Spark Energy Extends Newly Identified Pegmatite Corridor to 7.2km of Strike, Defines New Targets Across Its Arapaima Lithium Project in Brazil's Lithium Valley and Provides Corporate Update
Spark Energy Extends Newly Identified Pegmatite Corridor to 7.2km of Strike, Defines New Targets Across Its Arapaima Lithium Project in Brazil's Lithium Valley and Provides Corporate Update
Vancouver, British Columbia--(Newsfile Corp. - December 13, 2024) - Spark Energy Minerals Inc. (CSE: SPRK) (OTC Pink: SPARF) (FSE: 8PC) ("Spark" or the "Company") an exploration Company focused on the discovery of battery metals in Brazil's prestigious Lithium Valley, is pleased to provide an update from the second week of exploration at the Company's 64,359-hectare Arapaima Lithium project located in Lithium Valley, Minas Gerais, Brazil.
不列顛哥倫比亞省溫哥華--(Newsfile CORP.,2024年12月13日)——專注於在巴西著名的鋰谷發現電池金屬的勘探公司Spark Energy Minerals Inc.(CSE:SPRK)(場外交易代碼:SPARF)(FSE:8PC)(「Spark」 或 「公司」)很高興提供該公司佔地64,359公頃的Arapaimaim勘探第二週的最新情況一個位於巴西米納斯吉拉斯州鋰谷的鋰項目。
Arapaima Lithium Project Exploration Highlights:
Arapaima 鋰項目勘探亮點:
- Recent work (Targets 1, 2 and 3) completed by teams 1 and 2 has identified two new pegmatite bearing corridors through a large erosional window in lateritic cover sequences both to the northeast and southeast of the ~1.7km corridor segment first identified in early December and adding an additional 5.5km of strike. (Figure 2).
- When combined with these new corridors the total prospective targets in the north (now encompassing targets 1, 2 and 3) extends over ~7.2 km of strike and remains open.
- Geologically the areas can be described as saprolite comprising deeply weathered (kaolinized) - two mica granites with remnant quartz - black tourmaline aggregates hosting numerous pegmatite veins and dykes.
- The third team has recently focused on more regional traverses over the broad target areas 4 and 5 in the west-central sector of the tenement package.
- Work here continues to identify, map and sample various pegmatite exposures hosted by granite. Prominent structural trends that are coincident with geophysical responses including magnetic and radiometric signatures (especially thorium) are starting to appear as occurrence and sampling points begin to populate the geological maps.
- The first batch of nearly 100 samples (rock chip, stream sediment, channel and soil) is being prepared for submission to the accredited SGS laboratory in Belo Horizonte on the 15th of December with results expected to be reported by mid January.
- 由第一和第二組完成的最新工作(目標1、2和3)已經確定了兩條新的偉晶岩走廊,穿過紅土覆蓋層序列的大型侵蝕窗口,分別位於12月初首次確定的約1.7公里走廊段的東北和東南,並增加了5.5千米的走廊。(圖 2)。
- 當與這些新走廊結合使用時,北部的潛在目標總數(現在包括目標1、2和3)的攻擊距離超過7.2千米,並且保持開放狀態。
- 從地質學上講,這些區域可以描述爲腐生巖,包括深度風化(高嶺化)——兩塊帶有殘留石英的雲母花崗岩——含有大量偉晶礦脈和堤壩的黑碧璽聚集體。
- 第三個小組最近專注於在物業一攬子計劃中西部4和5的廣泛目標區域上進行更多區域穿越。
- 這裏的工作繼續識別、繪製和採樣由花崗岩承載的各種偉晶岩暴露情況。隨着發生點和採樣點開始填充地質圖,與包括磁和輻射特徵(尤其是釷)在內的地球物理反應相一致的突出結構趨勢開始出現。
- 第一批近100份樣本(岩屑、溪流沉積物、河道和土壤)正在準備中,將於12月15日提交給位於貝洛奧裏藏特的經認證的SGS實驗室,結果預計將在1月中旬公佈。
Figure 1: Figure showing location of geological data points and samples collected to date relative to the priority target areas over the Arapaima Lithium project tenements
圖 1:該圖顯示了迄今爲止在 Arapaima Lithium 項目礦權上方優先目標區域收集的地質數據點和樣本的位置
Spark's exploration continued with field reconnaissance mapping and sampling with two teams now focusing on further evaluation of and definition of extensions to the prominent, pegmatite corridor, recently identified (see PR dated December 3rd, 2024, here). The third team continued the more regional focused first pass reconnaissance mapping and stream sediment sampling. To date exploration has covered approximately 10-15% of Spark's extensive tenement package in the region defining five priority target areas. A total of 130 geological points have been described and 89 samples have been collected (Figure 1).
