share_log

Canadian Gold Corp. Commences Phase 3 Drill Program at Tartan Mine

Canadian Gold Corp. Commences Phase 3 Drill Program at Tartan Mine

加拿大黃金公司開始在塔坦礦開展第三階段鑽探計劃。
newsfile ·  07/31 04:30

Toronto, Ontario--(Newsfile Corp. - July 30, 2024) - Canadian Gold Corp. (TSXV: CGC) ("Canadian Gold" or the "Company") is pleased to provide an exploration update for the Tartan Mine property, located near Flin Flon, Manitoba.

資訊公司Newsfile Corp.(2024年7月30日,安大略省多倫多)加拿大黃金公司(TSXV:CGC)(“加拿大黃金”或“公司”)非常高興地爲塔坦礦山物業提供勘探更新,該物業位於馬尼托巴省弗林弗倫附近。

Phase 3 Drill Program Initial Focus: Expanding the Hanging Wall Zone & Main Zone

第三階段鑽探計劃最初的重點:拓展掛牆區和主區。

The Phase 3 Drill Program is now underway at the Tartan Mine. The Company had deferred the start of the Drill Program to ensure that a veteran drill crew would be on site for the program.

第三階段鑽探計劃現已在塔坦礦山展開。公司推遲鑽探計劃的開始,以確保一支有經驗的鑽井隊在項目現場。

As previously disclosed, the initial focus of the Phase 3 Drill Program is testing the western extent of the Hanging Wall Zone (HWZ), following up on two important intersections and the Main Zone record length intercept at depth.

正如之前披露的,第三階段鑽探計劃的最初重點是測試掛牆帶的西部範圍,跟進兩個重要的交叉口和Main Zone記錄長度的深度攔截。

The two important intersections of the HWZ, which remains open to the west and starts approximately 670 metres below surface, include the first hole that returned 23.8 gpt gold over 12.6 metres, including 47.6 gpt gold over 5.8 metres and the second intercept, drilled earlier in 2024, returning 20.6 gpt gold over 5.7 metres, including 30.4 gpt gold over 3.0 metres.

掛牆區的兩個重要交叉口(仍向西開放,並從表面以下約670米開始)包括第一口井,返回12.6米的23.8克/噸金,其中包括5.8米的47.6克/噸金,和第二個交叉,早在2024年之前鑽探,返回5.7米的20.6克/噸金,其中包括3.0米的30.4克/噸金。

In the Main Zone the most important hole drilled in the earlier drill programs returned the longest intercept in the history of the Tartan Mine with an impressive 4.2 gpt gold over 53.7 metres, including 12.0 gpt gold over 8.0 metres. A detailed analysis of the drill data indicates that there is considerable potential to expand this zone to the west. Should the planned drill holes in this target area return similar assay results, it would represent a material increase to the size of the resource at the Tartan Mine.

在主區,在早期的鑽探項目中鑽孔最重要的是,以牙買加鐵路爲歷史最長的攔截歸還4.2克/ 公斤的黃金在53.7米,其中包括8.0米的12.0克/噸金。鑽探數據的詳細分析表明,該區域拓展到西部的潛力巨大。如果該目標區域計劃的鑽孔返回相似的化驗結果,那麼它將代表尺寸在塔坦礦山上的資源的實質性增加。

Management believes the ability to expand these important zones remains key to unlocking value at the Tartan Mine.

管理層認爲,擴大這些重要區域的能力仍然是釋放塔坦礦山價值的關鍵。

Further updates on the program will follow.

計劃還將提供進一步的更新。

Proceeds from Canadian Gold's recently completed private placement offering (announced July 17, 2024) will be deployed for this Phase 3 Drill Program. Insiders of the Company subscribed to the offering resulting in related party considerations pursuant to TSX Venture Exchange Policy 5.9 and Multilateral Instrument 61-101 - Protection of Minority Security Holders in Special Transactions ("MI 61-101"). Canadian Gold relied on the exemptions contained in Section 5.5(c) of MI 61-101 for an exemption from the formal valuation requirement and Section 5.7(1)(b) of MI 61- 101 for an exemption from the minority shareholder approval requirement as the fair market value of the securities distributed under the offering, insofar as it involved interested parties, did not exceed $2,500,000.

