share_log

Equity Metals Reports Final Assay Results From Summer Drilling on the Silver Queen Property, BC; Provides Drilling Update

Equity Metals Reports Final Assay Results From Summer Drilling on the Silver Queen Property, BC; Provides Drilling Update

Equity Metals報告了BC白銀女王物業夏季鑽探的最終化驗結果;提供鑽探更新
newsfile ·  10/29 00:25

Vancouver, British Columbia--(Newsfile Corp. - October 28, 2024) - Equity Metals Corporation (TSXV: EQTY) ("Equity") reports final assay results from the Summer '24 drill program on its 100% owned Silver Queen Au-Ag project, British Columbia including new assay results from the George Lake, Camp and Camp North targets.

2024年10月28日,加拿大不列顛哥倫比亞省溫哥華 - (新聞資訊 Corp.) - Equity Metals Corporation (TSXV: EQTY)("Equity")報告了其在英屬哥倫比亞擁有100%所有權的Silver Queen Au-Ag項目的Summer '24鑽探項目的最終化驗結果,包括George Lake、Camp和Camp North靶區的新化驗結果。

These latest assays represent the final results from Equity's Summer '24 drill program on its Silver Queen property. Drilling has successfully extended the George Lake target up to 550 metres to the southeast of the original discovery, returned further Bonanza-grade silver intercepts from several veins along the western margin of the Camp Deposit and made a new, thick sulphide-rich drill discovery at the Camp North target, which remains open to extension. Exploration continues on the property with new drilling on the No. 3 Vein North target that started in late September and continues through the Fall.

這些最新的化驗結果代表了Equity在Silver Queen物業的Summer '24鑽探項目的最終結果。鑽探成功地將George Lake靶區向東南方延伸了550米,從Camp Deposit西緣多個礦脈中返回了更多的富含大號銀的拐點性銀截獲結果,並在Camp North靶區發現了一個新的、厚度較大的含硫化物的鑽井發現,該靶區仍具有延伸潛力。在物業上的勘探工作持續進行,9月下旬開始對No. 3 Vein North靶區進行新的鑽探,並持續至秋季。

New highlight assays from the George Lake Target include intercepts from hole SQ24-120:

從George Lake靶區的新的突出化驗結果包括來自孔道SQ24-120的截獲結果:

  • A 0.5 metre (Est. TT) interval grading 2.6g/t Au, 81g/t Ag, 2.2% Pb and 11.5% Zn (13.6g/t AuEq or 1,008g/t AgEq) within a broader 1.5 metre (est. TT) interval averaging 1.2g/t Au, 38g/t Ag, 0.8% Pb and 3.8% Zn (5.0g/t AuEq or 375g/t AgEq) starting 247.4m downhole; and

  • A 0.6 metre (Est. TT) interval grading 2.0g/t Au, 51g/t Ag, 0.6% Pb and 11.9% Zn (12.0g/t AuEq or 895g/t AgEq) within a broader 3.5 metre (est. TT) interval averaging 0.5g/t Au, 17g/t Ag, 0.6% Pb and 2.8% Zn (3.1g/t AuEq or 234g/t AgEq) starting 272.7m downhole.

  • 位於孔道下方24740米處的0.5米 (Est. TT) 區間,品位爲2.6g/t Au, 81g/t Ag, 2.2% Pb和11.5% Zn (13.6g/t AuEq或1,008g/t AgEq),包含在較寬的1.5米 (est. TT) 區間內,平均爲1.2g/t Au, 38g/t Ag, 0.8% Pb和3.8% Zn (5.0g/t AuEq或375g/t AgEq);

  • 位於孔道下方27270米處的0.6米 (Est. TT) 區間,品位爲2.0g/t Au, 51g/t Ag, 0.6% Pb和11.9% Zn (12.0g/t AuEq或895g/t AgEq),包含在較寬的3.5米 (est. TT) 區間內,平均爲0.5g/t Au, 17g/t Ag, 0.6% Pb和2.8% Zn (3.1g/t AuEq或234g/t AgEq);

Drilling on the George Lake target continues to provide definition to multiple veins found in the target area which form clusters of gold and silver-enriched, northwest-trending polymetallic veins. Two prominent vein sets and several clusters of thicker intercepts have been identified in 3D modelling. Further analysis continues in order to define prospective targets down-dip of the thicker and higher-grade "mineralized-shoots" for follow-up drill testing.

