share_log

Skyharbour Partner Company Terra Clean Energy Signs Exploration Agreement With the English River First Nation and Receives Drilling Permits for the South Falcon East Uranium Project

Skyharbour Partner Company Terra Clean Energy Signs Exploration Agreement With the English River First Nation and Receives Drilling Permits for the South Falcon East Uranium Project

Skyharbour合作公司Terra清潔能源與英河第一民族簽署勘探協議,並獲得南獵鷹東鈾項目的鑽探許可證。
GlobeNewswire ·  12/23 21:30

Vancouver, BC, Dec. 23, 2024 (GLOBE NEWSWIRE) -- Skyharbour Resources Ltd. (TSX-V: SYH) (OTCQX: SYHBF) (Frankfurt: SC1P) ("Skyharbour" or the "Company") is pleased to announce that partner company Terra Clean Energy Corp. ("Terra", previously Tisdale Clean Energy) has announced the execution of an Exploration Agreement with the English River First Nation. This agreement strengthens their relationship and allows for access to the ancestral lands of The English River First Nation on which the South Falcon East Property (the "Project") lies, which hosts the Fraser Lakes B uranium deposit. Skyharbour optioned the Project to Terra and under the Option Agreement assuming the 75% interest is earned, Terra will fund exploration expenditures totaling CAD $10,500,000, as well as pay Skyharbour CAD $11,100,000 in cash of which $6,500,000 can be settled for shares in the capital of Terra ("Shares") over the five-year earn-in period.

不列顛哥倫比亞省溫哥華,2024 年 12 月 23 日(GLOBE NEWSWIRE)— Skyharbour Resources Ltd.(TSX-V: SYH) (OTCQX: SYHBF) (法蘭克福: SC1P)(「Skyharbour」 或 「公司」)欣然宣佈,合作伙伴公司Terra Clean Energy CORP.(「Terra」,前身爲提斯代爾清潔能源)已宣佈與英吉利河原住民簽署勘探協議。該協議加強了他們之間的關係,允許進入英吉利河原住民的祖傳土地,南方獵鷹東部地產(「項目」)所在的英吉利河原住民的祖傳土地,該地產是弗雷澤湖b鈾礦牀的所在地。Skyharbour選擇了該項目,根據期權協議,假設獲得75%的利息,Terra將爲總額爲1050萬加元的勘探支出提供資金,並向Skyharbour支付11,100,000加元的現金,其中650萬美元可以在五年收益期內結算Terra資本中的股份(「股份」)。

Map of South Falcon East Project Claims:

South Falcon East項目索賠地圖:

Terra also announces that it has received the required permits from the Saskatchewan Ministry of Environment to conduct its winter exploration program on the South Falcon East Property. These permits allow access to the project lands for a period of three years to conduct exploration activities including, but not limited to, geophysical surveys and diamond drilling. The South Falcon East Project lies 18 km outside the edge of the Athabasca Basin, approximately 50 km east of the Key Lake uranium mill and former mine, approximately 7 km north of the powerline servicing the Key Lake operation.

Terra還宣佈,它已獲得薩斯喀徹溫省環境部的必要許可,可以在South Falcon East地產上進行冬季勘探計劃。這些許可證允許在三年內進入項目用地進行勘探活動,包括但不限於地球物理調查和鑽石鑽探。South Falcon East項目位於阿薩巴斯卡盆地邊緣外18公里處,位於基湖鈾廠和前礦山以東約50公里處,在爲基湖運營提供服務的電力線以北約7公里處。

The winter 2025 drilling program is currently in the final planning and scheduling phase. While the Fraser Lakes B uranium deposit will remain a primary focus of early efforts on the property, Terra has ample additional drill-ready targets along the Way Lake conductor at South Falcon East. This includes the T-Bone Lake area, just north of Fraser Lakes B. The upcoming field program is anticipated to commence in late January to early February and will be executed by Terralogic Exploration Inc. under the supervision of Laura Tennent, Project Manager with TerraLogic Exploration and C. Trevor Perkins, consulting geologist for Terra Clean Energy Corp. The expected budget for this program is anticipated to be $1.5 million funded by Terra as the operator.

