VANCOUVER, British Columbia, Nov. 13, 2024 (GLOBE NEWSWIRE) -- Liberty Gold Corp. (TSX:LGD; OTCQX:LGDTF) ("Liberty Gold" or the "Company"), is pleased to announce its financial and operating results for the three and nine months ended September 30, 2024. All amounts are presented in United States dollars unless otherwise stated.
溫哥華,不列顛哥倫比亞省,2024年11月13日(全球資訊網)-- 自由黃金公司(tsx:lgd;otcqx:lgdtf)(「自由黃金」或「公司」)很高興地宣佈截至2024年9月30日的三個月和九個月的財務及運營結果。除非另有說明,所有金額均以美元爲單位。
THIRD QUARTER OF 2024 AND RECENT HIGHLIGHTS
2024年第三季度及最近亮點
- On October 7, 2024, we announced the close of the sale of the TV Tower project in northwest Türkiye ("TV Tower"), through the sale of our 73.7% owned subsidiary Orta Truva Madencilik Şanayi ve Ticaret A.Ş ("Orta Truva") to a major Turkish mining and construction company. The first of three staged consideration payments of $3.7 million was received on October 4, 2024. Our share of the remainder of the gross proceeds will be paid in two further stages as follows1:
- $2.2 million on October 4, 2025, and
- $2.6 million on October 4, 2026.
- On October 24, 2024, we published our 2023 Environmental, Social and Governance disclosure update2.
- 2024年10月7日,我們宣佈已完成在土耳其西北部的TV塔項目(「TV塔」)的出售,通過向一家主要的土耳其礦業和施工公司出售我們73.7%持股的子公司Orta Truva Madencilik Şanayi ve Ticaret A.Ş(「Orta Truva」)。第一筆分期付款370萬美元已於2024年10月4日收到賬。我們將在以下兩個進一步階段支付剩餘總收入的份額:
- 2025年10月4日支付220萬美元,
- 2026年10月4日支付260萬美元。
- 2024年10月24日,我們發佈了2023年的環保、社會和治理信息披露更新。
At the Black Pine project in Idaho ("Black Pine"),
在愛達荷州的黑松項目(「黑松」)中,
- On October 10, 20243, we announced the results of a Black Pine preliminary feasibility study ("Black Pine PFS"), demonstrating the commercial viability of an open pit, run-of-mine heap leach operation with a one-year construction period.
- As part of the Black Pine PFS a first-time mineral reserve for Black Pine was released, and the mineral resource previously published on February 15, 20244, was updated.
- On September 25, 20245 we announced the receipt of the Hardrock Prospector Permit ("HPP") at Black Pine adding 7.1 square kilometres ("km2") of key exploration and development ground in the centre and south of the known mineralized area and expanding the Black Pine Project Area by 10% to a total of 69.3 km2
- On July 17, 2024, we announced the commencement of a 20,000-metre drill exploration program at Black Pine targeting seven key areas identified on newly permitted ground6.
- On July 3, 2024, the Company reported on the Black Pine Mine Permitting initiation meeting with federal and states agencies.7
- 在2024年10月10日,我們宣佈了黑松初步可行性研究(「黑松PFS」)的結果,顯示出在一年的施工期內開放式礦坑、採礦堆浸控件的商業可行性。
- 作爲黑松PFS的一部分,首次發佈了黑松的礦石儲量,之前在2024年2月15日發佈的礦產資源信息得到了更新。
- 在2024年9月25日,我們宣佈在黑松獲得了Hardrock Prospector Permit(「HPP」),在已知礦化區域的中心和南部新增了7.1平方公里(「km2」)的重要勘探和開發用地,使黑松項目區域擴大了10%,總面積達到69.3 km2。
- 在2024年7月17日,我們宣佈開始在黑松進行20,000米的鑽探勘探計劃,針對新獲得批准的用地上識別出的七個關鍵區域。
- 在2024年7月3日,公司報告了關於黑松礦的批准啓動會議,涉及聯邦和州機構。
At the Goldstrike project in Utah, we announced the identification of a high-grade antimony mineralizing system that outcrops along the eastern extension of the main gold trend8.
在猶他州的黃金打擊項目中,我們宣佈發現了一種高品位的反鉛礦化系統,該系統沿着主要黃金趨勢的東部延伸出露。
SELECTED FINANCIAL DATA
選定財務數據
The following selected financial data is derived from our unaudited condensed interim consolidated financial statements and related notes thereto (the "Interim Financial Statements") for the three and nine months ended September 30, 2024, as prepared in accordance with IFRS Accounting Standards – IAS 34: Interim Financial Statements.