George Lake靶區的鑽探工作繼續爲靶區內發現的多條礦脈提供定義,這些礦脈形成了金和銀富集的、向西北方向傾斜的多金屬礦脈群。在3D建模中已經確定了兩組明顯的礦脈集合和幾個較厚截獲的簇。繼續進行進一步的分析,以確定更厚、更高品位的"礦化射流"下方潛在的靶點,進行跟進鑽探測試。

Camp Deposit

營地存款

New assay results were received from the Camp Deposit that identified both hangingwall and footwall veins adjacent to earlier reported intercepts of the main target veins and include:

從營地存款獲得了新的化驗結果,確認了早期報告的目標礦脈的頂石脈和基石脈,幷包括:

  • A 1.0 metre (est. TT) interval averaging 2.5/t Au, 57g/t Ag, 1.1% Pb and 11.6% Zn (12.9g/t AuEq or 958g/t AgEq) from a shallow hangingwall vein in drillhole SQ24-123; and.

  • A 2.4 metre (est. TT) interval averaging 0.1g/t Au, 173g/t Ag, 0.1% Pb and 0.3% Zn (2.7g/t AuEq or 202g/t AgEq) from a deeper footwall vein in drillhole SQ24-123.

  • 從鑽孔SQ24-123中的淺層頂石脈中,1.0米(估計TT)區間平均2.5克/噸的金,57克/噸的白銀,1.1%的市淨率和11.6%的鋅(黃金當量12.9克/噸或白銀當量958克/噸);

  • 從鑽孔SQ24-123中的深層基岩脈中,2.4米(估計TT)區間平均0.1克/噸的金,173克/噸的白銀,0.1%的市淨率和0.3%的鋅(黃金當量2.7克/噸或白銀當量202克/噸);

These new assay results compliment previously reported results from drill hole SQ24-123 (2.3m (est. TT) of 557g/t AgEq; see NR-09-24 dated Aug 27, 2024) and continue to confirm the presence of both the high-grade hangingwall vein identified in earlier drilling and also deeper mineralized intervals that remain open for further delineation and potential extension. For reference, earlier reported intercepts from the Summer '24 drill program in the Camp Deposit include:

這些新的化驗結果補充了先前的SQ24-123鑽孔(等估計TT爲230萬的557克/噸白銀當量;請參閱日期爲2024年8月27日的NR-09-24),並繼續證實了早期鑽探中確定的高品位頂石脈以及仍然未確定的更深礦化區間的存在,這些區間對進一步界定和潛在延伸仍然開放。以參考爲基礎,夏季'24年營地存款鑽探項目中較早報告的插孔包括:

  • A 3.5 metre (est. TT) interval of 1901g/t AgEq in drillhole SQ24-124 (see NR-09-24; Aug 27, 2024); and

  • A 7.5 metre (est. TT) interval of 255g/t AgEq in drill hole SQ24-125 (see NR-10-24; Oct 1, 2024);

  • 在SQ24-124鑽孔(請參閱NR-09-24;2024年8月27日)中,3.5米(估計TT)區間的1901克/噸白銀當量;

  • 在SQ24-125鑽孔(請參閱NR-10-24;2024年10月1日)中,7.5米(估計TT)區間的255克/噸白銀當量;


Figure 1: Plan of Silver Queen project area


圖1:Silver Queen項目區域平面圖

Drilling also identified several narrow veins up-hole from the previously reported discovery intercept in the Camp North target (8.6m (down hole depth) of 352g/t AgEq from SQ24-128; see NR-10-24, Oct 1, 2024) which remains open both vertically and laterally to the east.

鑽孔還在Camp North目標的以前報告的發現截面上方識別出數條狹窄脈體(從SQ24-128的860萬(鑽孔深度),352g/t AgEq; 參見NR-10-24,2024年10月1日),該脈體在垂直和東側方向仍然向上開放。

The Summer '24 drill program extended multiple veins on the western margin of the Camp Deposit with well mineralized intercepts returned from both shallow hangingwall structures and deeper vein sets. New targeting has been identified at both the Camp and the Camp North targets for follow-up drilling as part of the Company's current Fall '24 drill program.