加拿大黃金最近完成私募股票發行(宣佈於2024年7月17日),所得款項將用於這個第三階段鑽探計劃。公司內部人士認購了這項發行,因涉及TSX Venture Exchange Policy 5.9和Multilateral Instrument 61-101 - Protection of Minority Security Holders in Special Transactions(“MI 61-101”),從而導致相關方考慮。加拿大黃金依賴於MI 61-101的第5.5(c)節的豁免來豁免正式估值要求,MI 61-101的第5.7(1)(b)節的豁免來豁免少數股東認可要求,因爲發行的證券的公允市場價值,對於涉及利益相關方的內容而言,沒有超過250萬加元。

For Further Information, Please Contact:

如需更多信息,請聯繫:

Michael Swistun, CFA
President & CEO
Canadian Gold Corp.
(204) 232-1373
info@canadiangoldcorp.com

Michael Swistun,CFA
總裁兼首席執行官
加拿大黃金公司
(204) 232-1373
info@canadiangoldcorp.com

Qualified Person

合格人士

The scientific and technical information disclosed in this news release was reviewed and approved by Wesley Whymark, P. Geo., Consulting Geologist for the Company, and a Qualified Person as defined under National Instrument 43-101.

本新聞稿所披露的科學技術信息由公司的諮詢地質師和National Instrument43-101下定義的合格人員Wesley Whymark,P.Geo.審查批准。

About Canadian Gold Corp.

關於加拿大黃金公司

Canadian Gold Corp. is a Toronto-based mineral exploration and development company whose objective is to expand the high-grade gold resource at the past producing Tartan Mine, located in Flin Flon, Manitoba. The historic Tartan Mine currently has a 2017 indicated mineral resource estimate of 240,000 oz gold (1,180,000 tonnes at 6.32 g/t gold) and an inferred estimate of 37,000 oz gold (240,000 tonnes at 4.89 g/t gold). The Company also holds a 100% interest in greenfields exploration properties in Ontario and Quebec adjacent to some of Canada's largest gold mines and development projects, specifically, the Canadian Malartic Mine (QC), the Hemlo Mine (ON) and Hammond Reef Project (ON). The Company is 35% owned by Robert McEwen, who was the founder and CEO of Goldcorp and is Chairman and CEO of McEwen Mining.

加拿大黃金公司是一家總部位於多倫多的礦產勘探和開發公司,其目標是擴大過去的生產地點塔坦礦山的高品位金資源,該礦山位於馬尼托巴省弗林弗倫。歷史悠久的塔坦礦山目前有2017年指示性礦產資源估計量爲240,000盎司黃金(1,180,000噸,金品位爲6.32克/噸)和推斷估計量爲37,000盎司黃金(240,000噸,金品位爲4.89克/噸)。該公司還持有100%的股權,在安大略和魁北克擁有青田勘探物業,與加拿大一些最大的金礦和開發項目毗鄰,特別是加拿大馬拉提克礦(QC),赫洛礦(ON)和漢密爾頓礁項目(ON)。該公司由RobertMcEwen擁有35%的股權,他是Goldcorp的創始人和首席執行官,並擔任McEwen Mining的董事長兼首席執行官。

CAUTION REGARDING FORWARD-LOOKING INFORMATION

關於前瞻性信息的警示

This news release of the Company contains statements that constitute "forward-looking statements." Such forward-looking statements involve known and unknown risks, uncertainties and other factors that may cause Canadian Gold's actual results, performance or achievements, or developments in the industry to differ materially from the anticipated results, performance or achievements expressed or implied by such forward-looking statements.

本公司新聞發佈中包含的陳述構成了“前瞻性陳述”。此類前瞻性陳述涉及已知和未知風險、不確定性和其他因素,可能會導致加拿大黃金的實際結果、業績或成就或行業發展與預期結果、業績或成就所表達或暗示的不同。

譯文內容由第三人軟體翻譯。


以上內容僅用作資訊或教育之目的,不構成與富途相關的任何投資建議。富途竭力但無法保證上述全部內容的真實性、準確性和原創性。
    搶先評論