Spark的探索仍在繼續,進行了實地偵察測繪製圖和採樣,現在有兩個小組專注於進一步評估和定義最近確定的著名偉晶岩走廊的延伸部分(見2024年12月3日的公關,此處)。第三組繼續進行更有區域針對性的首次探測測繪製圖和溪流沉積物採樣。迄今爲止,勘探已經覆蓋了Spark在該地區的大量物業套餐的大約10-15%,確定了五個優先目標區域。共描述了130個地質點,收集了89個樣本(圖1)。
Figure 2: Recently identified and mapped pegmatite corridors with a combined strike extent of 7.2km in the northern half of the Arapaima Lithium project tenements
圖 2:最近在 Arapaima Lithium 項目物業單位北半部確定並繪製了總走向範圍爲 7.2 千米的偉晶岩走廊
Continued exploration in this important newly defined target area will focus on detailed mapping and sampling of the highly weathered pegmatite exposures with the aim of positively identifying potential lithium bearing minerals such as spodumene (ref 1 & 2) that have been previously cited in government reports. This provides the team with a challenge in this region where the tropical weathering processes is expected to have largely converted spodumene to smectite clay which at times may still exhibit pseudomorphs of the original crystalline form of spodumene but only retaining low levels of Lithium in sample analyses.
在這個新確定的重要目標區域的持續勘探將側重於對高度風化的偉晶岩暴露情況進行詳細測繪和採樣,目的是積極識別潛在的含鋰礦物,例如鋰輝石(參考文獻1和2),這些礦物先前曾在政府報告中被引用。這給研究小組在該地區帶來了挑戰,預計該地區的熱帶風化過程將在很大程度上將鋰輝石轉化爲蒙脫石粘土,這些粘土有時仍可能表現出鋰輝石原始晶體形式的僞晶體,但在樣本分析中只能保留低水平的鋰。
Jon Hill, Director of Spark Energy Minerals, commented: "Exploration findings to date have been particularly encouraging, the team has successfully identified and confirmed metasomatized two mica granites intruded by pegmatites in the initial priority areas targeted by the program, where they are exposed through regolith and tertiary cover. Importantly the team has been able to further delineate and extend the footprint of these occurrences over a significant, combined 7.2 km strike length to date. The presence of old excavations intercepting these pegmatites has been an important find from drone reconnaissance and these will be accessed for mapping and sampling once this is safe to do so. Geophysical data also strongly suggests extensions to the zone of interest beneath the cover is probable. Based on work completed over the past two weeks it now seems likely we have identified several potential source pegmatites for the lithium bearing minerals like spodumene and lepidolite reported by the government heavy mineral -stream sediment samples."
Spark Energy Minerals董事喬恩·希爾評論說:「迄今爲止的勘探發現特別令人鼓舞,該團隊成功地發現並證實了在該項目最初目標區域中被偉晶岩侵入的兩塊雲母花崗岩,在那裏它們通過風化巖和三級覆蓋物暴露在外。重要的是,迄今爲止,該小組得以進一步描繪和擴大這些事件的覆蓋範圍,總打擊長度爲7.2千米。攔截這些偉晶岩的舊挖掘是無人機偵察中發現的一個重要發現,一旦安全地進行測繪和採樣,就可以使用這些挖掘物進行測繪和採樣。地球物理數據還強烈表明,掩護下方的興趣區域很可能會延伸。根據過去兩週完成的工作,現在看來我們很可能已經爲政府重礦物溪流沉積物樣本報告的鋰輝石和鋰雲母等含鋰礦物確定了幾種潛在的偉晶岩來源。」
Target Generation Program: Planning remainder of exploration in December 2024
目標挖掘計劃:在 2024 年 12 月規劃剩餘的勘探工作
- Submit first sample batches to SGS Laboratory in Belo Horizonte
- Team 1 and 2 continue to map and sample the combined target comprising the three pegmatite trends (1, 2 and 3) with the aim of accessing the old workings identified by the drone overflight.