2024年夏季鑽探項目在Camp存款西緣延伸了多條脈體,淺層牆體結構和更深的礦脈組都返回了良好的礦化截面。在Camp和Camp North目標都確定了新的鑽探方向,將作爲公司當前2024年秋季鑽孔計劃的跟進部分。

Drill Summary

鑽探總結

Twenty-four core holes totalling 10,543 metres were completed as part of Equity's Summer '24 exploration program, which includes 18 drillholes totalling 7,541 metres at the George Lake target, four drillholes totalling 2,687 metres at the Camp target, and two drillholes totalling 975 metres at the Camp North target. All assays from the drill program have been received.

Equity的2024年夏季勘探項目完成了總計10,543米的24口巖芯鑽孔,包括George Lake目標的18個總計7,541米的鑽孔,Camp目標的4個總計2,687米的鑽孔,以及Camp North目標的2個總計975米的鑽孔。所有鑽探項目的化驗結果均已收到。


Figure 2: George Lake Longitudinal Section showing historical and 2023-24 drill intercepts, and the distribution of potential mineralized shoots. Historical Intercepts are semi-transparent.


圖2:George Lake 縱向剖面圖,顯示歷史和2023-24年的鑽探截面,以及潛在礦化脈的分佈。歷史截面是半透明的。

Drilling Update

鑽探更新

The Company also reports that drilling continues on the No. 3 Vein North target. Seven core holes totalling 2,449 metres have been completed to date of the 14 holes planned for this target. This is a new target area for the Company, which could potentially extend the No. 3 Vein deposit a further 300 metres to the northwest. The No. 3 Vein North area has been previously tested by limited historical drilling, limited underground development, and minor historical mining. Initial drilling on the target is intended to confirm the encouraging historical drill results and then test lateral and downdip extensions of the higher-grade zones. Logging and sampling of the holes is in progress and new assay results are anticipated over the coming weeks.

公司還報告稱,在3號礦脈北部目標上的鑽探工作正在繼續進行。迄今已完成了2,449米的7個巖芯鑽孔,計劃對該目標進行14口鑽孔。這對於公司而言是一個新的目標區域,可能會將3號礦脈存款向西北延伸300米。3號礦脈北部區域曾受過有限的歷史鑽探、有限的地下開發和輕微的歷史開採。對目標的初始鑽探旨在確認令人鼓舞的歷史鑽探結果,然後檢驗高品位帶的側向和向下延伸。目前正在進行巖芯的記錄和取樣工作,新的化驗結果將在未來幾周內公佈。

Planning is underway for additional follow up holes for the Camp Deposit, Camp North and George Lake targets and will be added to the current drill program.

Camp存款、Camp North和George Lake目標的額外跟進鑽孔計劃正在籌備中,並將添加到當前的鑽探計劃中。

About Silver Queen Project

關於Silver Queen項目

The Silver Queen Project is a premier gold-silver property with over 100 years of historic exploration and development and is located adjacent to power, roads and rail with significant mining infrastructure that was developed under previous operators Bradina JV (Bralorne Mines) and Houston Metals Corp. (a Hunt Brothers company). The property contains an historic decline into the No. 3 Vein and the George Lake Vein, camp infrastructure, and a maintained Tailings Facility.

Silver Queen項目是一處擁有超過100年曆史的黃金銀礦產,毗鄰電力、道路和鐵路,具有由之前的運營商Bradina JV(Bralorne Mines)和Houston Metals Corp.(Hunt Brothers公司)開發的重要礦業基礎設施。該產權包括對No.3 Vein和George Lake Vein的歷史性下跌,工地基礎設施和維護的尾礦設施。

The Silver Queen Property consists of 46 mineral claims, 17 crown grants, and two surface crown grants totalling 18,871ha with no underlying royalties. Mineralization is hosted by a series of epithermal veins distributed over a 6 sq km area. An updated NI43-101 Mineral Resource Estimate with effective date December 1st, 2022 was detailed in a News Release issued on Jan 16, 2023, which can be found by clicking here and the full Technical Report can be found on SEDAR+ () and the Company's website.

