one oxide mill (Juniper), one refractory mill (Sage) with two autoclaves, one active leach pad (Izzenhood) and a refinery. The Vista Underground uses the existing infrastructure of the Turquoise Ridge Surface.
Power requirements for Turquoise Ridge Underground are purchased outside the local provider system under open-access provisions whereby power is purchased on the open market or from the Western 102 power plant (which is owned and operated by Nevada Gold Mines). Power requirements for Turquoise Ridge Surface, Vista Underground, and the process facilities located at the legacy Twin Creeks property, in addition to the supporting infrastructure, are satisfied by both the TS power plant owned by Nevada Gold Mines (originally built by Newmont and placed into operation in 2008) and grid power from NV Energy.
Certain of Barrick’s mineral reserves and operations at Nevada Gold Mines occur on unpatented lode mining claims and mill sites that are on federal lands subject to U.S. federal mining and other U.S. federal and state laws. See “Cortez Property – Infrastructure, Permitting and Compliance” for additional information.
All material permits and rights to conduct existing operations at the Turquoise Ridge mine have been obtained and are in good standing or were in the process of renewal.
Third Shaft
Production from the Third Shaft, with nameplate hoisting capacity of 5,000 tonnes per day, started in the fourth quarter of 2022 and is included in the current life of mine plan. Together with increased hoisting capacity, the Third Shaft provides additional ventilation for underground mining operations as well as shorter haulage distances. Site preparation for the Third Shaft started in 2017, and shaft sinking to its final depth of 989 meters below the collar was completed between 2019 and 2021. First
- 76 -
production skipping from the 2280 level began in the third quarter of 2022 and the Third Shaft was commissioned and substantially completed in the fourth quarter of 2022. In 2023, minor finishing work for stage 6 and the completion of stage 7 change house were completed, with minor finishing work completed in 2023 and 2024.
Environment
The climate in the area of the Turquoise Ridge Complex is a semi-arid, steppe climate characterized by dry, hot summers and cold winters. The Turquoise Ridge Complex operates on a year-round basis and is not regularly affected by climatic conditions.
The Turquoise Ridge Complex maintains several permits for the operation, and tracks permits carefully to ensure ongoing compliance. Nevada Gold Mines environmental staff carry out sampling, monitoring and record keeping, and are involved in permit applications and renewals as required. In 2024, all activities at the Turquoise Ridge Complex were, and continue to be, in compliance in all material respects with applicable corporate standards and environmental permits and regulations.
As at December 31, 2024, the recorded amount of estimated future reclamation and closure costs that were recorded under IFRS, as defined by IAS 37, and that have been updated each reporting period, was $71 million (100% basis) (as described in Note 2q to the Consolidated Financial Statements). Nevada Gold Mines has provided the financial security required by governmental authorities in connection with the reclamation of the mine area.
Exploration and Drilling
At Turquoise Ridge, Nevada Gold Mines is pursuing the considerable growth potential both near and between the mines. The Turquoise Ridge Complex has two deposits at both ends of an eight-kilometer trend. These two deposits (the legacy Turquoise Ridge and Twin Creeks properties) have a complex geological history with sparsely tested prospective ground between them. Significant work has been done on these deposits since the formation of Nevada Gold Mines, and multiple new targets in what was thought to be a maturing district have started to emerge.
Growth drilling for 2024 focused on building Nevada Gold Mines’ understanding of the upside potential, while testing updated mineral controls. At Turquoise Ridge Underground, a total of 20,500 meters was drilled across reserve conversion, resource addition, and step-out programs. Step-out drilling has confirmed mineralization potential along the Divide and BBT faults to the south. Drilling in 2025 will follow-up results along Getchell parallel structures to the south and west, as well as in structural intersections of favorable host rocks to the north and north-east.
At the Mega open pit, reserve conversion drilling is expected as early as 2025. Drilling will target immediately below the existing resource pit shell as a result of stacked units of carbonate material that was identified during the 2023 exploration drilling.
Royalties and Taxes
In connection with the formation of Nevada Gold Mines, each of Barrick and Newmont was granted a 1.5% net smelter return royalty over the respective properties they contributed (including Barrick’s 75% interest in the Turquoise Ridge mine and Newmont’s 25% interest in the Turquoise Ridge mine and its interest in Twin Creeks). Each of these 「retained royalties」 is only payable once the aggregate production from the properties subject to the royalty exceeds the publicly reported reserves and resources as of December 31, 2018. In addition, certain areas within Turquoise Ridge Surface are subject to 2% gross proceeds royalties payable to Royal Gold. Vista Underground and Turquoise Ridge Underground are not subject to any royalties (other than as described above).
- 77 -
The State of Nevada imposes a 5% NPT on the value of all minerals severed in the State. This tax is calculated and paid based on a prescribed net income formula which is different from book income.
Effective July 1, 2021, the State of Nevada also imposes a mining excise tax applied to gross proceeds. This is a tiered tax, with a highest rate of 1.1% and the revenue it generates is directed towards education.
Mining and Processing Information
The following table summarizes certain mining and processing information for the Turquoise Ridge Complex for the period indicated:
Year ended December 31, 20241 |
Year ended December 31, 20231 | |||||
Tonnes mined (000s) | 2,339 | 919 | ||||
Tonnes of ore processed (000s) | 2,268 | 2,608 | ||||
Average grade processed (grams per tonne) | 4.86 | 4.34 | ||||
Ounces of gold produced (000s) | 304 | 316 |
1 | Amounts represent Barrick’s 61.5% share. |
The most recent technical report on the Turquoise Ridge mine is the technical report entitled “NI 43-101 Technical Report on the Turquoise Ridge Complex, Humboldt County, Nevada, USA.” dated March 15, 2024 and authored by Nevada Gold Mines. This technical report has been filed on SEDAR+ in accordance with National Instrument 43-101.
The diagram on the following page sets out the design and layout of the Turquoise Ridge Complex.
- 78 -
- 79 -
Pueblo Viejo Mine
General Information
Project Description
The Pueblo Viejo mine is an open pit, conventional truck and shovel mining operation located in the province of Sánchez Ramírez in the central part of the Dominican Republic, on the Caribbean island of Hispaniola. The mine is approximately 100 kilometers northwest of the national capital of Santo Domingo. As of December 31, 2024, Pueblo Viejo employs approximately 3,000 employees and 2,600 contractors.
The Pueblo Viejo mine is situated on the Montenegro Fiscal Reserve (the 「MNFR」), an area specially designated by Presidential Decree for the leasing of minerals and mine development, which covers an area of 7,995 hectares at the head of the Arroyo Margajita Valley in The Eastern portion of the Cordillera Central. This includes all of the areas previously included in the Pueblo Viejo and Pueblo Viejo II concession areas, which were previously owned by Rosario Dominicana S.A. (Rosario) until 2002, as well as the El Llagal and new Naranjo TSF areas, the latter of which was approved to be included in the MNFR in 2022. A special lease agreement (「SLA」) between the Dominican State and Pueblo Viejo Dominicana Jersey 2 Limited (formerly Pueblo Viejo Dominicana Corporation, (「PVD」)) governs the development and operation of the Pueblo Viejo mine. The SLA provides PVD with the right to operate the Pueblo Viejo mine for a 25-year period that commenced on February 26, 2008, the date on which PVD delivered the Project Notice under the SLA, as defined therein, with one extension by right for 25 years and a second 25-year extension by mutual agreement of the parties, allowing a possible total term of 75 years. The Pueblo Viejo deposits are located in two major areas, the Monte Negro and Moore pits, as well as other smaller satellite pits. The property is accessible year-round by paved road from Santo Domingo.
Sufficient surface rights have been obtained for current operations at the property. The new Naranjo TSF requires PVD to obtain surface rights in the planned facility location and will require completion of a resettlement program. PVD is in the process of obtaining such rights and resettling affected persons.
History
Early mining activity at the site dates back to the 1500s. Subsequent to that early mining activity, Rosario Resources commenced mining operations on the property in 1975. In 1979, the Central Bank of the Dominican Republic purchased all foreign-held shares in Rosario Resources and the Dominican Government continued operations as Rosario Dominicana S.A. Gold and silver production from oxide, transitional, and sulfide ores occurred from 1975 to 1999. The mine ceased operations in 1999. In 2000, the Dominican Republic invited international bids for the leasing and mineral exploitation of the Pueblo Viejo minesite. In July 2001, PVD (then known as Placer Dome Dominicana Corporation), an affiliate of Placer Dome, was awarded the bid. PVD and the Dominican Republic subsequently negotiated the SLA for the MNFR, which was ratified by the Dominican National Congress and became effective on July 29, 2003. In March 2006, Barrick acquired Placer Dome and, in May 2006, the companies were amalgamated. At the same time, Barrick sold a 40% stake in the Pueblo Viejo project to Goldcorp (acquired by Newmont in 2019). On February 26, 2008, pursuant to the SLA, PVD delivered the Project Notice and Pueblo Viejo Feasibility Study to the Government of the Dominican Republic. In 2009, the Dominican Republic and PVD agreed to amend the terms of the SLA. The amendment became effective on November 13, 2009, following its ratification by the Dominican National Congress. The Pueblo Viejo mine achieved commercial production in January 2013. A second amendment to the SLA became effective on October 5, 2013, and resulted in additional and accelerated tax revenues to the Government of the Dominican Republic (see 「Royalties and Taxes」 below).
- 80 -
Geology
Geological Setting
The Pueblo Viejo deposit consists of high sulfidation or acid sulfate epithermal gold, silver, copper and zinc mineralization that was formed during the Cretaceous Age island arc volcanism. The key areas of mineralization are the Moore and Monte Negro pits with smaller surrounding satellite pits (Cumba, Mejita and ARD1). Exploration work continues to identify additional potential inside the MNFR. Pueblo Viejo is situated in the Los Ranchos Formation, a series of volcanic and volcaniclastic rocks that extend across The Eastern half of the Dominican Republic, generally striking northwest and dipping southwest.
Mineralization
The Moore deposit is located at The Eastern margin of the Pueblo Viejo member sedimentary basin. Stratigraphy consists of finely bedded carbonaceous siltstone and mudstone (PV sediments) overlying mainly quartz bearing facies (volcaniclastic and pyroclastic flow), which are underlain by horizons of andesitic facies (basaltic-andesite flows) and intrusive and pyroclastic flow. The Monte Negro deposit is located at the northwestern margin of the sedimentary basin. Stratigraphy consists of interbedded carbonaceous sediments ranging from siltstone to conglomerate that are interlayered with volcaniclastic flows. Metallic mineralization in the deposit areas is primarily pyrite with lesser amounts of sphalerite and enargite. Pyrite mineralization occurs as disseminations, layers, replacements and veins. Sphalerite and enargite mineralization are primarily in veins with pyrite, but disseminated sphalerite has also been noted in core. The mineralization extends for 2,800 meters north-south and 2,000 meters east-west and extends from the surface to 500 meters in depth.
Mining Operations
Production and Mine Life
The Pueblo Viejo mine is an open pit, conventional truck-and-shovel mining operation. It achieved commercial production in January 2013 and completed its ramp-up to full design capacity in 2014. Current mining operations will supplement fresh ore from the Monte Negro and Moore pits with stockpiled ore to deliver the increased throughput rates contemplated in the process plant expansion.
Based on the existing tailings facility and the completion of the process plant expansion in 2023, mining activity at Pueblo Viejo of fresh ore CAN continue until at least 2027. Additional tailings capacity (not directly related to the process plant expansion) will allow Barrick to extend the life of mine beyond the 2040s. The process plant expansion and mine life extension project at Pueblo Viejo are discussed in further detail below.
Pueblo Viejo produced 351,680 ounces of gold in 2024 (Barrick’s 60% share). Production in 2024 was impacted by challenges associated with the ramp up of the process plant expansion, including mill failures, lower flotation plant availability, lower limestone production and unplanned maintenance at the autoclaves.
Processing
Gold and silver are recovered through pressure oxidation (autoclave) of whole ore followed by hot cure and hot lime boil, prior to cyanidation of gold and silver in a CIL circuit.
Following completion of the plant expansion, the process plant is now designed to process approximately 30,000 tonnes per day of run-of-mine refractory ore. The primary unit operations are crushing, grinding, flotation, high-pressure oxidation, washing, neutralization and CIL circuits. The flotation circuit is used to increase sulfide grade from 6.85% to 9.8%, and the design basis for the oxygen plant is
- 81 -
to provide the oxygen required to oxidize approximately 109 tonnes per hour of sulfides. This is equivalent to 1,110 tonnes per hour of autoclave feed containing 9.8% sulfide sulfur, assuming a design factor of 2.2 tonnes of oxygen per tonne of sulfides. Lower sulfide ores are often fed to the plant resulting in higher tonnage, often well over 30,000 tonnes per day.
Copper is a by-product from the processing plant which was produced as a copper sulfide concentrate through the injection of hydrogen sulfide gas into a solution containing copper ion.
Infrastructure, Permitting and Compliance
The tailings storage area is located in the El Llagal valley, approximately four kilometers south of the plant site. The Lower Llagal tailings storage area, made up of one main dam and three saddle dams, will contain part of the potentially acid generating (「PAG」) waste rock generated over the life of the Pueblo Viejo mine as well as process tailings up to approximately 2030, at which point the tailings and waste rock storage will transition to the new Naranjo TSF. In addition to solids storage, the tailings facility is sized to provide storage for an operating pond and for extreme precipitation events. Additional tailings impoundment capacity, as required by the resource base, is being studied and is expected to be implemented as described in further detail below. The mine is situated in a seismically active area. The design of the dams at the site was based on the maximum credible earthquake criteria.
The process plant expansion and mine life extension project is designed to increase throughput to approximately 14 million tonnes per annum, allowing the mine to maintain minimum average annual gold production of approximately 800,000 ounces (100% basis) following full plant ramp-up and optimization, and extend the life of mine beyond the 2040s with the incorporation of the new Naranjo TSF. PVD completed a pre-feasibility study for the new Naranjo TSF, adding 6.5 million ounces of attributable proven and probable reserves, net of depletion in 2023.
The process plant expansion flowsheet includes an additional primary crusher, coarse ore stockpile and ore reclaim delivering to a new single stage semi-autogenous (「SAG」) mill, and a new flotation circuit that concentrates the bulk of the sulfide ore prior to oxidation. The concentrate is blended with fresh milled ore to feed the modified autoclave circuit, which has additional oxygen supplied from a new 3,000 tonnes-per-day facility. The existing autoclaves were upgraded to increase the sulfur processing capacity of each autoclave through additional high-pressure cooling water and recycle flash capability using additional slurry pumping and thickening.
Phase 1 of the expansion project, which is related to the process plant expansion, has been completed and achieved commercial production in the third quarter of 2024. Phase 2, which focuses on the new Naranjo TSF, continues to progress. The Environmental and Social Impact Assessment (「ESIA」) was approved by the Dominican Government during the second quarter of 2023. The Naranjo TSF feasibility study was completed in the third quarter of 2024 and has been submitted to the government for permitting. The estimated capital cost of the new Naranjo TSF was updated in 2024 following the completion of the feasibility study. Contracting and procurement for long lead items and major construction works began in the fourth quarter of 2024, with commitments starting in the first quarter of 2025 to support the construction ramp-up. The development of a new town and housing complex to resettle families displaced by the new Naranjo TSF is also progressing with over 100 houses now complete and over 300 more under construction. In parallel, the potable waste system for the settlement is mechanically complete and work on the elementary school is underway. The east site of the housing project remains on track to be ready for residents in the first quarter of 2025 and overall completion of the housing project is expected in 2025.
Permitting for the new Naranjo TSF remains on track with the feasibility study submitted to the government. An updated Temporary Water Management design was also submitted for approval, which reflects a simplified system based on the deferral of PAG placement in the basin from 2026 to 2028. Both
- 82 -
permits are expected in advance of planned construction start dates in the third quarter of 2025 and onward.
As at December 31, 2024, $1,130 million has been spent on the plant expansion and mine life extension project (100% basis). The estimated capital cost of the plant expansion and mine life extension project is now approximately $2.6 billion (100% basis), which includes the new Naranjo TSF.
The Hatillo and Hondo Reservoirs supply fresh water for the process plant. Reclaimed water from the El Llagal tailings containment pond is used as a supplementary water supply.
Operational power requirements vary, but are generally less than 200 megawatts at 26,000 tonnes per day. In 2013, PVD commissioned a 218 megawatt Wartsila combined cycle reciprocating-engine power plant, together with an approximately 72-kilometer transmission line connecting the plant to the minesite. The power plant is located near the port city of San Pedro de Macoris on the south coast and will provide the long-term power supply for the Pueblo Viejo mine. The plant is dual fuel and was converted to natural gas from heavy fuel oil in 2020. In 2019, PVD signed a 10-year natural gas supply contract with AES Andres DR, S.A. (「AES」) in the Dominican Republic. AES also completed a new gas pipeline to the facility. The power plant began supplying power to the mine using natural gas in the first quarter of 2020. Additional power will come from the grid or from a solar plant that is currently in the planning stage.
All material permits and rights to conduct existing operations at the Pueblo Viejo mine and power plant facilities have been obtained and are in good standing. Certain permits related to the construction of the Naranjo TSF are in the process of being prepared for submission to the relevant government authorities.
Environment
Elevation at the minesite ranges from 565 meters at Loma Cuaba to approximately 65 meters at the Hatillo Reservoir. The site is characterized by rugged and hilly terrain covered with subtropical wet forest and scrub cover. The region has a tropical climate with little fluctuation in seasonal temperatures. The heaviest rainfall occurs between May and October.
The Pueblo Viejo minesite is affected by a number of significant legacy environmental issues resulting from the conduct of operations at the site prior to Barrick’s involvement in the mine. Under the terms of the SLA, the Dominican State is obligated, at its sole cost and expense, to remediate and rehabilitate, or otherwise mitigate all historic environmental matters. Subject to the verification of certain conditions, PVD has agreed to act as an agent of the Dominican State to remediate the historical environmental liabilities of the State. PVD has agreed to cover the capital costs related to such remediation up to $75 million. In addition, upon PVD giving the Dominican State a Project Notice, which was issued by PVD in 2008 under the SLA, PVD assumed the responsibilities for all historic environmental matters within the boundaries of the 「Development Areas」, except for hazardous substances at the Rosario’s plant site which remain the responsibility of the Dominican State. Furthermore, the Dominican State is required under the SLA, in compliance with the applicable Environmental and Social Guidelines and Policies and at its sole cost and expense, to relocate and pay all indemnification and other compensation due to certain persons with valid claims to land within the MNFR. Under the SLA, PVD and the Dominican State were required to come into compliance with the historic environmental mitigation and remediation matters, for which they are responsible under that agreement, by November 2014. PVD achieved compliance by that deadline. In the second half of 2016, PVD was contracted to act as an agent of the Dominican State to carry out activities for which the Dominican State is responsible under the SLA pursuant to the Environmental Management Plan of the State.
The requisite environmental permits were received in November 2016 to carry out the first stage of the closure plan, which focuses on dewatering, buttressing, and improving the stability of the old Mejita
- 83 -
TSF. Dewatering of the old Mejita TSF was completed in 2018, as well as the geotechnical investigation program. In 2020, the Environmental Management Plan of the State achieved progress for the Mejita tailings cover component, with work occurring mainly at the north and central ponds. Progress was also made on the buttress excavation and Phase 1A was completed in 2021. In 2024, a risk analysis of the Mejita TSF was completed.
In 2024, PVD’s activities at the Pueblo Viejo mine were, and continue to be, in compliance in all material respects with applicable corporate standards and environmental regulations.
As at December 31, 2024, the recorded amount of estimated future reclamation and closure costs that were recorded under IFRS, as defined by IAS 37, and that have been updated each reporting period, was $103 million (100% basis) (as described in Note 2q to the Consolidated Financial Statements). In addition, an environmental reserve fund has been established in an offshore escrow account, as required by the SLA, and funded by PVD during operations until the funds are adequate to discharge PVD’s closure reclamation obligations.
Exploration and Drilling
As of December 31, 2024, the drill hole databases feature a total of 29,763 drill holes, amounting to approximately 1,732 kilometers of drilling. RC grade control data predominates, accounting for roughly 68% of the total drilling meters and 88% of the total number of drillholes. This database is used to support the development of mineral resources for the Pueblo Viejo property. The drill hole spacing is variable, ranging from 10 to 30 meters for grade control programs and 50 to 100 meters for exploration or condemnation programs.
During 2024, brownfield exploration drilling campaigns were focused on SLA District Target, Zambrana target (Tauro) with completion of 979 meters of diamond core drilling. No economic mineralization was intercepted, although sub-economical gold anomalies vectorize towards the north and northwest. Follow-up exploration works of mapping and sampling were performed to delineate the target extension to the northwest (Anastasia target) and north (Mojito target), which will be tested in 2025. An additional key project undertaken in 2024 was Phase 1 of the integrated geological model, which provides a framework for future exploration work within the district. Phases 2 and 3 are planned to be completed during 2025.
Also in 2024, several growth drilling and reserve definition projects were advanced, with a total of 6,146 meters drilled. The first program was located around ARD1, with 1,555 meters completed. Results indicate open favorable alteration toward the west underlying the limestone deposit. The Cumba North-West project with 463 meters is still in progress. Additional drilling for quarry development was executed for both diorite and limestone. In addition to the growth and development drilling projects described above, 16,191 meters for reserves infill drilling campaign within the five-year mining plan across Moore and Monte Negro pits was also completed.
Royalties and Taxes
Under the SLA, PVD is obligated to make the following payments to the Dominican Republic: a net smelter return royalty of 3.2% based on gross revenues less some deductible costs (royalties do not apply to copper or zinc); a net profits interest of 28.75% based on an adjusted taxable cash flow; a corporate income tax of 25% based on adjusted net income; a withholding tax on interest paid on loans and on payments abroad; and other general tax obligations. The SLA tax regime includes a stability clause.
A second amendment to the SLA became effective on October 5, 2013, resulting in additional and accelerated tax revenues to the Dominican Government. The second amendment to the SLA includes the establishment of a graduated minimum tax, which is adjusted up or down every three years based on a
- 84 -
financial model prepared by PVD and subject to government approval. Based on provisions of the SLA, PVD submitted the financial model underpinning the graduated minimum tax rates for the period from 2023 through 2025 in December 2022. This model was approved by the Ministry of Energy and Mines in March 2023. Based on the approved model, the relevant tax authorities established the minimum tax rates for 2023 through 2025. The next update to the model is expected to be submitted in December 2025 and will set the minimum tax rates for 2026 through 2028.
Streaming Transaction
On September 29, 2015, Barrick closed a gold and silver streaming transaction with Royal Gold for production linked to Barrick’s 60% interest in the Pueblo Viejo mine. Royal Gold made an upfront cash payment of $610 million and will continue to make cash payments for gold and silver delivered under the agreement. The $610 million upfront payment is not repayable and Barrick is obligated to deliver gold and silver based on Pueblo Viejo’s production. Barrick has accounted for the upfront payment as deferred revenue and recognizes it in earnings, along with the ongoing cash payments, as the gold and silver is delivered to Royal Gold. Barrick will also be recording accretion expense on the deferred revenue balance as the time value of the upfront deposit represents a significant component of the transaction.
Under the terms of the agreement, Barrick sells gold and silver to Royal Gold equivalent to: (i) 7.5% of Barrick’s interest in the gold produced at Pueblo Viejo until 990,000 ounces of gold have been delivered, and 3.75% thereafter; and (ii) 75% of Barrick’s interest in the silver produced at Pueblo Viejo until 50 million ounces have been delivered, and 37.5% thereafter. Silver is delivered based on a fixed recovery rate of 70%. Silver above this recovery rate is not subject to the stream. As at December 31, 2024, approximately 369,000 ounces of gold and 13 million ounces of silver have been delivered. There is no obligation to deliver gold or silver under the agreement if there is no production from Pueblo Viejo.
Barrick receives ongoing cash payments from Royal Gold equivalent to 30% of the prevailing spot prices for the first 550,000 ounces of gold and 23.1 million ounces of silver delivered. Thereafter, payments will double to 60% of prevailing spot prices for each subsequent ounce of gold and silver delivered. Ongoing cash payments to Barrick are tied to prevailing spot prices rather than fixed in advance, maintaining exposure to higher gold and silver prices in the future.
Mining and Processing Information
The following table summarizes certain mining and processing information for the Pueblo Viejo mine for the period indicated:
Year ended December 31, 20241 |
Year ended December 31, 20231 | |||||
Tonnes mined (000s) | 10,885 | 18,074 | ||||
Tonnes of ore processed (000s) | 5,730 | 5,332 | ||||
Average grade processed (grams per tonne) | 2.46 | 2.39 | ||||
Ounces of gold produced (000s) | 352 | 335 |
1 | Barrick’s 60% share. |
The most recent technical report on the Pueblo Viejo mine is the technical report entitled 「Technical Report on the Pueblo Viejo Mine, Dominican Republic」 dated March 17, 2023 and authored by Mike Saarelainen, Chad Yuhasz, Richard Quarmby, Neil Bar and Bill Burton. This technical report has been filed on SEDAR+ in accordance with National Instrument 43-101.
The Company has extensive operating experience in the Dominican Republic. Nevertheless, operating in emerging markets, such as the Dominican Republic, exposes the Company to risks and uncertainties that do not exist or are significantly less likely to occur in other jurisdictions such as the
- 85 -
United States or Canada, such as the SLA negotiations described above. For additional details, see 「Foreign investments and operations」, 「Permitting and government relations」, 「Inflation」, 「Joint ventures」, 「Security and human rights」, 「Community relations and license to operate」, 「Government regulation and changes in legislation」 and 「U.S. Foreign Corrupt Practices Act and similar worldwide anti-bribery laws」 in 「Risk Factors」.
While all risks cannot be mitigated or eliminated, the Company manages and mitigates controllable risks at its Pueblo Viejo operation through the consistent application of a variety of corporate governance structures and processes that are materially the same as those applied at its other operations located in developed markets. For additional details, see 「Narrative Description of the Business – Operations in Emerging Markets: Corporate Governance and Internal Controls」.
The diagram on the following page sets out the design and layout of the Pueblo Viejo mine.
- 86 -
- 87 -
Kibali Mine
General Information
Project Description
The Kibali gold mine (「Kibali」) is located in the northeast of the DRC in the Haut Uélé Province approximately 1,800 kilometers northeast of the capital city of Kinshasa, approximately 560 kilometers northeast of the capital of the Orientale Province, Kisangani, 1,800 kilometers from the Kenyan port of Mombasa, 1,950 kilometers from the Tanzanian port of Dar es Salaam, and 150 kilometers west of the Ugandan border town of Arua, near the international borders of Uganda and Sudan. Personnel access to Kibali is commonly through charter flight directly to site from Entebbe, Uganda which is served daily by commercial flights from European cities. Road access is available from Kampala, Uganda and is approximately 650 kilometers, which provides the primary route for the operational supply chain.
As at December 31, 2024, Kibali has approximately 2,450 employees and 4,400 contractors.
Kibali consists of multiple mineral deposits, including: KCD, Sessenge, Sessenge SW, Gorumbwa, Pakaka, Kombokolo, Pamao & Pamao South, Makoke, Mengu Hill, Mengu Village, Megi-Marakeke-Sayi, Kalimva, Ikamva, Aerodrome, Rhino, Ndala and Oere. The Kibali permit covers an area of approximately 1,836 square kilometers.
Kibali Goldmines SA (「Kibali Goldmines」), a joint venture company between Barrick, AngloGold Ashanti Limited (「AngloGold」), and Société Minière de Kilo-Moto SARL (formerly Offices des Mines d’Or de Kilo-Moto) (「SOKIMO」), has been granted ten Exploitation (Mining) Permits under the DRC Mining Code (2002), eight of which are valid until 2029 and two of which are valid until 2030. The current life of mine plan for Kibali’s mineral reserves extends beyond these dates.
Pursuant to the DRC Mining Code (2002), to KEEP mining concessions in good standing, concession holders are required to pay certain permit fees and annual surface rights fees. All of the Exploitation (Mining) Permits are in good standing. Sufficient surface rights have been obtained for current operations at the property.
History
Moto Goldmines Limited (「Moto」), the previous operator of the Kibali project, acquired a 70% interest in the Kibali project in 2004 from SOKIMO. Moto completed a pre-feasibility study in 2006, a feasibility study in 2007, and an optimized feasibility study in 2009.
In 2009, Randgold and AngloGold entered into a 50/50 joint venture, which acquired all of the issued share capital of Moto and, as a result, Moto’s 70% interest in the Kibali project. Later in 2009, The Joint venture acquired an additional 20% interest in the Kibali project from SOKIMO, giving Randgold a 45% interest in Kibali. On January 1, 2019, Barrick acquired Randgold’s 45% interest in Kibali by virtue of the Merger. Barrick is the operator of Kibali.
Geology
Geological Setting
The Kibali deposits are hosted within the Kibali Greenstone Belt (otherwise referred to as Moto granite-greenstone terrane), bounded to the north by the West Nile Gneiss and to the south by plutonic rocks of the Watsa district. The Kibali Greenstone Belt is an elongate west-northwest-east-southeast trending terrane containing Archean aged volcano-sedimentary conglomerate, carbonaceous shales, siltstone, banded iron formations, sub aerial basalts, mafic intermediate intrusions (dykes and sills) and multiple intrusive phases that range from granodiorite to gabbroic in composition. Based on textures and
- 88 -
types of lithologies present in the stratigraphy, the rocks within the Kibali permit area are interpreted as having been laid down in an aqueous environment.
The majority of the primary lithologies are sedimentary in origin, possibly being developed in a regional extensional environment such as a rift graben or half graben. At Kibali, the gold deposits are largely hosted in siliciclastic rocks, banded iron formations, and cherts that were metamorphosed under greenschist facies conditions, situated along a curvilinear zone 20 kilometers long and up to one kilometer in width, known as the 「KZ Trend」. Gold mineralization is concentrated in gently northeast to north-northeast-plunging fold axes whose orientations are generally parallel with a prominent lineation in the mineralized rocks.
The Kibali deposits differ from many orogenic gold deposits as they are hosted within a thrust stack sequence with ductile to brittle-ductile deformational structures and a complex folding history. There are two principal structure sets: northwest-southeast striking, northeast dipping thrust faults and a series of sub-vertical northeast-southwest shear structures both of which, in association with the folding, are considered important mineralizing controls. Unlike many other orogenic gold deposits, mineralization within the Kibali district typically lacks significant phases of auriferous quartz-rich veins.
Mineralization
The mineralized deposits of the Kibali district are associated with halos of quartz, ankerite, and sericite (ACSA-A) alteration that extend into the adjacent rocks.
The KCD deposit is the principal mineralized occurrence along the Sessenge-KCD Trend. It consists of five semi-vertically stacked lodes (3000, 5000, 9000, 11000 and 12000), hosted within the volcano-sedimentary units. The location of the individual lodes within the KCD deposit are intimately controlled by the position, shape, and orientation of a series of gently northeast-plunging tight to isoclinal folds. The lodes may be linked genetically by large-scale recumbent folding developed between two bounding northeast trending structures. Higher grade developed in zones of strong to intense alteration that overprinted and texturally-destroyed previous breccia, foliation and lithological textures. These are broadly categorized as the 3000 lodes, 5000 lodes, and the 9000 lodes, all of which plunge towards the northeast at low to moderate angles.
Both the Gorumbwa and Kombokolo deposits occur along a northeast trending mineralized corridor located 800 meters to the west of the main Sessenge-KCD structural zone. Both deposits are considered to be formed from the same mineralizing event, with similar alteration and structural characteristics to the KCD deposit but significantly smaller in size.
The Rhino and Agbarabo deposits located further to the north of the KCD deposit are positioned within smaller and more open folds with a similar north-eastward plunge. These satellite deposits exhibit mineralization primarily along a banded iron formation (「BIF」) horizon’s base, suggesting it acted as an aquiclude in confining hydrothermal fluids primarily to the underlying rocks. Multiple mineralized lenses are open down-plunge but characterized by a generally narrow width (30-50 meters).
The Mengu Hill deposit lies on the KZ North structure, to the northwest of Pakaka and to the south of Mofu-Oere. The mineralized lens is cigar-like in shape and plunges shallowly to the north-northeast. Mineralization remains open down plunge.
The Aerodrome-Pakaka-Pamao deposits are located along the KZ North trend, in the gently north-northeast- to east-dipping shear zone. The presence of significant arsenopyrite at Pakaka distinguishes it from other deposits and prospects along the northern half of the KZ Trend. The structures combine to produce a broad northeast plunging open anticlinal structure, with Pamao on the west limb, and Pakaka on the east. The weathering profile at Pakaka is relatively deep up to 70 meters.
- 89 -
The Mengu Village deposit is located near the northwest end of the Pakaka-Mengu Trend. The mineralization is tabular in form, trending northwest and dipping shallowly to the northeast, and is hosted by conglomerates with thin ironstone and carbonaceous shale intercalations.
The Megi-Marakeke-Sayi deposit comprises three individual deposits, Megi, Marakeke, and Sayi, separated by lower grade mineralization but are mined in a single open pit. The Megi-Marakeke-Sayi deposit occurs as multiple tabular lenses that trend northwest and dips gently to the northeast.
The Kalimva/Ikamva and Oere deposits are all located along the major lineament of the KZ North Trend, north of Mengu Hill. These deposits are broadly similar in geology. The mineralized lodes in Kalimva, show a shallowly north-northeast-plunging ore-shoot along a moderate to steeply east-dipping structure locally called the Kalimva Deformation Zone and interpreted as an equivalent of the Ikamva deposit.
