share_log

Red Pine Confirms Independent Sampling and Assaying Validating Corrected Assay Database for Updated Resource Estimation

Red Pine Confirms Independent Sampling and Assaying Validating Corrected Assay Database for Updated Resource Estimation

紅松公司確認獨立取樣和化驗驗證校正的化驗數據庫以更新資源估算。
GlobeNewswire ·  07/24 19:30

TORONTO, July 24, 2024 (GLOBE NEWSWIRE) -- Red Pine Exploration Inc. (TSXV: RPX, OTCQB: RDEXF) ("Red Pine" or the "Company") reports the results of the expanded independent verification sampling and assaying of drill core performed by WSP Canada Inc. ("WSP") as part of the ongoing resource estimation for the Wawa Gold Project, Ontario.

加拿大安大略省華甌金礦項目基準估值的持續資源估算的一部分,Red Pine Exploration Inc.(TSXV:RPX,OTCQB:RDEXF)("Red Pine"或"公司")報告了WSP Canada Inc.("WSP")擴大獨立驗證採樣和測試鑽孔核心的結果。

Michael Michaud, President and CEO of Red Pine commented: "I am pleased to see that the independent verification sampling completed by WSP is in good agreement with the corrected database assay values ensuring that we have a project database that is accurate to support the upcoming resource estimate. The independent verification sampling of core was the final stage of assay verification, and we now have full confidence in the database and the resource estimation, which remains on schedule to be completed in August.

Red Pine的總裁兼首席執行官Michael Michaud評論道:"我很高興看到WSP完成的獨立驗證取樣與經過校正的數據庫測定值很好地吻合,確保我們擁有一個準確的項目數據庫,以支持即將發佈的資源估算。核心的獨立驗證取樣是測定驗證的最後階段,我們現在對數據庫和資源估算完全有信心,並且計劃如期在8月份完成。"

In addition, the independent verification sampling also re-confirmed the presence of significant gold mineralization on the Wawa Gold Project and we continue to see the untested exploration potential of the property."

此外,獨立驗證採樣還再次確認了華甌金礦項目重要金礦化的存在,並且我們還看到了該物業未經開發的勘探潛力。"

Independent verification sampling methodology

獨立驗證採樣方法

Independent sample verification of the drill core was completed between May 21 and May 23, 2024 by Brian Thomas, P.Geo. of WSP Canada Inc. ("WSP"), a Qualified Person as defined by National Instrument 43-101. The verification sampling and assaying included core that was drilled since 2014 to present and included historic drill core collected by previous operators.

WSP Canada Inc.("WSP")的Brian Thomas,P.Geo.完成了自2014年以來的鑽孔核心獨立樣本驗證。鑽孔核心的獨立樣本驗證於2024年5月21日至23日完成,包括自2014年以來鑽探的巖芯以及前任操作者收集的歷史巖芯。

The sample verification program considered 50 samples from Red Pine drilling intersections from 2014 to 2024. Each verification sample consisted of either individual or composited samples selected from intersections distributed in 21 drill holes. A total of 33 verification samples covered the main zone of the Jubilee Shear, 1 sample covered the lower segments of the Jubilee Shear, 4 covered the Minto B Shear Zone and 12 covered the Minto Mine Shear. The verification samples consisted of quartered NQ-sized drill core for the drill holes completed between December 2014 and April 2015, and quartered HQ-sized drill core for the holes completed after May 2015.