Silver Queen礦產具有46個礦權,17個皇冠賠償權和兩個地表皇冠賠償權,總計18871公頃,沒有基礎的專有噸位。礦化物由分佈在6平方公里區域內的一系列低溫熱液脈承載。最新的NI43-101礦產資源評估(有效期爲2022年12月1日)在2023年1月16日發表的新聞稿中進行了詳細說明,可通過單擊 此處 查看,並完整的技術報告可以在SEDAR+()和公司的網站上找到。

More than 20 different veins have been identified on the property, forming an extensive network of zoned Cretaceous- to Tertiary-age epithermal veins. The property remains largely under-explored.

物業上已識別出20多個不同的礦脈,形成了廣泛的分帶白堊紀至第三紀低溫熱液脈充填網絡。該物業仍然大部分未開發。

Table 1: Select Currently Reported Composites from 2024 Drilling on the George Lake Target

表1:2024年George Lake Target鑽探報告的選擇目前的複合物

Hole # From (m) To (m) Interval (m)


ETT
(m)

Au
(g/t)
Ag
(g/t)
Cu
(%)
Pb
(%)
Zn
(%)
AuEq (g/t) AgEq (g/t) Comments
George Lake
SQ24-120 111.8 112.1 0.3 0.2 1.5 147 0.2 1.1 14.1 14.8 1104
SQ24-120 142.2 144.0 1.8 1.6 0.5 33 0.0 0.1 2.0 2.5 187
SQ24-120 224.4 226.5 2.1 1.8 0.6 20 0.0 0.7 1.6 2.4 180
SQ24-120 247.4 249.1 1.8 1.5 1.2 38 0.1 0.8 3.8 5.0 375
inc. 247.4 247.9 0.6 0.5 2.6 81 0.1 2.2 11.5 13.6 1008
SQ24-120 272.7 276.8 4.1 3.5 0.5 17 0.0 0.6 2.8 3.1 234
inc. 276.0 276.8 0.8 0.6 2.0 51 0.1 0.6 11.9 12.0 895
SQ24-120 291.9 295.7 3.8 3.2 0.4 12 0.0 0.3 1.8 2.1 155
inc. 292.9 293.3 0.4 0.3 1.8 37 0.0 1.8 8.9 9.9 735
SQ24-121 314.0 315.1 1.2 0.8 0.5 26 0.1 0.2 0.6 1.6 122
SQ24-122 224.3 225.5 1.3 0.6 0.5 49 0.1 0.7 1.8 3.0 222
Camp Deposit
SQ24-123 27.0 28.3 1.3 1.0 2.5 57 0.3 1.1 11.6 12.9 958
SQ24-123 256.6 258.0 1.4 1.2 0.1 72 0.1 0.9 0.8 2.3 174
SQ24-123 441.0 443.9 2.9 2.3 0.2 484 0.0 0.5 0.6 7.5 557 Previously Released
inc. 441.0 441.9 0.9 0.7 0.3 1156 0.0 0.8 0.8 16.9 1257Previously Released
SQ24-123 492.1 492.9 0.8 0.6 0.3 54 0.0 0.7 2.9 3.6 266
SQ24-123 498.2 501.2 3.0 2.4 0.1 173 0.0 0.1 0.3 2.7 202
inc. 500.1 501.2 1.0 0.8 0.1 320 0.0 0.1 0.5 4.8 359
SQ24-124 138.0 139.3 1.3 1.0 0.2 170 0.0 0.2 0.8 3.1 234
inc. 138.9 139.3 0.4 0.3 0.3 428 0.0 0.0 0.3 6.3 470
SQ24-124 148.7 153.0 4.3 3.5 0.5 1501 0.1 0.8 5.9 25.6 1901 Previously Released
inc. 148.7 149.5 0.9 0.7 0.4 7099 0.3 2.0 5.4 101.3 7532Previously Released
and inc. 150.6 151.1 0.5 0.4 1.1 108 0.1 1.6 32.9 28.2 2096Previously Released
SQ24-124 226.9 228.0 1.1 0.9 0.0 232 0.0 0.2 0.8 3.9 287
SQ24-125 58.0 66.5 8.5 7.5 0.5 63 0.1 0.5 2.3 3.4 255 Previously Released
inc. 61.7 63.6 1.9 1.7 1.5 217 0.4 1.4 7.5 11.2 835Previously Released
inc. 61.7 62.5 0.8 0.7 2.7 388 0.6 2.5 11.3 18.4 1372Previously Released
SQ24-125 497.8 498.3 0.5 0.4 0.1 97 0.0 2.0 0.5 2.7 202
SQ24-126 47.5 49.0 1.5 1.2 0.8 18 0.1 0.3 3.3 3.8 282
Camp North
SQ24-127 381.5 381.8 0.3 UNK 0.3 130 0.1 0.7 2.2 4.1 305
SQ24-127 520.8 521.7 0.9 UNK 0.0 102 0.0 0.5 0.2 1.8 133
SQ24-128 38.8 39.8 1.1 UNK 0.3 8 0.0 0.3 1.3 1.5 112
SQ24-128 65.6 66.7 1.1 UNK 0.4 25 0.0 0.7 3.2 3.5 263
SQ24-128 282.0 290.6 8.6 UNK 0.2 67 0.0 1.0 4.2 4.7 352 Previously Released
inc. 282.0 283.7 1.6 UNK 0.4 68 0.0 0.9 8.3 7.9 591Previously Released
and inc. 287.6 289.4 1.8 UNK 0.4 210 0.0 3.2 7.4 10.2 761Previously Released
孔號 從 (m) 到 (m) (m)