Mining Operations
Production and Mine Life
Open pit mining takes place in several satellite pits over approximately 20 kilometers. Most of the pits are being mined in phases. Mining has been completed at the Mofu, Rhino Phase 1, Mengu Hill Phase 1, Pakaka Phase 1, Kombokolo Phase 1, KCD Phase 1, 2 and 3, Sessenge Phase 1 and 2, Gorumbwa Phase 1 and 2 and most recently, Pamao Phase 1 and 2 pits.
As of December 31, 2024, the operational pits were Pamao Phase 3 and 4, Pamao South, Gorumbwa Phase 3, Ndala, Kalimva Hill, Ikamva East, Rhino Phase 2 and Upper Rhino Phase 1. Open pit mining is mainly conducted by the contractor Kibali Mining Services, a local DRC company, using either free-dig or conventional drill, blast, load, and haul methods. The mining equipment is jointly owned by Barrick and the contractor’s parent company, the Bouygues Group. Pits requiring smaller equipment due to their ramp size are being operated by local contractors.
From 2025 onwards, open pit production will come from the Sessenge, Sessenge SW, Ndala, Aerodrome, Pamao, Pamao South, Gorumbwa, Megi-Marakeke-Sayi, Kalimva, Ikamva (including Ikamva East), Oere, Pakaka, Rhino, Mengu Hill and KCD deposits. As all of the pits are characterized by the presence of a near-surface groundwater table with the potential for high groundwater inflows into the pits, a system of pumping and dewatering bore holes is established prior to the commencement of mining in each of the pits.
The upper levels of the open pits are usually in weathered material, which typically is free digging material. Once fresh (unweathered) rock is encountered, drilling and blasting is required. Free digging in the upper levels uses 5 meter high benches, with 10 meter high benches used for drilling and blasting operations. In between the oxide and fresh ore, there is a transitional zone being mined on 5 meter bench height that requires light drilling and blasting before mining.
The Kibali KCD underground mine is designed to extract the KCD deposit directly beneath the KCD open pit. A 50-meter crown pillar separates the pit bottom from the top of the underground mine. The Kibali underground mine is a long-hole stoping operation producing at a rate of approximately 3.8 million ore tonnes per year.
Development of the underground mine commenced in 2013. Stoping within the upper levels commenced in 2015, utilizing the twin surface decline system for the trucking of ore to surface. A vertical production shaft (751 meters deep) completed commissioning in December 2017 and ramped up to full production during 2018. From 2018 onwards, the majority of ore is hoisted to the surface via the shaft. The decline to surface is used to haul from some of the shallower stopes and to supplement shaft
- 90 -
haulage as well as to provide ready access for plant and equipment. A major pump station has been installed near the shaft bottom with redundant capacity in the pumps and pipelines to the surface.
A significant portion of the capital and access development for the mine is in place. To date 50,385 meters of capital and access development has been completed. The current life of mine plan contains a further 27,700 meters of capital lateral development based on mineral reserves.
The underground mining operations have been operated by Kibali staff since 2018. Mining methods are variants of long hole open stoping with cemented paste fill. Ore from stopes is loaded (both by tele-remote and conventional manual loaders) from the stopes into the eight ore passes via finger raises on the respective levels. This ore is then transferred by autonomous load haul dumpers into two coarse ore bins and then into two primary crushers, followed by two fine ore bins and independent skip loadout conveyors near the shaft bottom.
There have been no significant geotechnical failures in the active underground mining area and the rock mass model classified the rock mass as good. In addition, the life of mine deformation and stability assessment forecasts minor to locally moderate damage, which suggests mostly good mining conditions in general.
Based on current reserves, the Kibali open pit and underground operations are expected to continue until 2038. The addition of future open pit mineral reserves from additional exploration sites has the potential to extend open pit mining beyond 2038. The addition of future underground mineral reserves from resource conversion, such as at the 5,000 down plunge extension, have the potential to extend underground mining beyond 2038.
Kibali produced a total of 686,417 ounces of gold in 2024, of which Barrick’s share was 308,887 ounces of gold.
Processing
The Kibali gold processing plant comprises two largely independent processing circuits, the first one designed for oxide and transition ores and the second for sulphide refractory ore. However, both circuits are designed to process sulphide ore when the oxide and transition ore sources are no longer available. The circuit comprises crushing, ball milling, classification, gravity recovery, a conventional CIL circuit, flash flotation and conventional flotation, together producing a concentrate which goes to ultra-fine-grinding and a dedicated intensive cyanide leach. A cyanide recovery plant has been added to the circuit to deal with the quantity of cyanide going out of the plant.
The processing plant rated throughput is 3.6 million tonnes per annum of soft oxide rock ore through the oxide circuit and 3.6 million tonnes per annum of primary sulphide rock ore through a parallel sulphide circuit. Once the plant is sulphide only, the designed capacity is 7.2 million tonnes per annum of sulphide ore. The process plant has demonstrated improvements in throughput capability, performing beyond designed capacity at consistent recovery performance. Overall, the actual process plant gold recovery in 2024 met design standards at an average rate of 89.18%.
Infrastructure, Permitting and Compliance
The primary source of raw water supply is rain and spring water catchments with top-up from a borehole system and a final backup from the Kibali River. Raw water is collected and stored in the raw water dam, which has a storage capacity of 9,500 cubic meters. The processing plant requires approximately 33,000 cubic meters of water per day, which is sourced by reclaiming water from Kibali’s two TSFs.
- 91 -
Since there is no national grid power supply to the site, Kibali is dependent on its own power generation facilities. The power supply currently comes from a mix of on-site, high-speed diesel generator sets and three off-site hydropower stations (Nzoro II, Ambarau and Azambi). The hydropower system has a combined potential peak capacity of approximately 42 megawatts and has backup installed capacity for approximately 44 megawatts of thermal generation. An additional 16 megawatt solar power plant and battery energy system storage are under construction and expect to be commissioned in the second quarter of 2025.
All material permits and rights to conduct existing operations at the Kibali operations have been obtained and are in good standing.
Environment
An environmental management plan is in place, and the Kibali operations are ISO 14001:2015 certified and independently audited to continuously improve environmental management. The site is also audited against the requirements of the ICM Code and also fully compliant to GISTM standards since 2023.
Waste rock is generated and disposed of on Waste Rock Dumps that are located adjacent to the open pits and underground shaft.
Tailings are generated from the plant and disposed of in two separate TSFs – the unlined flotation TSF and a lined cyanide TSF, to protect infiltration of contaminants into the groundwater.
Commissioning of a cyanide recovery plant for the cyanide tailings stream commenced in 2023. The cyanide recovery plant has been fully operational since October 2024. As described in “Sustainability — Water” above, a plan is in place to achieve ICM Code certification at Kibali.
Although the original vegetation has been largely transformed through human activity, three plant species (Albizia (albizia ferruginea), Guarea Cedrate and Preygota Beguaertii) were recorded within the Kibali permit which are considered to be of conservational significance. The Company’s reforestation program results in the planting of more than 10,000 indigenous trees each year.
In 2024, all of Kibali’s activities were, and continue to be, in compliance in all material respects with applicable corporate standards and environmental regulations.
As at December 31, 2024, the recorded amount of estimated future reclamation and closure costs that were recorded under IFRS, as defined by IAS 37, and that have been updated each reporting period, was $27 million (Barrick’s 45% attributable share was $12 million) (as described in Note 2q to the Consolidated Financial Statements).
Exploration and Drilling
The focus of exploration at Kibali in 2024 was on resource replacement and additions, reviewing and testing opportunities and potential within and outside the known deposits and testing extensions down plunge down dip for underground potential.
During 2024, new indicated mineral resources were added on the Ndala and new conceptual mineralization was found at KCD, KCD north-west and Agbarabo-Rhino-Kombokolo (「ARK」). A number of deposits including at Oere and ARK also underwent drilling programs to test the down plunge and down dip continuity for underground opportunity. RC and diamond drilling were also conducted on early-stage targets, including Zambula and Aindi Watsa. Sterilization drilling was also conducted at Sessenge, Kalimva and Ndala. A total of 160,594 meters of diamond drill core in 1,179 holes and 265,241 meters of RC in 4,354 holes were drilled from surface exploration and grade control drilling programs in 2024.
- 92 -
Future greenfields exploration will continue to involve testing of grassroots targets identified by the historical soil and detailed mapping at Dembu and along KZ South. Follow-up works including geological mapping, local soil sampling grids and rock chip channel sampling will be focused at Dembu and KZ South. If successful, targets will be tested with further drilling. Additional anomalous catchments, together with the newly generated targets, will be tested during the next three to five years to sustain a level of exploration target turnover that ultimately supports the mine’s depletion replenishment pipeline for several years. Other planned works include continuing to drill test the potential highlighted at Zambula. A follow-up program will also be conducted based on results of the first phase of drilling.
Further brownfields exploration at the current underground drilling at KCD is aimed at defining additional extensions to mineralization to increase the underground mineral resources and mineral reserves over the next five years. Brownfields exploration will also continue across a number of satellite pits and deposits, including Oere and ARK. These pits and deposits will be drill tested for down plunge extensions to mineralization and to evaluate their economic viability for further smaller satellite underground operations to support the mine life extension outside of the existing mine life.
Combined exploration efforts are planned to target the delineation of satellite deposits within the gaps between and along the structural corridors of existing mineral resources and mineral reserves. This is planned with the goal of identifying and evaluating additional targets to add to the open pit and underground mineral resources and mineral reserve, maintaining a robust depletion replenishment pipeline for several years. In addition, a framework program is planned to test the geological concepts across ARK and KZ North with potential for near mine resources.
In all, a total of approximately 61,848 meters diamond drilling and 147,888 meters RC of exploration and grade control drilling is planned at Kibali in 2025.
Royalties and Taxes
The DRC Mining Code (2002) and associated regulations have been amended with an updated Mining Code which came into force on March 9, 2018 (the 「DRC Mining Code (2018)」) and the related amended mining regulations which came into force on June 8, 2018.
Further, in December 2024 a new Finance Law (the 「2025 Finance Law」) was promulgated. The 2025 Finance Law brings a series of changes to the tax and customs regime set out under the current DRC mining legislative framework.
The key changes introduced by the 2025 Finance Law are: (i) gold export duties are increased and together with existing duties and royalties will now equate to 8.5% of gold sales, an increase of 3% from the previous rate of 5.5%; (ii) removal of the general exemption from customs duties in respect of exports with customs duties on exports now being charged at rates varying from 0.5% to 10%; and (iii) various increases in import and other duties depending on consumables type, with these changes not anticipated to materially alter the life of mine profitability. A super profit tax was also introduced in the DRC Mining Code (2018) and applies if the average annual gold price is 25% above the one stated in the feasibility study submitted at the time of approval for the construction of the Kibali project.
Full payment has been made on all taxes required by the Government to date.
Mining and Processing Information
The following table summarizes certain mining and processing information for Kibali for the period indicated (Barrick’s 45% share):
- 93 -
Year ended December 31, 2024 |
Year ended December 31, 2023 |
|||||||
Tonnes mined (000s) | 19,398 | 17,837 | ||||||
Tonnes of ore processed (000s) | 3,827 | 3,700 | ||||||
Average grade processed (grams per tonne) | 2.82 | 3.21 | ||||||
Ounces of gold produced (000s) | 309 | 343 |
The most recent technical report on the Kibali gold mine is the technical report entitled 「Technical Report on the Kibali Gold Mine, Democratic Republic of the Congo」, with an effective date of December 31, 2021 and an issue date of March 18, 2022, authored by Rodney B. Quick, Simon Bottoms, Christopher Hobbs, Graham E. Trusler, Thamsanqa Mahlangu, Shaun Gillespie and Ismail Traore. This technical report has been filed on SEDAR+ in accordance with National Instrument 43-101.
The Company has extensive operating experience in the DRC. Nevertheless, operating in emerging markets, such as the DRC, exposes the Company to risks and uncertainties that do not exist or are significantly less likely to occur in other jurisdictions such as the United States or Canada. For additional details, see 「Foreign investments and operations」, 「Permitting and government relations」, 「Inflation」, 「Joint ventures」, 「Security and human rights」, 「Artisanal and illegal mining」, 「Community relations and license to operate」, 「Government regulation and changes in legislation」 and 「U.S. Foreign Corrupt Practices Act and similar worldwide anti-bribery laws」 in 「Risk Factors」.
While all risks cannot be mitigated or eliminated, the Company expects to manage and mitigate controllable risks at its DRC operation through the consistent application of a variety of corporate governance structures and processes that are materially the same as those applied at its other operations located in developed markets. For additional details, see 「Narrative Description of the Business – Operations in Emerging Markets: Corporate Governance and Internal Controls」.
The diagram on the following page sets out the design and layout of the Kibali gold mine.
- 94 -
- 95 -
Loulo-Gounkoto Mine Complex
General Information
Project Description
The Loulo-Gounkoto Mine Complex (「Loulo-Gounkoto」) is situated in western Mali adjacent to the Falémé River, which forms the international boundary between Mali and Senegal. Loulo-Gounkoto is located 350 kilometers west of the capital city of Bamako, 220 kilometers south of Kayes and to the northwest of the nearest town Kenieba. The Dakar to Bamako Millennium highway crosses the Loulo-Gounkoto haul road and serves as the primary access point for both mines and provides excellent road transport links with the rest of the country as well as to Senegal. As at December 31, 2024, Loulo-Gounkoto had approximately 2,900 employees and 5,200 contractors.
The Loulo gold mine (「Loulo」) consists of multiple mineral deposits including: Yalea, Gara, Loulo 3, Baboto, Gara West, PQ10, P129, P125L3 and P129QT. The Gounkoto gold mine (「Gounkoto」) consists of two mineral deposits: Gounkoto and Faraba. The Loulo and Gounkoto permits currently cover 261.23 square kilometers and 99.94 square kilometers respectively, for a total area of 361.17 square kilometers.
The Loulo gold mine is within the Loulo Exploitation Permit (the 「Loulo Permit」). The Loulo Permit was most recently amended on June 21, 2012. It covers the Gara and Yalea underground mineral reserves and the Baboto, Gara West and Loulo 3 open pit mineral reserves. The Loulo Permit remains in force for a period of 30 years from 2012, after which it is renewable if production is still taking place.
In 2010, the Gounkoto Exploitation Permit (the 「Gounkoto Permit」) was granted, which was split from the Loulo Permit. The Gounkoto Permit, which incorporates the Gounkoto and Faraba Reserves, is valid for 30 years from 2012.
To KEEP mining concessions in good standing, concession holders are required to pay royalties and corporate taxes to the Malian government. See 「Royalties and Taxes」 below.
Sufficient surface rights have been obtained for current operations at the property.
History
The Gara gold deposit was discovered in 1981 by a joint venture between the Malian Direction Nationale de la Géologie et des Mines and the French Bureau de Recherches Géologiques et Minières. In 1992, BHP Minerals Mali entered into an agreement with Société des Mines de Loulo SA (「SOMILO」), a Malian company, for a joint venture that developed the Gara deposit into a mineral resource that was deemed sub-economic at the time.
During 1996, Randgold acquired BHP Minerals Mali and undertook additional regional exploration which resulted in the 1997 discovery of Yalea, the second of two deposits that make up the Loulo gold mine. Gounkoto was discovered through regional exploration in 2009, with first gold being produced at the Gounkoto open pit in 2011. On January 1, 2019, Barrick acquired Randgold’s 80% interest in Loulo-Gounkoto by virtue of the Merger.
The Loulo mine is owned by SOMILO, which is owned 80% by Barrick and 20% by the State of Mali.
The Gounkoto gold mine is owned by Société des Mines de Gounkoto SA (「Gounkoto SA」), a Malian company, which is owned 80% by Barrick and 20% by the State of Mali.
- 96 -
Geology
Geological Setting
Loulo-Gounkoto is located within the Kedougou-Kenieba erosional inlier. The inlier is unconformably overlain by Upper Proterozoic sandstones towards the east and further south. Loulo-Gounkoto is predominantly underlain by the Kofi formation consisting of greywacke, sandstone, argillaceous sandstone, calcareous sandstone and tourmalinized sandstone, sheared greenstone units.
Mineralization
The Yalea main mineralized body is hosted by the Yalea Shear, where it is intercepted by the Yalea Structure. The Yalea Shear is a 1.4-kilometer long brittle-ductile, north-south striking, mineralized fault that transects the Yalea Structure, which is a complex, north to north-northeast striking shear zone. The Yalea mineralization is predominantly hosted in hydrothermally brecciated argillaceous pink quartzites.
Gara (previously known as Loulo 0) is hosted within an intensely tourmaline greywacke unit which outcrops on the surface due to its high resistance to weathering. Gold mineralization is strata bound and hosted by a stockwork of quartz-carbonite-pyrite veinlets that is enveloped by footwall greywacke and hanging wall (「HW」) Sheared Quartzite Rose. The higher gold grades generally occur where the veins are most intense and the range of vein orientations more complex.
Baboto is a shear hosted deposit situated along a north-south striking shear structure located approximately 14 kilometers north-northeast from the Yalea deposit. Baboto is dominated by a thick sequence of metasediments and structural breccias. Gold mineralization is mainly associated with the finely disseminated pyrite occurring in the brittle-ductile shear breccias.
Loulo 3 is located 4 kilometers north-northeast of the Yalea mine. Loulo 3 consists of four mineralized zones: a north-northwest trending main zone (「MZ1」), which is situated on the Loulo 3 structure and is transected by the north-northeast striking main zone (「MZ2」), which is situated on the Yalea structure, and two sub-parallel northwest striking footwall zones. The stratigraphy at Loulo 3 (inclusive of Loulo 2) comprises three major lithological subunits, which from east to west include: the HW package (subunits HW1 to HW5), the host package (subunits HP1 to HP4), and the footwall (「FW」) package (subunits FW1 to FW2). The mineralization in Loulo 3 is hosted in the HP4 subunit of the Main Sandstone package with a dominant vein-hosted mineralization style within MZ1 or quartz-tourmaline veins in MZ2. These vein arrays locally transition into bedding-parallel hydrothermal breccias with local semi-massive to massive pyrite, which CAN also include arsenopyite and hematite, and form the high-grade shoots within the Loulo 3 deposit. The position of the high-grade shoots is controlled by pre-existing competence contrasts within the host rock package.
Other minor satellite deposits are present within the Loulo Permit, which exhibit similar geological characteristics to the other major deposits outlined above.
Gounkoto is a large north-northwest trending shear zone, with a complex assemblage of ductile shear breccias, shears and faults characterized by a stepped geometry, with wider zones of mineralization generally seen on the northwest trending structures and narrower zones on the north-south trending structures.
The Faraba deposit strikes north-northwest and is comprised of several zones of gold mineralization hosted within and along the contacts of north-south striking, coarse-grained, gritty sandstone units (lithic wackes) and polymictic breccias, flanked by packages of sheared argillaceous sediments. Lithological layering (transposed bedding) dips steeply westward; however, the mineralized zones (with associated silica, silica-carbonate, and late overprinting hematite alteration) dip steeply to the east. The mineralization terminates up against the west-dipping Faraba Structure at depth. Mineralization is
- 97 -
predominantly pyrite, with subordinate arsenopyrite, local magnetite, rare chalcopyrite and pyrrhotite. The mineralization is rheological competency contrast controlled and is typically vein-hosted (i.e. massive, stringers and blebs), or occurs as dissemination in strongly altered hosts (i.e. blebs and fine grains), with semi-massive to massive sulphides typically within the lower parts of the system adjacent to the Faraba Structure. Higher-grade portions of the system appear to plunge shallowly southward in longitudinal section.
The Faraba North target consists of a series of discrete shears and hydrothermal breccia, with vein-style mineralization associated with pyrite and arsenopyrite. The mineralized zones are sub-parallel to stratigraphy and a total of eight mineralized zones have been generated in the HW domain, and two zones of Dip Domain Boundary (「DDB」) mineralization. The eight mineralized zones in the HW domain are characterized by strong hematite alteration within the first two zones. Then, silica albite, with minor tourmaline and chlorite alternation, for the next three zones, followed by silica carbonate dominant alteration in the lower most zones. The DDB mineralization is characterized by strong silica carbonate and hematite alteration, where the highest grades are related to high strain.
Mining Operations
Production and Mine Life
The Loulo-Gounkoto Complex is currently comprised of open pits at Gounkoto, Yalea South, Gara West, and Baboto. Under the current life-of-mine plan, mining at Loulo 3 open pit is expected to commence in 2027 and at Faraba open pit in 2029. Additionally, the Yalea, Gara and Gounkoto underground mines are accessed via portals located in the open pits and a box cut. The mining method for the underground mines consists of long hole stoping with paste fill. Development of Gounkoto underground commenced in 2020 with the mining of the crown pillar under the North Pit occurring from the second quarter of 2023, adding high-grade ounces to production up until the end of 2025. However, as described in Royalties and Taxes” below, the Company temporarily suspended operations at the Loulo-Gounkoto Complex on January 14, 2025 as a result of the ongoing Mining Conventions dispute with the Government of Mali. For additional details, see 「Legal Proceedings and Regulatory Actions—Loulo-Gounkoto Mining Conventions Dispute」.
Based on existing reserves, the Loulo-Gounkoto open pit operation is expected to continue until 2034 and the underground operation until 2041. Loulo-Gounkoto produced a total of 722,888 ounces of gold in 2024 produced from CIL circuit and fine carbon of which Barrick’s attributable share was 578,310 ounces of gold.
Processing
The Loulo processing plant uses a CIL gold extraction process with a design throughput capacity of approximately 4.8 million tonnes per annum, which has progressively reached a peak of 5.2 million tonnes per annum. Throughput capacity is expected to be increased to approximately 6.2 million tonnes per annum from 2031 onwards as a result of a planned process plant expansion that is scheduled to commence in 2027. The Loulo processing plant processes ore from both the Loulo and Gounkoto operations. The plant uses a conventional crushing, milling, CIL, and tailings disposal circuit. A gravity circuit was taken off-line in September 2017 as ultra-fine gold (-20 micrometers) was not being efficiently recovered, but it was proven to be leached post-CIL in final tails gold deportment test work. Recoveries have increased since 2019 year-on-year and further gold deportment work will be completed in 2024 to determine how efficiently this fraction is leached per size class. Test work in 2023 indicated additional residence time (CIL) will achieve higher recoveries and a project is in progress to evaluate the economics.
Gold recovery is maintained above 89% by blending the various ore sources (Yalea/Gara/Gounkoto) to control the copper and arsenic content within the mill feed. The current life-of-mine plan has an average recovery of 89.04%. The average gold recovery in 2024 was 90.62%.
- 98 -
Infrastructure, Permitting and Compliance
The climate at Loulo-Gounkoto is strongly influenced by the north and southward movement of the Inter Tropical Convergence Zone, which creates distinctive wet and dry seasons. Although annual evaporation exceeds the annual rainfall, an excess of water is available during the peak of the wet season (July to September) to generate surface water run-off. Water is sourced for the Loulo-Gounkoto Complex from the Gara and Falémé rivers, which run through the Loulo-Gounkoto site.
Power is mainly generated on site using light and heavy fuel generators. The mine is required to produce its own electrical power from a blend of renewable and thermal sources (including solar, battery energy storage, heavy fuel oil and diesel generators), as there is no available national power supply grid network for the site to connect to. These generators are supported by power from a grid solar plant, which offsets thermal energy used during the day.
In 2023, an expansion at the existing solar power plant was completed with an additional 40 megawatts (48 megawatts peak) and new battery energy storage system added. The photovoltaic solar farm has a total capacity of 60 megawatts with a 38 megavolt-amperes battery energy storage system. In 2024, this allowed for a reduction of 25.7 million liters of fuel, which translates to a saving of approximately 69 kilotonnes of carbon dioxide equivalent emissions. An additional 7 megawatts of heavy fuel oil (CM19) generators may be installed in the future to serve the power demand for life of mine.
As at December 31, 2024, project spend was $5.2 million for the CM19 generator and the total cost for this project is expected to be $6.1 million. The overall power project is expected to finish below the original capital cost of approximately $90 million (100% basis).
All material permits and rights to conduct existing operations at Loulo-Gounkoto have been obtained and are currently in good standing. However, see 「Legal Proceedings and Regulatory Actions—Loulo-Gounkoto Mining Conventions Dispute」.
Environment
Climatic conditions do not materially affect exploration, development or mining operations.
An environmental management plan is in place, and Loulo’s operations are ISO 14001:2015 compliant and independently audited to continuously improve environmental management. The site is also audited against the requirements of the ICM Code.
In 2024, all activities at Loulo-Gounkoto were, and continue to be, in compliance in all material respects with applicable corporate standards and environmental regulations.
As at December 31, 2024, the recorded amount of estimated future reclamation and closure costs that were recorded under IFRS, as defined by IAS 37, and that have been updated each reporting period, was $35 million (100% basis) for Loulo and an additional $7 million (100% basis) for Gounkoto (as described in Note 2q to the Consolidated Financial Statements).
Exploration and Drilling
Since 1993, the following sampling has been undertaken at Loulo for a total of 2,556,296 meters: (i) diamond drilling of 6,953 drill holes for 1,496,782 meters; (ii) RC drilling of 14,492 drill holes for 731,844 meters; (iii) rotary air-blasted (「RAB」), auger and Air Core (「AC」) drilling of 11,058 drill holes for 193,434 meters; (iv) trenches of 940 cuts for 50,208 meters; and (v) underground channels of 12,815 channels for 84,028 meters.
- 99 -
At Gounkoto, since 1993, the following sampling has been undertaken for a total of 1,271,896 meters: (i) diamond drilling of 1,476 drill holes for 401,334 meters; (ii) RC drilling of 9,815 drill holes for 756,758 meters; (iii) RAB and auger drilling of 7,875 drill holes for 75,693 meters; (iv) trenches of 368 cuts for 27,031 meters; and (v) underground channels of 2,143 channels for 11,080 meters.
Exploration at Loulo-Gounkoto is focused on advancing both brownfields and greenfields targets. Brownfields exploration involves testing underground and open pit extensions of the current mineral resources for high-grade mineralization based on the structural model. The current exploration concept has been proven to be effective, with both the discovery of Gounkoto and the successful replenishment of depleted mineral resources and mineral reserves at both mines.
Exploration continues at Loulo-Gounkoto to replenish resources that have been depleted from mining. Loulo-Gounkoto replaced 100% of depleted reserves in 2024 and opportunities for growth remain in both the Loulo and Gounkoto permits. In 2024, exploration focused on the Baboto Complex, Yalea Structure, Faraba extension, Gounkoto Deeps, and The Eastern Kofi domain.
Through 2024, various phases of drilling at the Baboto Complex have shown significant depth potential upside. At Baboto Main, drilling extended the mineralized system along strike and intersected emerging high-grade shoots at depth, both of which remain open, supporting the potential of the deposit to provide significant additional ounces to the life of mine in an expanded open pit and possible underground. Drilling at Baboto Far South confirmed the exploration potential for high grade zones of mineralization beneath Baboto village. Drilling has identified an emerging target, east of the Baboto Main (Eastern Zone) that shows potential to contribute to the overall mineral inventory, and is another indication of the major ore-body potential of the overall Baboto Complex.
Drilling along the Yalea Corridor in 2024 has highlighted the remaining upside potential both along strike and at depth, with the four defined areas of interest still showing upside for drill testing, which would aim to target both ore shoot and system (alteration/deformation) extensions. Maiden drilling at Barika, located 1.5 kilometers south of Yalea revealed the clear re-emergence of a south-plunging ore shoot, hosting high-grade intercepts and comparable to the overall southerly plunge of the Yalea system.
Exploration activity at Gounkoto in 2024 focused on certain internal mineralized zones (MZ): the MZ1 deep drilling and the geological model review at MZ2/MZ3; followed by drilling on potential inflow zones on both MZ2 and MZ3; the Kofi East auger geochemical screening; the program of high-resolution airborne magnetics; and a geochemical footprint study. The deep drilling did not confirm the interpreted geologic model. The geochemical footprint study was initiated to help to better constrain the high-grade shoot geometry and optimize the next phase of drilling. At Kofi East, auger drilling shows low tenor anomalies with multiple zones of gold anomalism identified, portable x-ray fluorescence analysis has been incorporated to refine the anomalies with pathfinders associated. All data is being integrated, including the high-resolution airborne magnetic data, to generate new prioritized targets for a robust target pipeline. The priority follow-up targets from this work for 2025 exploration include strike and depth upside at Baboto, Yalea Shear Extension (Barika and Sanili), Gara North (Saba), Gounkoto Deeps and Gounkoto DB target extension. This drilling program will commence once the temporary suspension of operations is lifted (see 「Royalties and Taxes」 below).
Royalties and Taxes
Separate establishment conventions applicable to each of the Loulo and Gounkoto mines regulate the fiscal conditions under which the mines operate and are based on the Mali Mining Code (1991) (together, the 「Mining Conventions」). The Mining Conventions guarantee the stability of the regimes set out therein, govern the applicable taxes and allow for international arbitration in the event of a dispute. The Mining Conventions also included exoneration on fuel duties for the life of the Loulo-Gounkoto Complex.
A 6% royalty is payable to the Malian government based upon production, together with a corporate tax rate on profits at 30% and a minimum of 0.75% on gross revenues if a loss is made. During the
- 100 -
second quarter of 2020, an agreement was reached whereby the Government of Mali undertook to extend for a 15-year period the convention governing the Loulo mine at its expiration in April 2023 in exchange for certain changes to the SOMILO establishment convention with immediate effect, namely the waiver of a withholding tax exemption and agreement to pay a priority dividend to the State. Such dividends have since been distributed to the State of Mali on 50% of its 20% shareholding in the mine.
In 2023, Mali adopted Law No. 2023-040, establishing the Mining Code in the Republic of Mali (the 「2023 Mining Code」) and initiated a review process of existing mining conventions, including the Mining Conventions of SOMILO and Gounkoto SA. As part of this process, the Government of Mali alleged that the Loulo Mining Convention expired in April 2023 and demanded that the mines become subject to the 2023 Mining Code, in direct violation of the stability rights contained in the Mining Conventions.
The Company has been engaging with the Government of Mali on these matters; however, after multiple good faith attempts to resolve the dispute, on December 18, 2024, SOMILO and Gounkoto SA submitted a request for arbitration in accordance with the provisions of their respective Mining Conventions. On January 14, 2025, due to restrictions imposed by the Government of Mali on gold shipments in violation of the Mining Conventions, the Company announced that the Loulo-Gounkoto Complex would temporarily suspend operations. For additional details, see 「Legal Proceedings and Regulatory Actions – Loulo-Gounkoto Mining Conventions Dispute」.
Mining and Processing Information
The following table summarizes certain mining and processing information for Loulo-Gounkoto (Barrick’s 80% share) for the periods indicated:
Year ended December 31, 2024 |
Year ended December 31, 2023 | |||
Tonnes mined (000s) |
36,447 | 28,200 | ||
Tonnes of ore processed (000s) |
4,163 | 4,049 | ||
Average grade processed (grams per tonne) |
4.73 | 4.61 | ||
Ounces of gold produced (000s) |
578 | 547 |
The most recent technical report on Loulo-Gounkoto is the technical report entitled 「Technical Report on the Loulo-Gounkoto Mine Complex, Mali」, with an effective date of December 31, 2022 and an issue date of March 17, 2023, prepared by Simon Bottoms, Richard Peattie, Graham E. Trusler, Thamsanqa Mahlangu, Derek Holm and Ismail Traore. This technical report has been filed on SEDAR+ in accordance with National Instrument 43-101.
The Company has extensive operating experience in Mali. Nevertheless, operating in emerging markets, such as Mali, exposes the Company to risks and uncertainties that do not exist or are significantly less likely to occur in other jurisdictions such as the United States or Canada. For additional details, see 「Foreign investments and operations」, 「Permitting and government relations」, 「Inflation」, 「Joint ventures」, 「Security and human rights」, 「Artisanal and illegal mining」, 「Community relations and license to operate」, 「Government regulation and changes in legislation」 and 「U.S. Foreign Corrupt Practices Act and similar worldwide anti-bribery laws」 in 「Risk Factors」.
While all risks cannot be mitigated or eliminated, the Company expects to manage and mitigate controllable risks at its Mali operation through the consistent application of a variety of corporate governance structures and processes that are materially the same as those applied at its other operations located in developed markets. For additional details, see 「Narrative Description of the Business – Operations in Emerging Markets: Corporate Governance and Internal Controls」.
- 101 -
The diagram on the following page sets out the design and layout of the Loulo-Gounkoto Mine Complex.
- 102 -
- 103 -
Reko Diq Project
General Information
Project Description
The Reko Diq Project (「Reko Diq」) is situated in the north-west corner of the Balochistan Province of Pakistan, which borders Iran to the west, Afghanistan to the north, the Punjab and Sindh Provinces of Pakistan to the east, and the Arabian Sea to the south. The region is sparsely populated with the nearest settlement being Humai, located approximately 19 kilometers away. Nok Kundi, located approximately 75 kilometers away, is the closest major regional center. From Nok Kundi, Reko Diq is accessed by regional gravel road which, while adequate for exploration and drilling requirements, will be upgraded to support construction and operational needs. Reko Diq is accessed from other major regional centers via the national highway N40 (approximately 40 kilometers away), which runs from Quetta, the capital city of Balochistan, to the border with Iran.
In 2024, Barrick completed an update of Reko Diq’s 2010 feasibility and 2011 feasibility expansion studies. Once complete, Reko Diq will comprise two open pit mines and a processing plant, together with other associated mine operation and regional infrastructure. Mining is planned to occur in two phase (Phase 1 and Phase 2). Reko Diq will produce copper concentrate which includes gold for smelting as a by-product by third-party operated smelters. Concentrate will be delivered by the existing rail network route (for which upgrades to meet project requirements will be required) from the mine to Port Qasim for export to international markets.