- Team 3 to evaluate extension of Si6 area into Spark tenement and commence traverses over the southern tenement blocks to determine an appropriate stream sampling strategy.
- 向位於貝洛奧裏藏特的 SGS 實驗室提交第一批樣品
- 第 1 和第 2 組繼續對包含三種偉晶岩趨勢(1、2 和 3)的組合目標進行測繪和採樣,目的是訪問無人機飛越時發現的舊工作場所。
- 第三組將評估將Si6區域擴展到Spark物業單位,並開始遍歷南部物業單位區塊,以確定適當的溪流採樣策略。
Eugene Hodgson, CEO of Spark Energy Minerals, stated: "The extension of our pegmatite corridor to 7.2km of strike at the Arapaima Lithium Project is a significant milestone for Spark Energy. The identification of these new targets, reinforces our belief in the project's potential within Brazil's Lithium Valley. Our exploration teams have made remarkable progress in a short time, and we're excited about the prospects these findings."
Spark Energy Minerals首席執行官尤金·霍奇森表示:「我們的偉晶岩走廊延伸至阿拉派瑪鋰項目的7.2千米的罷工距離是Spark Energy的一個重要里程碑。這些新目標的確定增強了我們對該項目在巴西鋰谷內潛力的信念。我們的勘探團隊在短時間內取得了顯著進展,我們對這些發現的前景感到興奮。」
Extension of Marketing Agreement
延長營銷協議
Additionally, Spark announces that it has extended its previously announced (see the Company's August 8, 2024, news release) engagement with bullVestor Medien GmbH ("bullVestor") and its General Manager, Helmut Pollinger, to provide certain strategic planning services to the Company, which services may include investor relations activities within the meaning of applicable securities laws and the policies of the Canadian Securities Exchange.
此外,Spark宣佈延長了先前宣佈的(見公司2024年8月8日的新聞稿)與BullveStor Medien GmbH(「BullveStor」)及其總經理赫爾穆特·波林格的合作,向公司提供某些戰略規劃服務,這些服務可能包括適用證券法和加拿大證券交易所政策所指的投資者關係活動。
The Company has extended the engagement with bullVestor for an additional term of three months ending on April 30, 2025, in consideration for the Company making a cash payment of $200,000. bullVestor and its principal are at arm's length to the Company and, to the knowledge of the Company, bullVestor does not own, control, or direct any securities of the Company. (bullVestor Medien GmbH; Address: Gutenhofen 4 - 4300 St. Valentin; Email: kontakt@bullvestor.at; Tel: +43 (0) 7435-44077)
該公司已將與BullveStor的合作再延長三個月,截至2025年4月30日,以換取該公司支付20萬美元的現金。BullveStor及其本金與公司保持一定距離,據公司所知,BullveStor不擁有、控制或指導公司的任何證券。(Bullvestor Medien GmbH;地址:Gutenhofen 4-4300 聖瓦倫丁;電子郵件:kontakt@bullvestor.at;電話:+43 (0) 7435-44077)
Qualified Person:
合格人員:
The scientific and technical information disclosed in this document has been reviewed and approved by Jonathan Victor Hill BSc Hons, FAUSIMM, a Qualified Person consistent with NI 43-101.
本文件中披露的科學和技術信息已獲得喬納森·維克多·希爾榮譽理學士學位、FausIMM的審查和批准,他是一名符合NI 43-101的合格人士。
- Source: ''Evaluation of the Lithium Potential in Brasil`` - Mid - Jequitinhonha River, North -East Minas Gerais`` ministry of Mines and Energy, Secretary of Geology, Mines and Development, the Geological Survey of Brazil promoting mineral research. Technical Report - 2016
- Source: ''Lithium Potential Assessment Project in Brasil`` in the Eastern Pegmatite Province of Brasil: the Geological Survey of Brazil promoting mineral research. Technical Report 19 - August 2023 DOI: 10.29396/ITCPRM.2023.19
- 來源:「巴西鋰潛力評估」 ——中部——米納斯吉拉斯州東北部的熱基蒂尼奧尼亞河中部—— “礦業和能源部,地質、礦業與發展部長,促進礦產研究的巴西地質調查局。技術報告-2016
- 來源:巴西東部偉晶岩省的 「巴西鋰潛力評估項目:促進礦物研究的巴西地質調查局」。技術報告 19-2023 年 8 月 DOI: 10.29396/itcprm.2023.19
About Spark Energy Minerals Inc.