ETT
(米)

黃金
(克/噸)
白銀
(克/噸)

(%)
市淨率
(%)

(%)
金剛石當量(克/噸) 0.5 評論
George Lake
SQ24-120 111.8 112.1 0.3 0.2 1.5 147 0.2 1.1 14.1 14.8 1104
SQ24-120 142.2 144.0 1.8 1.6 0.5 33 0.0 0.1 2.0 2.5 187
SQ24-120 224.4 226.5 2.1 1.8 0.6 20 0.0 0.7 1.6 2.4 180
SQ24-120 247.4 249.1 1.8 1.5 1.2 38 0.1 0.8 3.8 5.0 375
公司。 247.4 247.9 0.6 0.5 2.6 81 0.1 2.2 11.5 13.6 1008
SQ24-120 272.7 276.8 4.1 3.5 0.5 17 0.0 0.6 2.8 3.1 234
公司。 276.0 276.8 0.8 0.6 2.0 51 0.1 0.6 11.9 12.0 895
SQ24-120 291.9 295.7 3.8 公司將按照計劃所規定的條件出售和發行普通股。這些普通股已獲得授權並將在全額支付所規定的代價的情況下發行,且按照計劃中的規定獎勵。作爲開曼群島法律規定,只有在其已被納入成員(股東)登記冊時,股份才被認爲已發行。 0.4 12 0.0 0.3 1.8 2.1 155
公司。 292.9 293.3 0.4 0.3 1.8 37 0.0 1.8 8.9 9.9 735
SQ24-121 314.0 315.1 1.2 0.8 0.5 26 0.1 0.2 0.6 1.6 122
SQ24-122 224.3 225.5 1.3 0.6 0.5 49 0.1 0.7 1.8 3.0 222
營地存入資金
化驗結果 在2023年9月30日結束的9個月和2022年,公司分別減記了股份補償費用$百萬。這是由於員工離職而導致的放棄活動。 28.3 1.3 1.0 2.5 57 0.3 1.1 責任範圍 12.9 958
化驗結果 256.6 258.0 1.4 1.2 0.1 72 0.1 0.9 0.8 2.3 174
化驗結果 441.0 2.9 2.3 0.2 484 0.0 0.5 0.6 7.5 557 之前發佈
公司。 441.0 441.9 0.9 0.7 0.3 1156 0.0 0.8 0.8 16.9 1257之前發佈
化驗結果 由收購產生的無形資產的攤銷 (b) (-48.6) 492.9 0.8 0.6 0.3 54 0.0 0.7 2.9 3.6 266
化驗結果 498.2 501.2 3.0 2.4 0.1 173 0.0 0.1 0.3 2.7 202
公司。 500.1 501.2 1.0 0.8 0.1 320 0.0 0.1 0.5 4.8 359
1.6 138.0 150.9 1.3 1.0 0.2 170 0.0 0.2 0.8 3.1 234
公司。 138.9 150.9 0.4 0.3 0.3 428 0.0 0.0 0.3 6.3 470
1.6 148.7 153.0 4.3 3.5 0.5 1501 0.1 0.8 5.9 25.6 1901 之前發佈
公司。 148.7 149.5 0.9 0.7 0.4 7099 0.3 2.0 5.4 101.3 7532先前發佈
and inc. 150.6 151.1 0.5 0.4 1.1 108 0.1 1.6 32.9 28.2 2096年之前發佈
1.6 226.9 228.0 1.1 0.9 0.0 232 0.0 0.2 0.8 3.9 287
SQ24-125 58.0 66.5 8.5 7.5 0.5 63 0.1 0.5 2.3 3.4 255 之前發佈
公司。 61.7 63.6 1.9 1.7 1.5 217 0.4 1.4 7.5 11.2 835之前發佈
