WHITE ROCK, BC / ACCESSWIRE / January 8, 2025 / TDG Gold Corp. (TSXV:TDG) (the "Company" or "TDG") is pleased to announce an updated Mineral Resource Estimate1 ("MRE") incorporating the results of (1) its relogging, resampling and assay program of 2007 and 2010 historical diamond drillholes comprising ~3,250 metres ("m") at the former producing Shasta gold-silver ("Au-Ag") mine and (2) its 2024 drill program at the Tailings Storage Facility #1 ("TSF1") located adjacent to the Baker Mill. The key outcomes of the updated MRE are improved grades and a significant reduction in the estimated quantity of waste rock within the conceptual mineral resource limiting pit. An updated technical report will be filed on the Company's website and SEDAR within 45 calendar days of this disclosure.

白岩石,BC / ACCESSWIRE / 2025年1月8日 / TDG Gold CORP. (TSXV:TDG)("公司"或"TDG")欣然宣佈更新的涉礦概念評估1("MRE"),該評估整合了(1)對2007年和2010年曆史金剛石鑽孔進行的重新記錄、重取樣和分析程序,涉及約3250米("m")的前期生產的沙斯塔金銀("Au-Ag")礦,以及(2)其2024年在位於貝克磨坊旁的尾礦存儲設施#1("TSF1")的鑽探程序。更新的MRE的關鍵結果是品位改善和概念礦產限制坑內廢巖估計數量顯著減少。更新的技術報告將在公司網站和SEDAR上發佈,預計在本公告後45個日歷天內。

Highlights: Updated Mineral Resource Estimate (see Table 1; below for details)

亮點:更新的涉礦概念評估(見表1;下文詳細信息)

  • Indicated Mineral Resource of 515.8 thousand ounces ("koz") gold equivalent ("AuEq*") grading 1.35 grams per tonne ("g/t") AuEq*(see Table 1 below for grades by metal and Table 1 Notes for AuEq* calculation) contained within 11.9 million metric tonnes ("Mt").

  • 2Inferred Mineral Resource of 505.5 koz AuEq* grading 1.04 g/t AuEq2, contained within 15.14 Mt and including 12,120 oz AuEq* grading 1.37 g/t AuEq* contained within TSF1 (see Table 1 below for grades by metal and Table 1 Notes for AuEq* calculation).

  • Cut-off grade maintained at 0.4 g/t AuEq* cut-off grade ("COG") for the base case.

  • Significant silver contribution (14.2 million ounces ("Moz") Indicated / 14.3 Moz Inferred) included in the AuEq* ounces.

  • MRE conceptual pit outline extends to within 100 m of the Newberry exploration target zone3 which has never been drill tested (Figure 1).

  • MRE shows continuity and consistency, with an increased COG resulting in a relatively minor reduction in the pit-constrained AuEq* ounces within the Shasta deposit, while increasing the grade (Table 1). The MRE for TSF1 is an inaugural estimate.

  • Shasta deposit remainsopen at depth and along strike3 (see TDG news release March 20, 2023).

  • MRE does not include any of the Greater Shasta-Newberry3 satellite exploration target zones, or any of the second Tailings Storage Facility,located adjacent to TSF13 (Figure 2).

  • 指示的礦產資源爲51.58萬盎司("koz")黃金當量("AuEq*"),品位爲每噸1.35克("g/t")AuEq*(見下表1中的金屬品位和表1註釋以獲取AuEq*計算),總量包含1190萬公噸("Mt")。

  • 推測的礦產資源爲505.5 koz AuEq*,品位爲每噸1.04 g/t AuEq2,包含在15.14 Mt中,幷包括在TSF1中的12,120盎司AuEq*,品位爲每噸1.37 g/t AuEq*(見下表1中的金屬品位和表1註釋以獲取AuEq*計算)。

  • 保留的截止品位爲0.4 g/t AuEq*截止品位("COG")作爲基準案例。

  • 顯著的白銀貢獻(1420萬盎司("Moz")指示 / 14.3 Moz推測)包含在AuEq*盎司中。

  • MRE概念坑輪廓擴展至新貝瑞勘探目標區3的10000萬之內,該區域從未進行鑽探測試(圖1)。

  • MRE顯示出連續性和一致性,增加的COG導致沙斯塔礦中限制坑內AuEq*盎司的相對較小減少,同時提高了品位(表1)。TSF1的MRE是首次估計。

  • Shasta存入資金在深度和沿走向上保持開放(見TDG新聞稿2023年3月20日)。

  • MRE不包括大Shasta-Newberry的衛星勘探目標區域,或位於TSF13旁邊的第二個尾礦儲存設施(見圖2)。

Fletcher Morgan, TDG's CEO, commented: "TheShasta mineral resource demonstrates continuity and consistency across the deposit and ~25% of the estimated AuEq* is contributed by silver. There are known parts of the deposit that merit further HQ drilling, as both infill and larger diameter core have consistently increased the grade of the areas drilled. However, the greater opportunity is testing for potential extensions to the mineralized system, particularly the 2.5 kilometre 'Fisher Zone3' extending from Shasta to the boundary with the Freeport-Amarc JV ground to southeast (Figure 1); and the Newberry exploration target area3 immediately north of the Shasta MRE, which has never been drill tested.

TDG的首席執行官Fletcher Morgan評論道:"Shasta礦產資源展示了存入資金的連貫性和一致性,約25%的AuEq*是由白銀貢獻的。已知存入資金的部分值得進行進一步的HQ鑽探,因爲填充和較大直徑的岩心一貫提高了鑽探區域的品位。然而,更大的機會是測試礦化系統的潛在延伸,特別是從Shasta延伸到與Freeport-Amarc合資企業東南邊界的2.5公里'Fisher Zone3'(見圖1);以及Shasta MRE正北方的Newberry勘探目標區域3,該區域從未進行過鑽探測試。"

The calculated 12,100 AuEq* ounces within TSF1 is in line with the historical4 production records at Baker-Shasta from 1981-2012 and is located within our Baker-Shasta Permitted Mine Area. The definition of an inaugural Inferred2 MRE at TSF1 represents an opportunity to convert a potential liability into a net asset by demonstrating a path to reasonable prospects for eventual economic extraction."

