share_log

ST Engineering Bags $180m Metro Infrastructure Contracts in Bangkok

ST Engineering Bags $180m Metro Infrastructure Contracts in Bangkok

新科工程在曼谷獲得價值18000萬美元的地鐵製造行業合同
Singapore Business Review ·  12/19 09:44

The contracts were awarded to its Urban Solutions business.

合同被授予給其城市解決方案業務。

ST Engineering's Urban Solutions business has secured contracts worth $180m for metro infrastructure projects in Bangkok, Thailand.

新科工程的城市解決方案業務已獲得價值18000萬美元的地鐵基礎設施項目合同,項目位於泰國曼谷。

The projects involve the deployment of a communications system, Supervisory Control and Data Acquisition (SCADA) system, and AGIL Platform Screen Door (PSD) solution for the 35.9-kilometre MRT Orange Line.

這些項目涉及部署通信系統、監督控制與數據採集(SCADA)系統,以及AGIL平台屏門(PSD)解決方案,服務於35.9公里的MRt橙線。

The communications system will leverage advanced networking technologies to ensure timely data transmission, facilitating efficient operations and predictive maintenance. Meanwhile, the SCADA system will enable real-time monitoring and control of metro operations.

通信系統將利用先進的網絡技術確保及時的數據傳輸,從而促進高效的運營和預測性維護。同時,SCADA系統將能夠實時監控和控制地鐵運營。

ST Engineering Urban Solutions will also provide over 500 sets of full-height PSDs and more than 160 sets of half-height PSDs for the 21 underground stations and seven elevated stations on the Orange Line.

新科工程城市解決方案還將爲橙線的21個地下站和7個高架站提供超過500套全高PSD和超過160套半高PSD。

The Orange Line, which connects eastern and western Bangkok, is expected to serve approximately 400,000 daily passengers when fully operational in 2030.

橙線連接曼谷東部和西部,預計在2030年全面投入運營時每天將服務約400,000名乘客。

譯文內容由第三人軟體翻譯。


以上內容僅用作資訊或教育之目的,不構成與富途相關的任何投資建議。富途竭力但無法保證上述全部內容的真實性、準確性和原創性。
    搶先評論