2025年冬季鑽探計劃目前處於最後的規劃和調度階段。儘管弗雷澤湖b鈾礦牀仍將是該地產早期工作的主要重點,但Terra在南方獵鷹東部的Way Lake導體沿線還有大量其他準備鑽探的目標。這包括位於弗雷澤湖以北的T-bone湖地區。即將到來的實地項目預計將於1月下旬至2月初開始,將由Terralogic勘探公司在TerraLogic勘探公司項目經理勞拉·坦南特和Terra Clean Energy CORP諮詢地質學家C. Trevor Perkins的監督下執行。該計劃的預期預算預計爲150萬美元,由Terra作爲運營商提供資金。

South Falcon East Project Summary:

South Falcon East項目摘要:

The South Falcon East Project is a uranium exploration project in the southeast Athabasca Basin and covers approximately 12,464 hectares. It lies 18 kilometres outside the Athabasca Basin, approximately 50 kilometres east of the Key Lake Mine. Historical exploration at the South Falcon East Project identified an area of U-Th-REE mineralization at the Fraser Lakes Zone B over an area comprising 1.5 km by 0.5 km along an antiformal fold nose cut by an east-west dextral ductile-brittle cross-structure adjacent to a 65 km long EM conductor.

South Falcon East項目是位於阿薩巴斯卡盆地東南部的一個鈾勘探項目,佔地約12,464公頃。它位於阿薩巴斯卡盆地外18公里處,位於基湖礦以東約50公里處。South Falcon East項目的歷史勘探發現,弗雷澤湖區b區有一片面積爲1.5千米乘0.5千米的區域,沿着一個由東西向右軟韌脆性橫截結構切割的反形褶皺鼻子,與一條長65千米的電磁導體相鄰。

Qualified Person:

合格人員:

The technical information in this news release has been prepared in accordance with the Canadian regulatory requirements set out in National Instrument 43-101 and reviewed and approved by David Billard, P.Geo., a Consulting Geologist for Skyharbour as well as a Qualified Person.

本新聞稿中的技術信息是根據National Instrument 43-101中規定的加拿大監管要求編制的,並由Skyharbour的諮詢地質學家兼合格人員David Billard,P.Geo. 進行了審查和批准。

About English River First Nation:

關於英吉利河原住民:

As 'people of the river' (Des Nëdhë́'iné), English River First Nation is dedicated to the stewardship of the land and the education of future generations. ERFN is guided by the knowledge of their Elders, the traditions of their ancestors, and the ambitions of their future generations, while being a respected partner in relations with industries, governments, and organizations.

作爲 「河中人」(Des Nedheè'ineé),英吉利河原住民致力於土地的管理和子孫後代的教育。ERFN以長輩的知識、祖先的傳統和子孫後代的抱負爲指導,同時也是與行業、政府和組織關係中受人尊敬的合作伙伴。

English River First Nation's two home reserves are located at the Wapatuanak and La Plonge Reserves in Northern Saskatchewan. English River First Nation's Ancestral Territory spans 75,000 square km of North Central Saskatchewan and contains nineteen different reserves belonging to the Nation of English River. Learn more at

英吉利河原住民的兩個家園保護區位於薩斯喀徹溫省北部的瓦帕圖阿納克和拉普隆格保護區。英吉利河原住民的祖先領地橫跨薩斯喀徹溫省中北部 75,000 平方千米,包含屬於英吉利河民族的 19 個不同的保護區。要了解更多,請訪問

About Terra Clean Energy Corp.:

關於 Terra 清潔能源公司:

Terra Clean Energy (formerly Tisdale Clean Energy Corp) is a Canadian-based uranium exploration and development company. The Company is currently developing the South Falcon East uranium project, which holds a 6.96M pound inferred uranium resource within the Fraser Lakes B uranium/thorium deposit, located in the Athabasca Basin region, Saskatchewan, Canada.

Terra Clean Energy(前身爲提斯代爾清潔能源公司)是一家總部位於加拿大的鈾勘探和開發公司。該公司目前正在開發South Falcon East鈾礦項目,該項目在位於加拿大薩斯喀徹溫省阿薩巴斯卡盆地地區的弗雷澤湖b鈾/釷礦牀內擁有696萬磅的推斷鈾資源。

About Skyharbour Resources Ltd.:

關於天港資源有限公司:

Skyharbour holds an extensive portfolio of uranium exploration projects in Canada's Athabasca Basin and is well positioned to benefit from improving uranium market fundamentals with interest in twenty-nine projects, ten of which are drill-ready, covering over 580,000 hectares (over 1.4 million acres) of land. Skyharbour has acquired from Denison Mines, a large strategic shareholder of the Company, a 100% interest in the Moore Uranium Project, which is located 15 kilometres east of Denison's Wheeler River project and 39 kilometres south of Cameco's McArthur River uranium mine. Moore is an advanced-stage uranium exploration property with high-grade uranium mineralization at the Maverick Zone that returned drill results of up to 6.0% U3O8 over 5.9 metres, including 20.8% U3O8 over 1.5 metres at a vertical depth of 265 metres. Adjacent to the Moore Project is the Russell Lake Uranium Project, in which Skyharbour is an operator with joint-venture partner Rio Tinto. The project hosts several high-grade uranium drill intercepts over a large property area with robust exploration upside potential. The Company is actively advancing these projects through exploration and drill programs.

Skyharbour在加拿大阿薩巴斯卡盆地擁有廣泛的鈾勘探項目組合,完全有能力從鈾市場基本面的改善中受益,有29個項目感興趣,其中10個項目已準備就緒,覆蓋超過58萬公頃(超過140萬英畝)的土地。Skyharbour已從該公司的主要戰略股東丹尼森礦業手中收購了摩爾鈾項目的100%權益,該項目位於丹尼森惠勒河項目以東15公里處,卡梅科麥克阿瑟河鈾礦以南39公里處。摩爾是一個處於後期鈾勘探階段,在小牛區有高品位的鈾礦化區,其鑽探結果顯示,在5.9米以上的八氧化三鈾含量高達6.0%,包括在垂直深度爲265米處超過1.5米的20.8%的八氧化三鈾。與摩爾項目相鄰的是羅素湖鈾項目,Skyharbour是該項目的運營商,合資夥伴力拓是該項目的運營商。該項目在具有強大勘探潛力的大片土地上進行了幾次高品位鈾鑽探截獲點。該公司正在通過勘探和鑽探計劃積極推進這些項目。

Skyharbour also has joint ventures with industry leader Orano Canada Inc., Azincourt Energy, and Thunderbird Resources at the Preston, East Preston, and Hook Lake Projects respectively. The Company also has several active earn-in option partners, including CSE-listed Basin Uranium Corp. at the Mann Lake Uranium Project; CSE-listed Medaro Mining Corp. at the Yurchison Project; TSX-V listed North Shore Uranium at the Falcon Project; UraEx Resources at the South Dufferin and Bolt Projects; Hatchet Uranium at the Highway Project; Mustang Energy at the 914W Project; and TSX-V listed Terra Clean Energy at the South Falcon East Project which hosts the Fraser Lakes Zone B uranium and thorium deposit. In aggregate, Skyharbour has now signed earn-in option agreements with partners that total over $41 million in partner-funded exploration expenditures, over $30 million worth of shares being issued, and over $22 million in cash payments coming into Skyharbour, assuming that these partner companies complete their entire earn-ins at the respective projects.

Skyharbour還與行業領導者加拿大歐拉諾公司、Azincourt Energy和Thunderbird Resources分別在普雷斯頓、東普雷斯頓和胡克湖項目設立合資企業。該公司還有幾個活躍的盈利期權合作伙伴,包括曼恩湖鈾項目在歐洲證券交易所上市的盆地鈾公司;位於尤爾奇森項目的歐洲證券交易所上市的梅達羅礦業公司;在獵鷹項目中上市的多倫多證券交易所上市的北岸鈾礦;南達弗林和博爾特項目的Uraex資源;公路項目的哈切特鈾礦;914W項目的野馬能源;以及在多倫多證券交易所上市的Terra Clean Energy 位於弗雷澤湖區 b 鈾和釷礦牀的 South Falcon East 項目中。總體而言,Skyharbour現在已經與合作伙伴簽署了盈利期權協議,這些協議的合作伙伴資助的勘探支出總額超過4,100萬美元,發行了價值超過3000萬美元的股票,並向Skyharbour支付了超過2200萬美元的現金,前提是這些合作伙伴公司完成了各自項目的全部收益。

Skyharbour's goal is to maximize shareholder value through new mineral discoveries, committed long-term partnerships, and the advancement of exploration projects in geopolitically favourable jurisdictions.