在TSF1計算的12,100 AuEq*盎司與1981-2012年Baker-Shasta的歷史生產記錄一致,並位於我們的Baker-Shasta許可證礦區內。首次定義TSF1的推測2 MRE代表了一個將潛在負債轉化爲淨資產的機會,通過展示合理的經濟開採前景路徑。"

2Inferred Mineral Resources are considered too speculative geologically to have economic considerations applied to them that would enable their classification as Mineral Reserves. However, it is reasonably expected that the majority of Inferred Mineral Resources could be upgraded to Measured or Indicated Mineral Resources with continued exploration and additional data.

推測礦產資源在地質上被認爲過於投機,以至於無法應用經濟考慮來進行分類爲礦產儲備。然而,可以合理預計,大多數推測礦產資源可以通過持續勘探和附加數據升級爲已測量或指示礦產資源。

Table 1 - Shasta Updated 2024 Mineral Resource Estimate including Sensitivity (base case highlighted)*

表1 - 包括敏感性(基礎案例突出顯示)的Shasta更新2024礦產資源估計*

Class

AuEq
Cutoff

In Situ Tonnage and Grade

AuEq*
Metal

Au
Metal

Ag
Metal

AuEq*

Au

Ag

NSR

(g/t)

Mt

(g/t)

(g/t)

(g/t)

($CDN)

(koz)

(koz)

(koz)

Indicated

(Shasta)

0.30

15.169

1.13

0.86

31.2

101

552.3

417.2

15,231

0.35

13.327

1.24

0.94

34.4

111

533.1

402.6

14,718

0.40

11.881

1.35

1.02

37.3

120

515.8

389.3

14,256

0.45

10.710

1.45

1.10

40.2

129

499.8

377.1

13,832

0.50

9.743

1.55

1.17

42.9

138

485.1

365.9

13,438

1.00

4.580

2.50

1.89

69.3

223

368.5

278.0

10,207

Inferred
(Shasta)

0.30

19.331

0.87

0.65

24.9

78

543.1

405.9

15,469

0.35

16.927

0.95

0.71

27.0

85

518.1

387.9

14,683

0.40

14.865

1.03

0.78

29.1

92

493.4

370.2

13,888

0.45

12.930

1.12

0.85

31.4

100

467.0

351.1

13,066

0.50

11.482

1.21

0.91

33.5

107

444.9

335.2

12,374

1.00

4.388

2.02

1.56

51.9

180

284.5

219.6

7,323

Inferred
(TSF1)

N/A

0.276

1.37

0.97

45.0

122

12.1

8.6

398

課堂

AuEq
截止日期

原位噸位與品位

金屬當量*
金屬

黃金
金屬


金屬

AuEq*

黃金

NSR

(克/噸)

百萬噸

(克/噸)

(克/噸)

(克/噸)

($加元)

(千盎司)

(千盎司)

(千盎司)

指示

(沙斯塔)

0.30

15.169

1.13

0.86

31.2

101

552.3

417.2

15,231

0.35

13.327

1.24

0.94

34.4

111

533.1

402.6

14,718

0.40

11.881

1.35

1.02

37.3

120

515.8

389.3

14,256

0.45

10.710

1.45

1.10

40.2

129

499.8

377.1

13,832

0.50

9.743

1.55

1.17

42.9

138

485.1

365.9

13,438

1.00

4.580

2.50

1.89

69.3

223

368.5

278.0

10,207

推測資源
(沙斯塔)

0.30

19.331

0.87

0.65

24.9

78

543.1

405.9

15,469

0.35

16.927

0.95

0.71

27.0

85

518.1

387.9

14,683

0.40

14.865

1.03

0.78

29.1

92

493.4

370.2

13,888

0.45

12.930

1.12

0.85

31.4

100

467.0

351.1

13,066

0.50

11.482

1.21

0.91

33.5

107

444.9

335.2

12,374

1.00

4.388

2.02

1.56

51.9

180

284.5

219.6

7,323

推測資源
(TSF1)

不適用

0.276

1.37

0.97

45.0

122

12.1

8.6

398

*Notes to the MRE table:

*MRE表的註釋:

  1. The Mineral Resource estimate has been prepared by Sue Bird, P.Eng., an independent Qualified Person. The effective date of the mineral resource estimate is December 29, 2024.

  2. Mineral Resources are reported using the 2014 CIM Definition Standards and were estimated in accordance with the CIM 2019 Best Practices Guidelines, as required by NI43-101.

  3. Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability. There is no certainty that all Mineral Resources will be converted into Mineral Reserves.

  4. The Mineral Resource has been confined by a "reasonable prospects of eventual economic extraction" pit using the following assumptions, which were estimated from comparable projects:

    1. Au price of US$2,250/oz, Ag price of US$25/oz at an exchange rate of 0.74 US$ per CDN$;

    2. a 1.5 % NSR royalty;

    3. 93 % metallurgical recovery for Au, based on past TDG test work, historical mill records4 and nearby project comparables6;

    4. 86 % recovery for Ag based on nearby project comparables6 and, while prior MREs assumed somewhat lower Ag recoveries based on historical mill records4 and limited past TDG test work , test work was not optimized for Ag recoveries. Further, test work at comparable projects indicate that improvement could be expected;

    5. 99.9 % payable Au; 95.0 % payable Ag; US$7.00/oz Au and US$3.00/oz Ag offsite costs (refining, transport and insurance);

    6. Mining costs of CDN$4.00/tonne mineralized material;

    7. Processing Costs of CDN$15/tonne and G&A of CDN$8.00/tonne processed;

    8. Pit slopes of 45 degrees.

  5. The resulting NSR equation is: NSR (CDN$) = 95.79*Au Grade*0.93 + 0.92*Ag Grade*0.86

  6. The resulting AuEq equation is: AuEq = Au + Ag*0.00887

  7. The bulk density of the deposit is based on 2021 & 2022 measurements and is assumed to be 2.61 throughout the deposit and 2.00 for overburden.

