share_log

Battery Mineral Resources Announces up to C$7 Million in Royalty Financing

Battery Mineral Resources Announces up to C$7 Million in Royalty Financing

電池礦產資源宣佈最多可達700萬加元的特許權融資
newsfile ·  11/25 21:00

Definitive Agreement Signed with Electric Royalties, Raising C$3.5 Million in Financing via Sale of Non-Dilutive Royalty on Its Punitaqui Copper Mine in Chile; Commitments Obtained from Additional Investors for up to an Incremental C$3.5 Million in Royalty Financing

與Electric Royalties簽署最終協議,通過在其智利Punitaqui銅礦銷售非稀釋性的Royalty,籌集了350萬加元的融資;額外投資者承諾最多增加350萬加元的Royalty融資

Vancouver, British Columbia--(Newsfile Corp. - November 25, 2024) - Battery Mineral Resources Corp. (TSXV: BMR) (OTCQB: BTRMF) ("Battery" or "BMR" or the "Company") is pleased to announce that the Company has entered into a definitive agreement with Electric Royalties Ltd. (TSXV: ELEC) (OTCQB: ELECF) ("Electric Royalties"), to sell a 0.75% Gross Revenue Royalty (the "GRR") on its producing Punitaqui copper mine in Chile (the "Project" or "Punitaqui") in exchange for cash consideration of C$3,500,000 (the "Electric Transaction").

溫哥華,不列顛哥倫比亞省 - (Newsfile corp. - 2024年11月25日) - 電池礦產公司(tsxv:BMR)(OTCQB:BTRMF)("電池"或"BMR"或"公司")很高興宣佈,公司已與Electric Royalties Ltd.(tsxv:ELEC)(OTCQB:ELECF)("Electric Royalties")簽訂最終協議,出售智利Punitaqui銅礦產的0.75%毛收入Royalty("GRR"),以現金形式獲得350萬加元的考慮("Electric交易")

The Company has also received indications of interest for up to an incremental C$3,500,000 in royalty financing via sale of an additional 0.75% GRR, which, if closed, would bring the total gross proceeds up to C$7,000,000 via the sale of an aggregate 1.50% GRR. Any incremental royalty financing would be expected to close before December 31, 2024 and, if consummated, will be announced in a subsequent news release by the Company.

公司還收到了最高達350萬加元的Royalty融資的興趣指示,通過銷售額外的0.75% GRR融資,如果達成,將通過出售總共1.50% GRR的款項獲得700萬加元的總毛收入。預計任何額外的Royalty融資將在2024年12月31日之前完成,如果達成,將由公司在隨後的新聞發佈中宣佈

Martin Kostuik, Chief Executive Officer, stated, "This additional capital will enable Battery to further increase fresh mine feed production and milling at the Punitaqui project, as well as accelerate mining activities by establishing access to the mineralized zones at Cinabrio and San Andres and driving access towards Cinabrio Norte. Since the restart of mining and milling last May, the timeline from first fresh mine feed through the mill to full planned mill capacity is expected to take approximately nine months, reaching a run rate of approximately 90,000 tonnes per month of fresh and third party mill feed. We are working towards a full annual copper production rate at Punitaqui in the range of 19 million to 23 million pounds of copper in concentrate."

首席執行官馬丁·科斯圖伊克表示:"這筆額外的資本將使電池有望進一步增加Punitaqui項目的新鮮礦石生產和磨礦,加速採礦活動,建立進入Cinabrio和聖安德烈礦化區域並朝着Cinabrio Norte走向的通道。自從去年5月重新啓動開採和磨礦以來,預計從首次新鮮礦石饋入磨機到達到全面規劃的磨機容量大約需要九個月的時間,達到約每個月新鮮礦石和第三方磨礦料的運行速度約9萬噸。我們的目標是使Punitaqui的全年銅生產率達到每1900萬到2300萬磅的濃縮銅的區間"

Max Satel, Chief Financial Officer, added, "The sale of a modest GRR on the Punitaqui project represents a creative and non-dilutive form of financing, continuing our track record of preserving shareholder value during the challenging equity market conditions currently faced by mining companies."

