share_log

Eloro Resources Intersects 66.90g Ag/t, 0.63% Zn, 0.42% Pb and 0.11% Sn (111.14g Ag Eq/t) Over 289.13m in First Hole of Definition Drilling at the Iska Iska Project, Potosi Department, Southwestern Bolivia

Eloro Resources Intersects 66.90g Ag/t, 0.63% Zn, 0.42% Pb and 0.11% Sn (111.14g Ag Eq/t) Over 289.13m in First Hole of Definition Drilling at the Iska Iska Project, Potosi Department, Southwestern Bolivia

Eloro Resources在波托西省伊斯卡伊斯卡项目的首眼定义钻井中遇到66.90克每吨的银、0.63%的锌、0.42%的铅和0.11%的锡(相当于111.14克每吨的银),共计28913万长度。
GlobeNewswire ·  2024/11/26 20:00
  • Intersection in hole DSB-68 above also includes higher grade intervals of:
    • 126.10g Ag/t, 0.55% Zn, 0.60% Pb and 0.09% Sn (160.72g Ag eq/t) over 122.03m,
    • 47.61g Ag/t, 0.22% Zn, 0.40% Pb and 0.45% Sn (146.06g Ag eq/t) over 16.51m, and
    • 25.52g Ag/t, 2.19% Zn, 0.65% Pb and 0.10% Sn (129.60g Ag eq/t) over 7.46m
  • The high grade mineralization is associated with a prominent intrusion breccia body that is widening at depth over a vertical interval of over 500m and likely extends much further to the south. This breccia body is likely a major feeder for mineralization.
  • DSb-68孔中的交集还包括高品位区间:
    • 126.10g 白银/t, 0.55% Zn, 0.60% 市净率 和 0.09% Sn (160.72g 白银当量/t) 过 12203万,
    • 47.61g 白银/t, 0.22% Zn, 0.40% 市净率 和 0.45% Sn (146.06g 白银当量/t) 过 1651万,以及
    • 25.52g 白银/t, 2.19% Zn, 0.65% 市净率 和 0.10% Sn (129.60g 白银当量/t) 过 7.46m
  • 高品位的矿化与一个显著的侵入角砾岩体相联系,该岩体在深度上在超过50000万的垂直区间内逐渐变宽,并且可能进一步向南延伸。这个角砾岩体可能是矿化的重要供给源。
  • Geophysical data indicates that there is a prominent northwest trending structural corridor 500m wide that extends from the Santa Barbara area southeastwards for at least 2km. Within the Santa Barbara High Grade Corridor, a strong spatial correlation is evident between the high-grade intersections in the intrusion breccia and areas of higher chargeability.
  • This hole is the first of a strategic infill program in the potential starter pit area at Santa Barbara to better define the vertical and lateral extent of high-grade Ag mineralization; fill-in gaps that are presently categorized as low-grade or waste in the mineral resource model but are very likely mineralized; expand the higher-grade Sn mineralization to the west; and complete two large size PQ holes for further metallurgical testing (see Eloro press release of September 4, 2024).
  • 地球物理数据显示,有一个显著的西北趋势结构走廊,宽50000万,从圣巴巴拉地区向东南延伸至少2公里。在圣巴巴拉高品位走廊内,高品位交汇点与高可充电区域之间存在明显的空间相关性。
  • 这个孔是圣巴巴拉潜在开采区战略填充方案的第一个孔,旨在更好地界定高品位白银矿化的垂直和水平范围;填补目前在矿产资源模型中被归类为低品位或废石的空白,但很可能是矿化的;将高品位锡矿化向西扩展;并完成两个大型PQ孔以进行进一步的冶金测试(请参阅Eloro于2024年9月4日的新闻稿)。

TORONTO, Nov. 26, 2024 (GLOBE NEWSWIRE) -- Eloro Resources Ltd. (TSX: ELO; OTCQX: ELRRF; FSE: P2QM) ("Eloro", or the "Company") is pleased to announce the initial assay results in its definition diamond drilling program in the potential Santa Barbara starter pit area in the Iska Iska silver-tin polymetallic project in the Potosi Department of southwestern Bolivia. To date 2,561.9m of diamond drilling have been completed in six (6) holes including two (2) holes in progress. PQ core size has been used for all holes in this program to obtain larger, more representative core samples.

多伦多,2024年11月26日(全球新闻)-- Eloro Resources Ltd.(tsx: ELO; otcqx: ELRRF; FSE: P2QM)(“Eloro”或“公司”)很高兴地宣布在位于玻利维亚西南部的伊斯卡伊斯卡银锡多金属项目中,潜在的圣巴巴拉开采区进行的初步钻探结果。截至目前,已在六(6)个孔中完成了256190万的金刚石钻探,包括两个(2)个正在进行的孔。该计划中所有孔都采用PQ核心尺寸,以获得更大、更加具有代表性的核心样本。

Table 1 below lists significant results for the first hole DSB-68. Figure 1 shows locations of all the definition drill holes completed to date and in progress. Silver equivalent values (g Ag eq/t) have been calculated using 3-year average metal prices and preliminary metallurgical recoveries (see note below Table 1 for more information). Table 2 lists the coordinates of the definition drill holes completed and in progress.

