share_log

Tower Completes First Phase of 2024 Drilling Program at Rabbit North, Prepares for Larger Follow-Up Drilling Campaign in September

Tower Completes First Phase of 2024 Drilling Program at Rabbit North, Prepares for Larger Follow-Up Drilling Campaign in September

塔架在兔子北區完成2024年鑽探計劃的第一階段工作,準備在九月進行更大規模的後續鑽探活動。
newsfile ·  08/26 19:30

Vancouver, British Columbia--(Newsfile Corp. - August 26, 2024) - Tower Resources Ltd. (TSXV: TWR) ("Tower" or the "Company") is pleased to report that it has completed the first phase of its planned 2024 drilling program on the Rabbit North property in the heart of the Kamloops mining district (see Fig. 1) and is planning a larger Phase II follow-up campaign for mid-September.

卑詩省溫哥華--(Newsfile Corp. - 2024年8月26日)- 塔架資源有限公司(tsxv:twr)(「塔架」或「公司」)非常高興地宣佈已完成2024年計劃鑽探項目的第一階段,並計劃在9月中旬進行更大規模的第二階段跟進活動,該項目位於坎盧普斯礦區的兔北區域(見圖1)。

Phase I Drill Program

一期鑽探項目

The Phase I campaign comprised 1015 m in five drill holes, Nos. RN24-050 to 054.

一期鑽探活動包括1015萬加元的五個鑽孔,編號爲RN24-050至054。

Holes 050 and 052 tested for a possible northwestern extension of the favourable magmatic-hydrothermal breccia body (see Fig. 2) that hosts last year's Rainbow porphyry Cu-Au-Mo discovery (72.0 m grading 0.27% Cu, 0.40 g/t Au and 0.01% Mo in Hole RN23-042).

050號和052號井試驗了有利的岩漿熱液角礫岩體(見圖2)的可能的西北延伸,該巖體是去年發現的彩虹斑岩銅-金-鉬礦牀(7200萬分級0.27%銅、0.40克/噸金和0.01%鉬,位於RN23-042孔中)。

Holes 051, 053 and 054 tested three of the four shear-hosted Au targets that are the main focus of the 2024 drilling program (see press release of May 23, 2024).

051、053和054號井試驗了2024年鑽探項目的四個走向剪切瑞蝕型金靶區中的三個(見2024年5月23日的新聞稿)。

Hole 051 targeted the southern shear trend between the Thunder and Lightning Zones. It was designed to cross the east-northeast trending shear zone ~150 m east of last year's Thunder discovery hole RN23-041, which encountered two strongly mineralized intervals 10 m apart averaging 3.28 g/t Au over 13.25 m and 2.19 g/t Au over 10.12 m, and 300 m west of the Lightning Zone which has been intersected in six holes over core lengths of 26.5 to 138.0 m at an average grade of ~1.5 g/t Au (see Fig. 3).

051號井以雷暴區與閃電區之間的南向剪切帶爲目標。設計上,它將會穿過去年雷暴發現孔RN23-041以東約15000萬的東東北向剪切帶,該孔穿越了兩個強礦化間隔,間隔爲1000萬,平均金品位爲1325萬 g/t, 以及2.19克/噸Au,長度爲1012萬遇到的以及位於閃電區以西30000萬的剪切帶,後者經過6個孔段,總長度爲26.53到13800萬,平均品位爲1.5 g/t Au(見圖3)。

Hole 052 targeted the central shear trend ~200 m northeast of the Lightning Zone (see Fig. 2) as a potential source for the eastern part of the Dominic Lake gold grain dispersal train (see press release of April 25, 2024). Hole 053 targeted the same shear trend ~60 m west along strike from last year's Thunder North discovery hole RN23-039, which intersected 25.7 m @ 2.04 g/t Au.

052號井以閃電區東北約20000萬的中央帶爲目標(見圖2),作爲多米尼克湖金砂擴散帶東部的潛在來源(見2024年4月25日的新聞稿)。053號井以相同的剪切帶爲目標,其位於去年雷暴北部發現孔RN23-039以西約6000萬的走向延伸斷層帶上,後者於2570萬@2.04克/噸Au交叉。

The core from Holes 050 to 052 has been cut and submitted for analysis; the remaining core will be submitted as a separate batch.

050號到052號井的岩心已經切割並提交進行分析;剩下的岩心將作爲另一個批次提交。

Next Steps

下一步

Based in part on Lightning-type shearing and alteration observed in the drill core, a larger follow-up drilling campaign of up to ten holes is planned for mid-September.

根據鑽孔岩心中觀察到的雷電式剪切和變質情況,計劃在九月中旬進行多達十口井的更大規模後續鑽探。

Methods and Qualified Person

方法和合格人員

The drill core is being logged at Tower's leased, fully equipped core facility near Kamloops by Matthew Husslage, P.Geo. and Sean Jubinville, G.I.T. Mr. Husslage has managed or co-managed all of Tower's Rabbit North diamond drilling programs since the discovery of the Lightning Zone in December 2021.