Skyharbour的目標是通過新的礦產發現、堅定的長期合作伙伴關係以及在地緣政治有利的司法管轄區推進勘探項目,實現股東價值最大化。

Skyharbour's Uranium Project Map in the Athabasca Basin:

Skyharbour 在阿薩巴斯卡盆地的鈾項目地圖:

To find out more about Skyharbour Resources Ltd. (TSX-V: SYH) visit the Company's website at .

要了解有關Skyharbour Resources Ltd.(多倫多證券交易所股票代碼:SYH)的更多信息,請訪問該公司的網站 .

SKYHARBOUR RESOURCES LTD.

天港資源有限公司

"Jordan Trimble"

「喬丹·特林布爾」

__________________________________

__________________________________

Jordan Trimble
President and CEO

喬丹·特林布爾
總裁兼首席執行官

For further information contact myself or:
Nicholas Coltura
Investor Relations Manager
‎Skyharbour Resources Ltd.
‎Telephone: 604-558-5847
‎Toll Free: 800-567-8181
‎Facsimile: 604-687-3119
‎Email: info@skyharbourltd.com

欲了解更多信息,請聯繫我本人或:
尼古拉斯·科爾圖拉
投資者關係經理
‎Skyharbour 資源有限公司
‎Telephone: 604-558-5847
‎Toll 免費:800-567-8181
‎Facsimile: 604-687-3119
‎Email: info@skyharbourltd.com

NEITHER THE TSX VENTURE EXCHANGE NOR ITS REGULATION SERVICES PROVIDER ACCEPTS RESPONSIBILITY FOR THE ADEQUACY OR ACCURACY OF THE CONTENT OF THIS NEWS RELEASE.

多倫多證券交易所風險交易所及其監管服務提供商均不對本新聞稿內容的充分性或準確性承擔責任。

The securities offered have not been, and will not be, registered under the United States Securities Act of 1933, as amended (the "U.S. Securities Act") or any U.S. state securities laws, and may not be offered or sold in the United States or to, or for the account or benefit of, United States persons absent registration or an applicable exemption from the registration requirements of the U.S. Securities Act and applicable U.S. state securities laws. This press release does not constitute an offer to sell or the solicitation of an offer to buy securities in the United States, nor in any other jurisdiction.

所發行的證券過去和將來都不會根據經修訂的1933年《美國證券法》(「美國證券法」)或任何美國州證券法進行註冊,也不得在美國境內發行或出售,也不得向未經註冊或適用《美國證券法》和適用的美國州證券法的註冊要求豁免的美國人發行或出售,也不得爲美國人的賬戶或利益進行發行或出售。本新聞稿不構成在美國或任何其他司法管轄區出售證券的要約或要求購買證券的要約。

This release includes certain statements that may be deemed to be "forward-looking statements". All statements in this release, other than statements of historical facts, that address events or developments that management of the Company expects, are forward-looking statements, including the Private Placement. Although management believes the expectations expressed in such forward-looking statements are based on reasonable assumptions, such statements are not guarantees of future performance, and actual results or developments may differ materially from those in the forward-looking statements. The Company undertakes no obligation to update these forward-looking statements if management's beliefs, estimates or opinions, or other factors, should change. Factors that could cause actual results to differ materially from those in forward-looking statements, include market prices, exploration and development successes, regulatory approvals, continued availability of capital and financing, and general economic, market or business conditions. Please see the public filings of the Company at for further information.

本新聞稿包括某些可能被視爲 「前瞻性陳述」 的陳述。除歷史事實陳述外,本新聞稿中涉及公司管理層預期的事件或事態發展的陳述均爲前瞻性陳述,包括私募股權。儘管管理層認爲此類前瞻性陳述中表達的預期基於合理的假設,但此類陳述並不能保證未來的業績,實際業績或發展可能與前瞻性陳述中的業績或發展存在重大差異。如果管理層的信念、估計或觀點或其他因素髮生變化,公司沒有義務更新這些前瞻性陳述。可能導致實際業績與前瞻性陳述存在重大差異的因素包括市場價格、勘探和開發成功率、監管部門的批准、資本和融資的持續可用性以及總體經濟、市場或商業狀況。請參閱公司的公開文件,網址爲 以獲取更多信息。


譯文內容由第三人軟體翻譯。


以上內容僅用作資訊或教育之目的,不構成與富途相關的任何投資建議。富途竭力但無法保證上述全部內容的真實性、準確性和原創性。
    搶先評論