  8. Numbers may not sum due to rounding.

  1. 礦產資源估計由獨立的合格人員Sue Bird,P.Eng.製備。礦產資源估計的有效日期爲2024年12月29日。

  2. 礦產資源報告採用2014年CIm定義標準,並根據NI43-101的要求按照CIm 2019最佳實踐指南進行估算。

  3. 不是礦產儲量的礦產資源沒有證明經濟可行性。所有礦產資源轉化爲礦產儲量並沒有確定性。

  4. 廢礦資源已經通過使用以下假設的"最終經濟開發前景合理"坑限制:

    1. 黃金價格爲每盎司2250美元,白銀價格爲每盎司25美元,匯率爲每加元0.74美元;

    2. 1.5%的NSR特許權使用費;

    3. 基於過去的TDG測試工作、歷史磨坊記錄和附近項目的比較,黃金的冶金回收率爲93%;

    4. 基於鄰近項目可比的銀回收率爲86%,雖然之前的礦產資源評估假設銀的回收率略低,是基於歷史磨礦記錄和有限的以往TDG測試工作,但測試工作並未針對銀回收率進行優化。此外,可比項目的測試工作表明,改善是可以預期的;

    5. 可 지급晶金屬黃金99.9%;可 지급晶銀95.0%;離岸費用爲每盎司黃金7.00美元和每盎司銀3.00美元(精煉、交通和保險);

    6. 礦石材料的開採成本爲每噸4.00加元;

    7. 處理成本爲每噸15.00加元,管理費用爲每噸8.00加元;

    8. 礦坑坡度爲45度。

  5. 最終的淨回報率(NRS)公式爲:NSR (加元) = 95.79*黃金品位*0.93 + 0.92*銀品位*0.86

  6. 最終的黃金當量(AuEq)公式爲:AuEq = Au + Ag*0.00887

  7. 該礦牀的塊密度基於2021年和2022年的測量,假定礦牀整個區域爲2.61,表土爲2.00。

  8. 數字可能由於四捨五入而不相加。

Figure 1: Shasta Plan Map with MRE Resource-limiting Pit Outline

圖1:Shasta計劃圖,包含資源限制的礦坑輪廓

Figure 2: Tailings Storage Facility 1 & 2

圖2:尾礦儲存設施1和2

Overview

概述

The 2024 MRE update was based on the incorporation of ~3,250 m of historical diamond drilling from the 2007 (16 drillholes now included) and 2010 (10 drillholes now included) drill campaigns. These drillholes were not included in prior MRE calculations as collars could not accurately be validated and/or assay data was not recovered as part of the acquisition. However, TDG has since: (i) re-logged, re-sampled and assayed the cores (where available) with modern assaying techniques, and (ii) completed a comprehensive data validation and ground-truthing to confidently place those collars in 3D space. This endeavour was one of the 'low hanging fruit' objectives from the Shasta MRE forward plan (see TDG news release May 01, 2023). The result is an increase in grade and decrease in tonnage (Figure 3). Additionally, metal prices and NSR derived costs have been updated to reflect a higher price environment.

2024年MRE更新基於大約325000萬的歷史金剛石鑽探數據,這些數據來自於2007年(現包含16個鑽孔)和2010年(現包含10個鑽孔)的鑽探項目。這些鑽孔沒有被包含在之前的MRE計算中,因爲無法準確驗證鑽孔位置和/或未回收的樣品數據。然而,TDG隨後:(i)使用現代化的檢測技術重新記錄、重新採樣和分析了核心(如可用),並且(ii)完成了全面的數據驗證和現場驗證,以自信地將這些鑽孔位置放置於三維空間中。這個工作是Shasta MRE前進計劃中的「低垂果實」目標之一(見TDG新聞稿2023年5月1日)。結果是礦石品位的提高和噸位的減少(圖3)。此外,金屬價格和由NSR衍生的成本已更新,以反映更高的價格環境。

Figure 3 - 2022 vs. 2023 vs. 2024 MRE Visual Comparison.

圖3 - 2022年與2023年與2024年MRE視覺比較。

Note: the 2022, 2023 and 2024 MREs each have their own set of assumptions and modifying factors and are not directly comparable estimates, but this figure is provided for illustration purposes.

注意:2022年、2023年和2024年的MRE各自有其特定的假設和修改因素,無法直接比較這些估算,但提供此圖僅供說明用途。

Mineral Resource overview

涉礦概念概述

The Shasta deposit mineral resource database consists of 367 drillholes with 19,896 assay intervals from 1983 through 2022 drilling. This represents 23,936 m of assayed intervals at an average interval of 1.3 m per assay interval. Approximately 50 % of all assayed interval lengths of core used in the mineralized domains is comprised of TDG's modern, HQ diameter, oriented, diamond drill core from 2021 and 2022. The remaining assay intervals from the mineralized domains are from historical4,5 drilling. All data used for the MRE has been validated statistically to show no significant bias, either by twinned drillholes in 2021 or through statistical comparison of historical4,5 data with TDG drilling using Point Validation. Historical collar locations have also been validated by field validation of collar locations.

The Shasta deposit mineral resource database consists of 367 drillholes with 19,896 assay intervals from 1983 through 2022 drilling. This represents 2393600萬 of assayed intervals at an average interval of 130萬 per assay interval. Approximately 50 % of all assayed interval lengths of core used in the mineralized domains is comprised of TDG's modern, HQ diameter, oriented, diamond drill core from 2021 and 2022. The remaining assay intervals from the mineralized domains are from historical4,5 drilling. All data used for the MRE has been validated statistically to show no significant bias, either by twinned drillholes in 2021 or through statistical comparison of historical4,5 data with TDG drilling using Point Validation. Historical collar locations have also been validated by field validation of collar locations.