公司。 61.7 62.5 0.8 0.7 2.7 388 0.6 2.5 11.3 18.4 1372之前發佈
SQ24-125 497.8 498.3 0.5 0.4 0.1 97 0.0 2.0 0.5 2.7 202
SQ24-126 47.5 49.0 1.5 1.2 0.8 18 0.1 0.3 3.3 3.8 282
北方營地
SQ24-127 381.5 381.8 0.3 UNK 0.3 130 0.1 0.7 2.2 4.1 305
SQ24-127 520.8 521.7 0.9 UNK 0.0 102 0.0 0.5 0.2 1.8 133
SQ24-128 38.8 39.8 1.1 UNK 0.3 8 0.0 0.3 1.3 1.5 112
SQ24-128 65.6 66.7 1.1 UNK 0.4 25 0.0 0.7 公司將按照計劃所規定的條件出售和發行普通股。這些普通股已獲得授權並將在全額支付所規定的代價的情況下發行,且按照計劃中的規定獎勵。作爲開曼群島法律規定,只有在其已被納入成員(股東)登記冊時,股份才被認爲已發行。 3.5 263
SQ24-128 282.0 290.6 8.6 UNK 0.2 67 0.0 1.0 4.2 4.7 352 之前發佈
公司。 282.0 283.7 1.6 UNK 0.4 68 0.0 0.9 8.3 7.9 之前已發佈591
and inc. 287.6 289.4 1.8 未知 0.4 210 0.0 公司將按照計劃所規定的條件出售和發行普通股。這些普通股已獲得授權並將在全額支付所規定的代價的情況下發行,且按照計劃中的規定獎勵。作爲開曼群島法律規定,只有在其已被納入成員(股東)登記冊時,股份才被認爲已發行。 7.4 10.2 761已發佈

Notes: drill core samples were analyzed by FA/AAS for gold and 48 element ICP-MS by MS Analytical, Langley, BC. Silver (>100ppm), copper, lead and zinc (>1%) overlimits assayed by ore grade ICP-ES analysis, High silver overlimits (>1000g/t Ag) and gold overlimits (>10g/t Au) re-assayed with FA-Grav. Silver >10,000g/t re-assayed by concentrate analysis, where a FA-Grav analysis is performed in triplicate and a weighed average reported. Downhole composites calculated using a 80g/t AgEq (1g/t AuEq) cut-off and <20% internal dilution, except where noted. Accuracy of results is tested through the systematic inclusion of QA/QC standards, blanks and duplicates into the sample stream. AuEq and AgEq were calculated using prices of $1,800/oz Au, $22/oz Ag, $3.50/lb Cu, $0.95/lb Pb and $1.30/lb Zn. AuEq and AgEq calculations utilized relative metallurgical recoveries of Au 70%, Ag 80%, Cu 80%, Pb 81% and Zn 90%.