下面的表1列出了DSb-68孔的显著结果。图1显示了迄今为止完成和正在进行的所有定义钻孔的位置。白银当量值(克Ag当量/吨)是使用三年平均金属价格和初步选矿回收率计算得出的(有关更多信息,请参见表1下方的注释)。表2列出了已完成和正在进行的定义钻孔的坐标。

Hole DSB-68 returned a long intersection from near surface grading 66.90g Ag/t, 0.63% Zn, 0.42% Pb and 0.11% Sn (111.14g Ag eq/t) over 289.13m from 41.0m to 330.13m. This intersection includes higher grade intervals of:

DSb-68孔返回了近表面长距离交叉,品位为66.90克Ag/吨,0.63%锌,0.42%铅和0.11%锡(111.14克Ag当量/吨),深度为28913万,从4100万到33013万。这次交叉包含更高品位的区间:

  • 126.10g Ag/t, 0.55% Zn, 0.60% Pb and 0.09% Sn (160.72g Ag eq/t) over 122.03m from 57.52m to 179.55m,
  • 47.61g Ag/t, 0.22% Zn, 0.40% Pb and 0.45% Sn (146.06g Ag eq/t) over 16.51m from 193.20m to 209.71m, and
  • 25.52g Ag/t, 2.19% Zn, 0.65% Pb and 0.10% Sn (129.60g Ag eq/t) over 7.46m from 235.33m to 242.79m
  • 126.10克Ag/吨,0.55%锌,0.60%铅和0.09%锡(160.72克Ag当量/吨),深度为12203万,从5752万到17955万,
  • 47.61克Ag/吨,0.22%锌,0.40%铅和0.45%锡(146.06克Ag当量/吨),深度为1651万,从19320万到20971万,以及
  • 25.52克Ag/吨,2.19%锌,0.65%铅和0.10%锡(129.60克Ag当量/吨),深度为746万,从23533万到242.79米

The high grade mineralization is associated with a prominent intrusion breccia body which is shown in cross section in Figure 2 and in plan in Figure 3. This unit which is characterized by angular fragments of principally dacite in a matrix with sulphides, is approximately 200m wide and is becoming much thicker at depth.

高品位矿化与一个显著的侵入角砾岩体相关,该岩体在图2中的截面和图3中的平面图中显示。该单元以角状岩屑为特征,主要由流纹岩构成,并含有硫化物,宽度约为20000万,并在深处变得更厚。

The average grade of 66.90 g Ag/t over 289.13m, including 126.10g Ag/t over 122.03m, obtained in Hole DSB-68 demonstrates potential significant underestimation of the silver grade, similar to that of previously reported metallurgical test results from a 6.3 tonne bulk sample which returned a much higher silver head grade of 91 g Ag/t, compared with the 31 g Ag/t average grade from the original twinned holes (see Eloro press release of January 23, 2024). Further infill drilling with larger diameter drill holes has the potential to significantly increase the overall silver grade in the likely starter pit area.

在28913万的平均品位为66.90克银/吨(包括在孔DSb-68中12203万的126.10克银/吨)显示出白银品位可能被严重低估,类似于之前报道的来自于6.3吨散装样品的冶金检测结果,其返回的银头品位为91克银/吨,相比之下,原始双孔的平均品位为31克银/吨(见Eloro于2024年1月23日的新闻稿)。进一步用更大直径的钻孔进行填充钻探,有潜力显著提高可能的起始露天矿区的总体白银品位。

Dr. Osvaldo Arce, P.Geo., Eloro's Executive Vice President, Latin America and General Manager of Eloro's Bolivian subsidiary, Minera Tupiza S.R.L., who is a recognized expert on Bolivian mineral deposits said: "The on-going definition diamond drilling at the Santa Barbara zone confirms the occurrence of large high-grade mineralized shoots. It corroborates that systematic, more tightly spaced infill drilling at Iska Iska can produce very positive results that could significantly enhance the mineral resources."

厄尔罗的拉丁美洲执行副总裁兼厄尔罗玻利维亚子公司Minera Tupiza S.R.L.的总经理Osvaldo Arce博士表示:"圣巴巴拉区域正在进行的定义钻探证实了大规模高品位矿化脉的存在。这证实了在Iska Iska进行系统性更密集的填充钻探可以产生非常积极的结果,从而显著增强矿产资源。"

Dr. Arce continued: "The breccia pipes host much of the high grade silver-tin values, as well as Zn polymetallic bodies in the deposit. They are likely the main feeders of the mineralization at Iska Iska. The breccia bodies intersected in the upper zones are widening at depth over a vertical interval of over 500m. Mineralization occurs both within and outside these breccia bodies, emphasizing their importance as feeders. Zoning is evident in the mineralization with silver-rich zinc-lead near surface with silver-tin mineralization deeper down, especially to the west and northwest, while epithermal zinc-silver-lead mineralization is peripheral to this breccia unit hosted in dacites particularly to the southeast. This "zoning" model in the Bolivian Tin Belt is similar to that seen in the "giant" massive silver/tin deposits at Cerro Rico (Ag-Sn) and Oruro (Ag-Sn) as well at the major tin intrusive porphyry at Chorolque located 40 km to the north of Iska Iska."