Two mineralized domains were generated based on: (i) the major north-south Shasta fault system as well as, (ii) the northwest trending, sub-vertical JM zone. The block model has a block size of 5 m x 5 m x 5 m to correspond to expected selective mining unit, with interpolation of Au and Ag by Inverse Distance Cubed ("ID3"). The interpolations were limited by the domain boundaries and were clipped to the overburden surface. Historical mine workings4 were removed from the in-situ mineral MRE.

Two mineralized domains were generated based on: (i) the major north-south Shasta fault system as well as, (ii) the northwest trending, sub-vertical Jm zone. The block model has a block size of 500萬 x 500萬 x 500萬 to correspond to expected selective mining unit, with interpolation of Au and Ag by Inverse Distance Cubed ("ID3"). The interpolations were limited by the domain boundaries and were clipped to the overburden surface. Historical mine workings4 were removed from the in-situ mineral MRE.

There are no other known factors or issues that materially affect the MRE other than normal risks faced by mining projects in the province of British Columbia, Canada, in terms of environmental, permitting, taxation, socio-economic, marketing, and political factors and additional risk factors as listed in the "Cautionary Note Regarding Forward-Looking Information" section below.

There are no other known factors or issues that materially affect the MRE other than normal risks faced by mining projects in the province of British Columbia, Canada, in terms of environmental, permitting, taxation, socio-economic, marketing, and political factors and additional risk factors as listed in the "Cautionary Note Regarding Forward-Looking Information" section below.

Mineral Resource growth potential & Forward Plan

Mineral Resource growth potential & Forward Plan

The Shasta Deposit still has many avenues for further improvements, including in-fill drilling to improve the confidence and continuity and potentially improve grade and/or classification as well as test the zones of known mineralized extension. Additionally, the Greater Shasta-Newberry project offers potential for the discovery of new mineralized zones3 that could increase the existing 2024 MRE. Such potential endeavours include:

The Shasta Deposit still has many avenues for further improvements, including in-fill drilling to improve the confidence and continuity and potentially improve grade and/or classification as well as test the zones of known mineralized extension. Additionally, the Greater Shasta-Newberry project offers potential for the discovery of new mineralized zones3 that could increase the existing 2024 MRE. Such potential endeavours include:

  1. 'Scout' Drilling. Using a small mobile drill to drill test the Greater Shasta area following up on historical drilling and exploration that suggest additional proximal zones of mineralization, adjacent to the Shasta Deposit (Fisher, Hood, Cody Lee and North Shasta Zones3)

  2. Expansion Potential. The Shasta Deposit remains open along the strike and at depth, beyond the known and defined mineralized zones3. Further diamond drilling could unlock more mineralization to be incorporated into the Shasta Deposit MRE.

  3. 'Upgrade' Drilling. From data analysis, replacing historical holes (small diameter, historical assay methods) with modern, HQ (large diameter) diamond drilling coupled with modern precious metal assays has the potential to increase grade and confidence by providing more representative samples.

  4. Metallurgical testing. TDG has initiated Phase 1 metallurgical testing of core samples collected from the Shasta Project in order to optimize metallurgical recoveries and support future economic studies.

  5. Economic Studies. To take the known mineral deposit area in accordance with NI 43-101 and advance through studies to evaluate potential economic scenarios.

  1. 『偵查』鑽探。使用小型移動鑽機在大沙斯塔地區進行鑽探測試,跟進歷史鑽探和勘探結果,這些結果表明,在沙斯塔存款(費舍爾、霍德、科迪·李和北沙斯塔區域3)附近還有額外的礦化區。

  2. 擴展潛力。沙斯塔存款在已知和定義的礦化區3之外,沿着走向和深度仍然開放。進一步的金剛石鑽探可能會解鎖更多的礦化,以便納入沙斯塔存款MRE中。

  3. 『升級』鑽探。通過數據分析,用現代的HQ(大直徑)金剛石鑽探替代歷史鑽孔(小直徑,歷史測定方法),並結合現代貴金屬分析,有可能通過提供更具代表性的樣本來提高品位和信心。

  4. 冶金測試。TDG已經啓動了對從沙斯塔項目收集的岩心樣本進行第一階段的冶金測試,以優化冶金回收並支持未來的經濟研究。

  5. 經濟研究。依據NI 43-101對已知的礦牀區域進行研究,推進評估潛在的經濟場景。

Steven Kramar, TDG's VP Exploration, commented: "Our systematic review of Greater Shasta continued throughout 2024, incorporating ~4,500 m of historical diamond drill core information that we recovered in 2023, in addition to the ~3,250 m of 2007 and 2010 specific information. We're now ready to launch a scout drill campaign, having identified multiple target locations to evaluate the four known extensions3 to the Shasta mineral deposit area with a priority focus on the Fisher Zone3. Our aim would be to follow-up with HQ diamond drilling to rapidly add additional mineral resources3 that offer the best potential to improve the overall scale and economics of the project. A similar approach would apply for expanding the high-grade gold Mets mining lease3. We continue to believe that Greater Shasta-Newberry & Mets, in combination, represent a compelling opportunity for the definition of a substantial global mineral resource in an established mining district."

史蒂文·克拉瑪,TDG的副總裁探索,評論道:"我們對大沙斯塔的系統性審查持續到2024年,整合了我們在2023年收回的約450000萬的歷史金剛石鑽探岩心信息,此外還有約325000萬的2007年和2010年特定信息。我們現在準備啓動偵查鑽探活動,已識別多個目標位置以評估沙斯塔礦牀區域的四個已知延伸3,優先關注費舍爾區域3。我們的目標是跟進HQ金剛石鑽探,以快速增加額外的礦產資源3,這些資源提供了改善項目整體規模和經濟性的最佳潛力。類似的方法將適用於擴展高品位黃金Mets礦業租賃3。我們繼續相信,大沙斯塔-紐伯裏與Mets的組合代表了在一個成熟礦區內定義可觀的全球礦產資源的誘人機會。"

Data Verification

數據驗證

TDG followed industry standard Quality Assurance/Quality Control ("QA/QC") protocols for the 2021 and 2022 drill programs by inserting blind certified reference materials ("CRMs"), field duplicates and blanks into the sample stream of core samples at sufficient proportions to primary core samples. QA/QC is maintained internally at the lab through rigorous use of internal CRMs, blanks, and duplicates.