The mineral titles held by Reko Diq Mining Company (Private) Limited (「RDMC」), a Pakistani corporation, were issued pursuant to an amendment to the Regulation of Mines and Oilfields and Mineral Development (Government Control) Act, 1948, which permits the granting of mineral title through private negotiations. The various mineral titles held by RDMC were customized for Reko Diq as part of the Reconstitution (defined in 「History」 below) and are not generally subject to the Balochistan Mineral Rules, 2002. The key mineral titles granted to RDMC are two mining leases, an exploration license and a surface rights lease. Among other things, the mining leases are subject to annual rental fees and a one-time security deposit. RDMC’s mining leases are valid until 2052 (with automatic renewals for incremental periods of up to 30 years), and its exploration license is valid until the third anniversary of commercial production (subject to renewal for two additional three-year terms). RDMC’s surface rights lease has an initial term until 2052 (subject to renewal).
The surface rights secured for Reko Diq cover approximately 643 square kilometers and are sufficient to allow for the development and operation of both phases of the project, including mining-related infrastructure such as the open pits, process plant, workshops, offices, tailings storage facility, and waste rock storage facilities. In 2024, RDMC submitted an application to amend one of its mining leases to accommodate the optimized design of the tailings storage facility. The amended mining lease is expected to be issued sufficiently in advance of operational requirements.
As at December 31, 2024, Reko Diq has approximately 400 employees and 1,300 contractors. During construction, approximately 11,500 jobs are anticipated to be created with more than 3,000 required during the operational phases.
History
Several companies have held interests in Reko Diq since 1996, with approximately 360 kilometers of drilling being undertaken within the exploration license. Exploration commenced in 1996 with several campaigns of drilling being completed, culminating with the latest drilling to support the mineral resource being completed in 2009. The project was put on hold in 2010 after disputes arose with the Government of Balochistan (the 「GoB」) and the Government of Pakistan (the 「GoP」).
- 104 -
In November 2011, Tethyan Copper Company Pty. Limited (「TCC」, which is now known as RDMC) filed for arbitration against the GoP and the GoB in respect of contractual and treaty investment claims relating to Reko Diq. By July 2019, arbitration tribunals ruled in favor of TCC and, among other things, rendered a multi-billion-dollar damages award against the GoP (the 「Award」). Barrick, Antofagasta, the GoB, and the GoP subsequently engaged in discussions regarding alternatives for the resolution of the Award that satisfied the objectives of each party and all related stakeholders. Ultimately, these negotiations resulted in the reconstitution of the project.
Reko Diq was formally reconstituted on December 15, 2022 (the 「Reconstitution」). The completion of the Reconstitution involved, among other things, the resolution of the Award and execution of all of the definitive agreements, including The Joint Venture Agreement and Mineral Agreement which respectively form the basis for the governance of the project and the applicable royalty and tax regime, including fiscal stabilization, as well as the grant the mining leases, an exploration license, and surface rights lease as discussed in 「Project Description」 above. The Reconstitution was approved by the GoB, the GoP and the Supreme Court, which issued a favorable opinion in respect of the legality of the agreements concluded as part of the Reconstitution under Pakistan law.
The reconstituted project is owned by RDMC, which is indirectly held 50% by Barrick and 50% by Pakistani stakeholders, comprising a 10% free-carried, non-contributing share held by the GoB, an additional 15% held by a special purpose company owned by the GoB and 25% owned by other federal Pakistani state-owned enterprises. Barrick is the operator of Reko Diq.
Geology
Geological Setting
The Reko Diq deposits lie on the Tethyan copper-gold metallogenic belt regionally extending from central Europe to Pakistan and locally within the Chagai Belt. The deposits are hosted within Oligocene and Miocene aged units. The Dalbandin formation is a volcanogenic sedimentary unit of sand and siltstone Dalbandin which is overlain by the Reko Diq formation which is characterized by sub-aerial volcanic units of andesite and breccias. The deposits are centered around Miocene aged porphyry intrusion that lie between the Tozgi and Drana Koh fault systems that are parallel to the Makran subduction zone.
Mineralization
Reko Diq hosts one of the world’s largest undeveloped open pit copper-gold porphyry deposits. Copper, gold and molybdenum mineralization is interpreted to be associated with a regional scale porphyry system primarily contained within a series of diorite to quartz-diorite bodies that have intruded the Dalbandin and Reko Diq Formations. These intrusions are fine to medium-grained displaying porphyritic textures with alteration halos radiating outwards. Mineralization is primarily within the intrusives; however, it also occurs in the adjacent altered wall rock. The intrusions occur as stocks, dykes, sills, and dyke swarms, with bodies typically ranging in size, but have diameters less than three kilometers.
The Western Porphyries display a minor (less than 50 meter) leach cap with primary mineralization occurring at surface. The limited leach cap formed when the system was uplifted quickly during deformation resulting in the minor development of a supergene system. Mineralization at the Western Porphyries is primary hypogene with chalcopyrite dominant near surface with bornite abundance increasing at depth. Extensive pyrite has been identified (generally less than 4%) with minimal oxide mineralization identified.
The porphyry units that host the main mineralization are broken into several units identified by texture, changes in mineral content, and distribution. In the Western Porphyries, the host rocks are diorite
- 105 -
porphyries with dominantly feldspar and biotite assemblages. These have been named PFB1 to PFB3 (Feldspar-Biotite Porphyry). PFB1 is the oldest and most fertile, while PFB3 is the least fertile based on current drilling. PFB1 and PFB2 are volumetrically similar and consist of the main mineralization in the core of the system around H14 and H15. Two older and less mineralized feldspar-hornfels and feldspar-quartz (PFH and PFQ) porphyries occur at the north end of H15 and in H79.
Tanjeel is a supergene system with mineralization occurring as a moderately well developed, sub-horizontal, copper enrichment blanket. The system is relatively small compared to Western Porphyries (representing approximately 6% of the total recovered copper for the life of Reko Diq) and contains an upper pyrite-chalcocite system with a pyrite-chalcopyrite hypogene underlying system. Copper oxide is common and occurs as malachite, copper wad, as well as chalCANthite where exposed chalcocite has oxidized. The pyrite content CAN reach 12% accounting for the required generation of sulphur to mobilize copper in the supergene system.
The porphyry units at Tanjeel are older than the Western Porphyries and are feldspar-quartz or quartz-feldspar diorites (PFQ and PQF). These intrusions are sub-horizontal compared to the sub-vertical PFB units in Western Porphyries. A key differentiation is the supergene enrichment zone at Tanjeel, with some hypogene mineralization at depth. The main intrusive feeder for the system appears to be found at depth to the south-east of Tanjeel.
Mining Operations
Production and Mine Life
Reko Diq will comprise two open pit mines: the main open pit at Western Porphyries; and a satellite pit at Tanjeel. Mining will be carried out year-round, 24 hours per day using conventional drill, blast, load and haul methods. The initial construction phase is anticipated to take approximately four years. Mining of the Western Porphyries is planned to start in 2027 with mill feed expected in 2028. The mining will ramp up to provide the Phase 1 mill capacity of 45 million tonnes per annum by 2030. Phase 2 ramp up is scheduled to start in 2033, reaching the Phase 2 capacity of 90 million tonnes per annum in 2035. Mill feed material from Tanjeel will start in 2038.
Based on existing reserves, the total mine life is expected to be approximately 37 years from commissioning of the plant in 2028. Mining is forecast to finish at Reko Diq in 2061, followed by three years of processing of stockpiles to 2064. Reko Diq is estimated to produce a total of 13.1 million tonnes of copper and 17.9 million ounces of gold (100% basis).
Processing
Ore will be processed at the Reko Diq processing plant. A phased approach to process plant development will be undertaken. Phase 1 will comprise design, construction and commissioning of the first stage process plant, with a nominal capacity of 45 million tonnes per annum, to treat the first five years of mined ore. Phase 2 will comprise duplication of the Phase 1 processing facilities, with the development of a parallel plant to achieve a total capacity of 90 million tonnes per annum starting in 2035. The two plants will operate largely independently but with common support facilities, services and concentrate and tails handling.
The process flowsheet is based on industry standard proven technology that will comprise feed preparation using two-stage crushing and high-pressure grinding rolls followed by a closed-circuit ball milling circuit. Product from the comminution circuit will feed a bulk sulphide rougher flotation circuit with rougher concentrate reground and upgraded to final concentrate grade in a two-stage cleaner circuit. The final concentrate handling circuit will consist of concentrate thickening and filtration, with filter cake stored on-site before being transported to the port via rail. A processing testwork program was completed from 2023 to 2024, which built upon previous work conducted between 2007 and 2009.
- 106 -
The expected average recovery rate is 89.9% for copper and 69.9% for gold, based on the current life-of-mine plan and testwork completed as of December 31, 2024. Copper recovery in the first 10 years is forecasted at 90.1%. Changes in the feed material characteristics may impact the actual achieved recovery. First production is targeted for the end of 2028.
Infrastructure, Permitting and Compliance
Reko Diq is located approximately 915 meters above Sea level, with a hyper-arid climate and in the Sistan Desert ecological region. The climatic conditions are typically hot and dry, with high sunshine exposure throughout the year, and average rainfall of less than 35 millimeters per annum, which occurs predominately in the early part of the year. As there are limited surface water resources, groundwater is planned as the primary water supply for Reko Diq. Water will be supplied from boreholes located north of the mine and will be supplied via a pipeline of approximately 70 kilometers. Water demand has been calculated and based on expected water usage for both construction and operations. Water distribution will be via dedicated service lines at the required pressures and flows, to all required facilities and buildings on site.
Power will be supplied by an on-site hybrid microgrid power solution, comprised of heavy fuel oil power generating sets, diesel generating sets, a 150 megawatt solar photovoltaic array, and a 50 megawatt/100 megawatt hour battery energy storage system (including an on-site transmission line). The base case assumes the power supply will be sourced from the national grid from year 15 of mining, with the heavy fuel oil generating sets remaining on standby. RDMC has advanced this strategy with Pakistan’s National Transmission and Dispatch Company to ensure it aligns with the strategic direction for the country’s power connectivity. Additional studies are also being undertaken to assess the feasibility of other power sources to increase the percentage of power delivered from the national grid or by renewable energy sources and reduce the dependence on heavy fuel oil.
Site infrastructure will include a water treatment plant for potable water, security facilities, airstrip, roads, accommodation village, maintenance facilities, stockpiles, and other auxiliary buildings. The site common purpose infrastructure will be initially developed to support Phase 1 with allowance for expansion where appropriate to support Phase 2.
Reko Diq is also planned to have a TSF to store rougher and cleaner tailings. The TSF has been designed using conventional deposition method and will accommodate approximately 2,816 million tonnes of rougher tailings (split between two facilities) and 320 million tonnes of cleaner tailings (split between three facilities). Construction of the TSF is expected to commence in 2026 and will be completed in phases. Tailings deposition is planned to commence in 2028 and continue until 2064. GISTM (along with other international and Barrick principles, standards and guidelines) was utilized to direct the assessment of tailings placement, technology, and overall management of Reko Diq’s tailings handling and storage facilities.
Based on the current mine plan, no resettlement is anticipated for the development of Reko Diq.
The Mineral Agreement sets out a list of permits and approvals from various governmental authorities that are expected to be required in connection with the construction, development and operation of Reko Diq. The processes to obtain and renew the required permits are well understood by RDMC and similar permits have been granted in the past. RDMC expects to obtain the required permits and approvals in the normal course.
- 107 -
Security
RDMC has developed a security strategy that is suitable for the Reko Diq context and location. The foundations of the Reko Diq security strategy were agreed between Barrick, the GoB and the GoP as part of the Reconstitution.
The strategy takes a three-tiered approach: a private security force (at and within the mine site); the Balochistan provincial security force, the Balochistan Levies; and Pakistan’s regional security force, the Frontier Corps. Among other things, the project’s security strategy includes the development and implementation of strict security protocols for all employees, contractors and visitors, as well as the formation of a security committee to ensure effective operational communication between the security service providers. The security strategy and implementation arrangements for Reko Diq are based on international best practice and include, among other things, commitments for all security personnel to be trained on Barrick’s Human Rights Policy and to uphold international human rights standards, such as the VPSHR. See 「Human Rights」 under 「Sustainability」.
An early works program for security is underway. This program includes establishing a perimeter boundary fence, gatehouse and surveillance systems. The gatehouse will employ full personnel and vehicle screening throughout the operation. The plant and accommodation village and other infrastructure areas will have fencing surrounding major areas with details to be developed during the execution phase.
For additional details regarding risks and uncertainties associated with the security situation in Pakistan, refer to 「Foreign investments and operations」 and 「Security and human rights」 in 「Risk Factors」.
Environment
Climatic conditions do not materially impact exploration, development or mining operations.
As part of the ESIA submitted in late 2024, an Environmental and Social Management and Monitoring Plan for Reko Diq was developed. An Environmental and Social Monitoring System is in the process of being developed to ensure compliance with applicable national, provincial, and international legislation, standards, guidelines and practices.
In 2024, all activities at Reko Diq were, and continue to be, in compliance in all material respects with applicable corporate standards and environmental regulations.
As at December 31, 2024, there were no amounts recorded for estimated future reclamation and closure costs under IFRS, as defined by IAS 37. Future reclamation and closure costs at Reko Diq will increase over time as the project is developed and operated. RDMC is required to establish and contribute to a closure fund account in the final ten years of Reko Diq’s mine life.
Exploration and Drilling
Exploration at Reko Diq has focused on the Western Porphyries and Tanjeel areas, with works recommencing by RDMC in 2023 to support ongoing design and construction studies. As noted above, RDMC holds an exploration license which encompasses the Western Porphyries and Tanjeel.
As part of the ongoing studies, drilling was recommenced in August 2023 with a total of 18,968 meters of geotechnical and 2,973 meters of metallurgical holes, both using diamond drilling, being completed in 2023 and 2024 (combined).
Since the Reconstitution in 2022, RDMC has been actively adding to the existing exploration knowledge in an effort to expand the mineral resource base of Reko Diq. RDMC has identified several key targets that demonstrate the potential to add further copper and gold resources to the project from
- 108 -
nearby porphyry surface expressions including the depth extension of the currently defined resources and regional exploration targets. Defining economic viability, continuity of mineralization and assessing the application of modifying factors to the nearby porphyry surface expressions is underway.
In 2024, a site-based exploration team worked on re-logging historic drill holes, re-interpreting legacy datasets and modeling historic and newly generated targets. The team has also completed a large mapping and rock chip survey containing more than three thousand samples and covering an area of 300 square kilometers, and is in process of completing geological and structural mapping at various scales, with infill geochemical and geophysical surveys ongoing in parallel.
Royalties and Taxes
The Reconstitution included an agreed fiscal regime and 30-year stabilization period for the project (i.e., until December 15, 2052).
The key fiscal terms for Reko Diq include a 5% net smelter return royalty payable to the GoB, a 1% net smelter return final tax regime payable to the GoP (subject to a 15-year exemption following commercial production), and a 0.5% net smelter return royalty export processing zone surcharge.
To ensure that Balochistan is receiving benefits during the development and construction phases, advance royalty payments to the GoB were made in year 1 ($5 million) and year 2 ($7.5 million), and will be made in year 3 until commercial production ($10 million per year), for a maximum total amount of advance payments of $50 million. The lesser of 25% or $12.5 million of the total amount advanced will be credited against the GoB royalty payments owed during each of the first four years of commercial production.
The agreed tax regime includes set rates for the life of Reko Diq, with several taxes subject to holidays that provide relief until commercial production is reached.
Economic Analysis
A financial analysis was carried out using a discounted cash flow approach to support the declaration of mineral reserves in the most recent technical report on Reko Diq. The model projected yearly cash inflows, or revenues, and subtracted yearly cash outflows, such as operating costs, capital costs, and taxes.
The resulting net annual cash flows are discounted back to the date of valuation and totaled to determine the net present value of Reko Diq.
The economic modelling in the most recent technical report shows that Reko Diq is economically viable, having a positive after-tax net present value. Using the three-year trailing average copper price of $4.03 per pound, the economic analysis indicates a total free cash flow of $70.2 billion, a net present value of $13 billion at a discount rate of 8%, and an after-tax internal rate of return of 21%. The payback period is the time calculated from the start of production until all project capital expenditures have been recovered. The payback period is estimated to be approximately six years. Using Barrick’s copper price assumption of $3.00 per pound to estimate reserves as of December 31, 2024, the economic analysis indicates a total free cash flow of $34 billion, a net present value of $4 billion at a discount rate of 8%, an internal rate of return of 13%, and an estimated payback period of approximately eight and a half years.
As at December 31, 2024, total spend on the feasibility study update was $186 million. This amount is recorded in exploration, evaluation and project expense and excludes amounts relating to fixed asset purchases that were capitalized. Capital expenditures commenced in the second quarter of 2024, with total capitalized spend for the year of $168 million (100% basis). For 2025, the Company expects to incur approximately $1 billion (100% basis) in capital expenditure as construction advances.
- 109 -
The total estimated capital cost of Phase 1 is between $5.6 and 6 billion (100% basis, exclusive of capitalization of financing costs) to be spent between 2025 and 2029. On February 11, 2025, Barrick’s Board of Directors conditionally approved the development of Phase 1 subject to the closing of up to $3 billion of limited recourse project financing. Assuming $3 billion of project financing, Barrick’s share of the total partner equity contribution required to fund the construction of Phase 1 is expected to be between $1.4 and 1.7 billion (exclusive of capitalization of financing costs). The total estimated capital cost of Phase 2 is between $3.3 and 3.6 billion (100% basis, exclusive of capitalization of financing costs), to be spent between 2029 and 2033.
Mining and Processing Information
As Reko Diq is in the process of being developed, there is no mining and processing information available for the years ended December 31, 2024, and December 31, 2023. Such information will be reported by the Company once mining commences.
The most recent technical report on Reko Diq is the technical report entitled “NI 43-101 Technical Report on the Reko Diq Project, Balochistan, Pakistan”, with an effective date of December 31, 2024, and an issue date of February 19, 2025, prepared by Simon Bottoms, Peter Jones, Mike Saarelainen, Daniel Nel, David Morgan and Ashley Price. This technical report has been filed on SEDAR+ in accordance with National Instrument 43-101.
The Company has extensive operating experience in emerging markets. Nevertheless, operating in emerging markets, such as Pakistan, exposes the Company to risks and uncertainties that do not exist or are significantly less likely to occur in other jurisdictions such as the United States or Canada. For additional details, see 「Foreign investments and operations」, 「Permitting and government relations」, 「Inflation」, 「Joint ventures」, 「Security and human rights」, 「Community relations and license to operate」, 「Government regulation and changes in legislation」 and 「U.S. Foreign Corrupt Practices Act and similar worldwide anti-bribery laws」 in 「Risk Factors」.
While all risks cannot be mitigated or eliminated, the Company expects to manage and mitigate controllable risks at its Pakistan operation through the consistent application of a variety of corporate governance structures and processes that are materially the same as those applied at its other operations located in developed markets. For additional details, see 「Narrative Description of the Business – Operations in Emerging Markets: Corporate Governance and Internal Controls」.
The diagram on the following page sets out the proposed design and layout of Reko Diq.
- 110 -
- 111 -
Lumwana
General Information
Project Description
The Lumwana Mine (「Lumwana」) is an operating open-pit copper mine with two open pits, Chimiwungo and Malundwe, a conventional sulphide flotation processing plant, and associated site infrastructure. Lumwana is located in the North-Western Province of Zambia, approximately 60 kilometers west of the provincial capital of Solwezi and 400 kilometers northwest of Lusaka. As of December 31, 2024, Lumwana employs approximately 3,000 employees and 2,500 contractors.
The property is accessed via a 10 kilometer road branching off the paved two-lane 「T5」 highway linking Lumwana and Solwezi to the copper belt and other parts of the North-Western Province. Subject to obtaining approvals, construction of a new two kilometer airstrip at the mine is planned to commence during 2025, which will facilitate flights directly to Lumwana from Lusaka.
In Zambia, mining rights and surface rights are distinct concepts administered under separate legal frameworks. Lumwana is covered by six large-scale mining licenses with a total area of 1,192 square kilometers, granted under the Mines Act of Zambia Act No.11 of 2015 to Lumwana Mining Company Limited (「LMC」), which provide for the mining of copper, cobalt, gold, silver, uranium, and sulphur (the 「Mining Licenses」). In 2005, LMC was granted the right to exercise its mining rights within the Mining Licenses. The Mining Licenses also permit exploration and mineral processing without the requirement to apply for separate exploration or mineral processing licenses. All of Lumwana’s Mining Licenses are valid until 2029, and are currently in good standing. There are no significant risks that could result in the loss of ownership of the deposits or loss of the Mining Licenses, in part or in whole, or that the Mining Licenses will not be renewed in the future.
In 2009, LMC secured the surface rights to an additional area of land measuring 35,000 hectares for a period of 99 years (or until 2108) (the 「Surface Rights」). LMC owns the Surface Rights in the form of a 99-year lease covering the current operations and a majority of the planned infrastructure of the Lumwana Super Pit Expansion Project (the 「Super Pit Expansion Project」), including the proposed TSF and expanded processing plant, as well as the Chimiwungo, Malundwe and Kababisa open pits.
In 2024, Barrick completed a feasibility study for the Super Pit Expansion Project, which entails an expansion of the current mining operations at Chimiwungo and Malundwe, the opening of two new open pits at Kamisengo and Kababisa, the expansion of the current processing plant, tailings and water supply infrastructure, and an upgrade of existing site infrastructure.
The Kamisengo Inflow Control Dam and the Kamisengo open pit are situated in an area which is within the Acres National Forest 105 (the 「National Forest」) and will require either degazetting or obtaining permission and a license to operate in this 8,000 hectare area of the National Forest. LMC’s current surface rights area includes 28,500 hectares of the National Forest that was previously degazetted by the President of Zambia in 2009, and as such, subject to obtaining the necessary permission and a license, LMC does not anticipate any barriers preventing the development of the aforementioned infrastructure.
History
Copper mineralization was initially discovered in the 1930s with exploration and mining studies completed between the 1950s and 1990s by previous owners, including Roan Selection Trust Limited, Azienda General Italiana Petroli, and Phelps Dodge Corporation. Lumwana was brought into production in 2008 by Equinox Copper Ventures, which was acquired by Barrick in 2011.
- 112 -
The first commercial copper production was achieved in 2009 and total production to 2024 is 1,845 thousand tonnes of copper.
Significant drilling, including 290,908 meters of DD and 448,541 meters of RC drilling has been completed between 2022 and 2024 to further define the extent, continuity, and structural controls on mineralization at each of the four main deposits, as further described in 「Exploration and Drilling」 below.
Lumwana is owned by LMC, a Zambian registered exploration and mining company and wholly owned subsidiary of Barrick.
Geology
Geological Setting
The copper deposits at Lumwana are large, tabular bodies of disseminated mineralization, which are often referred to as basement hosted copper deposits. They are hosted within the Mwombezhi Dome, which is part of the Domes Region of the Lufilian Arc. The Domes Region is part of the Central African Copperbelt, which is a metallogenic province in the border region of Zambia and the Democratic Republic of Congo. The deposits are characterized by pyrite, chalcopyrite, and occasional bornite, which is typically associated with higher copper grades. The mineralization is hosted within either biotite or muscovite dominant schists.
Copper mineralization at Lumwana is hosted in the basement Lufubu Schist and is located in the Domes Region of the Lufilian Arc. Within the Domes Region, the Kabompo and Mwombezhi Domes are the most significant with respect to mineralization. The mineralization at Lumwana is associated with the Mwombezhi Dome.
Mineralization
There are four main copper deposits (with subordinate uranium) at Lumwana. The principal deposit is Chimiwungo, with additional deposits Malundwe (6 kilometers northwest of Chimiwungo), Kamisengo (14 kilometers north-northeast of Chimiwungo), and Kababisa (10 kilometers north-northwest of Chimiwungo). The deposits generally comprise a hanging wall gneiss, a mineralized schist containing barren gneiss, and a footwall gneiss, with Kamisengo being more geometrically complex than the other three deposits. All have relatively shallow dips between 5 degrees and 25 degrees and extend from surface to maximum depths of between 250 meters and 950 meters.
Mining Operations
Production and Mine Life
The Lumwana Mine is an open pit, conventional truck-and-shovel mining operation. Current operations involve open pit mining of two deposits, Chimiwungo, (which comprises three individual open pits: Chimiwungo West, Chimiwungo East, and Chimiwungo South), and Malundwe. As part of the Super Pit Expansion Project, both Chimiwungo and Malundwe will be expanded, resulting in the three open pits at Chimiwungo being merged into a single, large 『Super Pit』. Additionally, two new satellite open pits, Kababisa and Kamisengo will be developed in 2035 and 2036, respectively. There will be no major changes to the mining methodology for the Super Pit Expansion Project, although new pit crushers are planned for both Chimiwungo (in 2027 and 2031) and Kamisengo (in 2036) to allow increased volumes to be crushed, while reducing ore haulage distances and associated costs. The current mining rate of Lumwana is 150 million tonnes per annum. With the Super Pit Expansion Project, mining production is expected to ramp-up to 350 million tonnes per annum. Annual copper output is expected to range between 200 kilotonnes to 300 kilotonnes for most of Lumwana’s life, with a life-of-mine average of 240 kilotonnes per annum.
- 113 -
Based on existing reserves, the total mine life is expected to be extended from the current 16 years to approximately 33 years, as a result of the Super Pit Expansion Project ending in 2057, with the final two years allocated only to stockpile processing. Overall, 1.56 billion tonnes of ore is planned to be mined over the life-of-mine.
Lumwana produced 122,723 tonnes of copper in 2024.
Processing
The Lumwana processing plant has been operational since 2009, and consists of two primary crushing facilities, one at Malundwe and one at Chimiwungo, each delivering crushed ore via overland conveyors to a single crushed ore stockpile. Primary crushed ore is drawn from the stockpile and fed to a SAG-ball grinding circuit.
To meet the increased production needs resulting from the Super Pit Expansion Project, processing rates at the plant will be increased from the current 27 million tonnes per annum to 52 million tonnes per annum, with peak design capacity of 54 million tonnes per annum, through the construction of a parallel processing plant. The new plant will use a similar flow sheet to the current plant and will involve the installation of two new primary crushing and overland conveying systems in 2027, with a further in-pit crusher to be installed in 2031.
For the Super Pit Expansion Project feasibility study, metallurgical test work was completed on samples that reflect the ore supply proportions. The test work determined plant parameters required to produce a saleable copper concentrate from the new Kamisengo and Kababisa open pits, as well as the extensions to the existing Chimiwungo and Malundwe open pits. No material difference is expected in recovery and concentrate grades between currently processed mineralization and expected mineralization to be processed from the Super Pit Expansion Project.
The expected average fresh recovery is 92.7% copper, based on the current life-of-mine plan and test work completed to date. Changes in the feed material characteristics may impact the actual achieved recovery. Operating data between 2021 and 2024 indicates that the plant has been able to consistently achieve reasonable recoveries, with an average of 89.6%, across both fresh ore and transitional material, and produced saleable copper concentrates over the past three years of operation. This is in line with expectations based on the plant operation since commissioning in 2009.
Elements with deleterious impact include insoluble material, carbonaceous material, pyrrhotite, and uranium. Almost all of these elements exist in small quantities and are not expected to generate smelter penalties over the life-of-mine. Uranium head grades are higher than life-of-mine average for the Malundwe ore; however, this ore will be blended with Chimiwungo ore, which has a lower uranium content, to ensure no-net smelter penalty over the-life-of-mine or negative impacts on outflow water quality.
Infrastructure, Permitting and Compliance
Lumwana has well-developed infrastructure to support current operations and detailed plans for additional infrastructure to support the Super Pit Expansion Project. The most significant changes to infrastructure will be increases in power supply and power infrastructure, a significant increase in the capacity of the TSF, and significant changes to the water storage facility.
Power is supplied to the mine by Zambia’s state-owned power company, Zambia Electricity Supply Company (「ZESCO」), and distributed across the site from the main 33 kV consumer substation located adjacent to the processing plant. This primary power supply is supplemented by an on-site diesel-fired power station with a current capacity of 23.5 megawatts, to mitigate any grid outages, and will be increased to 30 megawatts as part of the Super Pit Expansion Project. As a result of the Super Pit
- 114 -
Expansion Project, Lumwana’s power demand will increase from 60 MVA to 177 MVA. An agreement with ZESCO has been executed to approve and increase the peak supply from 65 MVA to 180 MVA.
In the short-term, the strategy focuses on upgrading ZESCO’s network infrastructure by introducing static synchronous compensators (STATCOM) in the Northwestern power corridor, in close proximity to Lumwana, and constructing an additional 330 kV overhead line from Kalumbila to Lumwana. These measures will increase the available power to Lumwana without increasing national power generation requirements. The additional available power will be sufficient for the Super Pit Expansion Project requirements.
In the medium and long-term, the focus shifts to securing generating capacity through a sustainable, long-term power supply solution. Lumwana is collaborating with various independent power producers, key Zambian grid utility partners, and financiers to identify opportunities. LMC has also completed wheeling agreements with alternative suppliers, in case of a supply shortage in the national grid.
Current Lumwana operations include an extensive system of water management infrastructure designed to manage open pit water, collect stormwater from operational areas, divert flows from undisturbed catchments around Lumwana, and accommodate the TSF. The Lumwana East River, which along with its main tributaries are the primary fresh watercourse in the mine area, has been diverted to facilitate mining of the Malundwe deposit and the construction of the TSF. This diversion consists of approximately 20 kilometers of channels and two main diversion dams. The diversion channels ultimately report back into the Lumwana East River downstream of the Malundwe pit.
Construction of the current TSF commenced in 2006. The facility is situated in a natural waterway within the former Lumwana East River valley, which runs from the northeast to the southwest. The original design capacity was 360 million tonnes, which is predicted to be reached by mid-2025 at the current rate of production. During 2024, the existing tailings storage facility stormwater diversion channel was realigned, widened, regraded, and a flood bund was constructed along the entire channel. The upgraded diversion channel allows for stormwater management in accordance with GISTM and the Barrick Tailings Management Standards. It also provides the TSF with an additional storage capacity of 40 million tonnes, bringing the current total capacity to 400 million tonnes.
The existing water storage facility will be dewatered and filled with tailings as part of the tailings storage facility expansion from 2029. A new water storage facility (Kamisengo Inflow Control Dam) will be constructed in 2026 upstream of Kamisengo, which will divert outflow through a new diversion channel into the Malundwe Stream. The ultimate water storage capacity will be reduced from 65 million cubic meters (in the current water storage facility) to 40 million cubic meters in the new Kamisengo Inflow Control Dam, minimizing the affected footprint while maintaining the ability to supply water to the operations throughout the life-of-mine.
All material permits and rights to conduct existing operations at Lumwana have been obtained and are in good standing. Approximately 50 licenses are renewed annually as part of ongoing operations. Key outstanding permits required for the Super Pit Expansion Project include approval of the resettlement action plan and completion of the land tenure acquisition process, described above in 「Project Description」. Applications for outstanding key permits have been submitted by LMC and those not yet approved are expected to be received prior to commencement of construction.
Environment
The property is characterized by gently rolling hills with elevations ranging from approximately 1,270 meters to approximately 1,410 meters above Sea level within the general vicinity of operations. Vegetation consists of woodlands, and wetlands are common along watercourses. Lumwana is located in an area with a monsoon-influenced humid tropical climate characterized by relatively high temperatures.
- 115 -
The region has distinct dry (May to October) and wet (November to April) seasons. Operations take place at Lumwana year round, although dig rates are reduced during the wet season due to adverse impacts to ground conditions. The impacts of heavy rainfall are addressed through a stockpiling strategy that provides feedstock to the processing plant when open pit ore is not accessible. The impact that the wet season will have on construction timing for the Super Pit Expansion Project has been considered and factored into the execution schedule.
In connection with the initial environmental impact assessment completed for Lumwana, an environmental and social management plan for the mine was developed and approved in 2014. The plan will be required to be updated to include changes that have taken place in mining operations subsequent to it being approved, along with expected changes relating to the Super Pit Expansion Project. In addition, a radiation management plan was developed to mitigate and manage uranium-bearing dust.
In 2024, all activities at Lumwana were, and continue to be, in compliance in all material respects with applicable corporate standards and environmental regulations.
As at December 31, 2024, the recorded amount of estimated future reclamation and closure costs that were recorded under IFRS, as defined by IAS 37, and that have been updated each reporting period, was $55 million (as described in Note 2q to the Consolidated Financial Statements). Future reclamation and closure costs at Lumwana will increase over time as the Super Pit Expansion Project is developed and operated.
An ESIA process was commissioned to identify and quantify the environmental and social impacts which could arise from the Super Pit Expansion Project. The process was undertaken as required by the Zambia Environmental Management Agency, and in November 2024, the assessment for the Super Pit Expansion Project was approved.
The Super Pit Expansion Project requires a significant increase in the footprint of the mine. As a result, a resettlement action plan has been developed for the resettlement of 279 households in Kamisengo and has been submitted to the Zambia Environmental Management Agency, with approval expected in the first quarter of 2025. Household agreements for the affected households are more than 95% complete, with the remaining households expected to sign agreements in the first quarter of 2025.
Exploration and Drilling
Significant exploration work has been undertaken over the life of Lumwana, including geological mapping, soil geochemistry, ground, and airborne geophysics. Exploration drilling targeting near surface mineralization has LED to the discovery of the four main deposits at Lumwana, as well as other exploration prospects.
Exploration completed since 2022 has focused on delineating mineralization in areas where significant infrastructure is planned for the Super Pit Expansion Project. Sufficient exploration has now been conducted to ensure that potential mineralization will not be impacted by planned infrastructure.