首席財務官馬克斯·薩特爾補充道:"在Punitaqui項目上出售一筆適度的GRR代表了一種創新且非稀釋性的融資形式,延續了我們在目前礦業公司面臨的有挑戰性的股權市場條件下保持股東價值的記錄"

Transaction Terms with Electric Royalties

與Electric Royalties的交易條款

Upon payment of total consideration of C$3,500,000 in cash, Electric Royalties will acquire a 0.75% GRR on the mining claims, mining leases and mineral tenures comprising the Project. In addition, the 0.75% GRR will apply to any third-party ore or other materials processed through the Punitaqui mill from the effective date of the definitive agreement, to December 31, 2027. C$3,050,000 of the purchase price for the 0.75% GRR is payable on closing of the Transaction, and the remaining C$450,000 is payable within 45 days of closing.

支付總價值爲C$3,500,000現金後,Electric Royalties將在項目涵蓋的採礦權、採礦租賃和礦業特許權上獲得0.75%的毛收入減除權(GRR)。此外,0.75%的GRR將應用於自確定性協議的生效日期起,至2027年12月31日之間通過Punitaqui磨礦廠處理的任何第三方礦石或其他材料。購買0.75%的GRR價值爲C$3,050,000將在交易完成時支付,剩餘的C$450,000將在交易完成後45天內支付。

Battery will have the right to buy back one-half of the 0.75% GRR (i.e., buy-down the GRR to 0.375%) sold to Electric Royalties for a cash payment of US$1,500,000 from the date on which the Company has made royalty payments to Electric Royalties in excess of C$4,000,000.

Battery將有權在公司向Electric Royalties支付超過C$4,000,000的版稅之後的時間內,以美元$1,500,000現金支付,回購已售給Electric Royalties的0.75%的GRR的一半(即,減少GRR至0.375%)。

Copies of the Electric Transaction documents will be filed on the Company's SEDAR+ profile at .

Electric Transaction文件的副本將在公司的SEDAR+資料檔案中提交。

Closing Timeline and Conditions

交易的結束時間表和條件

The Electric Transaction is expected to close in November 2024. The Other Investor Transaction, if consummated, is expected to close in December 2024.

預計Electric Transaction將於2024年11月結束。如果完成,其他投資者交易預計將於2024年12月結束。

The Electric Transaction is an arm's length transaction and no finder's fees are payable in connection with the Transaction. The Company will pay an advisory fee to an arm's-length corporate finance advisor equal to 2.25% of the gross proceeds of the Electric Transaction. Completion of the transactions disclosed herein remains subject to a number of conditions, including: the receipt of any required regulatory and TSX Venture Exchange approvals; and other customary closing conditions.

Electric Transaction是一項長臂交易,與交易無關的費用不應支付。公司將向一家長臂企業財務顧問支付一筆諮詢費,等額於Electric Transaction的總交易款的2.25%。此處披露的交易完成仍需滿足多項條件,包括:獲得任何必要的監管和TSX Venture Exchange批准;以及其他慣例的交易結束條件。

About Battery Mineral Resources Corp.

關於電池礦產資源公司。

Battery Mineral Resources' mission is to build a mid-tier copper producer and has recently initiated mine and mill operations at the Punitaqui Mining Complex, a historic copper-gold-silver producer, in the Coquimbo region of Chile. The Company's portfolio also consists of two cobalt assets and one lithium asset located in North America and two graphite assets in South Korea. The Company is focused on providing shareholders accretive exposure to copper and the global mega-trend of electrification while being focused on growth through cash-flow, exploration, and acquisitions in favorable mining jurisdictions.

Battery Mineral Resources的使命是打造中型銅生產商,最近在智利Coquimbo地區的Punitaqui礦業綜合體啓動了礦山和磨坊運營,這是一個歷史悠久的銅-金-銀生產商。該公司的投資組合還包括兩個位於北美的鈷資產和一個鋰資產,以及兩個位於韓國的石墨資產。公司專注於爲股東提供對銅和全球電氣化巨大趨勢的增值曝光,同時專注於通過在有利的礦業管轄區進行現金流、探索和收購來實現增長。

For more information about Battery Minerals, please visit our website at, or email us at info@bmrcorp.com.