TDG遵循行業標準質量保證/質量控制("QA/QC")協議,對2021年和2022年的鑽探項目,通過將盲法認證參考材料("CRMs")、現場重複樣本和空白樣本以足夠的比例插入核心樣本的樣本流中。QA/QC在實驗室內部通過嚴格使用內部CRMs、空白樣本和重複樣本得以維持。

If a QA/QC sample returned an unacceptable value an investigation into the results is triggered and, when deemed necessary, the samples that were tested in the batch with the failed QA/QC sample were re-tested.

如果QA/QC樣本返回的價值不可接受,將觸發對結果的調查,並在必要時重新測試與失敗的QA/QC樣本在同一批次中測試的樣本。

The drill cores from 2021 and 2022 drilling were delivered to the core shack at TDG's Baker Mine site, and processed by geologists who inserted QA/QC samples into the sampling sequence. The drill core was cut in half (1/2 HQ core) and placed in zip-tied polyurethane bags, then in security-sealed rice bags before being delivered directly from the Baker Mine site to Bandstra Transportation Systems in Prince George, B.C., enroute to either:

2021年和2022年的鑽探核心被送往TDG的貝克礦區的核心儲存室,由地質學家處理,地質學家在取樣序列中插入QA/QC樣本。鑽探核心被切成兩半(1/2 HQ核心),並放入用拉鍊封口的聚氨酯袋中,再放入安全密封的米袋中,最後直接從貝克礦區送往位於喬治王子的Bandstra交通系統,途中送往:

  1. SGS' laboratory in Burnaby, B.C., for preparation and analysis of 2021 drillcore samples. Samples were prepared and analyzed following procedures summarized in Table 2, where information about methodology can be found on the SGS Canada Website, in the analytical guide (here).

  2. ALS' preparation facility in Kamloops, B.C., and ultimately to the ALS' laboratory in North Vancouver, B.C., for 2022 and 2023 drillcore samples. Samples were prepared and analyzed following procedures summarized in Table 2, where information about methodology can be found on the ALS Global website, in the analytical guide (here).

  1. SGS位於本那比的實驗室,進行2021年鑽探核心樣本的準備和分析。樣本的準備和分析遵循表2中總結的程序,關於方法的信息可在SGS加拿大網站的分析指南中找到(這裏)。

  2. ALS位於坎盧普斯的準備設施,最終送往位於北溫哥華的ALS實驗室,進行2022年和2023年鑽探核心樣本的處理。樣本的準備和分析遵循表2中總結的程序,關於方法的信息可在ALS全球網站的分析指南中找到(這裏)。

Table 2 - 2021 & 2022 Assay Methodology

表2 - 2021年和2022年分析方法

Year

Lab

Method (Au)

Method (Ag)

Method (Overlimit - Au)

Method (Overlimit - Ag)

2021

SGS

GO_FAI50V10

GE_IMS40Q12

N/A

GO_ICP42Q100/GO_FAG37V

2022

ALS

AU-ICP22

MEMS61

Au-GRA22

Ag-GRA22

2023

ALS

AU-ICP22

MEMS61

Au-GRA22

Ag-GRA22

年份

實驗室

方法(黃金)

方法(白銀)

方法(超限 - 黃金)

方法(超限 - 白銀)

2021

SGS

GO_FAI50V10

GE_IMS40Q12

不適用

GO_ICP42Q100/GO_FAG37V

2022

ALS

AU-ICP22

MEMS61

Au-GRA22

Ag-GRA22

2023

ALS

AU-ICP22

MEMS61

Au-GRA22

Ag-GRA22

Historical4,5 data were verified using Point Validation, by interpolating the Au and Ag grades to locations of the historical4,5 data for comparison. In addition, two of the 2021 drillholes were twins of historical4,5 drilling. Based on these analyses, the historical4,5 drilling for years 1983 to 2006 show no significant bias.

通過點驗證對歷史4,5數據進行了驗證,方法是將Au和Ag的品位插值到歷史4,5數據的位置以進行比較。此外,2021年的兩個鑽孔是歷史4,5鑽探的雙胞胎。根據這些分析,1983年至2006年的歷史4,5鑽探顯示沒有顯著偏差。

Drill collar validation was completed using handheld (GARMIN GPSMAP64 or equivalent) GPS equipment, selecting a subset of historical4,5 collars to validate positions inherited from the historical4,5 database. In 2022, a DGPS was utilized to further validate historical4,5 collars and rectify locations into modern UTM NAD83 Zone: 9 north coordinate system (from a locally derived mine grid). Collar locations from the 1980/90s era drilling were validated for use in the mineral resource database.

使用手持設備(GARMIN GPSMAP64 或相當設備)完成了鑽孔基地驗證,選擇了歷史鑽孔數據中的一部分,以驗證從歷史數據庫繼承的位置。在2022年,使用DGPS進一步驗證歷史鑽孔,並將位置修正爲現代UTM NAD83區:9北座標系統(來自本地衍生的礦區網格)。來自1980/90年代的鑽井鑽孔位置已被驗證用於礦產資源數據庫。

Methods Used for the Mineral Resource Estimate

礦產資源估算所採用的方法

Grade Capping

等級上限

Cumulative probability plots ("CPPs") for the assays within both domains have been used to determine high grade outliers which were capped (Table 3). CPPs of the composited data (composited at 2 m) have also been used to determine the Outlier Restriction during interpolation. Outlier restriction values are applied for distances beyond 5 m from the composite locations.