Drilling at Lumwana is completed regularly as part of mining operations. Diamond drilling is used for exploration, mineral resource definition, and infill drilling. RC drilling is used for grade control. Drill spacing varies across the deposits. RC drilling is the closest spaced at 12.5 meters by 25 meters. The diamond drilling completed for infill drilling is spaced at 50 meters to 100 meters, and diamond drilling completed for mineral resource definition is spaced at 100 meters to 100 meters.
Since 1961, the following sampling has been undertaken for a total of 2,758,480 meters: (i) diamond drilling of 3,233 holes for 878,980 meters; (ii) RC drilling of 48,544 drill holes for 1,860,725 meters; and (iii) RAB, air core and tri-cone drilling of 290 holes for 18,774 meters (all occurring prior to Barrick’s acquisition of Lumwana).
- 116 -
Future exploration at Lumwana will focus on understanding the geology and structural controls at the Greater Odile prospect, which is located approximately three kilometers west of Malundwe.
Royalties and Taxes
Lumwana is subject to income tax at a rate of 30%, as well as the Zambian Mineral Royalty Tax. In 2022, the Zambian government amended the taxation of mineral royalties, with effect from January 1, 2023, to implement a sliding scale that taxes only the incremental value in each price range when the mineral price crosses the applicable price threshold, rather than an increasing royalty rate applicable to all revenue, as under the previous regime. In 2022, the government also reinstated customs and excise duties on petrol and diesel. As at December 31, 2024, the applicable rates are as follows:
Price Range ($ per tonne Cu) | Rate (%) | Taxable Amount (per tonne) | ||
Less than $4,000 |
4 | The first $4,000 | ||
Between $4,001 and $5,000 |
6.5 | The next $1,000 | ||
Between $5,001 and $7,000 |
8.5 | The next $2,000 | ||
$7,001 or more |
10 | Balance |
These rates may be subject to change in the future. As of January 1, 2022, commodity royalties are tax deductive for corporate income purposes pursuant to the Income Tax Amendment Act 43 of 2021.
Economic Analysis
A financial analysis was carried out using a discounted cash flow approach to support the declaration of mineral reserves in the most recent technical report on Lumwana. The model projected yearly cash inflows, or revenues, and subtracted yearly cash outflows, such as operating costs, capital costs, and taxes.
The resulting net annual cash flows are discounted back to the date of valuation and totaled to determine the net present value of Lumwana.
The economic modelling shows that Lumwana (including the Super Pit Expansion Project and closure allowances) is economically viable, having a positive after-tax net present value. Using the three-year trailing average copper price of $4.03 per pound, the economic analysis indicates a total after-tax net cash flow of $15.2 billion, a net present value of $3.9 billion at a discount rate of 8%, and an after-tax internal rate of return of 49%. The payback period is the time calculated from the start of production until all project capital expenditures have been recovered. The payback period is estimated to be approximately two years. Using Barrick’s copper price assumption of $3.00 per pound to estimate reserves as of December 31, 2024, the economic analysis indicates a total after-tax net cash flow of $4.4 billion, a net present value of $2.0 billion at a discount rate of 8%, an internal rate of return of 10%, and an estimated payback period of approximately eight years.
As at December 31, 2024, the total spend on prior studies and the feasibility study work for the Super Pit Expansion Project was $75 million (incurred in 2023 and 2024). Barrick also capitalized $120 million in 2024 related to early works, infrastructure improvements and down payments on fleet and long-lead equipment. For 2025, the Company expects to incur approximately $0.6 billion in capital expenditure.
The Company’s total capital cost to develop the Super Pit Expansion Project is estimated to be approximately $2 billion, incurred between 2025 and 2028.
- 117 -
Mining and Processing Information
The following table summarizes certain mining and processing information for Lumwana for the periods indicated:
Year ended December 31, 2024 |
Year ended December 31, 20231 | |||
Tonnes mined (000s) |
140,866 | 113,633 | ||
Tonnes of ore processed (000s) |
25,783 | 26,797 | ||
Average grade processed (grams per tonne) |
0.53% | 0.49% | ||
Tonnes of copper produced (000s) |
123 | 118 |
1 | Starting in 2024, the Company presents its copper production and sales quantities in tonnes rather than pounds (1 tonne is equivalent to 2,204.6 pounds). Production and sales amounts for prior periods have been restated for comparative purposes. Barrick’s copper cost metrics are still reported on a per pound basis. |
The most recent technical report on Lumwana is the technical report entitled “NI 43-101 Technical Report on the Lumwana Mine Expansion, Republic of Zambia”, with an effective date of December 31, 2024, and an issue date of February 19, 2025, and authored by Simon P. Bottoms, Richard Peattie, Derek Holm, Marius Swanepoel and Graham E. Trusler. This technical report has been filed on SEDAR+ in accordance with National Instrument 43-101.
The Company has extensive operating experience in Zambia. Nevertheless, operating in emerging markets, such as Zambia, exposes the Company to risks and uncertainties that do not exist or are significantly less likely to occur in other jurisdictions such as the United States or Canada. For additional details, see 「Foreign investments and operations」, 「Permitting and government relations」, 「Inflation」, 「Security and human rights」, 「Community relations and license to operate」, 「Government regulation and changes in legislation」 and 「U.S. Foreign Corrupt Practices Act and similar worldwide anti-bribery laws」 in 「Risk Factors」.
While all risks cannot be mitigated or eliminated, the Company expects to manage and mitigate controllable risks at its Zambia operation through the consistent application of a variety of corporate governance structures and processes that are materially the same as those applied at its other operations located in developed markets. For additional details, see 「Narrative Description of the Business – Operations in Emerging Markets: Corporate Governance and Internal Controls」.
The diagram on the following page sets out the design and layout of Lumwana, including the proposed layout of the Super Pit Expansion Project.
- 118 -
- 119 -
LEGAL MATTERS
Legal Proceedings and Regulatory Actions
Other than as described herein, Barrick is not currently, and was not during the year ended December 31, 2024, a party to or the subject of any legal proceedings, nor are any such proceedings known to be contemplated, which are required to be disclosed in this Annual Information Form in accordance with applicable securities legislation. In addition, other than as described herein, there have been no penalties or sanctions imposed against Barrick by a court relating to securities legislation or by a securities regulatory authority during the year ended December 31, 2024, or any other time which are required to be disclosed in this Annual Information Form in accordance with applicable securities legislation. Barrick has not entered into any settlement agreements with a court relating to securities legislation or with a securities regulatory authority during the year ended December 31, 2024.
Proposed Canadian Securities Class Actions (Pascua-Lama)
In 2014, proposed secondary market liability securities class actions were initiated in Ontario and Quebec against the Company and certain of its former senior executives. These actions relate to public disclosures concerning Barrick’s Pascua-Lama Project. The Ontario case primarily focuses on disclosure regarding capital cost and schedule estimates for Pascua-Lama and environmental compliance matters in Chile between February 2012 and June 2013, while the Quebec case pertains only to disclosure regarding environmental matters in Chile between July 2012 and October 2013. In the Ontario proceedings, plaintiffs are seeking damages exceeding $3 billion. Alleged damages in the Quebec case have yet to be quantified.
Efforts to resolve the Quebec case through mediation were unsuccessful in November 2023. Subsequently, the plaintiffs filed their Originating Application in February 2024 and Barrick responded formally in March 2024. On February 12, 2025, Barrick filed its Statement of Defence in this proceeding. No trial date has been set as of this time. In the Ontario case, the plaintiffs’ application for leave to appeal to the Supreme Court of Canada from the February 13, 2024 decision of the Court of Appeal was dismissed on September 26, 2024. The plaintiffs’ motion for class certification has not yet been scheduled.
The Company intends to vigorously defend these actions.
Veladero – Operational Incidents and Associated Proceedings
MAS, The Joint venture company that operates the Veladero mine, is the subject of legal proceedings related to operational incidents at the Veladero Valley Leach Facility (「VLF」) occurring in March 2017 (the 「March 2017 Incident」), September 2016 and September 2015.
Following the March 2017 Incident, an 「amparo」 protection action (the 「Provincial Amparo Action」) was filed against MAS in the Jachal First Instance Court, San Juan Province (the 「Jachal Court」) by individuals who claimed to be living in Jachal, San Juan Province, Argentina, seeking the cessation of all activities at the Veladero mine or, alternatively, a suspension of the mine’s leaching process. The matter before the Jachal Court remains pending.
In 2017, the National Minister of Environment of Argentina filed an amparo action in the Federal Court in connection with the same March 2017 Incident (the 「Federal Amparo Action」) seeking an order requiring the cessation and/or suspension of activities at the Veladero mine.
On June 28, 2024, the Federal Court rejected the National Minister’s request for, among other things, an interim injunction requiring the cessation and/or suspension of activities at the Veladero mine. The National Minister has sought to appeal this decision twice in 2024, most recently seeking leave to the Federal Supreme Court on October 16, 2024. The Federal Amparo Action will continue before the Federal Court while the Federal Supreme Court considers whether to hear the appeal for an interim injunction.
- 120 -
The Company continues to believe that the Provincial and Federal Amparo Actions are without merit and intends to continue to vigorously defend its position.
Civil Action
In 2016, MAS was served notice of a civil action filed before the San Juan Provincial Court by certain persons allegedly living in Jachal, San Juan Province, claiming to be affected by the Veladero mine and, in particular, the VLF. The plaintiffs requested a court order that MAS cease leaching metals with cyanide solutions, mercury and other similar substances at the mine and replace that process with one that is free of hazardous substances, implement a closure and remediation plan for the VLF and surrounding areas, and create a committee to monitor this process. These claims were supplemented by new allegations that the risk of environmental damage had increased as a result of the March 2017 Incident.
MAS replied to the lawsuit in February 2017, responded to the supplemental claim and intends to continue defending this matter vigorously.
Legacy Philippines Matters
In 2009, Barrick Gold Inc. and Placer Dome Inc. (「Placer Dome」), which was acquired by the Company in 2006, were purportedly served in Ontario with a complaint filed in November 2008 in the Regional Trial Court of Boac, on the island of Marinduque in the Philippines, on behalf of two named individuals and purportedly on behalf of the approximately 200,000 residents of Marinduque.
The complaint alleges injury to the economy and the ecology of Marinduque as a result of the discharge of mine tailings from the Marcopper mine into Calancan Bay, the Boac River, and the Mogpog River. Placer Dome, was previously a minority indirect shareholder of Marcopper Mining Corporation (「Marcopper」). The plaintiffs are claiming for abatement of a public nuisance and nominal damages for an alleged violation of their constitutional right to a balanced and healthful ecology. By an order dated November 9, 2011, the court granted the plaintiffs’ motion to suspend the proceedings.
On December 5, 2024, the court issued an order directing the plaintiffs to advise, within 10 days of receipt of the order, whether they intend to pursue the case. The order also stated that failure by the plaintiffs to do so would warrant dismissal of the case with prejudice. It is unclear whether or when the plaintiffs received a copy of the order.
On February 25, 2011, a Petition for the Issuance of a Writ of Kalikasan with Prayer for Temporary Environmental Protection Order was filed in the Supreme Court of the Republic of the Philippines by Eliza M. Hernandez, Mamerto M. Lanete and Godofredo L. Manoy against Placer Dome and the Company (the 「Petition」). The Petition alleges that Placer Dome violated the Petitioners’ constitutional right to a balanced and healthful ecology as a result of, amongst other things, the discharge of tailings into Calancan Bay, a dam breach in 1993, and a tailings spill in 1996. The Petition was subsequently transferred to the Court of Appeals. The Petitioners are seeking orders requiring Barrick to environmentally remediate the areas in and around the mine site that are alleged to have sustained environmental impacts.
On January 21, 2021, the Court of Appeals granted an Intervention Motion introduced by the Province of Marinduque (the 「Province」) and admitted the Province’s Petition-in-Intervention. In the Petition-in-Intervention, the Province seeks to expand the scope of relief sought within the Writ of Kalikasan to include claims seeking rehabilitation and remediation of alleged maintenance and structural integrity issues supposedly associated with Marcopper mine infrastructure.
In October 2022, the court granted the Company’s motion requesting court-ordered mediation between the parties and the proceeding has been suspended ever since.
- 121 -
If these matters are reactivated, the Company intends to defend the actions vigorously. No amounts have been recorded for any potential liability arising from these matters, as the Company cannot reasonably predict the outcome.
North Mara – Ontario Litigation
On November 23, 2022, an action was commenced against the Company in the Ontario Superior Court in respect of alleged security-related incidents in the vicinity of the North Mara Gold Mine in Tanzania. The named plaintiffs purport to have been injured, or to be the dependents of individuals who were allegedly killed, by members of the Tanzanian Police Force. The Statement of Claim asserts that Barrick is legally responsible for the actions of the Tanzanian Police Force, and that the Company is liable for an unspecified amount of damages.
In February 2024, an additional action was commenced against the Company in the Ontario Superior Court on behalf of different named plaintiffs in respect of alleged security-related incidents in the vicinity of the North Mara Gold Mine. The Statement of Claim in this second action is substantially similar to the Statement of Claim issued in November 2022. The Company believes that the allegations in both claims are without merit, including because the Tanzanian Police Force is a sovereign police force that operates under its own chain of command.
On November 26, 2024, the court granted Barrick’s motion to dismiss both actions on the grounds that the Ontario Superior Court of Justice lacks jurisdiction and that Tanzania is a more appropriate forum in which to litigate this matter. On December 27, 2024, the plaintiffs appealed this decision to the Ontario Court of Appeal. The hearing of this appeal has not yet been scheduled.
Loulo-Gounkoto Mining Conventions Dispute
In 2023, the Government of Mali adopted the 2023 Mining Code and initiated a review process of existing establishment conventions, including the Mining Conventions of SOMILO and Gounkoto SA for the Loulo-Gounkoto Complex. As part of this process, the Government of Mali demanded that the mines become subject to the 2023 Mining Code, in direct violation of the stability rights contained in the Mining Conventions.
Beginning in 2023, the Government of Mali initiated several fiscal and customs proceedings against SOMILO and Gounkoto SA, demanding payment of various charges, taxes, duties, and other amounts (including approximately $417 million in recoverable VAT charges as previously disclosed) from which they are exempt. Barrick continued its engagement with the Government of Mali to find a global settlement and in October 2024, Barrick made a payment of CFA 50 billion ($84 million) to advance those negotiations (which was expensed in the fourth quarter of 2024). Despite the Company’s efforts, in November 2024, SOMILO and Gounkoto SA were restricted from exporting gold from Mali, also in violation of the Mining Conventions.
On December 18, 2024, after multiple good faith attempts to resolve the dispute, SOMILO and Gounkoto SA submitted a request for arbitration to the International Centre for the Settlement of Investment Disputes (「ICSID」) in accordance with the provisions of their respective Mining Conventions. Among others, SOMILO and Gounkoto SA requested that the arbitral panel declare that the Mining Conventions are binding and are not subject to any legislative or regulatory changes under Malian law enacted after the entry into force of said Mining Conventions.
On January 2, 2025, an interim attachment order was issued by the Senior Investigating Judges of the Pôle National Économique et Financier (「Pôle Économique」) against the existing gold stock on the site of the Loulo-Gounkoto Complex. The order was executed on January 11, 2025, with the gold being removed from the site and transported to a custodial bank. This further disrupted normal operations and put gold exports at risk (see 「Abuse of Criminal Proceedings」 below).
- 122 -
On January 14, 2025, due to the restrictions imposed by the Government of Mali on gold shipments, the Company announced that the Loulo-Gounkoto Complex would temporarily suspend operations. Barrick remains in discussions with the Government of Mali to find an acceptable resolution to these disputes, while the Company continues to vigorously enforce SOMILO’s and Gounkoto SA’s rights through the ICSID arbitration process. No amounts have been recorded for any potential liability arising from these matters as the Company cannot reasonably predict the outcome of the dispute.
Abuse of Criminal Proceedings
The Government of Mali has initiated meritless criminal proceedings against the Company, its Malian subsidiaries, certain officers and directors, and several individual employees, alleging violations of exchange control regulations and threatening billions of dollars in fines and up to five years imprisonment for the individuals.
On September 24, 2024, employees of SOMILO and Gounkoto SA were summoned to appear at the Pôle Économique for interviews. When these employees appeared, five of them were illegally detained and held unlawfully in police custody for six days.
On November 25, 2024, the employees were again summoned to appear before the Investigating Judge at the Pôle Économique. At the end of the hearing, four employees were charged and incarcerated at the Central Prison of Bamako pending trial. These employees remain imprisoned unjustifiably.
On December 4, 2024, the Government of Mali caused an illegitimate arrest warrant to be issued against Barrick’s President and Chief Executive Officer, Mark Bristow, alleging money laundering and violations of exchange control regulations. As with all of the previous allegations made by the Government of Mali on these matters, there is no merit whatsoever to the claims outlined in the arrest warrant.
The Company is vigorously defending its rights, and the rights of its Malian subsidiaries and the impacted employees against these claims. No amounts have been recorded for any potential liability arising from the criminal proceedings as the allegations are wholly without merit.
Zaldívar Chilean Tax Assessment
In 2019 and 2020, Barrick’s Chilean subsidiary that holds the Company’s interest in the Zaldívar mine, Compañía Minera Zaldívar Limitada (「CMZ」), received notices of tax assessments from the Chilean Internal Revenue Service (「Chilean IRS」) amounting to approximately $1 billion in outstanding taxes, including interest and penalties for the tax years 2015 and 2016. At all times, the Company has maintained that these assessments were without merit. After several years of negotiations with the Chilean IRS, on November 20, 2024, the Company settled all claims and paid the agreed settlement amount through a combination of cash and the write-off of certain tax receivables. This matter is now closed.
Zaldívar Water Claims
In 2022, the State Defense Council (「CDE」), an entity that represents the interests of the Chilean state, filed a lawsuit in the Environmental Court of Antofagasta against Compañía Minera Zaldívar SpA (「CMZ SpA」), The Joint venture company that operates the Zaldívar mine, and two other companies with mining operations that utilize water from a shared aquifer (Minera Escondida Ltda. and Albermarle Ltda.), claiming that the extraction of groundwater by the defendants had caused environmental damage to the surrounding area. The Company denied these claims and after extensive negotiations with the CDE, in December 2024, a joint settlement proposal was approved by the court. All subsequent appeals have been exhausted and the matter is now closed.
- 123 -
RISK FACTORS
Barrick’s performance and its future operations are and may be affected by a wide range of risks. The risks described below are not the only ones facing Barrick. Additional risks not currently known to Barrick, or that Barrick currently deems immaterial, may also impair Barrick’s operations or projects.
Metal price volatility
Barrick’s business is strongly affected by the world market price of gold and copper. If the world market price of gold or copper was to drop and the prices realized by Barrick on gold or copper sales were to decrease significantly and remain at such a level for any substantial period, Barrick’s profitability and cash flow would be negatively affected.
Gold and copper prices have fluctuated widely in recent years. These fluctuations CAN be material and CAN occur over short periods of time and are affected by numerous factors, all of which are beyond Barrick’s control. Future production from Barrick’s mining properties is dependent on gold and copper prices that are adequate to make these properties economically viable. During 2024, the gold price ranged from $1,984 per ounce to an all-time high of $2,790 per ounce. The average market price of gold in 2024 was $2,386 per ounce, an all-time average annual high and an increase of 23% compared to the 2023 annual average. Based on current estimates of Barrick’s 2025 gold production and sales, a $100 per ounce increase or decrease from the $2,400 per ounce gold price assumption used to determine guidance will result in an approximately $450 million increase or decrease, as applicable, in the Company’s EBITDA. EBITDA is a non-GAAP financial performance measure with no standardized definition under IFRS. For further information, see “Non-GAAP Financial Measures” at pages 165 to 169 for a detailed discussion of each of the non-GAAP measures used in this Annual Information Form. Factors tending to affect the price of gold include:
• | industrial and jewelry demand; |
• | the level of demand for gold as an investment; |
• | central bank lending, sales and purchases of gold; |
• | the volume of recycled material available in the market; |
• | speculative trading; and |
• | costs and levels of global gold production by producers of gold. |
Gold prices may also be affected by macroeconomic factors, including:
• | expectations of the future rate of inflation; |
• | the strength of, and confidence in, the U.S. dollar, the currency in which the price of gold is generally quoted, and other currencies; |
• | the value of alternative investments, including global equity prices; |
• | interest rates; and |
• | global or regional, political or economic uncertainties, including changes in U.S. trade, tariff and other controls on imports and exports, tax, immigration or other policies that may impact relations with foreign countries or result in retaliatory policies. |
Based on current estimates of Barrick’s 2025 copper production and sales, a $0.25 per pound increase or decrease from the $4.00 per pound copper price assumption used to determine guidance will result in an approximately $120 million increase or decrease, as applicable, in the Company’s EBITDA. EBITDA is a non-GAAP financial performance measure with no standardized definition under IFRS. For further information, see “Non-GAAP Financial Measures” at pages 165 to 169 for a detailed discussion of
- 124 -
each of the non-GAAP measures used in this Annual Information Form. Factors tending to affect the price of copper include:
• | the worldwide balance of copper demand and supply; |
• | rates of global economic growth, trends in industrial production and conditions in the housing and automotive industries, all of which correlate with demand for copper; |
• | the rate of electrification and, in particular, the growth of the production of electric vehicles, which are more copper-intensive than vehicles with internal combustion engines, and the related demand for copper that will be required to build the electrical grids required to support the growth in usage of electric vehicles and other electrification goals; |
• | economic growth and political conditions in China, which has become the largest consumer of refined copper in the world, and other major developing economies; |
• | speculative investment positions in copper and copper futures; |
• | the availability of secondary material for smelting; |
• | expectations of the future rate of inflation; |
• | the price of input costs, including fuel, and potential increases in those prices resulting from the imposition of tariffs; |
• | the availability and cost of substitute materials; and |
• | currency exchange fluctuations, including the relative strength of the U.S. dollar. |
Barrick’s gold production is sold into the spot market or to refiners at market prices. The sales price for Barrick’s copper production is determined provisionally at the date of sale with the final price determined based on market copper prices at a future date set by the customer, generally one to three months after the initial date of sale. Market prices for copper may fluctuate during this extended settlement period. The prices of Barrick’s copper sales are marked-to-market at the balance sheet date based on the forward copper price for the relevant quotational period. All such mark-to-market adjustments are recorded in copper sale revenues. If the market price for copper declines, the final sale price realized by the Company at settlement may be lower than the provisional sale price initially recognized by the Company, requiring negative adjustments to Barrick’s average realized copper price for the relevant period.
In addition, certain of Barrick’s mineral projects include other minerals (principally silver), each of which is subject to price volatility based on factors beyond Barrick’s control.
Depending on the market price of the relevant metal, Barrick may determine that it is not economically feasible to continue commercial production at some or all of its operations or the development of some or all of its current projects, as applicable, which could have an adverse impact on Barrick’s financial performance and results of operations. In such a circumstance, Barrick may also curtail or suspend some or all of its exploration activities, with the result that depleted reserves are not replaced. In addition, the market value of Barrick’s gold or copper inventory may be reduced and existing reserves may be reduced to the extent that ore cannot be mined and processed economically at the prevailing prices.
Projects
Barrick’s ability to sustain or increase its present levels of gold and copper production is dependent in part on the success of its projects. There are many risks and unknowns inherent in all projects. For example, the economic feasibility of projects is based upon many factors, including:
• | the accuracy of reserve estimates; |
• | metallurgical recoveries with respect to gold, copper and by-products; |
- 125 -
• | capital and operating costs of such projects; |
• | the timetables for the construction, commissioning and ramp-up of such projects and any delays or interruptions; |
• | the reliability of construction designs and accuracy of engineering; |
• | changes in scope; |
• | the ability to manage large-scale construction; |
• | the future prices of the relevant minerals; |
• | the ability to secure appropriate financing to develop such projects; and |
• | in the case of Reko Diq, non-recourse project financing to mitigate geo-political risk. |
The stability of the legal and financial terms that apply to the development and exploitation of any given project, as well as the Company’s ability to maintain its license to operate, in the jurisdictions in which Barrick has projects is also important to the success of those projects (see 「Community relations and license to operate」).
Projects also require the successful completion of feasibility studies, agreement on fiscal (including royalties) and customs matters, as well as other terms applicable to the development and exploitation of the project, and the resolution of any matter arising in this respect, the issuance of, and compliance with, necessary governmental permits and the acquisition of satisfactory surface or other land rights. In some of the jurisdictions in which Barrick has projects, there may be little clarity on those agreements. It may also be necessary for Barrick to, among other things, find or generate suitable sources of water and power for a project, ensure that appropriate community infrastructure is developed by third parties to support the project and to secure appropriate financing to fund these expenditures (see 「Global financial conditions」 and 「Liquidity and level of indebtedness」). As orebodies become more remote, the complexity and cost of infrastructure for mining projects is increasing and key infrastructure, as well as suitable sources of water and power, may not always be readily available. It is also not unusual in the mining industry for new mining operations to experience unexpected problems during the start-up phase, resulting in delays and requiring the investment of more capital than anticipated.
Projects have no operating history upon which to base estimates of future financial and operating performance, including future cash flow. The capital expenditures and time required to develop new mines or other projects are considerable and changes in costs or construction schedules CAN affect project economics. As such, it is possible that actual costs may increase signifiCANtly and economic returns may differ materially from Barrick’s estimates or that metal prices may decrease signifiCANtly or that Barrick could fail to obtain the satisfactory resolution of fiscal and tax matters or the governmental approvals necessary for the operation of a project or obtain project financing on acceptable terms and conditions or at all, in which case, the project may not proceed either on its original timing or at all. For example, following the reconstitution of the Reko Diq project in December 2022, Barrick started a full update of the project’s 2010 feasibility and 2011 expansion pre-feasibility studies. The updated feasibility study for Reko Diq was completed in late 2024, with the end of 2028 targeted for first production. In 2024, Barrick also completed a feasibility study for the Super Pit Expansion Project at Lumwana, with 2028 targeted for first production. There are risks associated with projects in the early stages of evaluation, such as Reko Diq and the Super Pit Expansion Project at Lumwana, including, among other things, the ability to secure appropriate project financing in the case of Reko Diq and that considerable additional work beyond that which Barrick has planned may be required to complete further evaluation. As described above, such circumstances would have the potential to significantly impact costs, timing or even the feasibility for the project to progress to the next stage of development.
If Barrick declines or is unable to advance a project on a particular timetable or at all, the rights associated with the project and the estimated revenues and profits could be negatively affected.
- 126 -
Mineral reserves and resources
Barrick’s mineral reserves and mineral resources are estimates, and no assurance CAN be given that the estimated reserves and resources are accurate or that the indicated level of gold, copper or any other mineral will be produced. Such estimates are, in large part, based on interpretations of geological data obtained from drill holes and other sampling techniques. Actual mineralization or formations may be different from those predicted. Further, it may take many years from the initial phase of drilling before production is possible, and during that time the economic feasibility of exploiting a discovery may change.
Because Barrick prepares this Annual Information Form in accordance with the disclosure requirements of Canadian securities laws, it contains resource estimates, which are required by National Instrument 43-101. Mineral resource estimates for properties that have not commenced production are based, in many instances, on limited and widely spaced drill hole information, which is not necessarily indicative of the conditions between and around drill holes. Accordingly, such mineral resource estimates may require revision as more drilling information becomes available, as actual production experience is gained or as the Company’s mining methods are changed. No assurance CAN be given that any part or all of Barrick’s mineral resources constitute or will be converted into reserves.
Market price fluctuations of gold, copper, silver and certain other metals, as well as increased production and capital costs or reduced recovery rates, may render Barrick’s proven and probable reserves uneconomic to develop at a particular site or sites for periods of time or may render mineral reserves containing relatively lower grade mineralization uneconomic. Moreover, short-term operating factors relating to the mineral reserves, such as the need for the orderly development of ore bodies, the processing of new or different ore grades, the technical complexity of ore bodies, unusual or unexpected ore body formations, ore dilution or varying metallurgical and other ore characteristics may cause mineral reserves (or ore reserves) to be reduced or Barrick to be unprofitable in any particular accounting period. Estimated reserves may have to be recalculated based on actual production experience, fluctuations in the price of metals, or changes in other assumptions on which they are based. Any of these factors may require Barrick to reduce its mineral reserves (or ore reserves) and resources, which could have a negative impact on Barrick’s financial results.
Failure to obtain or maintain necessary permits or government approvals, or changes to applicable tax and customs regimes or applicable legislation, could also cause Barrick to reduce its reserves. In addition, changes to mine plans due to capital allocation decisions could cause Barrick to reduce its reserves. There is also no assurance that Barrick will achieve indicated levels of gold or copper recovery or obtain the prices assumed in determining such reserves.
Replacement of depleted reserves
Barrick’s mineral reserves must be replaced to maintain production levels over the long-term. Reserves CAN be replaced by expanding known ore bodies, locating new deposits or making acquisitions. Exploration is highly speculative in nature and identifying new ore bodies is becoming increasingly difficult. Barrick’s exploration projects involve many risks and are frequently unsuccessful. Once a site with mineralization is discovered, it may take several years from the initial phases of drilling until production is possible, during which time the economic feasibility of production may change. Substantial expenditures are required to establish proven and probable reserves and to construct mining and processing facilities. As a result, there is no assurance that current or future exploration programs will be successful or that new commercial mining operations will be developed. Depletion of reserves may not be offset by discoveries or acquisitions and divestitures of assets could lead to a lower reserve base. Barrick may continue to dispose of additional assets in 2025 or future years as part of its ongoing focus on Tier One Gold Assets, Tier Two Gold Assets, Tier One Copper Assets/Projects, Strategic Assets and other strategic initiatives, which may further deplete Barrick’s reserves. Reserves estimated in accordance with National Instrument 43-101 may also decrease due to economic factors such as the use of a lower metal price assumption. However, such a decline would not be a reduction in the actual mineral base of the
- 127 -
Company, as the ounces or pounds removed from Barrick’s reserves due to the use of a lower gold or copper price assumption would be transferred to resources, preserving the option to access them in the future at higher gold or copper prices. The mineral base of Barrick will decline if reserves are mined without adequate replacement and Barrick may not be able to sustain production to or beyond the currently contemplated mine lives, based on current production rates.
Foreign investments and operations
Barrick conducts or participates in mining, development and exploration and other activities through subsidiaries and/or joint ventures in many foreign countries, including the United States, Argentina, Chile, Côte d’Ivoire, the Dominican Republic, the DRC, Ecuador, Jamaica, Mali, Pakistan, Papua New Guinea, Peru, Saudi Arabia, Senegal, Tanzania and Zambia. Mining investments are subject to the risks normally associated with any conduct of business in foreign countries including:
• | renegotiation, cancellation or forced modification of existing contracts; |
• | expropriation or nationalization of property; |
• | changes in laws or policies or increasing legal and regulatory requirements of particular countries, including those relating to taxation, tariffs, royalties, imports, exports, duties, currency, in-country beneficiation or other claims by government entities, including retroactive claims and/or changes in the administration of laws, policies and practices; |
• | uncertain political and economic environments, war, terrorism, sabotage and civil disturbances; |
• | lack of certainty with respect to foreign legal systems, corruption and other factors that are inconsistent with the rule of law; |
• | international sanctions and trade restrictions; |
• | delays in obtaining or the inability to obtain or maintain necessary governmental permits or to operate in accordance with such permits or regulatory requirements; |
• | currency fluctuations; |
• | restrictions on the ability of local operating companies to sell gold, copper or other minerals offshore for U.S. dollars, and on the ability of such companies to hold U.S. dollars or other foreign currencies in offshore bank accounts; |
• | import and export regulations, including restrictions on the export of gold, copper or other minerals; |
• | limitations on the repatriation of earnings; |
• | reliance on advisors and consultants in foreign jurisdictions in connection with regulatory, permitting or other governmental requirements; |
• | increased financing costs; and |
• | risk of loss due to disease, such as malaria or the zika virus, and other potential medical endemic or pandemic issues, such as Ebola or Covid-19, as a result of the potential related impact to employees, disruption to operations, supply chain delays and impact on economic activity in affected countries or regions. |
Operating in emerging markets CAN increase the risk that contractual and/or mineral rights may be disregarded or unilaterally altered, including in respect of stability. By way of example, an SLA between the DominiCAN State and PVD governs the development and operation of the Pueblo Viejo mine, including applicable tax rates. Barrick has a 60% equity interest in PVD. Following the achievement of commercial production at Pueblo Viejo mine in January 2013, the DominiCAN State engaged PVD in discussions to amend the SLA. These amendments became effective on October 5, 2013, and resulted in additional and accelerated tax revenues to the DominiCAN State.
- 128 -
In certain jurisdictions in which the Company operates, there is an increased focus by governments on securing greater economic benefit and increased financial and social benefits from extractive industries. Barrick has operations and conducts business, and is subject to taxation, in a number of emerging market jurisdictions. These taxation laws are complex, subject to varying interpretations and applications by the relevant tax authorities and subject to changes and revisions in the ordinary course. In addition, the mining legislation to which the Company is subject or the stability or other investments agreements to which the Company is a party may be subject to review or renegotiation by the relevant governments. Other laws, regulations or policies regarding such matters and their implementation and interpretation CAN be uncertain.