阿尔塞博士继续说道:"角砾岩管大部分承载着高品位的银-锡价值,以及矿床中的锌多金属体。它们可能是Iska Iska矿化的主要供给源。上部区域交叉的角砾岩体在深度上扩大,垂直区间超过50000万。矿化发生在这些角砾岩体内外,强调了它们作为供给源的重要性。矿化的分层在银富锌-铅表层和银-锡矿化的深层尤其明显,特别是向西和西北方向,而热液锌-银-铅矿化则位于该角砾岩单元的周边,特别是在东南部分。玻利维亚锡带的这种“分层”模型与Cerro Rico(银-锡)和Oruro(银-锡)巨型块状银/锡矿床中看到的类似,此外还有位于Iska Iska北部40公里处的主要锡侵入型花岗岩Chorolque。"

Dr. Bill Pearson, P.Geo., Eloro's Executive Vice President, Exploration commented: "The geophysical data adds considerably to the overall geological picture. As shown in a plan of chargeability in Figure 3, there is a prominent northwest trending structural corridor 500m wide that extends from the Santa Barbara area southeastwards for at least 2km. Within the Santa Barbara High Grade Corridor, a strong spatial correlation is evident between the high-grade intersections in the intrusion breccia and higher chargeability. This link is emphasized by the drill results from DSB-68, shown in the section in Figure 4. The section location which is depicted in Figure 3 also shows the outline of the intrusion breccia. The chargeability anomaly at elevation 4000m, which is the potential southern extension of the breccia body, has not been drilled. The chargeability anomaly at the 3700m elevation in the southeast, which also has not yet been drilled, shows that the mineralized corridor continues at this level where future drill-testing will be helped by the lower topography in the valley of the caldera. Overall the chargeability shows that the intrusion breccia and the mineralized corridor are products of a very deep-seated and extensive magmatic processes during the evolution of the Iska Iska caldera complex."

比尔·培生博士,地质学家,Eloro公司的执行副总裁,勘探部负责人评论道:“地球物理数据显著补充了整体地质图景。如图3中所示的可充电性平面,存在一条显著的西北趋势结构走廊,宽度为50000万,从圣巴巴拉地区向东南延伸至少2公里。在圣巴巴拉高品位走廊内,侵入角砾岩中的高品位交叉点与较高的可充电性之间存在强烈的空间相关性。DSb-68的钻探结果强调了这一联系,如图4所示的切面所示。图3中显示的切面位置也展示了侵入角砾岩的轮廓。海拔400000万的可充电性异常,是角砾岩体潜在的南部延伸,尚未钻探。东南方370000万海拔的可充电性异常,尚未钻探,显示出矿化走廊在此高度继续,未来的钻探测试将在喷口山谷的低地形中得到帮助。总体而言,可充电性表明,侵入角砾岩和矿化走廊是Iska Iska火山口复杂演化过程中非常深层且广泛的岩浆过程的产物。”

Table 1: Definition Diamond Drill Results as of November 26, 2024, Santa Barbara Deposit, Iska, Iska

表1:截止2024年11月26日,圣巴巴拉存入资金的金刚石钻探结果,Iska,Iska

SANTA BARBARA DEFINITION DIAMOND DRILL RESULTS
Hole No.
From (m)
To (m)
Length (m)
Ag Zn Pb Sn Ag eq
g/t % % % g/t
DSB-68 13.63 28.95 15.32 9.52 0.01 0.48 0.22 61.26
41.00 330.13 289.13 66.90 0.63 0.42 0.11 111.14
Incl. 57.52 179.55 122.03 126.10 0.55 0.60 0.09 160.72
Incl. 193.20 209.71 16.51 47.61 0.22 0.40 0.45 146.06
Incl. 235.33 242.79 7.46 25.52 2.19 0.65 0.10 129.60
349.75 366.25 16.50 13.99 0.30 1.03 0.09 62.20
379.78 402.90 23.12 8.87 0.53 0.40 0.10 53.75
圣巴巴拉定义金刚石钻探结果
孔号。
起始深度(m)
终止深度(m)
长度(米)
Zn Pb Sn 银当量
克/吨 % % % 克/吨
DSb-68 13.63 28.95 15.32 9.52 0.01 0.48 0.22 61.26
41.00 330.13 289.13 66.90 0.63 0.42 0.11 111.14
0.31 57.52 179.55 122.03 126.10 0.55 0.60 0.09 160.72
0.31 193.20 209.71 16.51 47.61 0.22 0.40 0.45 146.06
0.31 235.33 242.79 7.46 25.52 2.19 0.65 0.10 129.60
349.75 366.25 16.50 13.99 0.30 1.03 0.09 62.20
379.78 402.90 23.12 8.87 0.53 0.40 0.10 53.75


Note:
True width is approximately 80% of core length. Silver equivalent (Ag eq) grades are calculated using 3-year average metal prices of Ag = US$24.14/oz, Zn = US$1.36/lb , Pb = 0.98/lb and Sn = US$13.74/lb, and preliminary metallurgical recoveries of Ag = 88%, Zn = 87%, Pb= 80% and Sn = 50%. In selecting intervals, a cutoff grade of 30 g Ag eq/t has been used. Lower grade material may be included in intersections where geological continuity is warranted.