兩個領域內的分析結果的累積分佈概率圖("CPPs")已經用來判斷高品位異常值,並進行上限處理(見表3)。經複合的數據的CPPs(以2米爲複合)也用於在插值期間確定異常值限制。異常值限制值適用於超出複合位置500萬的距離。

Table 3 - Capping and Outlier Restriction Values

表3 - 上限和異常值限制值

Assay Capping Values

Composite Outliers

DOM

Au

# capped

Ag

# capped

Au

# of outliers

Ag

# of outliers

(g/t)

(g/t)

(g/t)

(g/t)

1

100

1

5000

1

30

10

5

5

2

50

1

3000

1

5

9

1000

2

分析結果的上限值

複合異常值

領域

黃金

# 限制

# 限制

黃金

# 異常值數量

# 異常值數量

(克/噸)

(克/噸)

(克/噸)

(克/噸)

1

100

1

5000

1

30

10

5

5

2

50

1

3000

1

5

9

1000

2

Variography and Interpolations

變異函數和插值法

Variography was completed on each domain for Au and Ag to determine appropriate search parameters. Interpolation has been done by ID3 in 4 passes with increasing search distances up to 150 m for the major and minor axes. The modelled grades have been validated using de-clustered composites (Nearest Neighbour or Polygonal model) and indicate no global bias with appropriate smoothing throughout the grade-tonnage curves.

在每個區域完成了黃金和白銀的變異函數分析,以判斷合適的搜索參數。插值使用ID3進行了4次,搜索距離逐漸增加,最大可達15000萬,針對主要和次要軸。使用去聚類的複合體(最近鄰或多邊形模型)驗證了模型化的品位,結果顯示沒有全球偏差,同時品位-噸位曲線的平滑性也得到了保證。

Classification of Mineral Resource Criteria

礦產資源分類標準

Volumes of the mineral resource that contained 2021 and/or 2022 drilling data with an average distance between two drillholes of 50 m (or less), were considered Indicated. The mineral resource was assigned to Inferred for all other blocks interpolated, with a Au grade.

在2021年和/或2022年鑽探數據中,兩個鑽孔之間平均距離爲5000萬(或更少)的礦產資源體積被視爲指示資源。所有其他插值區塊被分配爲推斷資源,具有一定的黃金品位。

Cut-off Grade

邊際品位

The COG was selected using AuEq* to cover, as a minimum, the processing and G&A costs and to account for the metallurgical recovery, smelter terms and royalties. In 2022, the base case COG was 0.3 g/t AuEq*which approximates the marginal economic COG; and in the 2023 and in the current, 2024 MRE the base case COG is assigned at 0.4 g/t AuEq*.

邊際品位的選擇使用 AuEq* 來覆蓋最低的處理和一般管理費用,並考慮冶金回收、冶煉條款和特許權使用費。在2022年,基本案例邊際品位爲0.3克/噸 AuEq*,大致對應於邊際經濟邊際品位;在2023年以及當前的2024 MRE中,基本案例邊際品位被設定爲0.4克/噸 AuEq*。

Qualified Person

合格人士

The technical content of this news release has been reviewed and approved by Steven Kramar, MSc., P.Geo., Vice President, Exploration for TDG., a qualified person as defined by National Instrument 43-101.

本新聞稿的技術內容已由Steven Kramar, MSC., P.Geo.審核並批准,他是TDG的副總裁、勘探部負責人,符合國家儀器43-101的合格人員定義。

The technical information relating to the mineral resource estimate has been prepared by Sue Bird, P.Eng. (Moose Mountain Technical Services) a Qualified Person, as defined under National Instrument 43-101 and who is independent of TDG.

與礦產資源估算相關的技術信息由Sue Bird, P.Eng.(摩斯山技術服務)準備,他是國家儀器43-101下定義的合格人員,並與TDG獨立。

1Mineral Resource Estimate (MRE): All scientific and technical information relating to the TDG's Shasta Project pertaining to the Mineral Resource Estimate ("Shasta MRE") contained in this news release is derived from the Technical Report dated June 14, 2023 (with an effective date of February 11, 2023) titled "The Toodoggone Portfolio and the 2023 Resource Estimate for the Shasta Deposit" (the "2023 Technical Report") prepared by Sue Bird, MSc., P.Eng. of Moose Mountain Technical Services. The information contained herein in respect of the Shasta MRE is subject to all of the assumptions, qualifications and procedures set out in the 2023 Technical Report and reference should be made to the full text of the 2023 Technical Report, a copy of which has been filed with the securities regulators in each of the provinces of Canada (except Québec) and is available on . An updated technical report for the 2024 MRE will be filed within 45 days of this release.

1礦產資源估算(MRE):與TDG的Shasta項目相關的所有科學和技術信息,涉及礦產資源估算("Shasta MRE"),均源於2023年6月14日的技術報告(有效日期爲2023年2月11日),題爲"Toodoggone組合及Shasta礦牀的2023年資源估算"("2023年技術報告"),由摩斯山技術服務的Sue Bird, MSC., P.Eng.準備。有關Shasta MRE的信息受制於2023年技術報告中列出的所有假設、資格和程序,應參考2023年技術報告的全文副本,後者已遞交給加拿大各省的證券監管機構(不包括魁北克),並可獲得。2024年MRE的更新技術報告將在本發佈後45天內提交。

2Inferred Mineral Resources: Inferred Mineral Resources are considered too speculative geologically to have economic considerations applied to them that would enable their classification as Mineral Reserves. However, it is reasonably expected that the majority of Inferred Mineral Resources could be upgraded to Measured or Indicated Mineral Resources with continued exploration and additional data.

推測的涉礦資源:推測的涉礦資源在地質上被認爲過於投機,無法應用經濟考慮,這是將其歸類爲礦產儲量的條件。然而,合理預期大多數推測的涉礦資源在持續勘探和額外數據的情況下可能會升級爲已測定或指示性涉礦資源。

3Mineral Exploration/Exploration Target Area(s): Exploration targets and/or Exploration zones and/or Exploration areas are speculative and there is no certainty that any future work or evaluation will lead to the definition of a mineral resource.