Spark 能源礦業公司簡介
Spark Energy Minerals, Inc. is a Canadian company focused on the acquisition, exploration, and development of battery metals and mineral assets, with a particular emphasis on its substantial interests in Brazil. The Company's flagship project is the Arapaima Lithium project spanning 64,359 hectares in Brazil's renowned Lithium Valley, one of the most prolific mining regions in the world. This region is rapidly gaining global recognition for its vast deposits of lithium and rare earth minerals, positioning Brazil as a critical player in the global energy transition.
Spark Energy Minerals, Inc. 是一家加拿大公司,專注於收購、勘探和開發電池金屬和礦產資產,特別強調其在巴西的重大權益。該公司的旗艦項目是Arapaima鋰項目,佔地64,359公頃,位於巴西著名的鋰谷,是世界上最多產的礦區之一。該地區因其龐大的鋰和稀土礦物儲量迅速獲得全球認可,這使巴西成爲全球能源轉型的關鍵參與者。
Neither the Canadian Securities Exchange nor its Regulation Services Provider (as that term is defined in the policies of the Canadian Securities Exchange) accepts responsibility for the adequacy or accuracy of this release.
加拿大證券交易所及其監管服務提供商(該術語在加拿大證券交易所的政策中定義)均不對本新聞稿的充分性或準確性承擔責任。
FOR ADDITIONAL INFORMATION, SEE THE COMPANY'S WEBSITE AT
Email to info@sparkenergyminerals.com
Contact: Eugene Hodgson, CEO, Tel. +1-778-744-0742
欲了解更多信息,請訪問該公司的網站
發送電子郵件至 info@sparkenergyminerals.com
聯繫人:首席執行官尤金·霍奇森,電話:+1-778-744-0742
Forward-Looking Statement Disclaimer
前瞻性聲明免責聲明
Certain statements contained in this release may constitute "forward-looking statements" or "forward-looking information" (collectively "forward-looking information") as those terms are used in the Private Securities Litigation Reform Act of 1995 and similar Canadian laws. These statements relate to future events or future performance. The use of any of the words "could," "intend," "expect," "believe," "will," "projected," "estimated", "anticipates" and similar expressions and statements relating to matters that are not historical facts are intended to identify forward-looking information and are based on the Company's current belief or assumptions as to the outcome and timing of such future events. Actual future results may differ materially. In particular, this release contains forward-looking information relating to the business of the Company, the Property, financing and certain corporate changes. The forward-looking information contained in this release is made as of the date hereof, and the Company is not obligated to update or revise any forward-looking information, whether as a result of new information, future events or otherwise, except as required by applicable securities laws.
本新聞稿中包含的某些陳述可能構成 「前瞻性陳述」 或 「前瞻性信息」(統稱爲 「前瞻性信息」),因爲這些術語在1995年《私人證券訴訟改革法》和類似的加拿大法律中使用。這些陳述與未來事件或未來表現有關。使用任何 「可能」、「打算」、「期望」、「相信」、「預計」、「估計」、「預期」 等詞語以及與非歷史事實相關的類似表述和陳述均旨在識別前瞻性信息,並基於公司目前對此類未來事件的結果和時間的看法或假設。未來的實際結果可能存在重大差異。特別是,本新聞稿包含與公司業務、房地產、融資和某些公司變更有關的前瞻性信息。本新聞稿中包含的前瞻性信息是截至本新聞稿發佈之日發佈的,除非適用的證券法要求,否則公司沒有義務更新或修改任何前瞻性信息,無論是由於新信息、未來事件還是其他原因。
譯文內容由第三人軟體翻譯。