注意:真实宽度大约是岩心长度的80%。银当量(Ag eq)等级是根据3年平均金属价格计算的,Ag = 24.14美元/盎司,Zn = 1.36美元/磅,Pb = 0.98美元/磅,Sn = 13.74美元/磅,以及初步冶金回收率:Ag = 88%,Zn = 87%,Pb = 80%和Sn = 50%。在选择区间时,采用了每吨30克Ag eq的截止品位。低品位材料可能会在地质连续性 warranted 的交叉中被包含。

Table 2: Summary of Diamond Drill Hole Coordinates for Drill Holes Reported, Completed and in Progress at Iska Iska as of November 26, 2024

表2:截至2024年11月26日,Iska Iska的钻孔坐标汇总,已报告、已完成和正在进行中的钻孔。

SUMMARY DIAMOND DRILLING ISKA ISKA
Hole No. Type Collar
Easting
Collar
Northing
Elev Azimuth Angle Hole Length
(m)
Santa Barbara Surface Definition Drill Holes Reported, In Progress and Planned
DSB-68 S 205390.0 7656251.0 4220.0 225° -50° 402.9
DSB-69 S 205262.0 7656133.0 4291.8 225° -85° 502.0
DSB-70 S 205460.0 7656319.0 4191.0 225° -50° 467.3
DSB-71 S 205203.0 7656016.0 4282.0 225° -85° 533.7
DSB-72 S 205088.0 7656107.0 4341.0 225° -85° 308.4*
DSB-73 S 205291.0 7656269.0 4273.0 225° -85° 347.6*
TOTAL 2561.9
*= holes in progress
S = Surface; collar coordinates in metres; azimuth and dip in degrees. Total drilling since start of the definition drilling program on October 4, 2024 is 2,561.9m in 6 holes with 2 holes in progress. Since the start of the drilling at Iska Iska on September 20, 2020, a total of 105,760m in 162 drill holes (34 underground holes and 128 surface holes) have been completed.
总结 金刚石 钻探 ISKA ISKA
孔号。 类型 区间
东方坐标
区间
北方
高程 方位角(度) 角度 孔长度
(m)
圣巴巴拉表面定义钻孔报告,进行中和计划中
DSb-68 S 205390.0 7656251.0 4220.0 225° -50° 402.9
DSb-69 S 205262.0 7656133.0 4291.8 225° -85° 502.0
DSb-70 S 205460.0 7656319.0 4191.0 225° -50° $
DSb-71 S 205203.0 7656016.0 4282.0 225° -85° 533.7
DSb-72 S 205088.0 7656107.0 4341.0 225° -85° 308.4*
DSb-73 S 205291.0 7656269.0 4273.0 225° -85° 347.6*
总计 2561.9
*= 正在进行的孔
S = 表面;孔口坐标以米为单位;方位角和倾角以度为单位。从2024年10月4日定义钻探计划开始至今,总共钻探256190万,6个孔中有2个孔正在进行中。自2020年9月20日在Iska Iska开始钻探以来,总共完成了10576000万的162个钻孔(34个地下孔和128个表面孔)。


Figure 1: Location Map of Definition Diamond Drill Holes, Santa Barbara, Iska Iska.


图1:圣巴巴拉地区钻探孔位置图,伊斯卡伊斯卡。

Figure 2: Southwest - Northeast Drill Hole Cross Section showing distribution of Intrusion Breccia which host much of the High Grade Ag-Sn mineralization in the potential starter pit area of Santa Barbara

图2:西南-东北钻探孔横截面显示了侵入角砾岩的分布,侵入角砾岩中蕴藏了圣巴巴拉潜在起始坑区的大部分高品位银-锡矿化。

Figure 3: Plan Map showing Major NW-SE Trending Mineralized Corridor, Distribution of Intrusion Breccia and Major Chargeability Anomalies, Iska Iska

图3:计划图显示主要的西北-东南走向矿化走廊、侵入角砾岩的分布以及主要的电性异常,伊斯卡伊斯卡。

Figure 4: Southwest - Northeast Cross Section Showing Strong Correlation between Intrusion Breccia and High Chargeability - g Ag eq/t values are shown in a histogram on drill hole DSB-68.

