E2Gold Closes First Tranche of Financing
E2Gold Closes First Tranche of Financing
NOT FOR DISTRIBUTION TO U.S. NEWSWIRE SERVICES OR FOR DISSEMINATION IN THE UNITED STATES OF AMERICA
不用于向美国新闻通讯社分发或在美利坚合众国传播
TORONTO, ON / ACCESSWIRE / December 19, 2024 / E2Gold Inc. (TSXV:ETU)(OTCQB:ETUGF) has closed the first tranche of its previously announced private placement (the "Offering") for proceeds of $50,000.
安大略省多伦多/ACCESSWIRE/2024年12月19日/E2Gold Inc.(多伦多证券交易所股票代码:ETU)(OTCQB: ETUGF)已完成其先前宣布的私募配售(“发行”)的第一批收益,收益为5万美元。
The financing consisted of the issuance of 5,000,000 Flow-Through shares priced at C$0.01. All securities issued and issuable pursuant to the Offering are subject to a statutory hold period expiring April 18, 2025. The Offering remains subject to the final approval of the TSX Venture Exchange. The Company intends to apply the gross proceeds from the Offering towards the exploration of its Hawkins project.
融资包括发行定价为0.01加元的5,000,000股流通股票。根据本次发行发行和可发行的所有证券的法定持有期将于 2025 年 4 月 18 日到期。本次发行仍有待多伦多证券交易所风险交易所的最终批准。该公司打算将此次发行的总收益用于勘探其霍金斯项目。
Proceeds of the financing will be used for exploration activities currently underway on the Company's Hawkins project in northern Ontario, where the Company is aiming to expand the footprint of its McKinnon Zone Inferred Reosurce.1
融资所得将用于该公司位于安大略省北部的霍金斯项目目前正在进行的勘探活动,该公司的目标是扩大其麦金农区推断资源的覆盖范围。1
ABOUT E2GOLD INC.
关于 E2GOLD INC.
E2Gold Inc. is a Canadian gold exploration company with a large flagship property, the 80 km long Hawkins Gold Project in north-central Ontario, about 140 km east of the Hemlo Gold Mine, and 75 km north of the Magino and Island Gold Mines. The property is anchored by the McKinnon Zone Inferred Resource of 6.2 Mt grading 1.65 Au g/t, for 328,800 ounces of gold.1 E2Gold is committed to increasing shareholder value through discoveries at Hawkins.
E2Gold Inc.是一家加拿大黄金勘探公司,拥有一处大型旗舰地产,即位于安大略省中北部的80公里长的霍金斯金矿项目,位于Hemlo金矿以东约140公里处,马吉诺和岛屿金矿以北75公里处。该物业由麦金农区推断资源为620万吨,品位为1.65澳元/吨,售价328,800盎司黄金。1 E2Gold致力于通过在霍金斯的发现来增加股东价值。
Note 1: NI 43-101 Technical Report and Updated Mineral Resource Estimate on Hawkins Gold Project, Ontario, by P&E Mining Consultants, effective date September 10, 2020.
注1:P&E Mining Consultants发布的安大略省霍金斯金矿项目NI 43-101技术报告和最新矿产资源估算,生效日期为2020年9月10日。
For further information please contact:
欲了解更多信息,请联系:
Jeff Pritchard
VP Corporate Development
info@e2gold.ca
+1 647 699 3340
杰夫·普里查德
企业发展副总裁
info@e2gold.ca
+1 647 699 3340
Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.
多伦多证券交易所风险交易所及其监管服务提供商(该术语在多伦多证券交易所风险交易所的政策中定义)均不对本新闻稿的充分性或准确性承担责任。
Forward Looking Statements - Certain information set forth in this news release may contain forward-looking statements that involve substantial known and unknown risks and uncertainties, certain of which are beyond the control of E2Gold, including with respect to the receipt of all regulatory approvals. Readers are cautioned that the assumptions used in the preparation of such information, although considered reasonable at the time of preparation, may prove to be imprecise and, as such, undue reliance should not be placed on forward-looking statements.
前瞻性陈述-本新闻稿中列出的某些信息可能包含前瞻性陈述,这些陈述涉及大量已知和未知的风险和不确定性,其中某些不在E2Gold的控制范围内,包括与获得所有监管部门批准有关的陈述。请读者注意,在准备此类信息时使用的假设虽然在准备时被认为是合理的,但可能被证明是不准确的,因此,不应过度依赖前瞻性陈述。
SOURCE: E2Gold Inc
资料来源:E2Gold Inc
译文内容由第三方软件翻译。