share_log

Soluna Announces Monthly Business Update; Signs Term Sheet With A Renewable Energy Leader For Project Rosa, Boosting Capacity By 187 MW Of Sustainable Energy For AI And Bitcoin Mining

Soluna Announces Monthly Business Update; Signs Term Sheet With A Renewable Energy Leader For Project Rosa, Boosting Capacity By 187 MW Of Sustainable Energy For AI And Bitcoin Mining

Soluna宣佈每月業務更新;與可再生能源領導者簽署期限表,爲Rosa項目增加187兆瓦的可持續能源能力,用於人工智能和比特幣挖礦
Benzinga ·  10/09 20:12

Soluna Holdings, Inc. ("SHI" or the "Company"), (NASDAQ:SLNH), a developer of green data centers for intensive computing applications including Bitcoin mining and AI, announced its September project site-level operations, developments, and updates.

Soluna控股公司("SHI"或"公司"),(納斯達克: SLNH),一家專注於爲比特幣挖礦和人工智能等高強度計算應用開發綠色數據中心的開發者,宣佈其9月項目現場運營、發展和更新。

This press release features multimedia. View the full release here:

本新聞稿涵蓋多媒體功能。在此處查看完整新聞稿:

The Company has provided the following Corporate and Site Updates.

公司已提供以下公司和現場更新。

Key Company Metrics:

關鍵公司指標:

The monthly metrics are now available here.

月度指標現已在此處提供。

Corporate Highlights:

企業重點:

  • Term Sheets for Project Rosa – Soluna signed a term sheet with a renewable energy leader for Project Rosa, boosting capacity by 187 MW of sustainable energy for AI and Bitcoin mining.
  • CEO John Belizaire attended the 2024 Ai4 Conference – A recording of the panel "The AI Ecosystem: Hardware, Cloud, and Enterprise Integration" can now be viewed here.
  • New Blog – We unpack the problems and novel solutions to AI's bottomless energy appetite. Read it here.
  • New Blog – We explore the convergence of artificial intelligence and renewable energy and the resulting innovative solutions. Read it here.
  • 項目Rosa的條款表 - Soluna與可再生能源領導者簽署了項目Rosa的條款表,爲人工智能和比特幣挖礦提供了187兆瓦的可持續能源容量。
  • 首席執行官約翰·貝利澤爾出席了2024年Ai4大會 - 面板"AI生態系統:硬件、雲和企業集成"的記錄現在可在此處觀看。
  • 新博客-我們解讀人工智能無窮無盡的能源需求問題以及新穎解決方案。在這裏閱讀。
  • 新博客-我們探討人工智能和可再生能源的融合以及由此產生的創新解決方案。在這裏閱讀。

Key Project Updates:

關鍵項目更新:

Project Dorothy 1A (25 MW, Bitcoin Hosting) / Project Dorothy 1B (25 MW, Bitcoin Prop-Mining):

多蘿西1A項目(25兆瓦,比特幣託管)/ 多蘿西10億項目(25兆瓦,比特幣礦場):

  • The Four Coincident Peak (4CP) period ended in September with our MaestroOS() control system successfully responding to all demand requirements.
  • Optimization efforts to include building insulation, heat shielding, and power infrastructure cooling solutions have been completed.
  • We successfully completed the summer program for our participation in ancillary services.
  • 四個同時發生的峯值(4CP)時期於九月結束,我們的MaestroOS(司令控制系統)成功響應了所有需求要求。
  • 已完成包括建築隔熱、熱屏蔽和電力基礎設施冷卻解決方案的優化工作。
  • 我們成功完成了參與輔助服務的夏季計劃。

Project Dorothy 2 (48 MW, Bitcoin Hosting):

多蘿西2項目(48兆瓦,比特幣託管):

  • Site grading will be completed in the coming weeks.
  • Civil construction teams are in the process of pouring concrete pads for the initial phase of work with MDC fabrication underway so building erection can follow shortly after.
  • All long lead power infrastructure has been received.
  • Dates to complete the substation interconnection are in the process of being finalized with work slated to begin in December.
  • 場地平整將在接下來的幾周內完成。
  • 土木施工團隊正在爲工作的初始階段澆築混凝土基礎,同時MDC製造正在進行中,建築安裝工作很快將隨之展開。
  • 所有長期電力基礎設施已經到貨。
  • 變電站互連完成日期的最終確定正在進行中,工作計劃於12月開始。

New Project Grace (2 MW at Dorothy 2, AI Cloud/Hosting):

新項目Grace(Dorothy 2, 2 MW,人工智能雲/託管):

  • Kicked off kW Mission Critical on the Concept design for Helix.
  • 啓動概念設計的kW Mission Critical項目芯軸。

New Project Ada (1 MW, AI Cloud with HPE):

新項目Ada(1 MW,人工智能雲,慧與科技):

  • 6 POCs in progress or completed with partners or potential customers.
  • New sales team in contract negotiations with several customers to fill the initial Cluster.
  • Demand for an additional 84 Nodes (or 672 GPUs) is on the waitlist.
  • Attracted leading aggregators to our Cloud platform.
  • 與合作伙伴或潛在客戶進行中或已完成的6個POC。
  • 新銷售團隊正在與幾家客戶進行合同談判,以填補初始集群。
  • 需求額外的84個節點(或672個GPU)已列入等待名單。
  • 吸引主要的聚合商加入我們的雲平台。

Project Sophie (25 MW, Bitcoin Hosting with Profit Share, AI Hosting):

Sophie項目(25 MW,比特幣託管並分享利潤,人工智能託管):

  • The site has continued to operate at a high level as cooler temperatures persist into the fall season.
  • Preparations are underway for an 8.8 MW fleet upgrade and 3.3 MW expansion of an existing customer to be completed in October.
  • 由於氣溫持續下降,該站點繼續高水平運轉進入秋季。
  • 準備工作正在進行中,以完成10月份8.8 MW的艦隊升級和現有客戶3.3 MW擴展。

Project Kati (166 MW, Bitcoin Hosting and AI):

Kati項目(166 MW,比特幣託管和人工智能):

  • Meter Design Proposal Submitted to AEP
  • Negotiations continue with landowners for the site land leases.
  • 表計設計方案已提交至AEP
  • 正在與土地所有者就場地租賃進行談判。

View Soluna's recent AMA here.

在這裏查看Soluna最近的AMA。

View Soluna 2024 Earnings Power Presentation here.

在這裏查看Soluna 2024年盈利能力演示。

譯文內容由第三人軟體翻譯。


以上內容僅用作資訊或教育之目的,不構成與富途相關的任何投資建議。富途竭力但無法保證上述全部內容的真實性、準確性和原創性。
    搶先評論