图4:西南-东北横截面显示了侵入角砾岩与高电性之间的强相关性,钻探孔DSb-68的银当量/吨值以直方图形式展示。

Qualified Person ("QP")

合格人("QP")。

Dr. Bill Pearson, P.Geo., Eloro's Executive Vice President, Exploration, and a Qualified Person ("QP") as defined by National Instrument ("NI") 43-101 has reviewed and approved the technical content of this news release. Dr. Pearson who has more than 50 years of worldwide mining exploration, development and production experience, including extensive work in South America, manages the overall technical program, working closely with Dr. Osvaldo Arce, P.Geo. Executive Vice President, Latin America for Eloro and General Manager of Eloro's Bolivian subsidiary, Minera Tupiza S.R.L., and a QP in the context of NI 43-101, who has supervised all field work carried out at Iska Iska.

比尔·培生博士,地质学家,Eloro的执行副总裁,勘探部,符合国家法规("NI") 43-101 定义的合格人员("QP"),已审查并批准本资讯稿的技术内容。培生博士在全球矿业勘探、开发和生产方面拥有超过50年的经验,包括在南美洲的广泛工作,负责整体技术项目,与Eloro拉丁美洲执行副总裁兼Eloro在玻利维亚子公司Minera Tupiza S.R.L.的总经理Osvaldo Arce博士紧密合作,Arce博士也是NI 43-101背景下的QP,监督在Iska Iska进行的所有现场工作。

IP/Res surveys were carried out by MES Geophysics using Eloro's ELREC-Pro 10 channel IP receiver and GDD 3600 watt IP transmitter. Dr. Chris Hale, P.Geo. and Mr. John Gilliatt, P.Geo. of Intelligent Exploration provided the survey design, preparation of the maps and interpretation of data processed, and quality reviewed by Mr. Rob McKeown, P. Geo. of MES Geophysics. Messrs. Hale, Gilliatt and McKeown are QPs as defined under NI 43-101 .

MES地球物理公司使用Eloro的ELREC-Pro 10通道IP接收器和GDD 3600瓦特IP发射器进行了IP/Res调查。克里斯·海尔博士,地质学家,和约翰·吉利特先生,地质学家,来自智能勘探公司,提供了调查设计、图纸准备和数据处理解释,并由MES地球物理公司的罗布·麦基翁先生,地质学家进行质量审查。海尔、吉利特和麦基翁先生是根据NI 43-101定义的QP。

Eloro utilized both ALS and AHK for drill core analyses, both of whom are major international accredited laboratories. Drill samples sent to ALS were prepared in both ALS Bolivia Ltda's preparation facility in Oruro, Bolivia and the preparation facility operated by AHK in Tupiza with pulps sent to the main ALS Global laboratory in Lima for analysis. Eloro employs an industry standard QA/QC program with standards, blanks and duplicates inserted into each batch of samples analyzed with selected check samples sent to a separate accredited laboratory.

Eloro利用ALS与AHk进行钻芯分析,这两家都是主要的国际认证实验室。发送到ALS的钻样本在ALS玻利维亚有限公司位于玻利维亚Oruro的准备设施以及由AHk在Tupiza运营的准备设施进行准备,后续样品被送往在利马的主ALS全球实验室进行分析。Eloro实施行业标准的质量保证/质量控制程序,在每批分析的样本中插入标准物、空白和重复样本,并将选定的检查样本发送到其他认证实验室。

Drill core samples sent to AHK Laboratories were prepared in a preparation facility installed and managed by AHK in Tupiza with pulps sent to the AHK laboratory in Lima, Peru. Check samples between ALS and AHK are regularly done as a QA/QC check. AHK is followed the same analytical protocols used as with ALS and with the same QA/QC protocols.

送往AHk实验室的钻探岩心样品是在AHk位于图皮萨的一个准备设施中准备的,样品浆液被送往位于秘鲁利马的AHk实验室。 ALS和AHk之间的检查样本定期进行,作为质量保证/质量控制检查。 AHk遵循与ALS相同的分析协议以及相同的质量保证/质量控制协议。

About Iska Iska

关于Iska Iska

The Iska Iska silver-tin polymetallic project is a road accessible, royalty-free property, wholly controlled by the Title Holder, Empresa Minera Villegas S.R.L. and is located 48 km north of Tupiza city, in the Sud Chichas Province of the Department of Potosi in southern Bolivia. Eloro has an option to earn a 100% interest in Iska Iska.

Iska Iska白银-锡多金属项目是一处道路可达、免版税的地产,完全由权利持有人Empresa Minera Villegas S.R.L控制,位于南美玻利维亚波托西省Sud Chichas省的图皮萨市以北48公里处。 Eloro有权获得Iska Iska的100%权益。

Iska Iska is a major silver-tin polymetallic porphyry-epithermal complex associated with a Miocene possibly collapsed/resurgent caldera, emplaced on Ordovician age rocks with major breccia pipes, dacitic domes and hydrothermal breccias. The caldera is 1.6km by 1.8km in dimension with a vertical extent of at least 1km. Mineralization age is similar to Cerro Rico de Potosí and other major deposits such as San Vicente, Chorolque, Tasna and Tatasi, all located along the same overall geological trend.