以下選定的財務數據來源於我們未經審計的簡明中期合併基本報表及相關附註("中期基本報表"),截至2024年9月30日的三個月和九個月,按照國際財務報告準則 - IAS 34:中期基本報表編制。
A copy of the Interim Financial Statements is available on the Company's website at libertygold.ca or on SEDAR+ at .
中期基本報表的副本可在公司網站libertygold.ca上或在SEDAR+上查閱。
The information in the tables below is presented in $'000s, except 'per share' data:
下表中的信息以$'000s呈現,除'每股'數據外:
Three months ended September 30, |
Nine months ended September 30, |
||||||||
2024 | 2023 | 2024 | 2023 | ||||||
Attributable to shareholders: | |||||||||
Loss for the period | $(5,750) | $(5,430) | $(12,621) | $(15,544) | |||||
Loss and comprehensive loss for the period | $(5,674) | $(5,485) | $(12,871) | $(15,443) | |||||
Basic and diluted loss per share from continuing operations | $(0.01) | $(0.02) | $(0.03) | $(0.05) |
截至
2024年9月30日 九月三十日 |
截至九個月 九月三十日, |
||||||||
2024 | 2023 | 2024 | 2023 | ||||||
歸屬於股東的: | |||||||||
期間損失 | $(5,750) | $(5,430) | $(12,621) | $(15,544) | |||||
本期虧損和綜合虧損 | $(5,674) | $(5,485) | $(12,871) | $(15,443) | |||||
持續經營的每股基本和攤薄虧損 | $(0.01) | $(0.02) | $(0.03) | $(0.05) |
As at September 30, | As at December 31, | |||
2024 |
2023 |
|||
Cash and short-term investments | $9,281 | $9,082 | ||
Working capital (excluding assets held for sale) | $6,696 | $7,648 | ||
Total assets | $35,268 | $35,337 | ||
Current liabilities | $6,020 | $1,750 | ||
Non-current liabilities | $759 | $3,180 | ||
Shareholders' equity | $25,860 | $27,636 |
截至9月30日, | 截至2023年12月31日 | |||
2024 |
2023 |
|||
現金及短期投資 | $9,281 | $9,082 | ||
運營資本(不包括待售資產) | $6,696 | $7,648 | ||
總資產 | $35,268 | $35,337 | ||
流動負債 | $6,020 | $1,750 | ||
非流動負債 | $759 | $3,180 | ||
股東權益 | $25,860 | $27,636 |
ABOUT LIBERTY GOLD
關於利博特黃金
Liberty Gold is focused on exploring for and developing open pit oxide deposits in the Great Basin of the United States, home to large-scale gold projects that are ideal for open-pit mining. This region is one of the most prolific gold-producing regions in the world and stretches across Nevada and into Idaho and Utah. We know the Great Basin and are driven to discover and advance big gold deposits that can be mined profitably in open-pit scenarios.
Liberty Gold專注於在美國大盆地探索和開發露天氧化礦牀,該地區是理想的露天採礦黃金項目所在地。該地區是世界上產金最豐富的地區之一,橫跨內華達州、愛達荷州和猶他州。我們熟悉大盆地,並致力於發現和推進可以用露天場景盈利開採的大型黃金礦牀。
For more information, visit libertygold.ca or contact:
更多信息,請訪問libertygold.ca或聯繫:
Susie Bell, Manager, Investor Relations
Phone: 604-632-4677 or Toll Free 1-877-632-4677
info@libertygold.ca
投資者關係經理:Susie Bell
電話:604-632-4677或免費電話1-877-632-4677
info@libertygold.ca
Peter Shabestari, P.Geo., Vice-President Exploration, Liberty Gold, is the Company's designated Qualified Person for this news release within the meaning of National Instrument 43-101 Standards of Disclosure for Mineral Projects ("NI 43-101") and has reviewed and validated that the information contained in the release is accurate.
Liberty Gold的副總裁勘探Peter Shabestari,P.Geo.,是本新聞發佈中符合《43-101號國家規範披露礦業項目標準》("NI 43-101")定義的指定合格人士,並已驗證並驗證了發佈的信息的準確性。
This news release contains "forward-looking information" and "forward-looking statements" within the meaning of applicable securities laws, including statements or information concerning, future financial or operating performance of Liberty Gold and its business, operations, properties and condition; planned de-risking activities at Liberty Gold's mineral properties; the potential quantity, recoverability and/or grade of minerals; the potential size of a mineralized zone or potential expansion of mineralization; proposed exploration and development of Liberty Gold's exploration property interests; the results of mineral resource estimates or mineral reserve estimates and preliminary feasibility studies; and the Company's anticipated expenditures.
