share_log

Reported Sunday, Ero Copper's Tucumã Operations Impacted By Storm-Induced Power Outage, Full Restoration Expected Within 14 Days

Reported Sunday, Ero Copper's Tucumã Operations Impacted By Storm-Induced Power Outage, Full Restoration Expected Within 14 Days

週日報道,銅巨人公司的圖庫馬運營受風暴導致的停電影響,預計全面恢復需要14天
Benzinga ·  13:40

Reported Sunday, Ero Copper's Tucumã Operations Impacted By Storm-Induced Power Outage, Full Restoration Expected Within 14 Days

週日報道,銅巨人公司的圖庫馬運營受風暴導致的停電影響,預計全面恢復需要14天

譯文內容由第三人軟體翻譯。


以上內容僅用作資訊或教育之目的,不構成與富途相關的任何投資建議。富途竭力但無法保證上述全部內容的真實性、準確性和原創性。
    搶先評論