Iska Iska是一个主要的白银-锡多金属斑岩-浅成矿床,与可能已经崩塌/复兴的中新世火山口相关,镶嵌在奥陶纪岩石中,具有主要的角砾岩管、二长岩丘和热液角砾岩。火山口的尺寸为1.6公里乘1.8公里,垂直深度至少为1公里。矿化年代与波托西的塞罗里科和其他主要矿床如San Vicente、Chorolque、Tasna和Tatasi相似,所有这些矿床均位于相同的整体地质趋势上。

Eloro began underground diamond drilling from the Huayra Kasa underground workings at Iska Iska on September 13, 2020. On November 18, 2020, Eloro announced the discovery of a significant breccia pipe with extensive silver polymetallic mineralization just east of the Huayra Kasa underground workings and a high-grade gold-bismuth zone in the underground workings. On November 24, 2020, Eloro announced the discovery of the Santa Barbara Breccia Pipe (SBBP) approximately 150m southwest of the Huayra Kasa underground workings.

Eloro于2020年9月13日开始在Iska Iska的Huayra Kasa地下工作面进行地下金刚石钻探。2020年11月18日,Eloro宣布发现一个重要的碎裂管,位于Huayra Kasa地下工作面东部,具备广泛的白银多金属矿化,并在地下工作面发现了一个高品位的黄金-铋区。2020年11月24日,Eloro宣布发现了Santa Barbara碎裂管(SBBP),其位置约在Huayra Kasa地下工作面西南15000万处。

Subsequently, on January 26, 2021, Eloro announced significant results from the first drilling at the SBBP including the discovery hole from 0.0m to 257.5m. Subsequent drilling has confirmed the presence of significant values of Ag-Sn polymetallic mineralization in the SBBP and the adjacent Central Breccia Pipe (CBP). A substantive mineralized envelope which is open along strike and down-dip extends around both major breccia pipes. Continuous channel sampling along the walls of the of the Santa Barbara Adit located to the east of SBBP returned average grades of 164.96 g Ag/t, 0.46%Sn, 3.46% Pb and 0.14% Cu over 166m including 446 g Ag/t, 9.03% Pb and 1.16% Sn over 56.19m. The west end of the adit intersects the end of the SBBP.

随后,在2021年1月26日,Eloro宣布了SBBP首次钻探的显著结果,包括发现孔从0万到25750万。后续钻探确认了在SBBP及其相邻的中央碎裂管(CBP)中存在显著的银-锡多金属矿化。一个重要的矿化包络在两个主要碎裂管周围延伸,并在走向和下倾方向上开放。位于SBBP东侧的Santa Barbara走道沿壁连续取样平均品位为164.96克银/吨、0.46%锡、3.46%铅和0.14%铜,长度为16600万,其中包括5619万的取样返回446克银/吨、9.03%铅和1.16%锡。走道的西端与SBBP的末端相交。

Since the initial discovery hole DHK-15 which returned 29.53g Ag/t, 0.078g Au/t, 1.45%Zn, 0.59%Pb, 0.080%Cu and 0.056%Sn over 257.5m, Eloro has released a number of significant drill results in the SBBP and the surrounding mineralized envelope which, along with geophysical data, has defined an extensive target zone. On October 17, 2023, Eloro filed the NI 43-101 Technical Report outlining the initial inferred MRE for Iska Iska, prepared by independent consultantsMicon International Limited. The MRE was reported in two domains, the Polymetallic (Ag-Zn-Pb) Domain which is primarily in the east and south of the Santa Barbara deposit and the Tin (Sn-Ag-Pb) Domain which is primarily in the west and north.

自首次发现孔DHk-15以来,该孔返回29.53克银/吨、0.078克黄金/吨、1.45%锌、0.59%铅、0.080%铜和0.056%锡,长度为25750万,Eloro已公布多个SBBP及周边矿化包络的显著钻探结果,这些结果与地球物理数据结合,确定了一个广泛的目标区。2023年10月17日,Eloro提交了NI 43-101技术报告,概述了Iska Iska的初步推断矿产资源评估(MRE),该评估由独立顾问Micon International Limited编制。该MRE分为两个区域,多金属(银-锌-铅)区域主要位于Santa Barbara矿床的东部和南部,而锡(锡-银-铅)区域主要位于西部和北部。

The Polymetallic Domain is estimated to contain 560Mt at 13.8 g Ag/t, 0.73% Zn & 0.28% Pb at an NSR cutoff of US$9.20 for potential open pit and an NSR cutoff of US$34.40 for potential underground. The majority of the mineral resource is contained in the constraining pit which has a stripping ratio of 1:1. The Polymetallic Domain contains a higher-grade mineral resource at a NSR cutoff of $US25/t of 132 million tonnes at 1.11% Zn, 0.50% Pb and 24.3 g Ag/t which has a net NSR value of US$34.40/t which is 3.75 the estimated operating cost of US$9.20/t. The Tin Domain which is adjacent to the Polymetallic Domain and does not overlap, is estimated to contain a mineral resource of 110Mt at 0.12% Sn, 14.2 g Ag/t and 0.14% Pb but is very under drilled.