This news release contains "forward-looking information" and "forward-looking statements" within the meaning of applicable securities laws, including statements or information concerning, future financial or operating performance of Liberty Gold and its business, operations, properties and condition; planned de-risking activities at Liberty Gold's mineral properties; the potential quantity, recoverability and/or grade of minerals; the potential size of a mineralized zone or potential expansion of mineralization; proposed exploration and development of Liberty Gold's exploration property interests; the results of mineral resource estimates or mineral reserve estimates and preliminary feasibility studies; and the Company's anticipated expenditures.
Forward-looking information is often, but not always, identified by the use of words such as "seek", "anticipate", "plan", "continue", "planned", "expect", "project", "predict", "potential", "targeting", "intends", "believe", "potential", and similar expressions, or describes a "goal", or variation of such words and phrases or state that certain actions, events or results "may", "should", "could", "would", "might" or "will" be taken, occur or be achieved. Forward-looking information is not a guarantee of future performance and is based upon a number of estimates and assumptions of management at the date the statements are made including, among others, assumptions about future prices of gold, and other metal prices, currency exchange rates and interest rates, favourable operating conditions, political stability, obtaining governmental approvals and financing on time, obtaining renewals for existing licenses and permits and obtaining required licenses and permits, labour stability, stability in market conditions, availability of equipment, timing or results of the publication of any mineral resources, mineral reserves, or pre-feasibility study, the availability of drill rigs, the timing of receipt of future staged payments from the sale of TV Tower, successful resolution of disputes and anticipated costs and expenditures. Many assumptions are based on factors and events that are not within the control of Liberty Gold and there is no assurance they will prove to be correct.
Forward-looking information is often, but not always, identified by the use of words such as "seek", "anticipate", "plan", "continue", "planned", "expect", "project", "predict", "potential", "targeting", "intends", "believe", "potential", and similar expressions, or describes a "goal", or variation of such words and phrases or state that certain actions, events or results "may", "should", "could", "would", "might" or "will" be taken, occur or be achieved. Forward-looking information is not a guarantee of future performance and is based upon a number of estimates and assumptions of management at the date the statements are made including, among others, assumptions about future prices of gold, and other metal prices, currency exchange rates and interest rates, favourable operating conditions, political stability, obtaining governmental approvals and financing on time, obtaining renewals for existing licenses and permits and obtaining required licenses and permits, labour stability, stability in market conditions, availability of equipment, timing or results of the publication of any mineral resources, mineral reserves, or pre-feasibility study, the availability of drill rigs, the timing of receipt of future staged payments from the sale of TV Tower, successful resolution of disputes and anticipated costs and expenditures. Many assumptions are based on factors and events that are not within the control of Liberty Gold and there is no assurance they will prove to be correct.
Such forward-looking information, involves known and unknown risks, which may cause the actual results to be materially different from any future results expressed or implied by such forward-looking information, including, risks related to the interpretation of results and/or the reliance on technical information provided by third parties as related to the Company's mineral property interests; changes in project parameters as plans continue to be refined; current economic conditions; future prices of commodities; possible variations in grade or recovery rates; the costs and timing of the development of new deposits; failure of equipment or processes to operate as anticipated; the failure of contracted parties to perform; the timing and success of exploration activities generally; the timing or results of the publication of any mineral resources, mineral reserves or pre-feasibility studies; delays in permitting; possible claims against the Company; labour disputes and other risks of the mining industry; delays in obtaining governmental approvals, financing, timing of receipt of staged payments on the sale of TV Tower or in the completion of exploration as well as those factors discussed in the Annual Information Form of the Company dated March 28, 2024, in the section entitled "Risk Factors", under Liberty Gold's SEDAR+ profile at .
Such forward-looking information, involves known and unknown risks, which may cause the actual results to be materially different from any future results expressed or implied by such forward-looking information, including, risks related to the interpretation of results and/or the reliance on technical information provided by third parties as related to the Company's mineral property interests; changes in project parameters as plans continue to be refined; current economic conditions; future prices of commodities; possible variations in grade or recovery rates; the costs and timing of the development of new deposits; failure of equipment or processes to operate as anticipated; the failure of contracted parties to perform; the timing and success of exploration activities generally; the timing or results of the publication of any mineral resources, mineral reserves or pre-feasibility studies; delays in permitting; possible claims against the Company; labour disputes and other risks of the mining industry; delays in obtaining governmental approvals, financing, timing of receipt of staged payments on the sale of TV Tower or in the completion of exploration as well as those factors discussed in the Annual Information Form of the Company dated March 28, 2024, in the section entitled "Risk Factors", under Liberty Gold's SEDAR+ profile at .