有關Battery Minerals的更多信息,請訪問我們的網站或發送電子郵件至info@bmrcorp.com。

For more information, please contact:

有關更多信息,請聯繫:

Martin Kostuik, CEO
Phone: +1 (604) 628-1110

馬丁·科斯圖克(Martin Kostuik),首席執行官
電話:+1(604)628-1110

Twitter: @BMRcorp_
Facebook: Battery Mineral Resources Corp. | Facebook
LinkedIn: Battery Mineral Resources Corp.: My Company | LinkedIn

Twitter: @BMRcorp_
Facebook:Battery Mineral Resources Corp. | Facebook
LinkedIn:Battery Mineral Resources Corp.:My Company | LinkedIn

Neither the TSXV nor its Regulation Services Provider (as that term is defined in the policies of the TSXV) accepts responsibility for the adequacy or accuracy of this press release.

TSXV及其監管服務提供商(如TSXV政策中所定義的那樣)不接受本新聞稿的充分性或準確性。

Forward Looking Statements

前瞻性聲明

This news release includes certain "forward-looking statements" under applicable securities laws, including without limitation statements relating to the closing of the Electric Transaction and the Other Investor Transaction and the satisfaction of any required conditions to closing, statements regarding anticipated production timing and capacity and statements regarding the anticipated use of proceeds of the Transaction. There can be no assurance that such statements will prove to be accurate, and actual results and future events could differ materially from those anticipated in such statements. Forward-looking statements reflect the beliefs, opinions and projections of the Company on the date the statements are made and are based upon a number of assumptions and estimates that, while considered reasonable by the Company, are inherently subject to significant business, economic, competitive, political and social uncertainties and contingencies. Many factors, both known and unknown, could cause actual results, performance, or achievements to be materially different from the results, performance or achievements that are or may be expressed or implied by such forward-looking statements and the parties have made assumptions and estimates based on or related to many of these factors. Such factors include, without limitation, the ability of the Company to satisfy the closing conditions to the Electric Transaction and the Other Investor Transaction, the ability of the Company to obtain regulatory consent for the Electric Transaction and the Other Investor Transaction, the ability of the Company to obtain sufficient financing to complete exploration and development activities, risks related to share price and market conditions, the inherent risks involved in the mining, exploration and development of mineral properties, the ability of the Company to meet its anticipated development and production schedule, government regulation and fluctuating metal prices. Accordingly, readers should not place undue reliance on forward-looking statements. BMR undertakes no obligation to update publicly or otherwise revise any forward-looking statements contained herein, whether as a result of new information or future events or otherwise, except as may be required by law. For further information regarding the risks please refer to the risk factors discussed in BMR's most recent Management Discussion and Analysis filed on SEDAR+ at .

本新聞稿包含根據適用證券法的某些"前瞻性聲明",包括但不限於與Electric交易和其他投資者交易的結束以及任何必要關閉條件的滿足相關的聲明,有關預期生產時間和能力的聲明,以及有關交易所籌款用途的聲明。不能保證這些聲明會被證明準確,實際結果和未來事件可能會與這些聲明中預期的結果大不相同。前瞻性聲明反映了公司在聲明發布日期對公司的信仰、意見和預測,這些聲明基於公司認爲合理的多個假設和估計,但本質上受到重大業務、經濟、競爭、政治和社會不確定性和不確定因素的影響。許多已知和未知的因素可能導致實際結果、績效或成就與這些前瞻性聲明所表達或暗示的結果、績效或成就有實質不同,雙方已根據或與許多這些因素相關的因素做出了假設和估計。這些因素包括但不限於公司能否滿足Electric交易和其他投資者交易的關閉條件、公司是否能夠獲得Electric交易和其他投資者交易的監管機構同意、公司能否獲得足夠的融資完成勘探和開發活動、與股價和市場狀況相關的風險、開採、勘探和礦產開發的固有風險、公司能否按照預期的發展和生產進度、政府監管和金屬價格的波動。因此,讀者不應過於依賴前瞻性聲明。BMR將不承諾公開更新或以其他方式修訂此處包含的任何前瞻性聲明,除非依法要求。有關風險的進一步信息,請參考BMR在SEDAR+上提交的最新管理討論與分析中討論的風險因素。

NOT FOR DISTRIBUTION TO UNITED STATES NEWSWIRE SERVICES OR FOR DISSEMINATION IN THE UNITED STATES

不得向美國新聞社發佈此新聞稿或在美國傳播。

譯文內容由第三人軟體翻譯。


以上內容僅用作資訊或教育之目的,不構成與富途相關的任何投資建議。富途竭力但無法保證上述全部內容的真實性、準確性和原創性。
    搶先評論