多金属区域的估计含量为560百万吨,银的品位为13.8克/吨,锌为0.73%,铅为0.28%,以潜在露天开采的NSR截止价为9.20美元和潜在地下开采的NSR截止价为34.40美元计算。大部分矿产资源包含在限制露天开采的矿坑中,剥离比率为1:1。多金属区域在NSR截止价为25美元/吨的条件下,含有更高品位的矿产资源,估计为13200万吨,锌为1.11%,铅为0.50%,银为24.3克/吨,净的NSR价值为34.40美元/吨,大约是估计的9.20美元/吨的运营成本的3.75倍。锡区域位于多金属区域旁边,未有重叠,视觉估计矿产资源为110百万吨,锡含量为0.12%,银含量为14.2克/吨,铅为0.14%,但钻探情况非常不足。

Results of the definition drill program which totalled 5,267.7m in 11 holes were reported on December 18, 2023 and January 11, 2024, respectively. Significant results included 279.22 g Ag/t, 0.47% Pb and 0.43% Sn (339.82g Ag eq/t) over 62.84m and 33.83 g Ag/t, 1.53% Zn, 0.93% Pb and 0.14% Sn (130.88g Ag eq/t) over 178.99m including 120.37 g Ag/t, 2.13% Zn, 1.57% Pb and 0.19% Sn in hole DSB-61; 57.62g Ag/t, 1.26% Zn, 0.94% Pb and 0.12% Sn (139.94g Ag eq/t) over 136.11min hole DSB-66 and 118.86g Ag/t, 0.35% Zn, 0.35% Pb and 0.15% Sn (152.29g Ag eq/t) over 81.28m in hole DSB-65. This latter intersection in hole DSB-65 included a very high-grade sample of 5,080g Ag/t, 0.12 g Au/t, 0.26% Zn, 1.34% Pb, 1.53% Cu and 1.27% Sn (4,746.46g Ag eq/t) over 1.46m.

定义钻探项目的结果总计526770万,涉及11个孔位,分别于2023年12月18日和2024年1月11日报告。显著结果包括6284万测得279.22克银/吨,0.47%市净率和0.43%锡(339.82克银当量/吨),以及测得17899万33.83克银/吨,1.53%锌,0.93%市净率和0.14%锡(130.88克银当量/吨),其中DSb-61孔位包括120.37克银/吨,2.13%锌,1.57%市净率和0.19%锡;DSb-66孔位测得57.62克银/吨,1.26%锌,0.94%市净率和0.12%锡(139.94克银当量/吨),以及DSb-65孔位测得118.86克银/吨,0.35%锌,0.35%市净率和0.15%锡(152.29克银当量/吨)。DSb-65孔位的这一交点包括一个非常高品位的样品,5,080克银/吨,0.12克黄金/吨,0.26%锌,1.34%市净率,1.53%铜和1.27%锡(4,746.46克银当量/吨),覆盖146万。

Metallurgical tests reported on January 23, 2024 from a 6.3 tonne PQ drill core bulk sample representative of the higher grade Polymetallic (Ag-Zn-Pb) Domain returned a significantly higher average silver value of 91 g Ag/t compared to the weighted average grade of the original twinned holes at 31 g Ag/t strongly suggesting that the average silver grade is likely significantly underreported in the original twinned holes due to the much smaller sample size.

2024年1月23日报告的冶金测试显示,6.3吨PQ钻芯大宗样品代表了更高品位的多金属(银-锌-铅)区,返回了显著高于原始双重孔位加权平均品位的91克银/吨,原始双重孔位的加权平均品位为31克银/吨,强烈表明原始双重孔位的平均银品位可能显著被低估,原因是样本数量较小。

On January 29, 2024, the Company reported that the new chargeability high outlined southeast of the MRE open pit by the expanded induced polarization (IP) survey indicates that the major mineralized structural corridor that is up to 800m wide extends a further 600m along strike to the southeast for an overall strike length of at least 2km. This new area has not been drilled.

2024年1月29日,公司报告显示,通过扩展的感应极化(IP)调查,MRE露天矿坑东南侧新勘测出的高电荷性区域表明,宽达80000万的主要矿化结构走廊向东南方向进一步延伸60000万,整体走向长度至少为2公里。该新区域尚未进行钻探。

The Company reported on July 30, 2024, that updated modelling of the potential starter pit area at Santa Barbara zone highlights the importance of completing additional drilling to better define the grade and extent of the mineral resource in this area. Areas with higher-grade resource typically have much better drilling density but holes outside the core potential pit area are too widely spaced to give an accurate estimate of grade.