礦產勘探/勘探目標區域:勘探目標和/或勘探區和/或勘探區域是投機性的,未來的任何工作或評估無法確保將導致礦產資源的定義。

4Historical Data: This news release includes historical information that has been reviewed by TDG's qualified person (QP). TDG's review of the historical records and information reasonably substantiate the validity of the information presented in this news release; however, TDG cannot directly verify the accuracy of the historical data, including (but not limited to) the procedures used for sample collection and analysis. Therefore, any conclusions or interpretations borne from use of this data should be considered too speculative to suggest that additional exploration will result in mineral resource delineation. TDG encourages readers to exercise appropriate caution when evaluating these data and/or results.

歷史數據:本新聞稿包含的歷史信息已由TDG的合格人員(QP)進行審核。TDG對歷史記錄和信息的審核在合理範圍內證實了本新聞稿中所呈現信息的有效性;然而,TDG無法直接驗證歷史數據的準確性,包括(但不限於)用於樣品收集和分析的程序。因此,從使用這些數據得出的任何結論或解讀應被認爲過於投機,無法建議額外的勘探將導致礦產資源的劃定。TDG鼓勵讀者在評估這些數據和/或結果時要謹慎行事。

5Historical Drill core Sampling & Assay Methodology: Historical core was geologically logged with lithologies identified and notable geological features recorded. Historical core was cut in half (and in rare cases sawn in half) along sample intervals (lithology and mineralization dependant) generally less than 3 m. Chemical analysis was performed dominantly for precious metal analysis (Au and Ag), and infrequently for base metals (Pb, Zn and Cu), and rarely for major elements and trace elements. Historically, different commercial laboratories were utilized in addition to an assay lab at Baker Mine site. These lab facilities may or may not have had accreditation and in all cases accreditation (if applicable) pre-dated current ISO standards. Over that period, a variety of digestion and assay methods were used, including atomic absorption, fire assay atomic absorption, aqua regia atomic absorption and aqua regia ICP with varying detection limits. Reference materials (if any) were inserted at the analytical level and thus were unblind to the facility processing the samples.

歷史鑽芯樣品及分析方法:歷史芯樣通過地質記錄進行記錄,識別出巖性並記錄顯著的地質特徵。歷史芯樣根據樣品間隔(依賴於巖性和礦化)通常被切成兩半(在少數情況下鋸成兩半),間隔一般小於300萬。化學分析主要用於貴金屬分析(Au和Ag),並且偶爾用於基礎金屬(Pb,Zn和Cu),並很少用於主要元素和微量元素。歷史上,除了貝克礦場的分析實驗室外,還利用了不同的商業實驗室。這些實驗室設施可能存在或不存在認證,在所有情況下,認證(如適用)早於當前ISO標準。在這段時間內,使用了多種消化和分析方法,包括原子吸收、火法分析原子吸收、王水原子吸收和王水ICP,檢測限各不相同。參考材料(如有)在分析級別插入,因此對處理樣品的設施沒有盲測。

6Adjacent Properties: The Company has no interest in, or rights to, any of the adjacent properties mentioned, and mineral deposits on adjacent properties are not necessarily indicative of mineralization on the Company's properties. Any references to resources, grades, metallurgical or process studies, engineering studies or historical results are provided for information only and do not imply any certainty of achieving similar results on the Company's properties.

相鄰物業:公司對提到的任何相鄰物業沒有權益或權利,相鄰物業上的礦產 deposits 並不一定表明公司物業上存在礦化現象。所有關於資源、品位、冶金或工藝研究、工程研究或歷史結果的引用僅供參考,不暗示在公司的物業上獲得類似結果的確定性。

About TDG Gold Corp.

關於 TDG 黃金公司。

TDG is a major mineral tenure holder in the historical Toodoggone Production Corridor of north-central British Columbia, Canada, with over 32,000 hectares of brownfield and greenfield exploration opportunities under direct ownership. TDG's flagship projects are the former producing, high-grade gold-silver Shasta and Baker mines, which produced intermittently between 1981-2012, and the historical high-grade gold Mets developed prospect, all of which are road accessible, and combined have over 65,000 m of historical drilling. The projects have been advanced through compilation of historical data, new geological mapping, geochemical and geophysical surveys and, at Shasta, 13,250 m of modern HQ drill testing of the known mineralization occurrences and their potential extensions. In May 2023, TDG published an updated Mineral Resource Estimate for Shasta (news release May 01, 2023) which remains open at depth and along strike. In January 2023, TDG defined a larger exploration target area adjacent to Shasta ('Greater Shasta-Newberry'; news release Jan 25, 2023). In Fall 2023, TDG published the first modern drill results from the Mets mining lease (news releases Sep 07, 2023, Sep 11, 2023 and Nov 28, 2023). In early 2024, TDG identified new copper-gold target areas over an expanded footprint covering ~53 sq.km known as the 'Baker Complex' (news release Feb 28, 2024).

TDG 是加拿大不列顛哥倫比亞省中北部歷史悠久的 Toodoggone 生產走廊的主要礦產租賃持有者,直接擁有超過 32,000 公頃的棕地和綠地勘探機會。TDG 的旗艦項目爲前生產的高品位黃金-白銀 Shasta 和 Baker 礦,這些礦在 1981-2012 年間間歇性地生產,以及歷史高品位黃金 Mets 開發前景,所有這些項目都可以通過公路通達,合計歷史鑽探超過 6500000萬米。通過對歷史數據的彙編、新的地質製圖、地球化學和地球物理勘查,Shasta 項目進行了先進,進行了 1325000萬米的現代 HQ 鑽探測試已知礦化現象及其潛在擴展。2023 年 5 月,TDG 發佈了 Shasta 的更新礦產資源估算(新聞稿 2023 年 5 月 01 日),該估算在深度和沿走向上仍然開放。2023 年 1 月,TDG 定義了一個更大的勘探目標區域,毗鄰 Shasta('Greater Shasta-Newberry'; 新聞稿 2023 年 1 月 25 日)。在 2023 年秋季,TDG 發佈了 Mets 礦區的首次現代鑽探結果(新聞稿 2023 年 9 月 07 日,9 月 11 日和 11 月 28 日)。在 2024 年初,TDG 確定了一個新的銅-金目標區域,覆蓋廣泛,面積約爲 53 平方公里,稱爲 'Baker Complex'(新聞稿 2024 年 2 月 28 日)。

