share_log

Great Prospect For Gamuda After Securing Australia's Hydro Power Generation Project

Great Prospect For Gamuda After Securing Australia's Hydro Power Generation Project

嘉模達在獲得澳洲水電項目後前景看好
Business Today ·  10:00
big

Gamuda Bhd' joint venture (JV) with Ferrovial Construction for the Oven Mountain Pumped Hydro (OMPH) project in New South Wales, Australia, has prompted two research houses, RHB Investment Bank Bhd (RHB Research) and MIDF Amanah Investment Bank Bhd (MIDF Research), to issue a BUY recommendation on the construction company.

Gamuda與Ferrovial Construction在澳大利亞新南威爾士州合作的Oven Mountain Pumped Hydro (OMPH)項目,促使RHb Investment Bank Bhd(RHb研究)和MIDF Amanah投資銀行(MIDF研究)分別發佈了一份對這家建築公司的買入建議。

The OMPH project marks Gamuda's first entry into hydro power generation, aligning with its strategy to build a two-gigawatt renewable energy (RE) portfolio in Australia over the next five years.

OMPH項目標誌着Gamuda首次進入水電發電領域,與其在未來五年內在澳大利亞建立兩千兆瓦可再生能源(RE)組合的戰略一致。

Both RHB Research and MIDF Research see the Early Contractor Involvement (ECI) role which Gamuda has secured as a strategic entry into the RE sector, underscoring Gamuda's growth potential in Australia.

RHb研究和MIDF研究均認爲Gamuda獲得的早期承包商參與(ECI)角色是對RE行業的戰略進入,突顯了Gamuda在澳大利亞的增長潛力。

Both research houses set a target price ranging between RM9.64 and RM10.52, implying a total expected return of 9.9% and 18% respectively.

兩家研究機構將目標價設定在RM9.64至RM10.52之間,分別暗示着9.9%和18%的總預期回報。

Gamuda's ECI role in the OMPH project involves initial design and planning activities, as well as addressing environmental and land acquisition considerations. The project is estimated to be worth A$1.5 billion (RM4.35 billion), with Gamuda's potential share valued at approximately RM2.18 billion.

Gamuda在OMPH項目中的ECI角色涉及初始設計和規劃活動,以及解決環保和土地收購問題。該項目估計價值爲15億澳元(43.5億令吉),Gamuda潛在股份價值約21.8億令吉。

The JV's successful completion of the ECI package enhances its chances of winning the larger engineering, procurement, construction and commissioning contract, expected to be awarded by the fourth quarter of 2025, pending necessary approvals.

JV成功完成ECI包的工作增加了贏得更大的工程、採購、建設和調試合同的機會,預計將在2025年第四季度獲得,待必要批准。

Gamuda's current order book stands at RM31.4 billion and the company is on track to reach RM35 billion by year-end, with projections to expand this to RM40-RM45 billion by 2025, supported by a robust portfolio in both traditional infrastructure and renewable energy projects across Australia.

Gamuda目前的60檔擺盤總額爲314億令吉,公司有望在年底達到350億令吉,並計劃到2025年將其擴大至40-450億令吉,支持其在傳統基礎設施和澳大利亞各地的可再生能源項目中的強大投資組合。

Citing its strategic international expansion and consistent wins in mega-project tenders, analysts continue to favour Gamuda as it solidified its position as a key player in the Malaysian construction sector.

分析師繼續看好Gamuda,認爲其戰略國際擴張和在大型項目招標中持續贏得優勢,穩固了其在馬來西亞建築板塊中的地位。

譯文內容由第三人軟體翻譯。


以上內容僅用作資訊或教育之目的,不構成與富途相關的任何投資建議。富途竭力但無法保證上述全部內容的真實性、準確性和原創性。
    搶先評論