Yinson Secures RM265 Million Financing For Peru Solar Project
Yinson Secures RM265 Million Financing For Peru Solar Project

Yinson Renewables has secured an RM265 million (USD 59 million) senior secured green financing for the Matarani Solar Project in Peru with IDB Invest and Natixis Corporate & Investment Banking ("Natixis CIB"). Natixis CIB acted as Sole Structuring Bank, Green Loan Coordinator, and Joint Lead Arranger alongside IDB Invest.
Yinson Renewables已與IDb Invest和Natixis Corporate&Investment Banking(「Natixis CIB」)爲秘魯Matarani太陽能項目獲得了26500萬令吉(5900萬美元)的高級綠色融資。Natixis CIB擔任唯一的結構銀行、綠色貸款協調員,以及與IDb Invest一起作爲聯合牽頭安排人。
The project is a milestone in Peru's energy sector, as it is the first non-subsidised operational solar plant to be financed through a green project finance facility, structured in line with the Green Loan Principles (2023).
該項目是秘魯能源板塊的里程碑,因爲它是第一個通過綠色項目融資設施融資的非補貼運營太陽能電站,符合綠色貸款原則(2023年)。
The 97 MWp Matarani Solar Plant, located near Arequipa, Peru, is backed by a long-term Power Purchase Agreement (PPA) with Orygen, Peru's leading renewable energy supplier and generator.
位於秘魯阿雷基帕附近的97兆瓦Matarani太陽能電廠由秘魯領先的可再生能源供應商和發電機Orygen提供長期的電力購買協議(PPA)支持。
James Scriven, Chief Executive Officer of IDB Invest commented, "We are pleased to support Yinson Renewables ́ first project in the region. This financing is key to Peru's energy transition to renewable sources."
IDb Invest首席執行官James Scriven評論說:「我們很高興支持Yinson Renewables在該地區的第一個項目。這項融資對秘魯的能源轉向可再生能源至關重要。」
Yinson Renewables acquired the project from Grenergy Renewables in January 2024. Grenergy provided a full turnkey EPC contract for the construction of the project and is also providing operation and maintenance services for the first two years.
Yinson Renewables於2024年1月從Grenergy Renewables收購了該項目。Grenergy提供了施工項目的全面交鑰匙EPC合同,並在前兩年提供運營和維護服務。
譯文內容由第三人軟體翻譯。