ON BEHALF OF THE BOARD

代表董事會

Fletcher Morgan
Chief Executive Officer

弗萊徹·摩根
首席執行官

For further information contact:

如需更多信息,請聯繫:

TDG Gold Corp.
Telephone: +1.604.536.2711
Email: info@tdggold.com

TDG 黃金公司。
電話:+1.604.536.2711
電子郵件:info@tdggold.com

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

TSX TSX Venture交易所及其監管服務提供商(如TSX Venture交易所的政策中所定義的那樣)不承擔此發佈的充分性或準確性的責任。

Forward Looking Statements

前瞻性聲明

This news release contains forward-looking statements that are based on the Company's current expectations and estimates. Forward-looking statements are frequently characterized by words such as "expand", "expect", "demonstrate", "outcome", "continue" "potential", "improve", "discover", "priority", "significant", "opportunity", "compel" "continuity", "consistent", "expected", "relative", "comprehensive", "confident", "concept", "unlock", "identify", "modest", and variations of these words as well as other similar words or statements that certain events or conditions "could", "may", "would" or "will" occur. Such forward-looking statements involve known and unknown risks, uncertainties and other factors that could cause actual events or results to differ materially from estimated or anticipated events or results implied or expressed in such forward-looking statements. Such factors include, among others: the actual results of current and planned exploration activities; the potential to expand the Shasta MRE beyond its current limits and to convert unclassified material within the MRE-limiting pit to mineral resources; the interpretation of the Fisher, Hood, Cody Lee and other Zones as representing potential mineralized trends, and the potential for extensions to the Fisher, Hood, Cody Lee and other Zones; the interpretation that the Greater Shasta-Newberry Target Area represents a larger mineralized system encompassing several target zones and the potential that such zones may represent additional Shasta-like deposits; the ability to further improve confidence in the Shasta MRE and the potential for, and timing of, a larger, updated MRE; the timing, results and conclusions of future economic evaluations; the improvement of the Shasta MRE by future drilling in the known historical areas utilizing larger diameter core and modern assay practices; changes in project parameters as plans to continue to be refined; results of current and future metallurgical testing; possible variations in grades of mineralization and/or future actual recovery rates; accidents, labour disputes and other risks of the mining industry; the availability of sufficient funding on terms acceptable to the company to complete the planned work programs; delays in obtaining governmental approvals or financing; and fluctuations in metal prices. There may be other factors that cause actions, events or results not to be as anticipated, estimated or intended. Any forward-looking statement speaks only as of the date on which it is made and, except as may be required by applicable securities laws, the Company disclaims any intent or obligation to update any forward-looking statement, whether as a result of new information, future events or results or otherwise. Forward-looking statements are not guarantees of future performance and accordingly undue reliance should not be put on such statements due to the inherent uncertainty therein.

本新聞稿包含基於公司當前期望和估計的前瞻性聲明。前瞻性聲明通常以「擴展」、「期望」、「展示」、「結果」、「繼續」、「潛在」、「改善」、「發現」、「優先級」、「顯著」、「機會」、「迫使」、「連續性」、「一致」、「預期」、「相對」、「全面」、「信心」、「概念」、「解鎖」、「識別」、「適度」以及這些詞的變體,以及其他類似的詞或陳述的特徵,某些事件或條件「可能」、「或許」、「將」或「會」發生。這些前瞻性聲明涉及已知和未知的風險、不確定性和其他因素,這些因素可能導致實際事件或結果與這些前瞻性聲明中暗示或表達的估計或預期的事件或結果有實質性差異。這些因素包括,但不限於:當前和計劃中的勘探活動的實際結果;將Shasta MRE擴展超出當前限制的潛力,以及將MRE限制坑內的未分類物料轉化爲礦產資源的潛力;將Fisher、Hood、Cody Lee和其他區域解釋爲代表潛在礦化趨勢的能力,以及對Fisher、Hood、Cody Lee和其他區域的擴展潛力的可能性;將Greater Shasta-Newberry目標區域解釋爲一個更大的礦化系統,包含幾個目標區,以及這些區域可能代表附加Shasta類礦牀的潛力;進一步提升Shasta MRE的信心的能力,以及更大、更新的MRE的潛力及時間;未來經濟評估的時間、結果和結論;通過使用更大直徑的岩心和現代化的化驗實踐,對已知歷史區域的未來鑽探改進Shasta MRE的能力;項目參數變更,計劃將持續優化;當前和未來冶金測試的結果;礦化等級和/或未來實際回收率的可能變化;事故、勞動糾紛和採礦行業的其他風險;在公司可接受的條款下獲得足夠資金以完成計劃工作項目的能力;獲得政府批准或融資的延遲;以及金屬價格的波動。可能還有其他因素導致行動、事件或結果未能按預期、估計或意圖進行。任何前瞻性聲明僅在作出之日有效,除非適用的證券法律要求,否則公司不對更新任何前瞻性聲明承擔任何意圖或義務,無論是由於新信息、未來事件或結果或其他原因。前瞻性聲明並不保證未來的表現,因此不應因其中固有的不確定性而過度依賴這些聲明。

SOURCE: TDG Gold Corp.

來源:TDG黃金公司。


譯文內容由第三人軟體翻譯。


以上內容僅用作資訊或教育之目的,不構成與富途相關的任何投資建議。富途竭力但無法保證上述全部內容的真實性、準確性和原創性。
評論 評論 · 瀏覽 332

熱點推薦

搶先評論

聲明

本頁的譯文內容由軟件翻譯。富途將竭力但卻不能保證翻譯內容之準確和可靠,亦不會承擔因任何不準確或遺漏而引起的任何損失或損害。