For example, in the DRC, the DRC Mining Code (2002) and associated regulations have been amended with an updated DRC Mining Code (2018) and related regulations. The updated law and regulations include potentially adverse changes with respect to, among others, fiscal stability protection, increased royalty rates, income taxes, import and other duties, value-added and other taxes, foreign exchange controls, indirect capital gains taxes and local content. Barrick has nevertheless made full payment on all taxes demanded by the government to date. All payments were made under duress in order to protect the Company’s acquired and vested rights under the DRC Mining Code (2002); however, there is no guarantee that the government will not challenge these acquired and vested rights under the DRC Mining Code (2002). Continued engagement with the government of the DRC has resulted in the submission of an application for a number of exemptions and waivers pursuant to article 220 of the DRC Mining Code (2018) as part of Barrick’s efforts to reach a mutually acceptable path forward. Article 220 creates a framework to provide benefits to mining companies in landlocked provinces with infrastructure challenges, such as the province in which the Kibali mine is located.
In Mali, Barrick operates Loulo-Gounkoto under Mining Conventions entered into with the Government of Mali. These Mining Conventions contain stabilization provisions to protect Barrick’s subsidiaries with interests in Mali from adverse amendments to the applicable tax regime or the Mali legislation. In August 2023, Mali adopted the 2023 Mining Code and initiated a review process of existing mining conventions, including the Mining Conventions of the Loulo-Gounkoto Complex. As part of this process, the Government of Mali demanded that the mines become subject to the 2023 Mining Code, in direct violation of the stability rights contained in the Mining Conventions. Due to restrictions imposed by the Government of Mali on the export of gold produced by the Loulo-Gounkoto Complex, and the subsequent attachment of that gold, operations at Loulo-Gounkoto have been temporarily suspended. Barrick remains in discussions with the Government of Mali to find an acceptable resolution to this and other disputes, while vigorously enforcing SOMILO’s and Gounkoto SA’s rights through the ICSID arbitration process. For further information, see 「Legal Proceedings and Regulatory Actions — Loulo-Gounkoto Mining Conventions Dispute」.
On December 15, 2022, Barrick completed the reconstitution of the Reko Diq project in Pakistan’s Balochistan province. The completion of this transaction involved, among other things, the execution of all of the definitive agreements including the mineral agreement stabilizing the fiscal regime applicable to the project, as well as the grant of mining leases, an exploration license, and surface rights. This completed the process that began earlier in 2022 following the conclusion of a framework agreement among the GoP, the GoB, Barrick and Antofagasta plc, which provided a path for the development of the project under a reconstituted structure. The reconstituted project is held 50% by Barrick and 50% by Pakistani stakeholders, comprising a 10% free-carried, non-contributing share held by the GoB, an additional 15% held by a special purpose company owned by the GoB and 25% owned by other federal state-owned enterprises. Failure of either Barrick or the GoP or GoB to adhere to the terms of the definitive agreements or the imposition of other measures by the GoP or GoB may have a material adverse impact on Barrick’s cash flows, earnings, results of operations, mineral reserve and mineral resource statements and financial position.
Over the past few years, the Company experienced other similar disputes in Tanzania and Papua New Guinea. In October 2019, Barrick reached an agreement with the Government of Tanzania (「GoT」) to
- 129 -
settle all disputes between the GoT and the mining companies formerly operated by Acacia, including in respect of an export ban and tax reassessments for approximately $190 billion. In connection with the settlement and resolution of all outstanding disputes, the GoT received a free carried shareholding of 16% in each of the former Acacia mines (Bulyanhulu, Buzwagi and North Mara) as part of the Twiga joint venture. In Papua New Guinea, the Porgera mine was placed on temporary care and maintenance from April 25, 2020, until December 22, 2023, following the Government of PNG’s decision not to extend Porgera’s SML and several tax disputes. These disputes, and legal proceedings initiated in respect of such disputes, were ultimately resolved through the negotiation and satisfaction of the conditions of the Commencement Agreement. This included the granting of the new SML to New Porgera Limited and ultimately increased the ownership interest of PNG stakeholders in Porgera to 51%. Although the above-noted disputes have been resolved, there CAN be no assurance that that the GoT or Government of PNG will not impose other measures that may negatively impact Barrick’s performance or operations or that additional disputes will not arise in the future.
In certain jurisdictions, general inflationary pressures may have a more acute effect on Barrick’s labor, commodity and other input costs at operations, which could have a materially adverse effect on Barrick’s financial condition, results of operations and capital expenditures for the development of its projects.
There CAN be a greater level of political, social and economic risk in the emerging markets in which Barrick operates. Operations or projects in emerging markets may be subject to more frequent civil disturbances and criminal activities such as trespass, illegal mining, sabotage, theft, vandalism and terrorism. These disturbances and criminal activities have the potential to cause disruptions at certain of Barrick’s operations, projects or joint ventures. In particular, there has been criminal activities and violence in the vicinity of the Porgera mine as well as terrorist activity and regional conflict in the vicinity of Pakistan’s Balochistan province, which is where the Company’s Reko Diq project is located.
Similarly, different economic and social issues exist in emerging markets which may affect Barrick’s operating and financial results. For example, infectious diseases (including malaria, HIV/AIDS, tuberculosis and the Ebola virus) are major health care issues in African countries. Workforce training and health programs to maximize prevention awareness and minimize the impact of infectious diseases, including HIV/AIDS and malaria in the DRC, Mali, Côte d’Ivoire, Tanzania, Zambia and other jurisdictions in Africa may prove insufficient to adequately address these serious issues.
The foregoing risks may limit or disrupt operating mines or projects, restrict the movement of funds, cause Barrick to have to expend more funds than previously expected, or result in the deprivation of contract rights or the taking of property by nationalization or expropriation without fair compensation, and may materially adversely affect Barrick’s financial position or results of operations. Certain of these risks have increased in recent years. Furthermore, in the event of disputes arising from Barrick’s activities in Argentina, Chile, Côte d’Ivoire, the DRC, the Dominican Republic, Ecuador, Jamaica, Mali, Pakistan, Papua New Guinea, Peru, Saudi Arabia, Senegal, Tanzania and Zambia, or from Barrick’s past activities in other emerging markets, Barrick has been and may continue to be subject to the jurisdiction of courts outside North America, which could adversely affect the outcome of the dispute.
Foreign subsidiaries
A significant portion of Barrick’s business is carried on through subsidiaries, including foreign subsidiaries. Accordingly, any limitation on the transfer of cash or other assets between the parent corporation and such entities, or among such entities, could restrict Barrick’s ability to fund its operations and projects efficiently. Any such limitations, or the perception that such limitations may exist now or in the future, could have an adverse impact on Barrick’s valuation and stock price.
- 130 -
Production and cost estimates
Barrick prepares estimates of future production, total cash costs and capital costs of production for particular operations. No assurance CAN be given that such estimates will be achieved. Failure to achieve production or cost estimates or material increases in costs could have an adverse impact on Barrick’s future cash flows, profitability, results of operations and financial condition.
Barrick’s actual production and costs may vary from estimates for a variety of reasons, including: actual ore mined varying from estimates of grade, tonnage, dilution and metallurgical and other characteristics; short-term operating factors relating to mineral or ore reserves, such as the need for sequential development of ore bodies and the processing of new or different ore grades; revisions to mine plans; unusual or unexpected ore body formations; risks and hazards associated with mining; natural phenomena, such as inclement weather conditions, increased incidence of extreme weather events, water availability, floods, and earthquakes; and unexpected labor shortages or strikes. Costs of production may also be affected by a variety of factors, including: changing waste-to-ore ratios, ore grade metallurgy, labor costs, the cost of commodities, general inflationary pressures and currency exchange rates.
Government regulation and changes in legislation
The Company’s business is subject to various levels of government controls and regulations, which are supplemented and revised from time to time. Barrick is unable to predict what legislation or revisions may be proposed that might affect its business or when any such proposals, if enacted, might become effective. Such changes, however, could require increased capital and operating expenditures and could prevent or delay certain operations by the Company. To the extent that Barrick fails to or is alleged to fail to comply with any applicable regulation, whether in the future or in the past, the Company may be unable to continue to operate successfully at a particular location. For example, operations at the Loulo-Gounkoto Complex in Mali have been temporarily suspended, pending the resolution of ongoing disputes with the Government of Mali related to unilateral changes in the application of certain laws and revisions of contractual terms, among other things. See 「Legal Proceedings and Regulatory Actions – Loulo-Gounkoto Mining Conventions Dispute」. Barrick’s business is also subject to extensive tax laws and regulations in the various jurisdictions in which the Company operates. Changes in tax laws, regulations, or administrative practices, including shifts in tax policy, tax base, or tax rates, could materially affect Barrick’s financial position and results of operations.
Permitting and government relations
Barrick’s mining and processing operations and development and exploration activities are subject to extensive permitting requirements. Failure to obtain required permits and/or to maintain compliance with permits once obtained could result in injunctions, fines, suspension or revocation of permits and other penalties. While Barrick strives to obtain and comply with all of its required permits, there CAN be no assurance that Barrick will obtain all such permits and/or achieve or maintain full compliance with such permits at all times. Activities required to obtain and/or achieve or maintain full compliance with such permits CAN be costly and involve extended timelines. Previously issued permits may be suspended or revoked, or not renewed, for a variety of reasons, including through government or court action. Failure to obtain and/or comply with required permits, government approvals or changes to applicable legislation CAN have serious consequences, including: damage to Barrick’s reputation; stopping Barrick from proceeding with the development of, or the CANcellation or expropriation of, a project; negatively impacting the operation or further development of a mine; or increasing the costs of development or production and litigation or regulatory action against Barrick including the imposition of fines and other administrative or judicial action. Accordingly, it may materially adversely affect Barrick’s business, results of operations or financial condition.
Barrick’s ability to successfully obtain and maintain key permits and approvals will be impacted by its ability to develop, operate and close mines in a manner that is compliant with applicable laws and
- 131 -
consistent with the creation of social and economic benefits in the surrounding communities and may be adversely impacted by real or perceived detrimental events associated with Barrick’s activities or those of other mining companies affecting the environment, human health and safety of the surrounding communities. Barrick has made, and expects to make in the future, significant expenditures to comply with permitting requirements and, to the extent reasonably practicable, create social and economic benefit in the surrounding communities.
Environmental, health and safety regulations
Barrick’s mining and processing operations and development and exploration activities are subject to extensive laws and regulations governing the protection of the environment, waste disposal, worker safety, mine development, water management and protection of endangered and other special status species. While Barrick strives to achieve full compliance with all such laws and regulations and with its environmental and health and safety permits, there CAN be no assurance that Barrick will at all times be in full compliance with such requirements. Failure to comply with applicable environmental and health and safety laws and regulations could result in injunctions, fines, suspension or revocation of permits, penalties or other judicial or administrative action, which may materially adversely affect Barrick’s business, results of operations or financial condition.
Future changes in applicable environmental and health and safety laws and regulations could substantially increase costs and burdens to achieve compliance or otherwise have an adverse impact on Barrick’s business, results of operations or financial condition (see 「Government regulation and changes in legislation」).
Barrick may also be held responsible for the costs of addressing contamination at the site of current or former activities or at third party sites. Barrick could also be held liable to third parties for exposure to hazardous substances. The costs associated with such responsibilities and liabilities may be signifiCANt. While Barrick has implemented extensive health and safety initiatives at its sites to protect the health and safety of its employees, contractors and members of the communities affected by its operations and projects, there is no guarantee that such measures will eliminate the occurrence of accidents or other incidents which may result in personal injuries, fatalities or damage to property, and in certain instances such occurrences could give rise to regulatory fines and/or civil liability. For example, Barrick had three tragic fatalities in 2024, one at North Mara and two at Kibali. Following each of these tragic incidents, Barrick investigated the underlying causes and implemented Fatality Prevention Criteria and gap assessments across the Company, with a view towards enhancing Barrick’s safety protocols and procedures and preventing similar tragedies from occurring in the future. Barrick resolutely believes that, with the right controls and appropriate training in place, incidents CAN be prevented, and that one fatality is one too many.
In certain of the countries in which Barrick has operations or projects, it is required to submit, for government approval, a reclamation plan for each of its mining sites that establishes Barrick’s obligation to reclaim property after minerals have been mined from the site. In some jurisdictions, bonds or other forms of financial assurances are required as security for these reclamation activities. Barrick may incur signifiCANt costs in connection with these reclamation activities, which may materially exceed the provisions Barrick has made for such reclamation. In addition, the unknown nature of possible future additional regulatory requirements and the potential for additional reclamation activities create further uncertainties related to future reclamation costs, which may have a material adverse effect on Barrick’s financial condition, liquidity or results of operations. Barrick is involved in various investigative and remedial actions. There CAN be no assurance that the costs of such actions would not be material. When a previously unrecognized reclamation liability becomes known or a previously estimated cost is increased, the amount of that liability or additional cost is expensed, which may materially reduce net income in that period.
- 132 -
In addition, Barrick’s activities, ownership interests or operations, past or present, could expose the Company to liability in the United States under CERCLA and its state law equivalents. Under CERCLA and its state law equivalents, present or past owners of a property may be held jointly and severally liable for cleanup costs or forced to undertake remedial actions in response to unpermitted releases of hazardous substances at such property, in addition to, among other potential consequences, potential liability to governmental entities for the cost of damages to natural resources, which may be substantial.
Climate change risks
Barrick recognizes that climate change is a global challenge that will affect its business in a range of possible ways. Barrick’s mining and processing operations are energy intensive, resulting in a carbon footprint either directly or through the purchase of fossil-fuel based electricity. As a result, Barrick is impacted by current and emerging policies and regulations relating to GHG emission levels, energy efficiency and reporting of climate-change related risks. While some of the costs associated with reducing emissions may be offset by increased energy efficiency and technological innovation, the current regulatory trend may result in additional transition costs at some of Barrick’s operations and projects. For example, policy and regulatory risks related to actual and proposed changes in climate and water-related laws, regulations and taxes developed to facilitate and regulate the transition to a low-carbon economy may result in increased costs for the Company’s operations and projects. These may include increased energy, equipment, environmental monitoring and reporting and other costs to comply with such regulations. The timeframe within which these transition risks may materialize for Barrick will vary and is, in part, dependent on how quickly the global transition to a low-carbon economy occurs. In addition, the physical risks of climate change may also have an adverse effect at some of Barrick’s operations and projects. These may include increased incidence of extreme weather events, resource shortages, changes in rainfall and storm patterns and intensities, water shortages, excess water flows, changing Sea levels and changing temperatures. Associated with these physical risks is an increasing risk of climate-related litigation (including class actions) and the associated costs.
Stakeholders are seeking enhanced disclosure on the material risks, opportunities, financial impacts and governance processes related to climate change. Negative publicity or climate-related litigation could have an adverse effect on Barrick’s reputation or financial condition. In addition, a failure or perceived failure to meet climate strategy commitments, Barrick’s Scope 1, 2 and 3 emissions reduction targets, and/or societal or investor expectations, including in respect of achieving or accurately reporting on such commitments and targets, could also result in damage to the Company’s reputation, decreased investor confidence and challenges in maintaining strong community relations. These impacts CAN pose additional obstacles to Barrick’s ability to conduct its operations and develop its projects, which may result in a material adverse impact on its business, financial position, results of operations and future growth prospects. Barrick’s ability to achieve its climate commitments and targets is also subject to numerous risks and uncertainties and relies on, among other things, the Company’s ability to deploy capital to fund emissions reduction projects, the Company’s ability to implement operational changes and the availability of technology necessary to efficiently and effectively achieve expected emissions reductions. In addition, the Company’s ability to achieve its Scope 3 emissions targets is subject to the actions of entities not within Barrick’s direct control. There is also a risk that some or all of the expected benefits of achieving such commitments and targets may fail to materialize within the Company’s anticipated time periods or at all.
Water supply, management and availability challenges could impact operations
The Company acknowledges the right to clean, safe water and recognizes that access to a reliable water supply is critical to the hygiene, livelihood and environmental health of Barrick’s host communities. A failure to meet the Company’s water targets and/or societal or investor expectations could result in damage to the Company’s reputation, decreased investor confidence and challenges in maintaining strong community relations, as well as legal action, including injunctions and fees.
- 133 -
Water is a critical input to Barrick’s mining operations, and the increasing pressure on water resources around the globe requires the Company to consider current and future conditions in its management of water resources. The Company has operations and projects in regions where water stress is an inherent risk and rainfall CAN vary greatly from year to year. Barrick defines water stress as both water scarcity and excess water. Barrick’s operations face challenges related to limited supply, increased demand, increased severity of weather events, including changes in temperatures that alter downstream flow and water availability, and impacted water in various forms. These changes to water flow and availability, and the resulting environmental and social consequences, CAN result in operational difficulties and careful management is required to address these potential water-related stresses and issues. Current and long-term risks include those that arise as a result of Barrick’s operations (e.g., the use of cyanide in process solution and risk of Acid Rock Drainage Metal Leaching) and events that are out of the Company’s control, such as extreme weather and other physical risks associated with climate change including changes in rainfall and water availability (see 「Risk Factors – Climate change risks」).
Water shortages may also result from environmental and climate events that are out of the Company’s control and ability to manage. For example, inadequate rainfall or the occurrence of drought may stop operations, which could impact production as a result. Conversely, as discussed above, excessive rainfall or flooding may also result in operational difficulties, including geotechnical instability (see 「Risk Factors – Geotechnical challenges could impact profitability」), increased dewatering demands, and additional water management requirements.
The Company cannot predict the potential outcome of pending or future permit applications, legal proceedings or negotiations related to water rights, claims, contracts and uses, which may impact Barrick’s operations or projects. The loss of water rights for any of Barrick’s mines, in whole or in part, including through the non-renewal or non-issuance of water permits, or shortages of water to which Barrick has established rights, could impact existing operations or prevent future exploration (see for example 「Legal Matters – Legal Proceedings and Regulatory Actions – Zaldívar Water Claims」). In addition, laws and regulations may be introduced in the jurisdictions in which the Company operates which could limit Barrick’s access to sufficient water resources (see 「Risk Factors – Government regulation and changes in legislation」). All of these events could result in increased costs or disruptions that may impact Barrick’s production, which in turn could adversely affect the Company’s results of operations and financial position.
Title to properties
The validity of mining claims, which constitute most of Barrick’s property holdings, CAN be uncertain, may be contested, and title insurance is not available. Each sovereign state or local government is generally the sole authority able to grant mineral rights. The ability to ensure that Barrick has obtained secure title to mineral properties or mining concessions may be severely constrained. Although Barrick has attempted to acquire satisfactory title to its properties, these properties may be subject to prior unregistered agreements, transfers or claims, including claims made by Indigenous communities and other title holders, and title may be affected by, among other things, undetected defects (particularly title to undeveloped properties). Any disputes about Barrick’s property holdings or title may have a material adverse impact on Barrick’s cash flows, earnings, results of operations and financial position.
Mining risks and insurance risks
The mining industry is subject to significant risks and hazards, including environmental hazards, industrial accidents, catastrophic equipment failures, unusual or unexpected geological conditions, labor force disruptions, civil strife, unavailability of materials and equipment, weather conditions, pit wall failures, tailings dam failures, rock bursts, cave-ins, flooding, seismic activity and water conditions, most of which are beyond Barrick’s control. Barrick is also exposed to theft, loss, attachment or confiscation of gold bullion, copper cathode or gold/copper concentrate. These risks and hazards could result in: damage to, or destruction of, mineral properties or producing facilities; personal injury or death;
- 134 -
environmental damage; delays in mining; and monetary losses and possible legal liability. As a result, production may fall below historic or estimated levels and Barrick may incur significant costs or experience significant delays that could have a material adverse effect on Barrick’s financial performance, liquidity and results of operations.
Barrick maintains insurance to cover some of these risks and hazards. The insurance is maintained in amounts that are believed to be reasonable depending on the circumstances surrounding the identified risk. No assurance CAN be given that such insurance will continue to be available, or that it will be available at economically feasible premiums, or that Barrick will obtain or maintain such insurance. Barrick’s property, liability and other insurance may not provide sufficient coverage for losses related to these or other risks or hazards. In addition, Barrick does not have coverage for certain environmental losses and other risks, as such coverage may not be available at all or at a commercially reasonable cost. The lack or insufficiency of insurance coverage could adversely affect Barrick’s cash flow and overall profitability.
Security and human rights
Barrick’s operations and development and exploration activities extend to jurisdictions which may be considered to have an increased degree of security risk. For example, during 2020 and 2021, Mali experienced a number of security-related challenges, including attacks by insurgent militants and a military coup in both August 2020 and May 2021, which LED to the implementation of a new transitional government in each case. These events have increased the security risk applicable to all mining companies in the country. The DRC has also experienced instability in certain provinces caused by militia groups. The impacts of these risks could impede the exploration, development and operation of Barrick’s mines in these and other high risk countries.
In addition, civil disturbances and criminal activities, such as trespass, illegal mining, sabotage, theft and vandalism, have caused disruptions at certain of Barrick’s operations, including the Porgera mine in Papua New Guinea operated by BNL, the Pueblo Viejo mine in the Dominican Republic, the Pierina mine (now in closure) in Peru, the Kibali mine in the DRC, the Tongon mine in Côte d’Ivoire and certain of Barrick’s operations in Tanzania, occasionally resulting in the suspension of operations in some cases. Affected sites have taken certain measures to protect their employees, property and production facilities from these risks. Certain sites have engaged security personnel and installed perimeter fencing, walls and cameras in sensitive areas, such as main entrances and processing plants.
Several sites have entered into arrangements with public security in relation to security in the areas surrounding their minesite. Incidents of criminal activity, trespass, illegal mining, theft and vandalism have occasionally LED to conflict with security personnel and/or police, which in some cases resulted in injuries and/or fatalities. The measures that have been implemented by the Company cannot guarantee that such incidents will not continue to occur and such incidents may halt or delay production, increase operating costs, result in harm to employees or trespassers, decrease operational efficiency, increase community tensions, negatively impact Barrick’s reputation or result in criminal and/or civil liability for the Company or its employees and/or financial damages or penalties.
The manner in which the Company’s personnel respond to civil disturbances and criminal activities CAN give rise to additional risks where those responses are not conducted in a manner that is consistent with international standards relating to the use of force and respect for human rights (see 「Narrative Description of the Business – Sustainability – Human Rights」). Barrick has implemented a number of measures and safeguards which are designed to assist its personnel in understanding and upholding these standards. The implementation of these measures will not guarantee that the Company’s personnel or public security forces (where arrangements with public security forces are in place) will uphold these standards in every instance. The failure to conduct security operations in accordance with these standards CAN result in harm to employees or community members, increased community tensions,
- 135 -
reputational harm to Barrick and its partners or result in litigation, criminal and/or civil liability for the Company or its employees and/or financial damages or penalties.
Illegal mining, which involves trespass into the operating area of the mine, is both a security and safety issue at the Porgera and North Mara mines, among others. The illegal miners from time to time have clashed with mine security staff and law enforcement personnel who have attempted to move them away from the facilities. The presence of the illegal miners, given the nature of the mines’ operations, creates a safety issue for the illegal miners as well as Barrick’s employees and CAN cause disruptions to mine operations.
It is not possible to determine with certainty the future costs that Barrick may incur in dealing with the issues described above at its operations and projects. However, if the number of incidents increases, costs associated with security, in the case of civil disturbances and illegal mining, may also increase, affecting profitability.
Community relations and license to operate
The Company’s relationships with the communities in which it operates are critical to the continued success of its existing operations and the construction and development of its projects. There is an ongoing and potentially increasing public concern relating to the perceived effect of mining activities on the environment and on communities impacted by such activities. Certain non-governmental organizations (「NGOs」) and activists, some of which oppose globalization and resource development, are often vocal critics of the mining industry and its practices, including the use of cyanide and other hazardous substances in processing activities. Adverse publicity generated by such NGOs, activists or others, including through the use of social media, related to extractive industries generally, or Barrick’s operations specifically, could have an adverse effect on the Company’s reputation or financial condition and may impact its relationship with the communities in which it operates. While Barrick is committed to operating in a socially responsible and transparent manner, there is no guarantee that the Company’s efforts in this respect will mitigate this potential risk.
Barrick’s ability to successfully obtain key permits and approvals to explore for, develop and operate mines and to successfully operate in communities around the world will likely depend on Barrick’s ability to develop, operate and close mines in a manner that is consistent with the creation of social and economic benefits in the surrounding communities, which may or may not be required by law. Mining operations should be designed to minimize the negative impact on such communities and the environment, for example, by modifying mining plans and operations or by relocating those affected to an agreed location. The cost of these measures could increase capital and operating costs and therefore could have an adverse impact upon Barrick’s financial condition and operations. Barrick seeks to promote improvements in health and safety, human rights, environmental performance and community relations. However, Barrick’s ability to operate could be adversely impacted by accidents or events detrimental (or perceived to be detrimental) to the health, safety and well-being of Barrick’s employees, human rights, the environment or the communities in which Barrick operates.
- 136 -
Reputational risk
As a result of the increased usage and the speed and global reach of social media and other web-based tools used to generate, publish and discuss user-generated content and to connect with other users, companies today are at much greater risk of losing control over how they are perceived in the marketplace. Damage to Barrick’s reputation CAN be the result of the actual or perceived occurrence of any number of events, and could include any negative publicity (for example, with respect to Barrick’s handling of environmental matters or the Company’s dealings with community groups), whether true or not. Barrick places a great emphasis on protecting its image and reputation, but the Company does not ultimately have direct control over how it is perceived by others. Reputation loss may lead to increased challenges in developing and maintaining host government as well as community relations, decreased investor confidence and an impediment to Barrick’s overall ability to advance its projects, thereby having a material adverse impact on financial performance, cash flows and growth prospects.
U.S. Foreign Corrupt Practices Act and similar worldwide anti-bribery laws
The Foreign Corrupt Practices Act (United States) and the Corruption of Foreign Public Officials Act (CANada) and anti-bribery laws in other jurisdictions generally prohibit companies and their intermediaries from making improper payments for the purpose of obtaining or retaining business or other commercial advantage. Barrick’s policies mandate compliance with applicable anti-bribery laws, which often carry substantial penalties. Barrick operates in jurisdictions that have experienced governmental and private sector corruption to some degree and, in certain circumstances, strict compliance with anti-bribery laws may conflict with certain local customs and practices. There CAN be no assurance that Barrick’s internal control policies and procedures will always protect it from reckless or other inappropriate acts committed by the Company’s affiliates, employees, agents or companies acquired by or merged with Barrick. Violations of these laws, or allegations of such violations, could have a material adverse effect on Barrick’s reputation, as well as business, financial position and results of operations and could cause the market value of Barrick’s common shares to decline. Investigations by governmental authorities could also have a material adverse effect on the business, consolidated results of operations, and consolidated financial condition of Barrick.
Litigation
Barrick is currently subject to litigation and may be involved in disputes with other parties in the future which may result in litigation. The results of litigation CANnot be predicted with certainty. The costs of defending or settling such litigation CAN be signifiCANt. If Barrick is unable to resolve these disputes favorably, it may have a material adverse impact on Barrick’s financial performance, cash flow and results of operations. See 「Legal Matters – Legal Proceedings and Regulatory Actions」.
Geotechnical challenges could impact profitability
Barrick and the mining industry are facing continued geotechnical challenges associated with the aging of certain mines and the need to mine deeper pits and more complex deposits. This leads to higher pit walls, more complex underground operations and increased exposure to geotechnical instability. As Barrick’s operations mature, the open pit and underground operations at certain sites are getting deeper. Barrick has experienced geotechnical failures at some open pit operations and seismic events at some underground operations. Seismic events may also affect mining operations in other ways. For example, on February 26, 2018, a 7.5 magnitude earthquake struck Papua New Guinea, causing signifiCANt damage to the Hides natural gas power plant that supplies electricity to the Porgera mine. In addition, in the first quarter of 2024, Barrick experienced a pit wall failure at Gold Quarry at Nevada Gold Mines, resulting in lower tonnes mined and a slower mining rate at the Gold Quarry pit and South Arturo in 2024. A redesign of the open pit was required to address geotechnical issues. No assurances CAN be given that unanticipated adverse geotechnical conditions, such as pit wall failures, underground cave-ins and other ground-related instability, will not occur in the future or that such events will be detected in advance.
- 137 -
Geotechnical instabilities CAN be difficult to predict and are often affected by risks beyond Barrick’s control, such as severe weather, higher than average rainfall and seismic events. In addition, Barrick has numerous operational and closed TSFs and heap leach facilities in a variety of climatic and topographic settings. As of December 31, 2024, Barrick manages 61 TSFs, of which 18 are operating and 43 are closed. In addition, a riverine tailings disposal system is used at the Porgera mine in Papua New Guinea. The failure of tailings storage facilities, and other impoundments at Barrick’s minesites, could cause severe and potentially catastrophic damage to property, the environment, persons and Barrick’s reputation. For example, in early 2019, the extractive industry experienced a large-scale tailings dam failure at an unaffiliated mine, which resulted in numerous fatalities and caused extensive property, environmental and reputational damage. The Company regularly reviews and inspects all Barrick-owned or controlled TSFs for compliance with applicable legal requirements and global best practices. For example, on August 4, 2023, the Company disclosed its conformance with the GISTM and that all of Barrick’s 「Extreme」 or 「Very High」 consequence sites are in conformance with the GISTM. Despite such efforts, there CAN be no assurance that these events will not occur in the future. Geotechnical, TSF or heap leach facility failures CAN result in limited access to minesites, suspension of operations, production delays, government investigations, civil and criminal liability, increased costs, as well as injuries and deaths in the most extreme cases. All of these could adversely impact Barrick’s results of operations and financial position.
Joint ventures
Barrick holds an indirect interest in a number of joint ventures and properties, including Nevada Gold Mines in Nevada (61.5%), the Veladero mine in Argentina (50%), the Zaldívar copper mine in Chile (50%), the Pueblo Viejo mine in the Dominican Republic (60%), the Porgera mine in Papua New Guinea (24.5%), the Tanzanian mines (84%), the Jabal Sayid copper mine in Saudi Arabia (50%), the Kibali mine in the DRC (45%), the Loulo-Gounkoto Complex in Mali (80%), the Tongon mine in Côte d’Ivoire (89.7%), the Norte Abierto project in Chile (50%), the Donlin mine in Alaska (50%), and the Reko Diq project in Pakistan (50%), the remaining interests in which are held by third parties, including states or state-affiliated entities. Barrick’s interests in these properties are subject to the risks customarily associated with the conduct of joint ventures, including: (i) disagreement with joint venture partners on how to develop and operate the mine efficiently or, in the case of exploration projects, on the exploration plan and related expenditures; (ii) inability to exert influence over certain strategic decisions; (iii) inability of joint venture partners to meet their obligations; and (iv) litigation regarding joint venture matters. Each of these risks could have a material adverse impact on Barrick’s profitability or the viability of its interests held through joint ventures, which could have a material adverse impact on Barrick’s future cash flows, earnings, results of operations and financial condition. In addition, Barrick is not always the operator of its joint venture projects. To the extent Barrick is not the operator, the success of any operations will be dependent on third party operators and Barrick may be unable to have any significant influence on the direction or control of the activities of the operators. Barrick will be subject to the decisions made by the operators of The Joint venture properties and will rely on the operators for accurate information about the properties.
Availability and increased cost of critical parts, equipment and skilled labor
An increase in worldwide demand for critical resources such as input commodities, drilling equipment, tires and skilled labor may cause unanticipated cost increases and delays in delivery times, thereby impacting the Company’s operating costs, capital expenditures and construction and production schedules.
The Company may be affected by global supply chain disruptions
Prolonged disruptions to the procurement of equipment, or the flow of materials, supplies and services to Barrick could have an adverse impact on its operating costs, capital expenditures and construction and production schedules. These disruptions may be the result of macroeconomic matters
- 138 -
outside of the Company’s control or ability to mitigate, such as from natural disasters, transportation disruptions, economic instability, global pandemics, international sanctions, including those imposed in the context of the invasion of Ukraine by Russia, and geopolitical concerns, such as the conflicts in the Middle East and ongoing conflict in Ukraine, among others. Supply chain impacts may also manifest as rising costs or shortages of certain commodities and labor. See also 「Availability and increased cost of critical parts, equipment and skilled labor」 and “Diseases and epidemics may adversely impact Barrick’s business”.
Price volatility and availability of other commodities
The profitability of Barrick’s business is affected by the cost and availability of commodities and critical parts and equipment which are consumed or otherwise used in connection with Barrick’s operations and projects, including, but not limited to, diesel fuel, natural gas, electricity, acid, Steel, concrete and cyanide. Prices of such commodities CAN be subject to volatility, which CAN be material and CAN occur over short periods of time, and are affected by factors that are beyond Barrick’s control. An increase in the cost, or decrease in the availability, of construction materials such as Steel and concrete may affect the timing and cost of Barrick’s projects. If Barrick’s proceeds from the sale of by-products were to decrease significantly, or the costs of certain commodities consumed or otherwise used in connection with Barrick’s operations and projects were to increase, or their availability to decrease, significantly, and remain at such levels for a substantial period of time, Barrick may determine that it is not economically feasible to continue commercial production at some or all of Barrick’s operations, or the development of some or all of Barrick’s current projects, which could have an adverse impact on Barrick as described under 「Metal price volatility」 above.
Artisanal and illegal mining
Artisanal and illegal miners are active on, or adjacent to, many of Barrick’s properties in emerging market jurisdictions, including the Company’s African and Asia Pacific minesites, such as North Mara and Bulyanhulu, Tongon, Kibali, Loulo-Gounkoto and Porgera. At some of these sites engagement with local and/or national authorities may be required in order to peacefully clear illegal miners. Artisanal and illegal mining may, but not always, involve trespass into the development or operating area of an existing mine. The methods used to extract minerals by artisanal and illegal miners may also be against the social and environmental laws of the relevant jurisdiction.