鑽孔岩心由Matthew Husslage P.Geo.和Sean Jubinville G.I.t.在Kamloops附近的Tower租賃的設備齊全的岩心設施進行記錄。自2021年12月雷電帶的發現以來,Husslage先生一直管理或共同管理Tower的Rabbit North金剛石鑽探項目。

Split samples of the core, generally 1.0 or 1.5 m in length, are being delivered directly to Activation Laboratories (ActLabs) in Kamloops, BC, a laboratory certified as ISO/IEC 17025 Accredited (Lab 790) by the Standards Council of Canada. QA/QC samples including blanks and standards are inserted regularly into the sample sequence at a ratio of approximately 1:20.

通常長度爲1.0或150萬的岩心樣品被分送至位於卑詩省Kamloops的Activation Laboratories (ActLabs),該實驗室被加拿大標準理事會認證爲ISO/IEC 17025認可的實驗室(實驗室790)。質量控制樣品包括空白樣和標準樣品被定期插入樣品序列中,比例約爲1:20。

The samples are being analyzed for Au by fire assay and ICP-OES and for Ag and 36 additional elements by ICP-OES using a four-acid, near-total digestion. Any over-limit (>5 g/t) Au analyses are repeated using the same fire assay procedure but with a gravimetric rather than ICP finish.

樣品通過火試金和ICP-OES分析黃金,並通過ICP-OES分析銀和其他36個元素,使用四酸近全消化法。任何超限(>5 g/t)的黃金分析都會使用相同的火試金程序重複進行,但使用比ICP更精確的重力計終點。

The technical content of this news release has been reviewed and approved by Stuart Averill, P.Geo., a director of the Company and a Qualified Person as defined by National Instrument 43-101.

本新聞稿的技術內容已由公司董事兼符合《加拿大43-101號國家儀器》定義的合格人士Stuart Averill P.Geo.審核和批准。

About Tower Resources

關於Tower Resources

Tower is a Canadian based mineral exploration company focused on the discovery and advancement of economic mineral projects in the Americas. The Company's key exploration assets, all in B.C., are the Rabbit North copper-gold porphyry project located between the New Afton copper-gold and Highland Valley copper mines in the Kamloops mining district, the Nechako porphyry-associated gold-silver project near Artemis' Blackwater project and the More Creek epithermal gold project on the critical "red line" structural zone connecting the mineral deposits of the Golden Triangle.

Tower是一家加拿大基於礦產勘查的公司,專注於在美洲發現和推進經濟礦產項目的開發。該公司的主要勘探資產全部位於卑詩省,其中包括位於Kamloops礦區New Afton銅金礦和Highland Valley銅礦之間的Rabbit North銅金斑岩項目、Nechako斑岩型金銀項目,與亞特米斯的Blackwater項目相鄰,以及More Creek淺成因金礦項目位於連接Golden Triangle礦牀的關鍵「紅線」構造帶上。

On behalf of the Board of Directors
Tower Resources Ltd.

謹代表董事會
Tower Resources Ltd.

Joe Dhami, President and CEO
(778) 996-4730

Joe Dhami,總裁兼首席執行官
(778)996-4730

Reader Advisory

讀者聲明

This news release may contain statements which constitute "forward-looking information", including statements regarding the plans, intentions, beliefs and current expectations of the Company, its directors, or its officers with respect to the future business activities of the Company. The words "may", "would", "could", "will", "intend", "plan", "anticipate", "believe", "estimate", "expect" and similar expressions, as they relate to the Company, or its management, are intended to identify such forward-looking statements. Investors are cautioned that any such forward-looking statements are not guarantees of future business activities and involve risks and uncertainties, and that the Company's future business activities may differ materially from those in the forward-looking statements as a result of various factors, including, but not limited to, fluctuations in market prices, successes of the operations of the Company, continued availability of capital and financing and general economic, market or business conditions. There can be no assurances that such information will prove accurate and, therefore, readers are advised to rely on their own evaluation of such uncertainties. The Company does not assume any obligation to update any forward-looking information except as required under the applicable securities laws.

本新聞發佈可能包含構成「前瞻性信息」的聲明,包括關於公司、董事或其管理層對公司未來業務活動計劃、意圖、信念和當前期望的聲明。使用「可能」、「將」、「可能」、「意圖」、「計劃」、「預計」、「相信」、「估計」、「期望」等表達方式來指代公司或其管理層的語言與前瞻性聲明有關。投資者應注意,任何此類前瞻性聲明均不構成未來業務活動的保證,其中涉及風險和不確定因素,因此公司未來的業務活動可能會因各種因素而與前瞻性聲明不同,其中包括但不限於市場價格波動、公司運營的成功、繼續獲得資本和融資以及一般經濟、市場或商業條件。無法保證該類信息的準確性,因此讀者被建議依靠自己對這些不確定因素的評估。除適用證券法規定外,公司不承擔更新任何前瞻性信息的義務。

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

TSX創業公司交易所及其監管服務提供者(如TSX創業公司政策所定義)均不承擔本發佈信息充分性或準確性的責任。

Figure 1 - Location of the Rabbit North property.

Figure 2 - Locations of Holes 050 to 054 relative to the five targets of the 2024 drilling program.

Figure 3 - Block model of the shear-hosted Thunder, Thunder North and Lightning Au zones. The Au component of the Rainbow porphyry Cu-Au zone is included.

譯文內容由第三人軟體翻譯。


以上內容僅用作資訊或教育之目的,不構成與富途相關的任何投資建議。富途竭力但無法保證上述全部內容的真實性、準確性和原創性。
    搶先評論