Dakota Gold Announced Results From Fifteen Drill Holes From The Ongoing Infill And Step-out Drill Program To Expand The Maiden Resource At The Richmond Hill Gold Project, The Results From The Drill Program Will Be Incorporated Into An Updated S-K 1300...
Dakota Gold Announced Results From Fifteen Drill Holes From The Ongoing Infill And Step-out Drill Program To Expand The Maiden Resource At The Richmond Hill Gold Project, The Results From The Drill Program Will Be Incorporated Into An Updated S-K 1300...
達科他黃金公司公佈了正在進行的填充和擴展鑽探項目中15個鑽孔的結果,以擴大里士滿山金礦項目的初步資源,這些鑽探項目的結果將納入更新的S-K 1300...
Dakota Gold Announced Results From Fifteen Drill Holes From The Ongoing Infill And Step-out Drill Program To Expand The Maiden Resource At The Richmond Hill Gold Project, The Results From The Drill Program Will Be Incorporated Into An Updated S-K 1300 Initial Assessment In Q1 2025
達科他黃金公司公佈了正在進行的充填和逐步鑽探計劃的十五個鑽孔的結果,該鑽探計劃旨在擴大列治文山金礦項目的首個資源,鑽探計劃的結果將納入2025年第一季度最新的s-k 1300初步評估中
The maiden S-K 1300 resource, which was announced on April 30, 2024 outlined an Indicated Resource of 51.83 million tonnes (Mt) at 0.80 grams per tonne gold (g/t Au) for 1.33 million ounces and Inferred Resource of 58.06 million tonnes (Mt) at 0.61 grams per tonne gold (g/t Au) for 1.13 million ounces.
首個S-k 1300資源於2024年4月30日公佈,概述了每噸黃金(g/t Au)0.80克的指示資源量爲5183萬噸(Mt),每噸黃金(g/t Au),113萬盎司,推斷資源爲5806萬噸(Mt),每噸黃金(g/t Au)。
譯文內容由第三人軟體翻譯。
以上內容僅用作資訊或教育之目的,不構成與富途相關的任何投資建議。富途竭力但無法保證上述全部內容的真實性、準確性和原創性。