Artisanal and illegal mining is associated with a number of negative impacts which present risk to humans and property, including environmental degradation, human rights abuse, child labor, forced labor, personal injury or death, security concerns, destruction of property and funding of conflict. The presence of artisanal and illegal miners CAN also lead to disputes and delays related to project development or operation of commercial gold deposits, and potentially lost gold production as a result of delays or theft. Additionally, effective local government administration is often lacking in the locations where artisanal and illegal miners operate where rapid population growth and the lack of functioning structures CAN create a complex social and unstable environment. The presence of artisanal and illegal miners could cause damage to Barrick’s properties or result in use of force or injury which may result in legal action directed against Barrick or its subsidiaries.
Barrick does not purchase any gold from artisanal or illegal miners. There is a misconception that artisanally-mined gold is channeled through large-scale mining operators, even though artisanal and illegal miners typically rely on their own supply chains distinct from those utilized by large-scale miners like Barrick. Such misconceptions have a negative impact on the reputation of the mining industry.
Infrastructure and information technology systems
Barrick’s mining, processing, development and exploration activities depend on adequate infrastructure and dependable information technology systems. Reliable power sources, water supply, roads and other infrastructure are important for Barrick’s operations and development projects. Water
- 139 -
shortages, power outages, sabotage, community, government or other interference in the maintenance or provision of such infrastructure could adversely affect Barrick’s business, financial condition and results of operations. For example, frequent power outages in Zambia due to infrastructure limitations have the potential to adversely impact the operations at Lumwana and the Super Pit Expansion Project.
Barrick also depends upon information technology systems, which refers to the computer systems, hardware, software, and networks of the Company and of its third party vendors and service providers, to conduct its operations. For example, the Company continues to incorporate more advanced technology into its operations, including autonomous haulage and automated process controls. Barrick could be adversely affected by disruptions of such systems caused by a variety of sources, including, without limitation, cybersecurity incidents - including those caused by computer viruses, malware, ransomware and other cyber-attacks (including those that exploit zero-day vulnerabilities) - as well as natural disasters and defects in design. Any of these or other events could result in information technology system failures, delays and/or increases in capital expenditures. Barrick’s operations also depend on the regular maintenance, upgrade and replacement of equipment and information technology systems, as well as pre-emptive expenses to mitigate the risk of failure. There CAN be no assurance that Barrick will not incur losses related to cybersecurity incidents, other network or system disruptions, or from corruption and manipulation of data in the future, including as a result of legal action directed at the Company in relation to a cybersecurity incident. As the nature and methods of cybersecurity incidents continue to evolve and increase in sophistication, the Company may be required to expend additional resources to continue to modify or enhance protective measures, or to investigate and remediate issues, related to cybersecurity incidents and other information technology system vulnerabilities. Such efforts may require continuous monitoring and reliance on third party vendors and service providers (including information technology service providers), and are not guaranteed to be successful in preventing or mitigating the potential impacts of cybersecurity incidents. In addition, such service providers may themselves be victims of cybersecurity incidents and breaches. Barrick and its third party vendors and service providers have experienced, and Barrick believes may experience in the future, cybersecurity incidents and cybersecurity breaches. Given the unpredictability of the timing, nature and scope of disruptions to information technology systems, Barrick could potentially be subject to production downtimes, operational delays, cybersecurity incidents, the compromising of confidential or otherwise protected information, reputational impacts, legal liability, or destruction or corruption of data, any of which could have a material adverse effect on the Company’s cash flows, competitive position, financial condition or results of operations, as well as on the Company’s ability to continue to operate its health and safety-related systems.
From time to time, Barrick pursues investments and initiatives to improve the productivity and efficiency of existing systems and operations, including through investments in digital technologies. There CAN be no certainty that some or any of such investments and initiatives will meet the Company’s capital allocation objectives. In addition, certain of such investments and initiatives are still in the early stages of evaluation, and additional engineering and other analysis is required to fully assess their impact. Further, there CAN be no certainty as to the time required for Barrick to extract value from these investments or initiatives, or that Barrick will achieve any anticipated savings or efficiency improvements.
- 140 -
Global financial conditions
Following the onset of the credit crisis in 2008, global financial conditions were characterized by extreme volatility and several major financial institutions either went into bankruptcy or were rescued by governmental authorities. While global financial conditions subsequently stabilized, there remains considerable risk in the system given the extraordinary measures adopted by government authorities to achieve that stability. Global financial conditions could suddenly and rapidly destabilize in response to future economic shocks, as government authorities may have limited resources to respond to future crises. Future economic shocks may be precipitated by a number of causes, including a rise in the price of oil, geopolitical instability, natural disasters and outbreaks of medical endemic or pandemic issues, such as Covid-19. Any sudden or rapid destabilization of global economic conditions could impact Barrick’s ability to obtain equity or debt financing in the future on terms favorable to Barrick. Additionally, any such occurrence could cause decreases in asset values that are deemed to be other than temporary, which may result in impairment losses. Further, in such an event, Barrick’s operations and financial condition could be adversely impacted.
Inflation
In addition to potentially affecting the price of gold, copper and silver, general inflationary pressures may also affect Barrick’s labor, commodity and other input costs, which could have a materially adverse effect on Barrick’s financial condition, results of operations and capital expenditures for the development of its projects. Over the course of 2024, global inflationary pressures eased and benchmark interest rates were cut, while the global economic outlook remained uncertain and geopolitical conflicts persisted. Global energy costs have also increased significantly following the invasion of Ukraine by Russia in February 2022. Country-specific political and economic factors in Argentina have also resulted in a hyperinflationary environment in that country. The Company has been impacted by these inflationary pressures in the form of higher costs for key inputs required for its operations, most notably higher energy costs. The Company has made assumptions around the expected costs of these key inputs, and Barrick’s actual costs in an inflationary environment may differ materially from those assumptions. These inflationary impacts may be felt directly through purchases of diesel and natural gas, as well as through higher transportation costs, and indirectly through higher costs of products which rely on energy as an input cost. In particular, costs incurred at Barrick’s Veladero mine and projects in Argentina are at higher risk for inflationary pressures due to country-specific political and economic factors. See 「Metal price volatility」, 「Projects」, 「Price volatility and availability of other commodities」, 「Production and cost estimates」 and 「Availability and increased cost of critical parts, equipment and skilled labor」.
Potential impact of proposed tariffs on the Company’s business
Barrick’s business operations are subject to risks associated with international trade policies. The U.S. Government has recently implemented comprehensive tariffs on imports from various countries around the world, which could affect Barrick’s business. These tariffs may lead to increased costs for raw materials, components and equipment, and could impact existing operations and material growth projects. See 「Projects」.
Liquidity and level of indebtedness
As of December 31, 2024, Barrick had cash and cash equivalents of approximately $4.1 billion and capital leases and total debt of approximately $4.7 billion. Although Barrick has been successful in repaying debt in the past and issuing new debt securities in capital markets transactions, there CAN be no assurance that it CAN continue to do so. In addition, Barrick may assume additional debt in future periods or reduce its holdings of cash and cash equivalents in connection with funding future acquisitions, existing operations, capital expenditures, dividends or in pursuing other business opportunities. Barrick’s level of indebtedness could have important consequences for its operations, including:
- 141 -
• | Barrick may need to use a large portion of its cash flow to repay principal and pay interest on its debt, which will reduce the amount of funds available to finance its operations and other business activities; and |
• | Barrick’s debt level may limit its ability to pursue other business opportunities, borrow money for operations or capital expenditures in the future or implement its business strategy. |
As of December 31, 2024, Barrick had approximately $12 million in debt maturing by the end of 2025. This amount excludes $13 million in capital lease payments expected in 2025. Currently, the Company’s undrawn $3.0 billion revolving credit facility terminates in May 2029.
In addition to future cash flow from operations, potential divestment and the creation of new joint ventures and partnerships, Barrick’s potential other sources of liquidity for the payment of its expenses and principal and interest payable on its debt in 2025 include issuing additional equity or unsecured debt and borrowing under the Company’s $3.0 billion revolving credit facility (subject to compliance with covenants and the making of certain representations and warranties). The key financial covenant in Barrick’s $3.0 billion revolving credit facility, requires Barrick to maintain a net debt to total capitalization ratio that does not exceed 0.60:1 (as of December 31, 2024, this ratio was approximately 0.02:1). Barrick’s ability to reduce its indebtedness and meet its payment obligations will depend on its future financial performance, which will be impacted by financial, business, economic and other factors. Barrick will not be able to control many of these factors, such as economic conditions in the markets in which it operates. Barrick cannot be certain that its existing capital resources and future cash flow from operations will be sufficient to allow it to pay principal and interest on Barrick’s debt and meet its other obligations. If these amounts are insufficient or if there is a contravention of its debt covenants, Barrick may be required to refinance all or part of its existing debt, sell assets, borrow more money or issue additional equity. The ability of Barrick to access the bank, public debt or equity capital markets on an efficient basis may be constrained by a dislocation in the credit markets and/or capital and/or liquidity constraints in the banking, debt and/or equity markets at the time of issuance. See 「Global financial conditions」. If Barrick is unable to maintain its indebtedness and financial ratios at levels acceptable to its credit rating agencies, or should Barrick’s business prospects deteriorate, the ratings currently assigned to Barrick by Moody’s Investor Services, Standard & Poor’s Ratings Services or DBRS Morningstar could be downgraded, which could adversely affect the value of Barrick’s outstanding securities and existing debt and its ability to obtain new financing on favorable terms, and increase Barrick’s borrowing costs.
Barrick is also exposed to liquidity and various counterparty risks including, but not limited to: (i) Barrick’s lenders and other banking counterparties; (ii) Barrick’s insurance providers; (iii) financial institutions that hold Barrick’s cash; (iv) companies that have payables to Barrick, including concentrate customers; and (v) companies that have received deposits from Barrick for the future delivery of equipment.
- 142 -
Market price of Barrick’s shares
Securities of mining companies have experienced volatility in the past, at times unrelated to the financial performance or prospects of the companies involved. These factors include macroeconomic developments in North America and internationally, currency fluctuations and market perceptions of the attractiveness of particular industries. The price of Barrick’s common shares is also likely to be affected by short-term changes in gold and copper prices. As a result of these changes, the market price of Barrick’s common shares at any given point in time may not accurately reflect Barrick’s long-term value. Securities class action litigation is also prevalent and is often brought against companies following periods of volatility in the market price of their securities. In addition to current ongoing litigation, such as the securities class actions related to Barrick’s Pascua-Lama project (see 「Legal Proceedings and Regulatory Actions - Proposed Canadian Securities Class Actions (Pascua-Lama)」), Barrick may in the future be the target of similar litigation which could result in substantial defense costs and divert management’s attention and resources.
Exchange and capital controls
Several of the emerging market countries in which the Company operates or has interests have adopted measures to restrict the availability of the local currency, the conversion of local currency into hard currency or the repatriation of capital across borders. These measures are sometimes imposed by governments and/or central banks during times of local economic instability to prevent the removal of capital or the sudden devaluation of local currencies or to maintain in-country foreign currency reserves. In addition, many emerging markets require supplementary consents or reporting processes before local currency earnings CAN be converted into U.S. dollars or other currencies and/or such earnings CAN be repatriated or otherwise transferred outside of the operating jurisdiction. Furthermore, some jurisdictions regulate the amount or proportion of earnings that CAN be repatriated or otherwise transferred outside of the operating jurisdiction or that CAN be maintained by operating entities in off-shore bank accounts or in U.S. dollar or other currency accounts and require additional earnings to be held by banks located in the country of operation and/or in local currency.
These measures CAN have a number of negative effects on the Company’s operations. For example, exchange and capital controls reduce the quantum of immediately available capital that the Company could otherwise deploy for investment opportunities or the payment of expenses. As a result, the Company may be required to use other sources of funds for these objectives which may result in increased financing costs. In addition, measures that restrict the availability of the local currency or impose a requirement to operate in the local currency may create practical difficulties for the Company. For example, the cash and cash equivalents held at Kibali and Veladero are subject to various steps before they CAN be used to repay external debt, including shareholders loans.
Currency fluctuations
Currency fluctuations may affect the costs Barrick incurs at its operations and may also affect the value of Barrick’s assets and liabilities denominated in a foreign currency. As a result, currency fluctuations may affect Barrick’s operating results and cash flows. Gold and copper are each sold throughout the world based principally on the U.S. dollar price, but a portion of Barrick’s operating expenses are incurred in local currencies, such as the Australian dollar, Canadian dollar, Chilean peso, Argentine peso, Dominican peso, Peruvian sol, Pakistani rupee, Papua New Guinea kina, Tanzanian shilling, Zambian kwacha, West African CFA franc and the Congolese franc. Likewise, certain of Barrick’s assets and liabilities are denominated in these same local currencies, such as VAT receivable balances. Appreciation of certain non-U.S. dollar currencies against the U.S. dollar would increase the costs of production at Barrick’s mines, making such mines less profitable. Conversely, depreciation of these local currencies against the U.S. dollar would reduce the value of these local-currency denominated assets and liabilities in U.S. dollar terms. From time to time, Barrick enters into currency hedging contracts to mitigate the impact on operating costs of the appreciation of certain non-U.S. dollar currencies against the U.S.
- 143 -
dollar. Barrick may incur an opportunity loss if the U.S. dollar appreciates in value relative to non-U.S. dollar currencies. As of December 31, 2024, Barrick had no foreign currency derivative contracts beyond spot requirements. There CAN be no assurance that Barrick will enter into foreign currency hedging activities in the future. See 「Use of derivatives」.
Interest rates
A signifiCANt, prolonged decrease in interest rates could have a material adverse impact on the interest earned on Barrick’s cash balances ($4.1 billion at December 31, 2024). The Company’s interest rate exposure mainly relates to the carrying value of certain long lived assets and liabilities and to the interest payments on its variable-rate debt ($0.1 billion at December 31, 2024). There CAN be no assurance that Barrick will engage in any hedging activities in the future. See 「Use of derivatives」.
Use of derivatives
From time to time, Barrick may use certain derivative products to manage the risks associated with gold, copper and silver price volatility, changes in other commodity input prices, interest rates, foreign currency exchange rates and energy prices. The use of derivative instruments involves certain inherent risks including: (i) credit risk – the risk that the creditworthiness of a counterparty may adversely affect its ability to perform its payment and other obligations under its agreement with Barrick or adversely affect the financial and other terms the counterparty is able to offer Barrick; (ii) market liquidity risk – the risk that Barrick has entered into a derivative position that cannot be closed out quickly, by either liquidating such derivative instrument or by establishing an offsetting position; and (iii) unrealized mark-to-market risk – the risk that, in respect of certain derivative products, an adverse change in market prices for commodities, currencies or interest rates will result in Barrick incurring an unrealized mark-to-market loss in respect of such derivative products. For a summary of the derivative instruments used in the Company’s currency, interest rate and commodity hedge programs, see Note 25 to the Consolidated Financial Statements. See also 「Global financial conditions」.
Barrick’s management team may not be successful in implementing its business strategy
There CAN be no assurance that Barrick’s management team will be successful in implementing its strategy (including as set out in this Annual Information Form) or that past results will be reproduced going forward. The management team may experience difficulties in effecting key strategic goals such as the growth and investment in tier one assets, tier two assets and strategic assets, the sale of non-core assets or the development of exploration projects. The performance of Barrick’s operations could be adversely affected if Barrick’s management team cannot implement the stated business strategy effectively.
Acquisitions and integration
From time to time, Barrick examines opportunities to acquire additional mining assets and businesses. Any acquisition that Barrick may choose to complete may be of a significant size, may change the scale of Barrick’s business and operations, and may expose Barrick to new or greater geographic, political, operating, financial, legal and geological risks. Barrick’s success in its acquisition activities depends on its ability to identify suitable acquisition candidates, negotiate acceptable terms for any such acquisition and integrate the acquired operations successfully with those of Barrick. Any acquisitions and any potential acquisitions would be accompanied by risks. For example, there may be a significant change in commodity prices after Barrick has committed to complete the transaction and established the purchase price or exchange ratio; a material ore body may prove to be below expectations; Barrick may have difficulty integrating and assimilating the operations and personnel of any acquired companies (which may be compounded by geographical separation, unanticipated costs, and the loss of key employees), realizing anticipated synergies and maximizing the financial and strategic position of the combined enterprise, and maintaining uniform standards, policies and controls across the organization; the integration of the acquired business or assets may divert the attention of management
- 144 -
or disrupt Barrick’s ongoing business and its relationships with employees, customers, suppliers and contractors; and the acquired business or assets may have unknown liabilities which may be significant.
In the event that Barrick chooses to raise debt capital to finance any such acquisition, Barrick’s leverage will be increased. If Barrick chooses to use equity as consideration for any such acquisition, existing shareholders may suffer dilution. In addition, many companies in the mining industry have recently seen substantial downward pressure on their equity values after announcing signifiCANt acquisitions. There is a risk that if Barrick was to announce a signifiCANt acquisition, the value of Barrick’s common shares could decrease over the short-, medium- and/or long-term. Barrick CANnot assure that it CAN complete any acquisition or business arrangement that it pursues, or is pursuing, on favorable terms, or that any acquisitions or business arrangements completed will ultimately benefit Barrick’s business. There CAN be no assurance that Barrick would be successful in overcoming the risks noted above or any other problems encountered in connection with such acquisitions.
Divestitures
Barrick has recently sold or reduced its interest in certain assets and may continue to do so in the future. In connection with these dispositions, Barrick has given (and may in the future give) representations and warranties and indemnities customary for transactions of this type and may have also, in certain cases, agreed (or may in the future agree) to retain responsibility for certain liabilities related to the period prior to the sale. As a result, Barrick may incur liability in the future associated with assets it no longer owns or in which it has a reduced interest.
Competition
Barrick competes with other mining companies and individuals for mining claims and leases on exploration properties, the acquisition of mining assets and access to water, power and other required infrastructure. This competition may increase Barrick’s cost of acquiring suitable claims, properties and assets, should they become available to Barrick. Barrick also competes with other mining companies to attract and retain key executives and employees. There CAN be no assurance that Barrick will continue to be able to compete successfully with its competitors in acquiring properties, assets or access to infrastructure or in attracting and retaining skilled and experienced employees.
Barrick depends on its key personnel
Barrick’s success depends significantly on the continued individual and collective contributions of its senior, regional and local management teams. The loss of the services of members of these management teams or the inability to hire and retain experienced replacement management personnel could have a material adverse effect on Barrick’s business, results of operations and financial condition. In addition, to implement and manage Barrick’s business and operating strategies effectively, Barrick must maintain a high level of efficiency and performance, continue to enhance its operational and management systems and continue to successfully attract, train, motivate and manage its employees. If Barrick is not successful in these efforts, this may have a material adverse effect on its business, results of operations and financial condition. Any departures of key personnel could also be viewed in a negative light by investors and research analysts, which could cause the price of Barrick’s shares to decline.
- 145 -
Employee relations
Barrick’s ability to achieve its future goals and objectives is dependent, in part, on maintaining good relations with its employees and minimizing employee turnover. Work stoppages or other industrial relations events at Barrick’s major capital projects could lead to project delays or increased costs. These risks are more acute in jurisdictions in which Barrick’s workforce is highly unionized, including in Africa and Latin America. For example in 2018, prior to the Merger, Randgold’s Tongon mine in Cote d’Ivoire experienced an illegal labor action that lasted 53 days. A prolonged labor disruption at any of Barrick’s material properties could have a material adverse impact on its operations as a whole.
Diseases and epidemics may adversely impact Barrick’s business
The Company faces risks related to diseases and epidemics, which could significantly disrupt operations and may materially and adversely affect its operations and financial results. For example, in March 2020, a novel strain of coronavirus known as Covid-19 was declared a worldwide pandemic by the World Health Organization, and significantly impacted the global economy. While Barrick’s operations were not significantly affected, the impact of the Covid-19 pandemic included extreme volatility in financial markets and commodity prices, a slowdown in economic activity, and raised the prospect of an extended global recession. Efforts to slow the spread of any disease, epidemic or pandemic could severely impact the operation and development of Barrick’s mines and projects, including through the imposition of government-declared states of emergency and restrictive measures such as travel bans, quarantine and self-isolation. The timing and duration of such government measures when responding to pandemics is uncertain and may vary across the jurisdictions in which Barrick operates. If the operation or development of one or more Barrick mines is disrupted or suspended in the future as a result of these or other similar measures, it may have a material adverse impact on Barrick’s profitability, results of operations, financial condition and stock price.
In addition, to the extent that any disease, epidemic or pandemic adversely affects Barrick’s business and financial results, it may also have the effect of heightening many of the other risks described in this Annual Information Form. For example, the Chinese market is a significant source of global demand for commodities, including copper. A sustained slowdown in China’s growth or demand, or a significant slowdown in other markets, could have an adverse effect on the price and/or demand for copper produced at Barrick’s mines. Efforts to contain diseases like Covid-19 may have a significant effect on Chinese commodity prices and demand, and potentially broader impacts on the Company’s supply chain or the global economy, which could have a material adverse effect on Barrick’s cash flows, earnings, results of operations and financial position. For example, the plant expansion and mine life extension project at Pueblo Viejo experienced logistical challenges and related delays primarily due to the impact of Covid-19 on the global supply chain.
Finally, the actual and threatened spread of any disease globally, including business and social disruptions, could adversely affect global economies and financial markets resulting in a prolonged economic downturn and volatility in the value of Barrick’s stock price. The extent to which any disease, epidemic or pandemic impacts business activity or financial results, and the duration of any such negative impact, will depend on future developments, which are highly uncertain and cannot be predicted by Barrick, including new information which may emerge concerning such disease, epidemic or pandemic, the possibility of a recurrence or waves of outbreaks, or any existing or future variants of any disease, and the actions required to contain or treat its impact, among others.
Internal control environment
Internal control over financial reporting is a process designed to provide reasonable assurance regarding the reliability of financial reporting and the preparation of financial statements for external purposes in accordance with generally accepted accounting principles. Disclosure controls and procedures are designed to ensure that information required to be disclosed by a company in reports filed
- 146 -
with securities regulatory agencies is recorded, processed, summarized and reported on a timely basis and is accumulated and communicated to a company’s management, including its President and Chief Executive Officer and Chief Financial Officer, as appropriate, to allow timely decisions regarding required disclosure. Barrick has invested resources to document and analyze its system of disclosure controls and its internal control over financial reporting. A control system, no matter how well designed and operated, CAN provide only reasonable, not absolute, assurance with respect to the reliability of financial reporting and financial statement preparation. See 「Internal Control Over Financial Reporting and Disclosure Controls and Procedures」.
Ability to support the carrying value of goodwill and non-current assets
As of December 31, 2024, the carrying value of Barrick’s goodwill was approximately $3.1 billion or 7% of Barrick’s total assets. Goodwill is allocated to each cash generating unit (「CGU」), where CGUs generally represent individual mineral properties. Goodwill is tested annually for impairment in the fourth quarter. In addition, at each reporting period, Barrick assesses whether there is an indication that goodwill is impaired and, if there is such an indication, Barrick tests for goodwill impairment at that time. The test for goodwill impairment involves a comparison of the recoverable amount of an operating segment to its carrying value. A goodwill impairment charge is recognized for any excess of the carrying amount of the operating segment over its recoverable amount.
Non-current assets are tested for impairment when events or changes in circumstances suggest that the carrying amount of these assets may not be recoverable. The impairment test is carried out using the same approach that is used for goodwill.
For example, for the year ended December 31, 2024, Barrick recognized long-lived asset impairment reversals at Lumwana and Veladero. The Company also recognized a goodwill impairment at Loulo-Gounkoto of $484 million in the fourth quarter of 2024. See 「Legal Proceedings and Regulatory Actions – Loulo-Gounkoto Mining Conventions Dispute」 for details. The assessment for goodwill and non-current asset impairment is subjective and requires management to make estimates and assumptions for a number of factors that market participants would make about the recoverable amount of the CGU, including estimates of production levels, operating costs and capital expenditures and permitting assumptions reflected in Barrick’s life of mine plans, as well as economic factors beyond management’s control, such as gold and copper prices, discount rates and observable net asset value multiples. Should management’s estimate of the future not reflect actual events, further goodwill or non-current asset impairment charges may materialize.
MANAGEMENT’S DISCUSSION AND ANALYSIS OF FINANCIAL CONDITION AND RESULTS OF OPERATIONS
Reference is made to the Management’s Discussion and Analysis of Financial and Operating Results of the Company (IFRS) for the year ended December 31, 2024, which is available on SEDAR+ at www.sedarplus.ca and on EDGAR at www.sec.gov as an exhibit to Barrick’s Form 40-F.
CONSOLIDATED FINANCIAL STATEMENTS
Reference is made to the Company’s Consolidated Financial Statements as at and for the year ended December 31, 2024 (IFRS), which are available on SEDAR+ at www.sedarplus.ca and on EDGAR at www.sec.gov as an exhibit to Barrick’s Form 40-F.
CAPITAL STRUCTURE
Set forth below is a description of Barrick’s share capital. The following statements are brief summaries of, and are subject to the provisions of, the notice of articles and articles of Barrick and the relevant provisions of the BCBCA.
- 147 -
General
Barrick’s authorized share capital consists of an unlimited number of common shares.
Common Shares
The holders of Barrick common shares are entitled to one vote for each share on all matters submitted to a vote of shareholders and do not have cumulative voting rights. The holders of Barrick common shares are entitled to receive dividends if, as and when declared by the Board of Directors of Barrick in respect of the Barrick common shares. The holders of Barrick common shares are entitled to share rateably in any distribution of the assets of Barrick upon liquidation, dissolution or winding-up, after satisfaction of all debts and other liabilities. As of March 10, 2025, there were 1,723,408,591 Barrick common shares issued and outstanding.
The rights, preferences and privileges of holders of Barrick common shares are subject to the rights of the holders of shares of any class ranking senior to the Barrick common shares that Barrick may issue in the future.
There are no limitations contained in the notice of articles or articles of Barrick or in the BCBCA on the ability of a person who is not a Canadian resident to hold Barrick common shares or exercise the voting rights associated with Barrick common shares. The Barrick common shares are not subject to any exchange, conversion, exercise, redemption, retraction, surrender or similar rights or restrictions.
RATINGS
The following table sets out the ratings of Barrick’s corporate debt by the rating agencies indicated as at the dates set out below:
Rating Agency | ||||||
Moody’s Investors Service | Standard & Poor’s Ratings Services | DBRS Morningstar | ||||
Senior Unsecured Debt |
A3 | BBB+ | BBB |
The Moody’s credit rating is current to February 21, 2025, the S&P credit rating is current to October 23, 2024 and the DBRS Morningstar credit rating is current to February 28, 2025.
Moody’s Investors Service (“Moody’s”) credit ratings for long-term debt are on a rating scale that ranges from Aaa to C, which represents the range from highest to lowest quality of such securities rated. According to Moody’s, a rating of Baa is the fourth highest and a rating of A is the third highest of nine major categories. Moody’s appends numerical modifiers 1, 2 and 3 to each generic rating classification from Aa through Caa in its corporate bond rating system. The modifier 1 indicates that the obligation ranks in the higher end of its generic rating category; the modifier 2 indicates a mid-range ranking; and the modifier 3 indicates a ranking in the lower end of that generic rating category. A Moody’s rating outlook is an opinion regarding the likely rating direction over the medium-term. Ratings outlooks fall into four categories: positive, negative, stable, and developing. A stable outlook indicates a low likelihood of a rating change over the medium term. A negative, positive or developing outlook indicates a higher likelihood of a rating change over the medium term. The time between the assignment of a new rating outlook and a subsequent rating action has historically varied widely. On average, the next rating action has followed within about a year. The next rating action subsequent to the assignment of a negative rating outlook has historically been a downgrade or review for possible downgrade. On March 1, 2018, Moody’s upgraded the rating on Barrick’s senior unsecured debt to Baa2 with a stable outlook. On October 29, 2020, Moody’s upgraded the rating on Barrick’s senior unsecured debt to Baa1 with a stable outlook, noting Barrick’s track record of low leverage and strong cash flow generation. On December 14, 2022, Moody’s upgraded the rating on Barrick’s senior unsecured debt to A3 with a stable outlook, noting that the Barrick’s liquidity is excellent, which provides significant flexibility to maneuver through gold price
- 148 -
volatility. On each of December 13, 2023, March 22, 2024 and February 21, 2025, Moody’s confirmed its rating of Barrick at A3 with a stable outlook. According to the Moody’s rating system, long-term obligations rated A are considered upper-medium grade and are subject to low credit risk.
Standard & Poor’s Ratings Services (「S&P」) credit ratings for long-term debt are on a rating scale that ranges from AAA to D, which represents the range from highest to lowest quality of such securities rated. The BBB rating is the fourth highest of ten major categories. The ratings from AA to CCC may be modified by the addition of a plus (+) or minus (-) sign to show relative standing within the major rating categories. If S&P anticipates that a credit rating may change in the next six to 24 months, it may issue an updated ratings outlook indicating whether the possible change is likely to be 「positive」, 「negative」, 「stable」 or 「developing」. However, a rating outlook does not mean that a rating change is inevitable. On March 22, 2018, S&P upgraded the rating on Barrick’s senior unsecured debt to BBB with a stable outlook. On June 11, 2020, S&P affirmed the Company’s BBB rating and raised its outlook to positive from stable, noting that Barrick had materially strengthened its balance sheet over the past year and had current and prospective credit ratios that were strong for the rating. On March 29, 2022, S&P upgraded the rating on Barrick’s senior unsecured debt to BBB+ with a stable outlook, noting that the upgrade reflected Barrick’s significant financial flexibility, their favorable view of Barrick’s operating efficiency and breadth, and their expectation that the Company’s credit profile should remain highly resilient in the event of lower gold prices. On each of October 13, 2023 and October 23, 2024, S&P confirmed its rating of Barrick at BBB+ with a stable outlook.
DBRS Morningstar uses a long-term debt rating scale that ranges from AAA to D, which represents the range from highest to lowest quality of such securities rated, and, with the exception of the AAA and D categories, also contains the subcategories 「high」 and 「low」. The absence of either a 「high」 or 「low」 designation indicates the rating is in the 「middle」 of the category. On June 9, 2020, DBRS Morningstar upgraded its rating of Barrick to BBB from BBB (low) and changed the trend to stable from positive, noting that Barrick’s credit metrics were robust for the rating. On each of June 9, 2022, March 3, 2023, March 1, 2024 and February 28, 2025, DBRS Morningstar confirmed its rating of Barrick at BBB with a stable trend. According to DBRS Morningstar, a rating of BBB is in the fourth highest of ten major categories and is of adequate credit quality. The capacity for the payment of financial obligations is considered acceptable. Entities in this category are considered to be vulnerable to future events, but qualifying negative factors are considered manageable.
Barrick understands that the ratings are based on, among other things, information furnished to the above ratings agencies by Barrick and information obtained by the ratings agencies from publicly available sources. The credit ratings given to Barrick’s debt instruments by the rating agencies are not recommendations to buy, hold or sell such debt instruments since such ratings do not comment as to market price or suitability for a particular investor. There is no assurance that any rating will remain in effect for any given period of time or that any rating will not be revised or withdrawn entirely by a rating agency in the future if, in its judgment, circumstances so warrant. Credit ratings are intended to provide investors with: (i) an independent measure of the credit quality of an issue of securities; (ii) an indication of the likelihood of repayment for an issue of securities; and (iii) an indication of the capacity and willingness of the issuer to meet its financial obligations in accordance with the terms of those securities. Credit ratings accorded to Barrick’s debt instruments may not reflect the potential impact of all risks on the value of such instruments, including risks related to market or other factors discussed in this Annual Information Form (see also 「Risk Factors」).
Barrick has paid each of Moody’s and S&P its customary fees in connection with the provision of the above credit ratings. The Company has not made any payments to DBRS Morningstar and no payments have been made to Moody’s and S&P unrelated to the provision of their rating services for the last two years.
- 149 -
MARKET FOR SECURITIES
Barrick’s common shares are listed and posted for trading on the Toronto Stock Exchange under the symbol ABX and the New York Stock Exchange under the symbol GOLD. The following table outlines the closing share price trading range and volume of shares traded by month in 2024, and for the period from January 1, 2025 to March 10, 2025, based on trading information published by each exchange.
Toronto Stock Exchange | New York Stock Exchange | |||||||||||||||||
Share Price Trading Range |
Share Volume | Share Price Trading Range |
Share Volume | |||||||||||||||
High | Low | High | Low | |||||||||||||||
2024 | (C$ per share) | (millions) | ($ per share) | (millions) | ||||||||||||||
January | 24.28 | 20.62 | 60 | 18.23 | 15.33 | 391 | ||||||||||||
February | 21.49 | 18.65 | 67 | 16.05 | 13.76 | 411 | ||||||||||||
March | 22.62 | 19.81 | 77 | 16.70 | 14.56 | 451 | ||||||||||||
April | 26.05 | 22.25 | 90 | 18.95 | 16.10 | 666 | ||||||||||||
May | 24.48 | 22.18 | 77 | 18.10 | 16.17 | 387 | ||||||||||||
June | 23.86 | 21.91 | 76 | 17.53 | 15.92 | 412 | ||||||||||||
July | 26.58 | 22.46 | 71 | 19.45 | 16.41 | 448 | ||||||||||||
August | 28.47 | 23.04 | 81 | 20.89 | 16.09 | 473 | ||||||||||||
September | 28.67 | 25.72 | 81 | 21.21 | 18.94 | 377 | ||||||||||||
October | 29.50 | 26.42 | 70 | 21.35 | 19.16 | 454 | ||||||||||||
November | 27.20 | 23.46 | 81 | 19.54 | 16.59 | 505 | ||||||||||||
December | 25.02 | 21.73 | 68 | 17.74 | 15.11 | 379 | ||||||||||||
2025 | ||||||||||||||||||
January | 24.47 | 22.02 | 62 | 16.86 | 15.31 | 383 | ||||||||||||
February | 27.19 | 23.68 | 73 | 19.16 | 16.33 | 542 | ||||||||||||
March 1 to 10 | 27.02 | 25.32 | 23 | 18.88 | 17.48 | 145 |
MATERIAL CONTRACTS
Set out below is a description of Barrick’s material contracts as at December 31, 2024.