注意:岩心樣品通過FA/AAS分析黃金和48元素ICP-MS分析,由MS Analytical, Langley, BC進行。(>100ppm)的銀,(>1%)的銅,鉛和鋅通過礦石級ICP-ES分析進行超限分析,高銀超限(>1000g/t Ag)和高金超限(>10g/t Au)通過FA-Grav重新分析。(>10,000g/t)的銀通過濃縮分析重新分析,在其中進行了三重複FA-Grav分析和加權平均報告。鑽孔複合材料使用80g/t AgEq(1g/t AuEq)截止和

About Equity Metals Corporation

關於Equity Metals Corporation

Equity Metals Corporation is a member of the Malaspina-Manex Group. The Company owns 100% interest, with no underlying royalty, in the Silver Queen project, located along the Skeena Arch in the Omineca Mining Division, British Columbia. The property hosts high-grade, precious- and base-metal veins related to a buried porphyry system, which has been only partially delineated. The Company also has a controlling JV interest (57.49%) in the Monument Diamond project, NWT, strategically located in the Lac De Gras district within 40 km of both the Ekati and Diavik diamond mines.

Equity Metals Corporation是Malaspina-Manex集團的成員。該公司擁有Silver Queen項目的100%權益,沒有基礎版稅,在不列顛哥倫比亞省的Omineca礦業區的Skeena Arch沿線。該物業擁有與一個埋藏的斑岩系統相關的高品位貴金屬和基礎金屬礦脈,該系統僅部分被勘探。公司還在Lac De Gras地區,緊鄰Ekati和Diavik金剛石礦40公里以內的Monument Diamond項目中擁有控股JV權益(57.49%)。

Robert Macdonald, MSc. P.Geo, is VP Exploration of Equity Metals Corporation and a Qualified Person as defined by National Instrument 43-101. He is responsible for the supervision of the exploration on the Silver Queen project and for the preparation of the technical information in this disclosure.

Robert Macdonald,MSc. P.Geo,是Equity Metals Corporation的VP Exploration和根據National Instrument 43-101定義的合格人員。他負責監督Silver Queen項目的勘探,並準備此披露的技術信息。

On behalf of the Board of Directors
"Joseph Anthony Kizis, Jr."

謹代表董事會
「約瑟夫·安東尼·基齊斯·小姐。」

Joseph Anthony Kizis, Jr., P.Geo
President, Director, Equity Metals Corporation

約瑟夫·安東尼·基齊斯·小姐,工程師地質師(P.Geo)
總裁,董事,Equity Metals Corporation

For further information, visit the website at ; or contact us at 604.641.2759 or by email at corpdev@mnxltd.com.

欲了解更多信息,請訪問網站;或通過電子郵件corpdev@mnxltd.com或電話604.641.2759聯繫我們。

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release. This news release may contain forward-looking statements. Forward-looking statements address future events and conditions and therefore involve inherent risks and uncertainties. Actual results may differ materially from those currently anticipated in such statements. Factors that could cause actual results to differ materially from those in forward looking statements include the timing and receipt of government and regulatory approvals, and continued availability of capital and financing and general economic, market or business conditions. Equity Metals Corporation does not assume any obligation to update or revise its forward-looking statements, whether as a result of new information, future events or otherwise, except to the extent required by applicable law.

TSX Venture Exchange及其監管服務提供者(如TSX Venture Exchange的政策中所定義的)均不承擔此發佈的充分性或準確性的責任。此新聞稿可能包含前瞻性陳述。前瞻性陳述涉及未來事件和情況,因此涉及固有的風險和不確定性。實際結果可能與此披露中當前預期的結果有所不同。導致前瞻性陳述與實際結果不同的因素包括政府和監管部門批准的時間和收到的時間,以及資本和融資的持續可用性以及一般經濟,市場或業務狀況。 Equity Metals Corporation不承擔任何更新或修訂其前瞻性陳述的義務,無論是因爲新信息,未來事件或其他原因,除了法律規定的範圍。

譯文內容由第三人軟體翻譯。


以上內容僅用作資訊或教育之目的,不構成與富途相關的任何投資建議。富途竭力但無法保證上述全部內容的真實性、準確性和原創性。
    搶先評論