Although Liberty Gold has attempted to identify important factors that could cause actual actions, events or results to differ materially from those described in forward-looking information, there may be other factors that cause actions, events or results not to be as anticipated, estimated or intended. There can be no assurance that such information will prove to be accurate as actual results, and future events could differ materially from those anticipated in such statements. Liberty Gold disclaims any intention or obligation to update or revise any forward-looking information, whether as a result of new information, future events or otherwise, except for material differences between actual results and previously disclosed material forward-looking information, or as otherwise required by law.
Although Liberty Gold has attempted to identify important factors that could cause actual actions, events or results to differ materially from those described in forward-looking information, there may be other factors that cause actions, events or results not to be as anticipated, estimated or intended. There can be no assurance that such information will prove to be accurate as actual results, and future events could differ materially from those anticipated in such statements. Liberty Gold disclaims any intention or obligation to update or revise any forward-looking information, whether as a result of new information, future events or otherwise, except for material differences between actual results and previously disclosed material forward-looking information, or as otherwise required by law.
Except for statements of historical fact, information contained herein or incorporated by reference herein constitutes forward-looking statements and forward-looking information. Readers should not place undue reliance on forward-looking information. All forward-looking statements and forward-looking information attributable to us is expressly qualified by these cautionary statements.
除了歷史事實的陳述之外,此處或通過引用所包含的信息構成前瞻性陳述和前瞻性信息。讀者不應對前瞻性信息過度依賴。歸因於我們的所有前瞻性陳述和前瞻性信息均明確受到這些警示聲明的限制。
Note to United States Investors Concerning Estimates of Measured, Indicated and Inferred Resources
關於估算已測量、指示和推斷資源的美國投資者注意事項
The information in this MD&A, including any information incorporated by reference, and disclosure documents of Liberty Gold that are filed with Canadian securities regulatory authorities concerning mineral properties have been prepared in accordance with the requirements of securities laws in effect in Canada, which differ from the requirements of United States securities laws.
關於Liberty Gold礦產權相關信息的本MD&A及其引用的任何信息,以及提交給加拿大證券監管機構的披露文件均按照加拿大施行的證券法要求編制,這些要求與美國證券法律要求不同。
Without limiting the foregoing, these documents use the terms "measured resources", "indicated resources", "inferred resources" and "mineral reserves". These terms are Canadian mining terms as defined in, and required to be disclosed in accordance with, NI 43-101, which references the guidelines set out in the Canadian Institute of Mining, Metallurgy and Petroleum (the "CIM") – CIM Definition Standards, adopted by the CIM Council, as amended. However, these standards differ significantly from the mineral property disclosure requirements of the United States Securities and Exchange Commission (the "SEC") in Regulation S-K Subpart 1300 (the "SEC Modernization Rules") under the United States Securities Act of 1934, as amended. The Company does not file reports with the SEC and is not required to provide disclosure on its mineral properties under the SEC Modernization Rules and will continue to provide disclosure under NI 43-101 and the CIM Definition Standards.
在不限制上述內容的前提下,這些文件使用術語「已測量資源」、「指示資源」、「推斷資源」和「礦藏儲量」。這些術語是根據NI 43-101的定義並需要披露的加拿大礦業術語,該法規參考了加拿大礦業、冶金和石油協會(「CIM」)制定的指導方針——CIM定義標準,該標準由CIM委員會通過並修正。然而,這些標準與美國證券交易委員會(「SEC」)在1934年美國證券法修訂的S-k子部分1300(「SEC現代化規則」)下的礦產財產披露要求有顯著差異。公司不向SEC提交報告,也沒有義務根據SEC現代化規則提供關於其礦產財產的披露,並將繼續根據NI 43-101和CIM定義標準提供披露。
____________________
____________________
1 See news releases dated October 7, 2024 and April 17, 2024.
2 See news release dated October 24, 2024.
3 See news release dated October 10, 2024.
4 See news release dated February 15, 2024.
5 See news release dated September 25, 2024.
6 See news release dated July 17, 2024
7 See news release dated July 3, 2024.
8 See news release dated September 5, 2024.
1 查看發佈日期爲2024年10月7日和2024年4月17日的資訊稿。
2 查看發佈日期爲2024年10月24日的資訊稿。
3 查看發佈日期爲2024年10月10日的資訊稿。
4 查看發佈日期爲2024年2月15日的資訊稿。
5 查看發佈日期爲2024年9月25日的資訊稿。
6 請參閱日期爲2024年7月17日的新聞發佈
7 請參閱日期爲2024年7月3日的新聞發佈。
8 請參閱日期爲2024年9月5日的新聞發佈。
譯文內容由第三人軟體翻譯。