On March 6, 2003, Placer Dome entered into an Indenture (the 「2003 Indenture」) with Deutsche Bank Trust Company Americas in connection with the issuance of senior debt securities.
On March 6, 2003, Placer Dome entered into a First Supplemental Indenture with Deutsche Bank Trust Company Americas in connection with the issuance and sale by Placer Dome of $200 million principal amount of 6.375% debentures on March 6, 2003. This First Supplemental Indenture, together with the original 2003 Indenture, sets out the terms and conditions pertaining to the $200 million principal amount 6.375% debentures.
On October 10, 2003, Placer Dome entered into a Second Supplemental Indenture with Deutsche Bank Trust Company Americas in connection with the issuance and sale by Placer Dome of $300 million principal amount of 6.45% debentures on October 10, 2003. This Second Supplemental Indenture, together with the original 2003 Indenture, sets out the terms and conditions pertaining to the $300 million principal amount 6.45% debentures.
- 150 -
On November 12, 2004, Barrick entered into an Indenture with BGI, Barrick Gold Finance Company and JPMorgan Chase Bank (the 「2004 Indenture」). Pursuant to the 2004 Indenture, (a) Barrick issued $200 million principal amount of 5.80% notes due 2034 (the 「Barrick 2034 Notes」), (b) Barrick Gold Finance Company issued $200 million principal amount of 5.80% notes due 2034 (the 「BGFC 2034 Notes」), and (c) Barrick Gold Finance Company issued $350 million principal amount of 4.875% notes due 2014 (the 「BGFC 2014 Notes」), all on November 12, 2004. On December 16, 2013, the entire balance of the BGFC 2014 Notes was repaid in full. The 2004 Indenture sets out the terms and conditions pertaining to the Barrick 2034 Notes and the BGFC 2034 Notes. The BGFC 2034 Notes are unconditionally guaranteed by Barrick.
On October 12, 2006, Barrick International (Barbados) CORP., formerly Barrick International Bank CORP. (「BIBC」), issued an aggregate of $1 billion of notes (the 「BIBC Notes」) comprised of $400 million of 5.75% notes due 2016 and $600 million of 6.35% notes due 2036 pursuant to an Indenture dated as of the same date among BIBC, as issuer, Barrick (HMC) Mining Company (「Barrick (HMC)」), as initial joint obligor, Barrick, as parent guarantor, and The Bank of New York, as trustee (the 「2006 Indenture」). The 2006 Indenture sets out the terms and conditions pertaining to the BIBC Notes, which include an unconditional guarantee by Barrick.
On the same date, and as part of the same transaction, ABX Financing Company (「ABXFC」), a company incorporated for the purpose of acquiring the BIBC Notes, issued an aggregate of $1 billion of notes (the 「ABXFC Notes」) comprised of $400 million of 5.75% notes due 2016 and $600 million of 6.35% notes due 2036 pursuant to an Indenture dated as of the same date among ABXFC, as issuer, BIBC, Barrick (HMC) and Barrick, as guarantors, and The Bank of New York, as trustee (the 「ABXFC Indenture」). On October 15, 2015, the outstanding principal amount of the 5.75% notes due 2016 was repaid in full. The ABXFC Indenture sets out the terms and conditions pertaining to the ABXFC Notes, which include an unconditional guarantee by Barrick, BIBC and Barrick (HMC).
On September 11, 2008, Barrick entered into an Indenture with Barrick Gold Financeco LLC, Barrick North America Finance LLC and The Bank of New York Mellon (「2008 Indenture」). Pursuant to the 2008 Indenture, (i) Barrick Gold Financeco LLC issued $500 million principal amount 6.125% notes due 2013 (the 「BGFC 2013 Notes」), and (ii) Barrick North America Finance LLC issued $500 million principal amount 6.80% notes due 2018 (the 「BNAF 2018 Notes」) and $250 million principal amount 7.50% notes due 2038 (the 「BNAF 2038 Notes」), all on September 11, 2008. On March 19, 2009, Barrick issued an aggregate of $750 million principal amount 6.95% notes due 2019 (the 「BGC 2019 Notes」) pursuant to the 2008 Indenture. During 2013, upon maturity, the outstanding principal amount of the BGFC 2013 Notes was repaid in full. On October 28, 2015, pursuant to a cash tender offer, $275 million of the principal amount of the BGC 2019 Notes was repaid. On March 21, 2016, pursuant to a cash tender offer, approximately $227 million of the principal amount of the BNAF 2018 Notes and approximately $196 million of the principal amount of the BGC 2019 Notes was repaid. On September 26, 2016, the outstanding principal amount of the BNAF 2018 Notes was repaid in full. On June 20, 2017, the outstanding principal amount of the BGC 2019 Notes was repaid in full. The 2008 Indenture sets out the terms and conditions pertaining to the BNAF 2038 Notes. The BNAF 2038 Notes are unconditionally guaranteed by Barrick.
On October 16, 2009, Barrick entered into an Indenture with Barrick (PD) Australia Finance Pty Ltd. and the Bank of New York Mellon (the 「2009 Indenture」). Pursuant to the 2009 Indenture, Barrick (PD) Australia Finance Pty Ltd. issued $400 million principal amount 4.950% notes due 2020 (the 「BPDAF 2020 Notes」) and $850 million principal amount 5.950% notes due 2039 (the 「BPDAF 2039 Notes」), all on October 16, 2009. On March 21, 2016, pursuant to a cash tender offer, approximately $152 million of the principal amount of the BPDAF 2020 Notes was repaid. On July 15, 2019, the outstanding principal amount of approximately $248 million of the BPDAF 2020 Notes was repaid in full. The 2009 Indenture sets out the terms and conditions pertaining to the BPDAF 2039 Notes. The BPDAF 2039 Notes are unconditionally guaranteed by Barrick. In 2023, approximately $43 million of the principal amount of the BPDAF 2039 Notes was repaid pursuant to open market repurchases.
- 151 -
On June 1, 2011, Barrick entered into an Indenture with Barrick North America Finance LLC (「BNAF」), Citibank N.A. and Wilmington Trust Company (the 「2011 Indenture」). Pursuant to the 2011 Indenture, Barrick and BNAF issued an aggregate of $4.0 billion in debt securities comprised of: $700 million of 1.75% notes due 2014 (the 「Barrick 2014 Notes」) and $1.1 billion of 2.90% notes due 2016 (the 「Barrick 2016 Notes」), each issued by Barrick, as well as $1.35 billion of 4.40% notes due 2021 (the 「BNAF 2021 Notes」) and $850 million of 5.70% notes due 2041 (the 「BNAF 2041 Notes」), each issued by BNAF. On December 16, 2013, the outstanding principal amount of the Barrick 2014 Notes was repaid in full. On September 9, 2015, the outstanding principal amount of the Barrick 2016 Notes was repaid in full. In 2016, approximately $721 million of the principal amount of the BNAF 2021 Notes was repaid pursuant to cash tender offers. On July 17, 2018, the outstanding principal amount of approximately $629 million of BNAF 2021 Notes was repaid in full. The BNAF 2041 Notes are unconditionally guaranteed by Barrick.
On April 3, 2012, Barrick issued an aggregate of $2 billion in debt securities pursuant to the 2011 Indenture, comprised of $1.25 billion of 3.85% notes due 2022 (the 「BGC 2022 Notes」) and $750 million of 5.25% notes due 2042. In 2015, approximately $913 million of the principal amount of the 3.85% notes due 2022 was repaid pursuant to cash tender offers. On January 31, 2020, the outstanding principal amount of approximately $337 million of BGC 2022 Notes was repaid in full. In 2022, approximately $375 million of the principal amount of the 5.25% notes due 2042 was repaid pursuant to open market repurchases and cash tender offers.
On May 2, 2013, Barrick and BNAF issued an aggregate of $3 billion in debt securities pursuant to the 2011 Indenture, comprised of $650 million of 2.50% notes due 2018 and $1.5 billion of 4.10% notes due 2023 issued by Barrick as well as $850 million of 5.75% notes due 2043 issued by BNAF (collectively, the 「BNAF Notes」). The BNAF Notes are unconditionally guaranteed by Barrick. On December 3, 2013, pursuant to a cash tender offer, approximately $398 million of the principal amount of the 2.50% notes due 2018 was repaid. In 2015, approximately $129 million of the principal amount of the 2.50% notes due 2018 and approximately $769 million of the principal amount of the 4.10% notes due 2023 was repaid pursuant to cash tender offers. On March 21, 2016, pursuant to a cash tender offer, approximately $18 million of the principal amount of the 2.50% notes due 2018 was repaid. On June 24, 2016, the outstanding principal amount of the 2.50% notes due 2018 was repaid in full. On September 21, 2017, the outstanding principal amount of the 4.10% notes due 2023 was repaid in full.
On July 1, 2019, Barrick and Newmont, among others, entered into an amended and restated limited liability company agreement which sets out the rights and obligations between them in respect of Nevada Gold Mines (the 「JV Agreement」). Pursuant to the JV Agreement, the management and control of Nevada Gold Mines is vested in its board of managers, which currently consists of five members (and five alternates), three of which were appointed by Barrick and two of which were appointed by Newmont. The JV Agreement also establishes advisory committees, including a technical committee, finance committee and exploration committee, with equal representation from Barrick and Newmont. Pursuant to the JV Agreement, Barrick was appointed as the initial operator with overall management responsibility, subject to the supervision and direction of the Board.
TRANSFER AGENTS AND REGISTRARS
Barrick’s transfer agent and registrar for its common shares is TSX Trust Company in Canada at its principal office in Toronto, Ontario and Equiniti Trust Company, LLC in the United States at its principal office in Brooklyn, New York.
DIVIDEND POLICY
On February 16, 2022, the Board of Directors increased the quarterly dividend by 11% from $0.09 to $0.10 per share in respect of the fourth quarter of 2021 (paid mid-March 2022), for a total annualized dividend of $0.37 per share in respect of 2021.
- 152 -
At its February 15, 2022 meeting, the Board of Directors approved a performance dividend policy that enhances the return to shareholders when the Company’s liquidity is strong. In addition to Barrick’s base dividend, the amount of the performance dividend on a quarterly basis is based on the amount of cash, net of debt, on Barrick’s consolidated balance sheet at the end of each quarter in accordance with the table below.
Performance Dividend Level |
Threshold Level | Quarterly Base Dividend |
Quarterly Performance Dividend |
Quarterly Total Dividend | ||||
Level I | Net cash <$0 | $0.10 per share | $0.00 per share | $0.10 per share | ||||
Level II | Net cash >$0 and <$0.5B |
$0.10 per share | $0.05 per share | $0.15 per share | ||||
Level III | Net cash >$0.5B and <$1B |
$0.10 per share | $0.10 per share | $0.20 per share | ||||
Level IV | Net cash >$1B | $0.10 per share | $0.15 per share | $0.25 per share |
In 2022, Barrick paid a quarterly dividend of $0.20 per share, including a $0.10 per share performance dividend, in respect of the first and second quarters of 2022 (paid in mid-June and mid-September, respectively), $0.15 per share, including a $0.05 per share performance dividend, in respect of the third quarter of 2022 (paid in mid-December), and $0.10 per share in respect of the fourth quarter of 2022 (paid in mid-March 2023), for a total annualized dividend of $0.65 per share in respect of 2022.
In 2023, Barrick paid a quarterly dividend of $0.10 per share in respect of the first, second and third quarters of 2023 (paid in mid-June, mid-September and mid-December, respectively). On February 14, 2024, Barrick announced a quarterly dividend of $0.10 per share in respect of the fourth quarter of 2023, which was paid on March 15, 2024, for a total annualized dividend of $0.40 per share in respect of 2023.
In 2024, Barrick paid a quarterly dividend of $0.10 per share in respect of the first, second and third quarters of 2024 (paid in mid-June, mid-September and mid-December, respectively). On February 12, 2025, Barrick announced a quarterly dividend of $0.10 per share in respect of the fourth quarter of 2024, which will be paid on March 17, 2025, for a total annualized dividend of $0.40 per share in respect of 2024.
The declaration and payment of dividends is at the discretion of the Board of Directors, and will depend on the Company’s financial results, cash requirements, future prospects, the number of outstanding common shares and other factors deemed relevant by the Board.
SHARE BUYBACK PROGRAM
At its February 15, 2022 meeting, the Board of Directors authorized the 2022 Repurchase Program, providing for the repurchase of up to $1.0 billion of the Company’s outstanding common shares over the subsequent 12 months. Barrick repurchased $424 million of shares in 2022 under the 2022 Repurchase Program. As a result, a total of $1.6 billion of cash was returned to shareholders through dividends and share buybacks during 2022, exceeding the record $1.4 billion of distributions made in 2021.
At its February 14, 2023 meeting, the Board of Directors terminated the 2022 Repurchase Program and authorized the 2023 Repurchase Program for the purchase of up to $1.0 billion of Barrick’s outstanding common shares over the next 12 months. Barrick did not purchase any shares under the 2023 Repurchase Program.
At its February 13, 2024 meeting, the Board of Directors authorized the 2024 Share Repurchase Program for the repurchase of up to $1 billion of Barrick’s outstanding common shares over the next 12 months. Barrick’s 2023 Repurchase Program was terminated in connection with the new program. Barrick
- 153 -
repurchased 28.675 million common shares in 2024 for approximately $498 million under the 2024 Share Repurchase Program.
At its February 11, 2025 meeting, the Board of Directors authorized the 2025 Share Repurchase Program for the repurchase of up to $1 billion of Barrick’s outstanding common shares over the next 12 months. Barrick’s 2024 Repurchase Program was terminated in connection with the new program.
The actual number of common shares that may be purchased, if any, and the timing of any such purchases, will be determined by Barrick based on a number of factors, including the Company’s financial performance, the availability of cash flows, and the consideration of other uses of cash, including capital investment opportunities, returns to shareholders, and debt reduction. The 2025 Repurchase Program does not obligate the Company to acquire any particular number of common shares, and the 2025 Repurchase Program may be suspended or discontinued at any time at the Company’s discretion.
DIRECTORS AND OFFICERS OF THE COMPANY
As of March 10, 2025, directors and executive officers of Barrick as a group beneficially own, directly or indirectly, or exercise control or direction over 12,966,429 common shares representing approximately 0.77% of the outstanding common shares of Barrick.
Directors of the Company
The present term of each director will expire at the next annual meeting of shareholders or upon such director’s successor being elected or appointed.
The following ten individuals are the directors of the Company as at March 10, 2025:
Name (age) and municipality of residence |
Principal occupations during past 5 years | |
Mark Bristow (66) Beau Champ, Mauritius |
Dr. Bristow was appointed President and Chief Executive Officer of Barrick effective January 1, 2019, following completion of the Merger. Previously, since its incorporation in 1995, Dr. Bristow was the Chief Executive Officer of Randgold following his pioneering exploration work in West Africa. He subsequently LED Randgold’s growth through the discovery and development of high quality assets into a major international gold mining business. Dr. Bristow played a pivotal role in promoting the emergence of a sustainable mining industry in Africa, and has a proven track record of delivering significant shareholder value. During his career, Dr. Bristow has held board positions at a number of global gold mining companies. Dr. Bristow holds a Doctorate in Geology from the University of KwaZulu-Natal in South Africa.
Barrick Board Details: • Director since January 2019
|
- 154 -
Name (age) and municipality of residence |
Principal occupations during past 5 years | |
Helen Cai (51) Hong Kong, China |
Ms. Cai is a finance and investment professional with more than two decades of experience in capital markets and all aspects of corporate finance, from strategic planning to M&A transactions. Ms. Cai worked most recently as a managing director with China International Capital Corporation until the spring of 2021. Prior to this, she worked as an analyst with the Goldman Sachs Group covering the American mining and technology sectors, and was highly ranked by the StarMine analyst ranking service. As a lead analyst at China International Capital Corporation, Ms. Cai was ranked as Best Analyst by Institutional Investor and Asia Money in their China Research Sector Polls for multiple years when covering Hong Kong and China listed companies. The landmark cross-border financing and M&A transactions she LED subsequently as a senior investment banker also won various awards from Asia Money and The Asset. Ms. Cai is a Chartered Financial Analyst and Chartered Alternative Investment Analyst and was educated at Tsinghua University in China and the Massachusetts Institute of Technology in the United States, where she received two master’s degrees and multiple fellowship awards.
Barrick Board Details: • Director since November 2021
| |
Christopher L. Coleman (56) London, United Kingdom |
Mr. Coleman is the Group Head of Banking and a Global Partner at Rothschild & Co. He has more than 25 years’ experience in the financial services sector, including corporate and private client banking and project finance. Since March 2023, Mr. Coleman has served as the Chair of the board of Papa John’s International, Inc., which he joined as an independent director in 2012. From 2008 until the completion of the Merger, he served as a non-executive director of Randgold, including as non-executive Chairman of the board, Chairman of the governance and nominating committee, and member of the remuneration committee. Mr. Coleman has had a long-standing involvement in the mining sector globally. He is a chairman of Rothschild & Co. Bank International in the Channel Islands and serves on a number of other boards and committees of the Rothschild & Co. Group, which he joined in 1989. From 2001 to 2008, Mr. Coleman was a non-executive director of the Merchant Bank of Central Africa. Mr. Coleman holds an undergraduate degree from the London School of Economics.
Barrick Board Details: • Director since January 2019
| |
Isela Costantini (53) Buenos Aires, |
Ms. Costantini is the Chief Executive of Grupo Financiero GST, a privately held asset management company. She has over 25 years of experience in international business, including as President and Chief Executive Officer of Argentina’s national airline, Aerolíneas Argentinas, and President and general director, Argentina, Paraguay and Uruguay, for General Motors. Ms. Costantini is also a past President of ADEFA, the Automotive Manufacturers’ Association in Argentina. She was included in the list of the 500 most influential leaders in Latin America by Bloomberg Línea and has been named by Fortune magazine as one of the 50 most powerful women in business outside the United States. She recently published Un Líder en Vos, a book about leadership, and sits on the board of CIPPEC (Centro de Implementación de Políticas Públicas para la Equidad y el Crecimiento), a think tank in Argentina, and is a member of the strategic council of Universidad Austral. She holds a bachelor’s degree in social communications and advertising from the Pontificia Universidade Católica do Paraná in Brazil and an MBA in marketing and international business from the Quinlan School of Business at Loyola University in Chicago. Ms. Costantini is also a member of Barrick’s International Advisory Board.
Barrick Board Details: • Director since November 2022
|
- 155 -
Name (age) and municipality of residence |
Principal occupations during past 5 years | |
Brian L. Greenspun (78) Las Vegas, Nevada USA |
Mr. Greenspun is the Publisher and Editor of the Las Vegas Sun. He is also Chairman and Chief Executive Officer of Greenspun Media Group. Mr. Greenspun has been appointed to two U.S. Presidential Commissions. In the early 1990s, he was appointed by President Bill Clinton to the White House Commission on Small Business. In December 2014, he was appointed by President Barack Obama to the Commission for the Preservation of America’s Heritage Abroad. He is a Trustee of The Brookings Institution, the University of Nevada Las Vegas Foundation, and the Simon Wiesenthal Museum of Tolerance. He is active in numerous civic and charitable organizations in the Las Vegas community. Mr. Greenspun holds a law degree and an undergraduate degree from Georgetown University.
Barrick Board Details: • Director since July 2014
| |
J. Brett Harvey (74) Mesquite, Nevada USA |
Mr. Harvey is Chairman of the board of Warrior Met Coal Inc., a leading producer and exporter of metallurgical coal for the global Steel industry, a position he has held since January 1, 2023. Mr. Harvey was Chairman Emeritus of CONSOL Energy Inc., a coal, gas, and energy services company from May 2016 to May 2017. He was CONSOL Energy Inc.’s Chairman from January 2015 to May 2016, Executive Chairman from May 2014 to January 2015, Chairman and Chief Executive Officer from June 2010 to May 2014, and Chief Executive Officer from January 1998 to June 2010. From January 2009 to May 2014, he was also the Chairman and Chief Executive Officer of CNX Gas Corporation, a subsidiary of CONSOL Energy Inc. He began his business career in mining, joining the Kaiser Steel Company in 1979 at the Sunnyside Mine in Utah, and, in 1984, he was appointed as Vice President and General Manager of Kaiser Coal of New Mexico. Mr. Harvey also served as Vice President, Mining for PacifiCorp. In 2016, he received the Charles F. Rand Memorial Gold Medal, awarded by the Society for Mining, Metallurgy and Exploration for distinguished achievement in mining administration. Mr. Harvey is the former chair of the National Mining Association and of the Coal Industry Advisory Board to the International Energy Agency. He is a former member of the National Executive Board of the Boy Scouts of America and a past chairman of the Laurel Highlands Council of the Boy Scouts. Mr. Harvey holds an undergraduate degree in mining engineering from the University of Utah.
Barrick Board Details: • Director since December 2005
| |
Anne N. Kabagambe (68) Washington, DC, USA |
Ms. Kabagambe formerly served on the board of the World Bank Group where, between 2016 and 2020, she represented the interests of 22 Sub-Saharan African countries, including Tanzania and Zambia, two jurisdictions where Barrick has operations. While at the World Bank, Ms. Kabagambe co-chaired the World Bank Board’s Gender Working Group and was a strong advocate for the advancement of women and a champion of diversity and inclusion. She has 35 years of experience spanning a diverse range of senior leadership positions in international institutions, including as Chief of Staff for the African Development Bank (AfDB) and has also served on the boards of the Africa American Institute (AAI) and Junior Achievement (JA) Africa. Ms. Kabagambe holds an undergraduate degree from the University of California at San Diego (UCSD), master’s degrees in Public Policy from Columbia University’s School of International and Public Affairs and George Washington University, and has also obtained post-graduate diplomas from Harvard University’s Business School & John F. Kennedy School of Government as well as the Cranfield School of Management.
Barrick Board Details: • Director since November 2020
|
- 156 -
Name (age) and municipality of residence |
Principal occupations during past 5 years | |
Andrew J. Quinn (71) Llanboidy, Carmarthenshire, United Kingdom |
Mr. Quinn was head of Mining Investment Banking for Europe and Africa at Canadian Imperial Bank of Commerce for 15 years prior to his retirement in 2011. From 2011 until 2018 he served as a non-executive director of Randgold, including in the roles of Senior Independent Director, Chairman of the remuneration committee, and member of the audit committee. Since 2016, Mr. Quinn has served as a non-executive director of the London Bullion Market Association, the international trade association which oversees the over-the-counter trading market for gold and silver. He has almost 50 years of experience in the mining industry, including positions at Anglo American, Greenbushes Tin, and The Mining Journal. Prior to joining Canadian Imperial Bank of Commerce in 1996, he worked for 12 years at James Capel & Co. Limited (later HSBC Investment Banking). Mr. Quinn holds an undergraduate degree in Mineral Exploitation (Mining Engineering) from Cardiff University.
Barrick Board Details: • Director since January 2019
|
- 157 -
Name (age) and municipality of residence |
Principal occupations during past 5 years | |
Loreto Silva (60) Santiago, Chile |
Ms. Silva is a partner at the Chilean law firm Bofill Escobar Silva Abogados. She has held important positions during a career spanning both the public and private sectors. Over the last two decades, she has LED policies and debates on public-private partnerships for the advancement of Chile’s infrastructure and the enhancement of water utilities services. At the end of 2012, Ms. Silva was the first woman in Chile to be appointed as Minister of Public Works. During her tenure, she spearheaded pivotal infrastructural projects and, in collaboration with private and public entities, formulated a comprehensive strategy for the management of water resources. Beyond her governmental role, Ms. Silva served as the Chair of the board of Chile’s national oil and gas company and contributed as a board member to several Chilean listed and privately held companies in Chile. Her expertise is highly regarded, as evidenced by her membership in prestigious industry think tanks and her role as an arbitrator for the Santiago Arbitration and Mediation Centre, where she specializes in infrastructure and construction disputes. Her professional achievements have been recognized with the esteemed “Chile’s 100 Leading Women Leaders” award. Ms. Silva holds a law degree from the University of Chile.
Barrick Board Details: • Director since August 2019
| |
John L. Thornton (71) Palm Beach, Florida USA |
Mr. Thornton was appointed Chairman on February 13, 2024. From April 30, 2014 to February 12, 2024, Mr. Thornton was Executive Chairman of Barrick. From June 5, 2012 to April 29, 2014, Mr. Thornton was Co-Chairman of Barrick. He is also Chairman of RedBird Capital Partners, a private investment firm, and Non-Executive Chairman of PineBridge Investments, a global asset manager. He is also lead director of Ford Motor Company, Lenovo Group Limited, Divergent Technologies Inc., a digital advanced manufacturing company, and SparkCognition, Inc. (dba Avathon), an industrial artificial intelligence company. He is a Professor of the Tsinghua University School of Economics and Management and serves as the Director of its Global Leadership Program. In addition, he is a member of the Advisory Boards of the Tsinghua Schools of Economics and Management and of Public Policy and Management. He is also Chairman Emeritus of the Brookings Institution in Washington, D.C. He retired in 2003 as President and a member of the board of The Goldman Sachs Group, Inc. Mr. Thornton is Co-Chair of the Asia Society, and is also a trustee, advisory board member or member of the China Investment Corporation (CIC), King Abdullah University of Science and Technology, McKinsey Advisory Council, Schwarzman Scholars, and the African Leadership Academy. He is also the former Vice Chairman of the Morehouse College Board of Trustees. Mr. Thornton holds an undergraduate degree from Harvard College, a degree in jurisprudence from Oxford University, and a master’s degree from the Yale School of Management.
Barrick Board Details: • Chairman since 2024, Executive Chairman from 2014 to 2024 and Director since February 2012
|
Dr. Bristow was a director and executive officer of Rockwell Diamonds Inc. (「RDI」). As a result of provisional liquidation proceedings of its South African operating subsidiaries, RDI was unable to complete and file its audited financial statements for the year ended February 28, 2018, the corresponding management discussion and analysis and applicable certificates by the prescribed deadline due to funding constraints and uncertainty of the outcome of the provisional liquidation process of its subsidiaries in South Africa. As a result, the Ontario Securities Commission issued a cease trade order in respect of RDI dated July 5, 2018. The cease trade order was revoked by the Ontario Securities Commission effective December 23, 2020, following which the shares of RDI resumed trading on the JSE Limited under the symbol RDI. As a result of the completion of an amalgamation and going-private transaction on April 16, 2021, RDI’s shares were de-listed from the JSE Limited and the Ontario
- 158 -
Securities Commission issued an order confirming that RDI had ceased to be a reporting issuer in Canada.
Dr. Bristow was also a director of Midway Resources International (「MRI」) and five of MRI’s wholly-owned subsidiaries, including Zarara Oil & Gas Ltd. (「Zarara」). MRI and its subsidiaries, including Zarara, are private companies. Zarara was placed into administration in November 2020 and MRI was placed into administration in March 2021. Following a restructuring process, the Grand Court of the Cayman Islands issued a final order completing the dissolution of MRI on October 26, 2022, and the Supreme Court of Mauritius issued a final order completing the dissolution of Zarara on November 26, 2024.
Corporate Governance and Committees of the Board
Barrick’s current corporate governance policies and practices are consistent with the requirements of Canadian securities laws. Barrick’s policies and practices also take into account the rules of the Toronto Stock Exchange and the corporate governance standards adopted by the New York Stock Exchange (the 「NYSE Standards」), even though the majority of the NYSE Standards do not directly apply to Barrick as a Canadian company. The one significant difference between Barrick’s corporate governance practices and the NYSE Standards which are applicable to U.S. companies is summarized below:
Section 303A.08 of the NYSE Standards requires shareholder approval of all 「equity compensation plans」 and material revisions. The definition of equity compensation plans under the NYSE Standards covers plans that provide for the delivery of newly issued securities, as well as plans that rely on securities reacquired on the market by the issuing company for the purpose of redistribution to employees and directors. In comparison, the Toronto Stock Exchange rules require shareholder approval of security-based compensation arrangements only in respect of arrangements which involve the delivery of newly issued securities or specified amendments thereto. Therefore, Barrick does not seek shareholder approval for equity compensation plans and amendments unless they involve newly issued securities or constitute specified amendments under the Toronto Stock Exchange rules.
ESG & Nominating Committee
The ESG & Nominating Committee is comprised of Brian L. Greenspun (Chair), Christopher L. Coleman, J. Brett Harvey, Anne N. Kabagambe and Loreto Silva.
Audit & Risk Committee
The Audit & Risk Committee is comprised of Loreto Silva (Chair), Helen Cai, J. Brett Harvey, Anne N. Kabagambe and Andrew J. Quinn.
Compensation Committee
The Compensation Committee is comprised of Isela Costantini (Chair), Helen Cai, Christopher Coleman, Brian L. Greenspun and J. Brett Harvey.
International Advisory Board
The members of the Board of Directors that also sit on the International Advisory Board are John L. Thornton, Isela Costantini and Mark Bristow.
Executive Officers of the Company
In addition to Mark Bristow, as set out above, the following are the executive officers of the Company as at March 10, 2025.
- 159 -
Name (age) and municipality of residence |
Office | Principal occupations during past 5 years | ||
Poupak Bahamin (54) Bethesda, Maryland USA |
General Counsel | General Counsel; prior to April 2022, Deputy General Counsel; prior to February 2020, partner at Norton Rose Fulbright | ||
Grant Beringer (44) Johannesburg, Gauteng South Africa |
Group Sustainability Executive | Group Sustainability Executive; prior to January 2019, Director of International Operations at Digby Wells Environmental | ||
Sebastiaan Bock (46) Stellenbosch, Western Cape South Africa |
Chief Operating Officer, Africa and Middle East | Chief Operating Officer, Africa and Middle East; prior to July 2022, Senior Vice President, Chief Financial Officer, Africa and Middle East; prior to January 2019, General Manager Finance at Randgold Resources Limited | ||
Simon Bottoms (38) Southampton United Kingdom |
Mineral Resource Management and Evaluation Executive | Mineral Resource Management and Evaluation Executive; prior to October 2022, Mineral Resource Manager, Africa and Middle East; prior to January 2019, Mineral Resource Manager at Randgold Resources Limited | ||
Henri Gonin (51) Elko, Nevada USA |
Managing Director, Nevada Gold Mines | Managing Director, Nevada Gold Mines; prior to August 2024, Head of Operations, Nevada Gold Mines; prior to October 2022, General Manager Carlin, Nevada Gold Mines; prior to January 2021, General Manager Cortez, Nevada Gold Mines | ||
Riaan Grobler (48) Stellenbosch, Western Cape South Africa |
Commercial and Supply Chain Executive | Commercial and Supply Chain Executive; prior to April 2021, Group Commercial and Supply Chain General Manager; prior to January 2019, General Manager Commercial and Supply Chain at Randgold Resources Limited | ||
Glenn Heard (53) Budapest Hungary |
Mining Executive | Mining Executive; prior to April 2021, Senior Vice President, Mining; prior to January 2019, Group General Manager, Mining at Randgold Resources Limited | ||
Mark Hill (60) Punta Cana, La Altagracia Dominican Republic |
Chief Operating Officer, Latin America and Asia Pacific | Chief Operating Officer, Latin America and Asia Pacific; prior to May 2020, Chief Operating Officer, Latin America and Australia; prior to January 2019, Chief Investment Officer | ||
Joel Holliday (51) Surrey United Kingdom |
Executive Vice President, Exploration | Executive Vice President, Exploration; prior to November 2021, Senior Vice President of Global Exploration; prior to January 2019, Group Exploration Manager at Randgold Resources Limited | ||
Rousseau Jooste (44) Paarl, Western Cape South Africa |
Global Head of Engineering, Projects and Technology | Global Head of Engineering, Projects and Technology; prior to January 2024, Technical and Capital Projects Executive, Africa and Middle East; prior to July 2022, Chief Engineer, Africa and Middle East |
- 160 -
Name (age) and municipality of residence |
Office | Principal occupations during past 5 years | ||
Christine Keener (49) Knoxville, Tennessee USA |
Chief Operating Officer, North America | Chief Operating Officer, North America; prior to February 2022, Vice President Operations, Europe and North America at Alcoa Corporation; prior to May 2020, Vice President, Operations, Europe and Middle East at Alcoa Corporation; prior to November 2019, Vice President, Commercial and Strategy at Alcoa Corporation | ||
Darian Rich (64) Henderson, Nevada USA |
Human Resources Executive | Human Resources Executive; prior to January 2019, Executive Vice President, Talent Management | ||
Graham Shuttleworth (56) Grouville, Jersey Channel Islands |
Senior Executive Vice President, Chief Financial Officer | Senior Executive Vice President, Chief Financial Officer; prior to January 2019, Chief Financial Officer at Randgold Resources Limited | ||
John Steele (64) ST Brelade, Jersey Channel Islands |
Metallurgy, Engineering and Capital Projects Executive | Metallurgy, Engineering and Capital Projects Executive; prior to January 2019, Technical and Capital Projects Executive at Randgold Resources Limited | ||
Kevin Thomson (68) Toronto, Ontario Canada |
Senior Executive Vice President, Strategic Matters | Senior Executive Vice President, Strategic Matters | ||
Lois Wark (70) Sandton, Johannesburg South Africa |
Group Corporate Communications and Investor Relations Executive | Group Corporate Communications and Investor Relations Executive; prior to January 2019, Group General Manager Corporate Communications at Randgold Resources Limited |
AUDIT & RISK COMMITTEE
Audit & Risk Committee Mandate
A copy of the Audit & Risk Committee’s mandate is attached hereto as Schedule 「A」.