公司在2024年7月30日的报告中提到,圣巴巴拉区潜在起始矿坑区域的更新建模突显了完成额外钻探以更好地定义该区域矿产资源品位和范围的重要性。资源品位较高的区域通常具有更好的钻探密度,但潜在矿坑核心区域外的孔位间距过大,无法准确估计品位。

On September 4, 2024, the Company announced the restart of definition drilling in the potential starter pit area at Santa Barbara. Previous drilling has shown that areas with high-grade mineralization typically have much better drilling density, whereas holes outside the core area are too widely spaced to give an accurate grade estimate. This increased drilling density is particularly important for defining the extent of the high-grade Ag-bearing and Sn-bearing structures, and for categorizing the mineral resources from inferred to indicated, which have a major influence on overall grade and resources that will contribute to the preliminary economic assessment ("PEA").

2024年9月4日,公司宣布在圣巴巴拉潜在的起始坑区重启定义钻探。之前的钻探显示,高品位矿化区域通常具有更好的钻探密度,而核心区域外的钻孔间距过大,无法提供准确的品位估算。这种增加的钻探密度对于定义高品位银矿和锡矿结构的范围至关重要,并将矿产资源从推断级别分类到指示级别,这对初步经济评估("PEA")的整体品位和资源有重要影响。

An initial program of 5,700m of diamond drilling in 13 holes in the Santa Barbara starter pit area is now in progress to better define the vertical and lateral extent of high-grade Ag mineralization; fill-in gaps that are presently categorized as low-grade or waste in the resource model but are very likely mineralized; expand the higher-grade Sn mineralization to the west; and complete an additional 1,400m in two large size PQ holes for further metallurgical testing.

当前在圣巴巴拉起始坑区进行的最初计划包括570000万的金刚石钻探,计划在13个钻孔中进行,以更好地定义高品位银矿的垂直和侧向范围;填补目前在资源模型中被分类为低品位或废石的空白,但很可能是矿化的;向西扩展更高品位的锡矿化;并完成额外的140000万用于两个大型PQ孔的进一步冶金测试。

About Eloro Resources Ltd.

关于Eloro Resources Ltd。

Eloro is an exploration and mine development company with a portfolio of gold and base-metal properties in Bolivia, Peru and Quebec. Eloro has an option to acquire a 100% interest in the highly prospective Iska Iska Property, which can be classified as a polymetallic epithermal-porphyry complex, a significant mineral deposit type in the Potosi Department, in southern Bolivia. A recent NI 43-101 Technical Report on Iska Iska, which was completed by Micon International Limited, is available on Eloro's website and under its filings on SEDAR. Iska Iska is a road-accessible, royalty-free property. Eloro also owns an 82% interest in the La Victoria Gold/Silver Project, located in the North-Central Mineral Belt of Peru some 50 km south of the Lagunas Norte Gold Mine and the La Arena Gold Mine.

Eloro是一家勘探与矿山开发公司,拥有位于玻利维亚、秘鲁和魁北克的黄金和基础金属矿产组合。Eloro拥有获取100%权益的选项,涉及极具前景的Iska Iska矿产,该矿可被归类为多金属热液-斑岩复合体,这是玻利维亚南部波托西省的一种重要矿床类型。最近关于Iska Iska的NI 43-101技术报告已由Micon国际有限公司完成,并可在Eloro的网站及其在SEDAR上的档案中获取。Iska Iska是一个便于通行且免版税的矿产。Eloro还拥有La Victoria黄金/白银项目82%的权益,该项目位于距Lagunas Norte金矿和La Arena金矿约50公里的秘鲁北中部矿带。

For further information please contact either Thomas G. Larsen, Chairman and CEO or Jorge Estepa, Vice-President at (416) 868-9168.

有关更多信息,请联系主席兼首席执行官托马斯·G·拉森(Thomas G. Larsen)或副总裁豪尔赫·埃斯特帕(Jorge Estepa),电话(416)868-9168。

Information in this news release may contain forward-looking information. Statements containing forward-looking information express, as at the date of this news release, the Company's plans, estimates, forecasts, projections, expectations, or beliefs as to future events or results and are believed to be reasonable based on information currently available to the Company. There can be no assurance that forward-looking statements will prove to be accurate. Actual results and future events could differ materially from those anticipated in such statements. Readers should not place undue reliance on forward-looking information.

本新闻稿中的信息可能包含前瞻性信息。包含前瞻性信息的陈述表达了公司对未来事件或结果的计划、估计、预测、投影、期望或信念,被认为是根据公司当前可得到的信息合理的。不能保证前瞻性陈述将证明是准确的。实际结果和未来事件可能会与预期的不同。读者不应过度依赖前瞻性信息。

Neither the TSX nor its Regulation Services Provider (as that term is defined in the policies of the TSX) accepts responsibility for the adequacy or accuracy of this release.

TSX或其监管服务提供者(如TSX政策中定义)对本发布的充分性或准确性不承担任何责任。

Photos accompanying this announcement are available at

此公告附带的照片可在以下链接中查看


译文内容由第三方软件翻译。


以上内容仅用作资讯或教育之目的,不构成与富途相关的任何投资建议。富途竭力但不能保证上述全部内容的真实性、准确性和原创性。
    抢沙发