Composition of the Audit & Risk Committee
The Audit & Risk Committee is comprised entirely of independent directors (Mses. Silva (Chair), Cai and Kabagambe and Messrs. Harvey and Quinn). There were four meetings of the Audit & Risk Committee in 2024. All of the members of the Committee attended all of the meetings held in 2024. Ms. Silva became a member of the Audit & Risk Committee on August 9, 2024, and attended the meeting that was held subsequent to her appointment.
- 161 -
Relevant Education and Experience
All of the members of the Audit & Risk Committee are financially literate and at least one member has accounting or related financial management expertise. Barrick’s Board of Directors has determined that Mr. Harvey and Ms. Cai is each an 「audit committee financial expert」 as defined by SEC rules and is independent, as that term is defined by the New York Stock Exchange’s corporate governance standards applicable to Barrick.
The rules adopted by the SEC indicate that the designation of Mr. Harvey and Ms. Cai as audit committee financial experts will not deem any of them to be an 「expert」 for any purpose or impose any duties, obligations or liability on them that are greater than those imposed on members of the Audit & Risk Committee and Barrick’s Board of Directors who do not carry this designation.
Set out below is a description of the education and experience of each Audit & Risk Committee member that is relevant to the performance of his or her responsibilities in that capacity. For more information about the members of Barrick’s Audit & Risk Committee, see 「Directors and Officers of the Company – Directors of the Company」.
Helen Cai |
Ms. Cai has been a member of the Board of Directors of Barrick since November 2021. Ms. Cai is a finance and investment professional with more than two decades of experience in capital markets and all aspects of corporate finance. She worked most recently as a managing director with China International Capital Corporation. Prior to this, she worked as an analyst with the Goldman Sachs Group covering mining and technology sectors. As a lead analyst at China International Capital Corporation, Ms. Cai covered Hong Kong and China listed companies, and subsequently LED various private placement, IPO, cross-border financing and M&A transactions as a senior investment banker. Ms. Cai is a Chartered Financial Analyst and Chartered Alternative Investment Analyst and was educated at Tsinghua University and the Massachusetts Institute of Technology, with two master’s degrees. | |
J. Brett Harvey |
Mr. Harvey has been a member of the Board of Directors of Barrick since December 2005. Mr. Harvey is Chairman of the board of Warrior Met Coal Inc., a leading producer and exporter of metallurgical coal for the global Steel industry, a position he has held since January 1, 2023. Mr. Harvey was Chairman Emeritus of CONSOL Energy Inc., a coal, gas, and energy services company from May 2016 to May 2017. He was CONSOL Energy Inc.’s Chairman from January 2015 to May 2016, Executive Chairman from May 2014 to January 2015, Chairman and Chief Executive Officer from June 2010 to May 2014, and Chief Executive Officer from January 1998 to June 2010. From January 2009 to May 2014, he was also the Chairman and Chief Executive Officer of CNX Gas Corporation, a subsidiary of CONSOL Energy Inc. Mr. Harvey brings extensive management experience to the Board of Directors as well as experience with internal controls and procedures for financial reporting. Mr. Harvey holds an undergraduate degree in mining engineering from the University of Utah. | |
Anne N. Kabagambe |
Ms. Kabagambe has been a member of the Board of Directors of Barrick since November 2020. She was formerly an Executive Director of the World Bank Group where, between 2016 and 2020, she represented the interests of 22 Sub-Saharan African countries, including Tanzania and Zambia, two jurisdictions where Barrick has operations. While at the World Bank, she served as a member of the Budget Committee, the Pension Benefits Administration Committee, and the Development Effectiveness Committee. Ms. Kabagambe has 35 years of experience spanning a diverse range of senior leadership positions in international institutions, including as Chief of Staff at the African Development Bank (AfDB). Ms. Kabagambe holds an undergraduate degree from the University of California at San Diego (UCSD), master’s degrees in Public Policy from Columbia University’s School of International and Public Affairs and George Washington University, and also obtained post-graduate diplomas from Harvard University’s John F. Kennedy School of Government and the Cranfield School of Management. |
- 162 -
Andrew J. Quinn |
Mr. Quinn has been a member of the Board of Directors of Barrick since January 2019. Mr. Quinn was head of Mining Investment Banking for Europe and Africa at Canadian Imperial Bank of Commerce for 15 years prior to his retirement in 2011. From 2011 until 2018 he served as non-executive director of Randgold, including in the roles of Senior Independent Director, Chairman of the remuneration committee, and member of the audit committee. Since 2016, Mr. Quinn has served as a non-executive director of the London Bullion Market Association, the international trade association which oversees the over-the-counter trading market for gold and silver. He has almost 50 years of experience in the mining industry, including positions at Anglo American, Greenbushes Tin, and The Mining Journal. Prior to joining Canadian Imperial Bank of Commerce in 1996, he worked for 12 years at James Capel & Co. Limited (later HSBC Investment Banking). Mr. Quinn holds an undergraduate degree in Mineral Exploitation (Mining Engineering) from Cardiff University. | |
Loreto Silva |
Ms. Silva has been a member of the Board of Directors of Barrick since August 2019. Ms. Silva is a partner at the Chilean law firm Bofill Escobar Silva Abogados. She has held important positions with a career spanning both the public and private sectors. Over the last two decades, she has LED policies and debates on public-private partnerships for the advancement of Chile’s infrastructure and the enhancement of water utilities services. Beyond her governmental role, Ms. Silva served as the Chair of the Board of Chile’s national oil and gas company and contributed as a board member to several Chilean-listed and privately held companies in Chile. Through her extensive career in both public and private sectors, she has demonstrated significant financial and audit expertise with a robust understanding of financial management and audit processes. |
- 163 -
Participation on Other Audit Committees
Members of the Audit & Risk Committee may not serve on more than two other public company audit committees without approval of the Board of Directors. No member of the Audit & Risk Committee currently serves on the audit committee of more than three publicly-traded companies, including Barrick.
Audit & Risk Committee Pre-Approval Policies and Procedures
Barrick’s Audit & Risk Committee has adopted a Policy on Pre-Approval of Audit, Audit-Related and Non-Audit Services (the “Pre-Approval Policy”) for the pre-approval of services performed by Barrick’s auditors. The objective of the Pre-Approval Policy is to specify the scope of services permitted to be performed by the Company’s auditor and to ensure that the independence of the Company’s auditor is not compromised through their engagement for other services. All services provided by the Company’s auditor are pre-approved by the Audit & Risk Committee as they arise or through an annual pre-approval of services and related fees for specific services. All services performed by Barrick’s auditor comply with the Pre-Approval Policy, and professional standards and securities regulations governing auditor independence.
External Auditor Service Fees
PricewaterhouseCoopers LLP are the auditors of Barrick’s Consolidated Financial Statements. The following PricewaterhouseCoopers LLP fees were incurred by Barrick in each of the years ended December 31, 2024 and 2023 for professional services rendered to Barrick:
Fees1 (amount in millions) |
2024 | 2023 | ||
Audit Fees2 | $9.7 | $9.9 | ||
Audit-related Fees3 | $0.2 | $0.3 | ||
Tax Fees4 | $0.2 | $0.4 | ||
All Other Fees | $0.0 | $0.0 | ||
Total | $10.1 | $10.6 |
1 | The classification of fees is based on applicable Canadian securities laws and SEC definitions. |
2 | Audit fees include fees for services rendered by the external auditor in relation to the audit and review of Barrick’s financial statements (inclusive of disbursements billed in 2024 and 2023, respectively), the financial statements of its subsidiaries, and in connection with the Company’s statutory and regulatory filings. |
3 | In 2024 and 2023, audit-related fees primarily related to compliance with regulatory filing requirements in local markets and translation services. |
4 | Tax fees mainly related to tax compliance services and audit support for various jurisdictions. |
INTERNAL CONTROL OVER FINANCIAL REPORTING AND DISCLOSURE CONTROLS AND PROCEDURES
Management is responsible for establishing and maintaining adequate internal control over financial reporting and disclosure controls and procedures. Internal control over financial reporting is a framework designed to provide reasonable assurance regarding the reliability of financial reporting and the preparation of financial statements for external purposes in accordance with International Financial Reporting Standards as issued by the International Accounting Standards Board. The Company’s internal control over financial reporting framework includes those policies and procedures that pertain to the preparation of financial information, including information contained in Barrick’s 2024 Annual Report and this Annual Information Form.
Disclosure controls and procedures form a broader framework designed to provide reasonable assurance that other financial and non-financial information disclosed publicly fairly presents in all
- 164 -
material respects the financial condition, results of operations and cash flows of the Company for the periods presented in the MD&A and Barrick’s 2024 Annual Report. Barrick’s disclosure controls and procedures framework includes processes designed to ensure that material information relating to Barrick, and its consolidated subsidiaries, is made known to management, including Barrick’s President and Chief Executive Officer and Senior Executive Vice-President, Chief Financial Officer, by others within those entities to allow timely decisions regarding required disclosure. Disclosure controls and procedures apply to various disclosures, including reports filed with securities regulatory agencies.
Together, the internal control over financial reporting and disclosure controls and procedures frameworks provide internal control over financial reporting and disclosure. A control system, no matter how well designed and operated, CAN provide only reasonable, not absolute, assurance with respect to the reliability of financial statement preparation and financial reporting. Accordingly, Barrick’s management, including Barrick’s President and Chief Executive Officer and Senior Executive Vice-President, Chief Financial Officer, does not expect that Barrick’s internal control over financial reporting and disclosure will prevent or detect all misstatements or fraud. Further, projections of any evaluation of the effectiveness of internal control to future periods is subject to the risk that controls may become inadequate because of changes in conditions, or that the degree of compliance with policies or procedures may change.
The management of Barrick, at the direction of the Company’s President and Chief Executive Officer and Senior Executive Vice-President, Chief Financial Officer, have evaluated the effectiveness of the design and operation of the Company’s internal control over financial reporting (as defined in rules adopted by the SEC) and disclosure controls and procedures as at December 31, 2024, based on the framework and criteria established in Internal Control – Integrated Framework (2013) as issued by the Committee of Sponsoring Organizations of the Treadway Commission. Based on management’s evaluation, Barrick’s President and Chief Executive Officer and Chief Financial Officer concluded that the Company’s internal control over financial reporting and disclosure controls and procedures were effective as at December 31, 2024. Barrick will continue to monitor the effectiveness of its internal control over financial reporting and disclosure and may make modifications from time to time as considered necessary or desirable.
Barrick’s annual management report on internal control over financial reporting and the integrated audit report of Barrick’s auditors for the year ended December 31, 2024 are included in Barrick’s 2024 Annual Report and its 2024 Form 40-F/Annual Information Form on file with the SEC and Canadian provincial securities regulatory authorities.
NON-GAAP FINANCIAL MEASURES
Total cash costs per ounce, All-in sustaining costs per ounce, C1 cash costs per pound and All-in sustaining costs per pound
Total cash costs per ounce and all-in sustaining costs per ounce are non-GAAP financial measures which are calculated based on the definition published by the WGC (a market development organization for the gold industry comprised of and funded by gold mining companies from around the world, including Barrick). The WGC is not a regulatory organization. Management uses these measures to monitor the performance of Barrick’s gold mining operations and its ability to generate positive cash flow, both on an individual site basis and an overall company basis.
Total cash costs start with Barrick’s cost of sales related to gold production and removes depreciation, the non-controlling interest of cost of sales and includes by-product credits. All-in sustaining costs start with total cash costs and includes sustaining capital expenditures, sustaining leases, general and administrative costs, minesite exploration and evaluation costs related to the current mine plan and reclamation cost accretion and amortization. These additional costs reflect the expenditures made to maintain current production levels.
- 165 -
The Company believes that its use of total cash costs and all-in sustaining costs will assist analysts, investors and other stakeholders of Barrick in understanding the costs associated with producing gold, understanding the economics of gold mining, assessing Barrick’s operating performance and also its ability to generate free cash flow from current operations and on an overall company basis. Due to the capital-intensive nature of the industry and the long useful lives over which these items are depreciated, there CAN be a signifiCANt timing difference between net earnings calculated in accordance with IFRS and the amount of free cash flow that is generated by a mine and therefore the Company believes these measures are useful non-GAAP operating metrics and supplement its IFRS disclosures. These measures are not representative of all of Barrick’s cash expenditures as they do not include income tax payments, interest costs or dividend payments. These measures do not include depreciation or amortization.
Total cash costs per ounce and all-in sustaining costs are intended to provide additional information only and do not have standardized definitions under IFRS and should not be considered in isolation or as a substitute for measures of performance prepared in accordance with IFRS. These measures are not equivalent to net income or cash flow from operations as determined under IFRS. Although the WGC has published a standardized definition, other companies may calculate these measures differently.
In addition to presenting these metrics on a by-product basis, Barrick has calculated these metrics on a co-product basis. Barrick’s co-product metrics remove the impact of other metal sales that are produced as a by-product of gold production from cost per ounce calculations but does not reflect a reduction in costs for costs associated with other metal sales.
C1 cash costs per pound and all-in sustaining costs per pound are non-GAAP financial measures related to Barrick’s copper mine operations. The Company believes that C1 cash costs per pound enables investors to better understand the performance of Barrick’s copper operations in comparison to other copper producers who present results on a similar basis. C1 cash costs per pound excludes royalties and production taxes and non-routine charges as they are not direct production costs. All-in sustaining costs per pound is similar to the gold all-in sustaining costs metric and management uses this to better evaluate the costs of copper production. The Company believes this measure enables investors to better understand the operating performance of its copper mines as this measure reflects all of the sustaining expenditures incurred in order to produce copper. All-in sustaining costs per pound includes C1 cash costs, sustaining capital expenditures, sustaining leases, general and administrative costs, minesite exploration and evaluation costs, royalties and production taxes, reclamation cost accretion and amortization and write-downs taken on inventory to net realizable value.
Further details including a detailed reconciliation of these non-GAAP financial measures to their most directly comparable GAAP measure are incorporated by reference and provided on pages 61-73 of the MD&A filed on SEDAR+ at www.sedarplus.ca and on EDGAR at www.sec.gov.
Realized Prices
Realized price is a non-GAAP financial measure which excludes from sales:
• | treatment and refining charges; and |
• | cumulative catch-up adjustment to revenue relating to Barrick’s streaming arrangements. |
Barrick believes this provides investors and analysts with a more accurate measure with which to compare to market gold prices and to assess the Company’s gold sales performance. For those reasons, management believes that this measure provides a more accurate reflection of the Company’s past performance and is a better indicator of its expected performance in future periods.
The realized price measure is intended to provide additional information, and does not have any standardized definition under IFRS and should not be considered in isolation or as a substitute for
- 166 -
measures of performance prepared in accordance with IFRS. The measure is not necessarily indicative of sales as determined under IFRS. Other companies may calculate this measure differently.
Further details including a detailed reconciliation of this non-GAAP financial measure to its most directly comparable GAAP measure are incorporated by reference and provided on page 75 of the MD&A filed on SEDAR+ at www.sedarplus.ca and on EDGAR at www.sec.gov.
Adjusted Net Earnings and Adjusted Net Earnings per Share
Adjusted net earnings is a non-GAAP financial measure which excludes the following from net earnings:
• | impairment charges (reversals) related to intangibles, goodwill, property, plant and equipment, and investments; |
• | acquisition/disposition gains/losses; |
• | foreign currency translation gains/losses; |
• | significant tax adjustments; |
• | other items that are not indicative of the underlying operating performance of Barrick’s core mining business; and |
• | tax effect and non-controlling interest of the above items. |
Management uses this measure internally to evaluate the Company’s underlying operating performance for the reporting periods presented and to assist with the planning and forecasting of future operating results. Management believes that adjusted net earnings is a useful measure of the Company’s performance because impairment charges, acquisition/disposition gains/losses and significant tax adjustments do not reflect the underlying operating performance of its core mining business and are not necessarily indicative of future operating results. Furthermore, foreign currency translation gains/losses are not necessarily reflective of the underlying operating results for the reporting periods presented. The tax effect and non-controlling interest of the adjusting items are also excluded to reconcile the amounts to Barrick’s share on a post-tax basis, consistent with net earnings.
As noted, Barrick uses this measure for internal purposes. Management’s internal budgets and forecasts and public guidance do not reflect the types of items that the Company adjusts for. Consequently, the presentation of adjusted net earnings enables investors and analysts to better understand the underlying operating performance of Barrick’s core mining business through the eyes of management. Management periodically evaluates the components of adjusted net earnings based on an internal assessment of performance measures that are useful for evaluating the operating performance of Barrick’s business segments and a review of the non-GAAP financial measures used by mining industry analysts and other mining companies.
Adjusted net earnings is intended to provide additional information only and does not have any standardized definition under IFRS and should not be considered in isolation or as a substitute for measures of performance prepared in accordance with IFRS. The measures are not necessarily indicative of operating profit or cash flow from operations as determined under IFRS. Other companies may calculate these measures differently.
Further details including a detailed reconciliation of this non-GAAP financial measure to its most directly comparable GAAP measure are incorporated by reference and provided on pages 59-60 of the MD&A filed on SEDAR+ at www.sedarplus.ca and on EDGAR at www.sec.gov.
- 167 -
Free Cash Flow
Free cash flow is a non-GAAP financial measure that deducts capital expenditures from net cash provided by operating activities. Management believes this to be a useful indicator of Barrick’s ability to operate without reliance on additional borrowing or usage of existing cash.
Free cash flow is intended to provide additional information only and does not have any standardized definition under IFRS, and should not be considered in isolation or as a substitute for measures of performance prepared in accordance with IFRS. The measure is not necessarily indicative of operating profit or cash flow from operations as determined under IFRS. Other companies may calculate this measure differently.
Further details including a detailed reconciliation of this non-GAAP financial measure to its most directly comparable GAAP measure are incorporated by reference and provided on page 60 of the MD&A filed on SEDAR+ at www.sedarplus.ca and on EDGAR at www.sec.gov.
Capital Expenditures
Capital expenditures are classified into minesite sustaining capital expenditures or project capital expenditures depending on the nature of the expenditure. Minesite sustaining capital expenditures is the capital spending required to support delivery of the current mine plan. Project capital expenditures represent the capital spending at new projects and major, discrete projects at existing operations intended to increase net present value through higher production or longer mine life. Management believes this to be a useful indicator of the purpose of capital expenditures and this distinction is an input into the calculation of all-in sustaining costs per ounce.
Classifying capital expenditures is intended to provide additional information only and does not have any standardized definition under IFRS, and should not be considered in isolation or as a substitute for measures of performance prepared in accordance with IFRS. Other companies may calculate these measures differently.
Further details including a detailed reconciliation of this non-GAAP financial measure to its most directly comparable GAAP measure are incorporated by reference and provided on pages 60-61 of the MD&A filed on SEDAR+ at www.sedarplus.ca and on EDGAR at www.sec.gov.
EBITDA, Adjusted EBITDA, Attributable EBITDA, Attributable EBITDA Margin and Net Leverage
EBITDA is a non-GAAP financial measure, which excludes the following from net earnings:
• | income tax expense; |
• | finance costs; |
• | finance income; and |
• | depreciation. |
Management believes that EBITDA is a valuable indicator of the Company’s ability to generate liquidity by producing operating cash flow to fund working capital needs, service debt obligations, and fund capital expenditures. Management uses EBITDA for this purpose. EBITDA is also frequently used by investors and analysts for valuation purposes whereby EBITDA is multiplied by a factor or 「EBITDA multiple」 that is based on an observed or inferred relationship between EBITDA and market values to determine the approximate total enterprise value of a company.
- 168 -
Adjusted EBITDA removes the effect of impairment charges; acquisition/disposition gains/losses; foreign currency translation gains/losses; and other expense adjustments. Barrick also removes the impact of the income tax expense, finance costs, finance income and depreciation incurred in its equity method accounted investments. Attributable EBITDA further removes the non-controlling interest portion. The Company believes these items provide a greater level of consistency with the adjusting items included in its adjusted net earnings reconciliation, with the exception that these amounts are adjusted to remove any impact on finance costs/income, income tax expense and/or depreciation as they do not affect EBITDA. The Company believes this additional information will assist analysts, investors and other stakeholders of Barrick in better understanding its ability to generate liquidity from its attributable business, including equity method investments, by excluding these amounts from the calculation as they are not indicative of the performance of Barrick’s core mining business and do not necessarily reflect the underlying operating results for the periods presented. Additionally, it is aligned with how the Company presents its forward-looking guidance on gold ounces and copper pounds produced.
Attributable EBITDA margin is calculated as attributable EBITDA divided by revenues - as adjusted. The Company believes this ratio will assist analysts, investors and other stakeholders of Barrick to better understand the relationship between revenues and EBITDA or operating profit.
EBITDA, adjusted EBITDA, attributable EBITDA, EBITDA margin and net leverage are intended to provide additional information to investors and analysts and do not have any standardized definition under IFRS, and should not be considered in isolation or as a substitute for measures of performance prepared in accordance with IFRS. EBITDA, adjusted EBITDA and attributable EBITDA exclude the impact of cash costs of financing activities and taxes, and the effects of changes in operating working capital balances, and therefore are not necessarily indicative of operating profit or cash flow from operations as determined under IFRS. Other companies may calculate EBITDA, adjusted EBITDA, attributable EBITDA, EBITDA margin and net leverage differently.
Further details including a detailed reconciliation of this non-GAAP financial measure to its most directly comparable GAAP measure are incorporated by reference and provided on pages 73-75 of the MD&A filed on SEDAR+ at www.sedarplus.ca and on EDGAR at www.sec.gov.
- 169 -
INTERESTS OF EXPERTS
The Company’s independent auditors are PricewaterhouseCoopers LLP, Chartered Professional Accountants, who have issued an independent auditor’s report dated February 11, 2025, in respect of the Company’s Consolidated Financial Statements as at December 31, 2024 and December 31, 2023 and for each of the years then ended and on the effectiveness of the Company’s internal control over financial reporting as at December 31, 2024. PricewaterhouseCoopers LLP has advised that they are independent with respect to the Company within the meaning of the relevant rules and related interpretations prescribed by the relevant professional bodies in Canada, including the CPA Code of Professional Conduct and any applicable legislation or regulations, as well as the rules of the U.S. SEC and the Public Company Accounting Oversight Board (PCAOB) on auditor independence.
ADDITIONAL INFORMATION
Additional information, including directors’ and officers’ remuneration and indebtedness, principal holders of the Company’s securities and securities authorized for issuance under equity compensation plans will be contained in the Company’s Management Information Circular and Proxy Statement expected to be dated March 28, 2025. As well, additional financial information is provided in the Company’s 2024 Annual Report, in the Company’s Consolidated Financial Statements (as prepared under IFRS) and Management’s Discussion and Analysis of Financial and Operating Results for the year ended December 31, 2024 (as prepared under IFRS), each of which is available electronically from SEDAR+ (www.sedarplus.ca) and from EDGAR (www.sec.gov). Additional information relating to Barrick is available on SEDAR+ at www.sedarplus.ca and on EDGAR at www.sec.gov.
- 170 -
SCHEDULE 「A」 AUDIT & RISK COMMITTEE MANDATE
Purpose
1. | The purpose of the Audit & Risk Committee (the 「Committee」) of the Board of Directors (the 「Board」) is to assist the Board in its oversight of: (a) the financial reporting process and the quality, transparency and integrity of the Company’s financial statements and other related public disclosures; (b) the Company’s internal controls over financial reporting; (c) the Company’s compliance with legal and regulatory requirements relevant to the financial statements and financial reporting; (d) the external auditor’s qualifications and independence; (e) the performance of the internal audit function and the external auditor; (f) the Company’s management of enterprise risks as well as the implementation of policies and standards for monitoring and mitigating such risks; and (g) the Company’s financial structure and investment and financial risk management programs generally. |
2. | The function of the Committee is oversight. The members of the Committee are not full-time employees of the Company. The Company’s management is responsible for the preparation of the Company’s financial statements in accordance with applicable accounting standards and applicable laws and regulations. The Company’s external auditor is responsible for the audit or review, as applicable, of the Company’s financial statements in accordance with applicable auditing standards and laws and regulations. |
Committee Responsibilities
3. | The Committee’s responsibilities include: |
External Auditor
(a) | retaining and terminating, and/or making recommendations to the Board and the shareholders with respect to the retention or termination of an external auditing firm to conduct review engagements on a quarterly basis and an annual audit of the Company’s financial statements; |
(b) | communicating to the external auditor that it is ultimately accountable to the Board and the Committee as representatives of the shareholders; |
(c) | obtaining and reviewing an annual report prepared by the external auditor describing: the firm’s internal quality control procedures; any material issues raised by the most recent internal quality control review, or peer review, of the firm, or by any inquiry or investigation by governmental or professional authorities, within the preceding five years, respecting one or more independent audits carried out by the firm, and any steps taken to deal with any such issues; |
(d) | evaluating the independence of the external auditor and any potential conflicts of interest and (to assess the auditor’s independence) all relationships between the external auditor and the Company, including obtaining and reviewing an annual report prepared by the external auditor describing all relationships between the external auditor and the Company; |
(e) | approving, or recommending to the Board for approval, all audit engagement fees and terms, as well as all non-audit engagements of the external auditor prior to the commencement of the engagement; |
(f) | reviewing with the external auditor the plan and scope of the quarterly review and annual audit engagements; |
- A-1 -
(g) | setting hiring policies with respect to the employment of current or former employees of the external auditor; |
Financial Reporting
(h) | reviewing, discussing and recommending to the Board for approval the annual audited financial statements and related management’s discussion and analysis of financial and operating results prior to filing with securities regulatory authorities and delivery to shareholders; |
(i) | reviewing and discussing with the external auditor the results of its reviews and audit, any issues arising and management’s response, including any restrictions on the scope of the external auditor’s activities or requested information and any significant disagreements with management, and resolving any disputes; |
(j) | reviewing, discussing and approving, or recommending to the Board for approval, the quarterly financial statements and quarterly management’s discussion and analysis of financial and operating results prior to filing with securities regulatory authorities and delivery to shareholders; |
(k) | reviewing and discussing with management and the external auditor the Company’s critical accounting policies and practices, material alternative accounting treatments, significant accounting and reporting judgments, material written communications between the external auditor and management (including management representation letters and any schedule of unadjusted differences) and significant adjustments resulting from the audit or review; |
(l) | reviewing and discussing with management the Company’s earnings press releases, as well as types of financial information and earnings guidance (if any) provided to analysts and ratings agencies; |
(m) | reviewing and discussing such other relevant public disclosures containing financial information as the Committee may consider necessary or appropriate; |
(n) | reviewing and discussing with management the disclosure controls relating to the Company’s public disclosure of financial information, including information extracted or derived from the financial statements, and periodically assessing the adequacy of such procedures; |
Internal Controls Over Financial Reporting
(o) | reviewing and discussing with management, the external auditor and the head of internal audit the effectiveness of the Company’s internal controls over financial reporting, including reviewing and discussing any significant deficiencies in the design or operation of internal controls, and any fraud, whether or not material, that involves management or other employees who have a significant role in the Company’s internal controls over financial reporting; |
(p) | discussing the Company’s process with respect to risk assessment (including fraud risk), risk management and the Company’s major financial risks and financial reporting exposures, all as they relate to internal controls over financial reporting, and the steps management has taken to monitor and control such risks; |
- A-2 -
(q) | reviewing and discussing with management the Company’s Code of Business Conduct and Ethics and anti-fraud program and the actions taken to monitor and enforce compliance; |
(r) | establishing procedures for: |
(i) | the receipt, retention and treatment of complaints regarding accounting, internal controls or auditing matters; and |
(ii) | the confidential, anonymous submission by employees of the Company of concerns regarding questionable accounting, internal controls or auditing matters; |
Internal Audit
(s) | reviewing and discussing with management, the external auditor and the head of internal audit the responsibilities and effectiveness of the Company’s internal audit function, including reviewing the internal audit mandate, independence, organizational structure, internal audit plans and adequacy of resources, receiving periodic internal audit reports and meeting privately with the head of internal audit on a periodic basis; |
(t) | approving in advance the retention and dismissal of the head of internal audit; |
Enterprise Risks
(u) | reviewing: |
(i) | the Company’s processes relating to enterprise risk management; |
(ii) | the Company’s overall strategy relating to enterprise risks, including financial, regulatory, strategic and operational risks; |
(iii) | the Company’s risk tolerance and its alignment with the Company’s strategic plans; and |
(iv) | the design and implementation of policies and standards that provide for the monitoring of, and promote compliance with, legal and regulatory requirements; |
(v) | at the request of the Board, reviewing and advising on the risk impact of any strategic decision or exposures to countries and key markets where the Company carries on business to ensure that they are in keeping with overall Company risk tolerances; |
(w) | reviewing the Company’s material publicly filed disclosure relating to risk and risk management; |
(x) | meeting as required with representatives of the Company’s various departments and/or external advisors to discuss the risks faced by the Company and the Company’s risk management activities; |
Financial Matters
(y) | reviewing the policies underlying the financial plan of the Company to ensure its adequacy and soundness in providing for the Company’s operational and capital plans; |
- A-3 -
(z) | reviewing the Company’s debt and equity structure; |
(aa) | reviewing proposed major financing activities; |
(bb) | reviewing the method for financing proposed major acquisitions by the Company; |
(cc) | reviewing the prepayment, redemption, acquisition or defeasance of any material issue of debt or equity; |
(dd) | authorizing policies or procedures for entering into investments and reviewing investment strategies for the Company’s cash balances; and |
(ee) | reviewing the Company’s financial risk management program, including any significant commodity, currency or interest rate hedging programs; |
Other
(ff) | meeting separately, periodically, with each of management, the head of internal audit and the external auditor; |
(gg) | reporting regularly to the Board and, where appropriate, making recommendations to management of the Company and/or to the Board; |
(hh) | liaising with the Compensation Committee and the Environmental, Social, Governance & Nominating Committee of the Board, as appropriate, on matters relevant to the Company’s management of enterprise risks; |
(ii) | reviewing and assessing its mandate and recommending any proposed changes to the Environmental, Social, Governance & Nominating Committee of the Board on an annual basis; and |
(jj) | evaluating the functioning of the Committee on an annual basis, including with reference to the discharge of its mandate. |
Responsibilities of the Committee Chair
4. The fundamental responsibility of the Committee Chair is to be responsible for the management and effective performance of the Committee and provide leadership to the Committee in fulfilling its mandate and any other matters delegated to it by the Board. To that end, the Committee Chair’s responsibilities include:
(a) | working with the Chairman and the Secretary to establish the frequency of Committee meetings and the agendas for meetings; |
(b) | providing leadership to the Committee and presiding over Committee meetings; |
(c) | facilitating the flow of information to and from the Committee and fostering an environment in which Committee members may ask questions and express their viewpoints; |
(d) | reporting to the Board with respect to the significant activities of the Committee and any recommendations of the Committee; |
- A-4 -
(e) | liaising with the Chairs of the Compensation Committee and the Environmental, Social, Governance & Nominating Committee of the Board, as appropriate, on matters relevant to the Company’s management of enterprise risks; |
(f) | leading the Committee in annually reviewing and assessing the adequacy of its mandate and evaluating its effectiveness in fulfilling its mandate; and |
(g) | taking such other steps as are reasonably required to ensure that the Committee carries out its mandate. |
Powers
5. The Committee shall have the authority, including approval of fees and other retention terms, to obtain advice and assistance from outside legal, accounting or other advisors in its sole discretion, at the expense of the Company, which shall provide adequate funding for such purposes. The Company shall also provide the Committee with adequate funding for the ordinary administrative expenses of the Committee. The Committee shall have unrestricted access to information, management, the external auditor and the head of internal audit, including private meetings, as it considers necessary or appropriate to discharge its duties and responsibilities. The Committee may, in its discretion, delegate all or a portion of its duties and responsibilities to a subcommittee of the Committee.
Composition
6. The Committee shall be appointed by the Board annually and shall be comprised of a minimum of three directors. If an appointment of members of the Committee is not made as prescribed, the members shall continue as such until their successors are appointed.
7. All of the members of the Committee shall be directors whom the Board has determined are independent, taking into account the applicable rules and regulations of securities regulatory authorities and/or stock exchanges.
8. Each member of the Committee shall be 「financially literate」 and at least one member of the Committee shall have 「accounting or related financial management expertise」.(1) At least one member of the Committee shall be an 「audit committee financial expert」, as defined in the applicable rules and regulations of securities regulatory authorities and/or stock exchanges.
9. If a Committee member simultaneously serves on the audit committee of more than two other public companies, the Board shall make a determination as to whether such service impairs the ability of such member to serve effectively on the Committee and disclose such determination in the Company’s annual proxy statement.
Meetings
10. The Committee shall have a minimum of four meetings per year, to coincide with the Company’s financial reporting cycle. Additional meetings will be scheduled as considered necessary or appropriate, including to consider specific matters at the request of the external auditor or the head of internal audit.
11. The time and place of the meetings of the Committee, the calling of meetings and the procedure at such meetings shall be determined by the Chair of the Committee unless otherwise determined by the articles of the Company or by resolution of the Board, provided that all matters put forward for approval by the Committee shall be determined by majority vote.
- A-5 -
(1) For purposes of this mandate, 「financially literate」 means the ability to read and understand a balance sheet, an income statement, a cash flow statement and the related notes that present a breadth and level of complexity of accounting issues that are generally comparable to the breadth and complexity of issues that CAN reasonably be expected to be raised by the Company’s financial statements, and 「accounting or related financial management expertise」 means the ability to analyze and interpret a full set of financial statements, including the related notes that present a breadth and level of complexity of accounting issues that are generally comparable to the breadth and complexity of issues that CAN reasonably be expected to be raised by the Company’s financial statements.
- A-6 -