取樣驗證計劃考慮了來自2014年至2024年間Red Pine鑽孔交叉口的50個試樣。每個驗證樣本由分佈在21個鑽孔中的交叉口中選擇的單個或組合樣本組成。總共33個驗證樣本涵蓋了Jubilee Shear的主要區域,1個樣本涵蓋了Jubilee Shear的下部段,4個涵蓋了Minto b Shear帶,12個涵蓋了Minto Mine Shear。驗證樣本包括鑽探孔爲2014年12月至2015年4月之間完成的孔的1/4 NQ大小的鑽孔核心,以及鑽探孔爲2015年5月之後完成的1/4 HQ大小的鑽孔核心。

The verification sampling of historical core (drilled prior to 2014 by previous operators) considered 15 composite samples all covering the main segment of the Jubilee Shear and distributed in 11 underground historical drill holes and 1 historical surface drill hole. Each sample of historical drill core consisted of a composite sample taken from the entire box of mechanically split A-sized to B-sized drill core. All the remaining half core that was present in each box was included in the samples. The drill holes and the intersections for the historical samples were selected based on the ability to establish precise boundaries for the previously sampled intervals, the composite grade of the intersections contained in the boxes and their location.

歷史核心的驗證採樣(在Red Pine購置該物業之前鑽探)考慮了15個組合樣本,均覆蓋Jubilee Shear的主要區段,並分佈在11個地下歷史鑽孔和1個歷史表面鑽孔中。每個歷史鑽孔的樣品由整個A型至b型巖芯機械分裂的組合樣品組成。每個箱子中剩餘的半鍵也包含在樣品中。歷史樣本的鑽孔和交叉口是基於能夠確立先前取樣區間的精確界限、文本框中包含的交叉口的組合級別及其位置而選擇的。

The verification samples were transported in sealed rice bags by WSP from the Wawa Gold Project to ALS Canada Ltd. in Sudbury. Sample preparation was done at ALS Sudbury and gold analyses were done at ALS Vancouver. Quartered HQ and NQ drill cores were crushed, and 250 gram ("g") fractions were pulverized to 85% passing 75 microns. Historical drill cores, because of the larger sample volume, were crushed and then a 1000 g fraction was pulverized to 85% passing 75 microns. Gold was analyzed for most of the verification samples by 50-g fire assaying with a gravimetric finish, with some larger, higher-grade samples analyzed by 1-kilogram ("kg") screen metallic assay methods. Metallic screening considered 1 kg pulp screened to 100 microns, duplicate 50-g fire assay on screen undersize and complete assaying of the oversize fraction. Blanks and certified reference materials were included in the analyses of the verification samples.

樣本驗證樣本由WSP封閉於大米袋中從華甌黃金礦項目運往Sudbury的ALS Canada Ltd。樣品製備在ALS Sudbury完成,金分析在ALS Vancouver完成。因爲樣品體積較大,鑽孔的HQ和NQ半芯被碎裂,250克("g")的樣品被粉碎成75微米,歷史鑽孔由於樣品量較大,被碎裂,然後1000克("kg")的樣品被粉碎至75微米85%經過篩分。對於大多數驗證樣品進行50克火試分以及重力法分析,對於一些較大、更高品位的樣品,採用1千克("kg")篩金屬測定方法進行分析。金屬篩選包括1千克泥漿篩選到100微米,屏幕下粉碎的重複50克火試分以及過剩部分的完全測量。在驗證樣品分析中包括白樣和認證參考材料。

Although there exists higher variability on an individual sample comparison as is typical of most gold deposits, the sampling completed by WSP on the Company's drill holes, and the historical drilling which occurred prior to Red Pine acquiring the property, are in good agreement with the assay values in Red Pine's corrected assay database. Based on the combined historical and Red Pine verified samples, the assay results from the verification sampling are on average within 13% of the original assay value.

儘管存在個體採樣比較的較高可變性,但WSP在公司鑽孔和Red Pine購置該物業前進行的歷史鑽探方面完成的採樣與Red Pine校正的測定值數據庫中的測定值很好地吻合。根據歷史和Red Pine驗證樣本的組合,驗證取樣的測定值平均比原始測定值高出13%。

The complete results of the verification sampling are presented at Appendix 1 and Appendix 2. The full reporting of the verification assays will be included in the Company's updated National Instrument 43-101 Technical Report.

驗證取樣的完整結果見附錄1和附錄2。驗證化驗結果的全部報告將包括在公司更新的43-101技術報告中。

Qualified Person

合格人士

Jean-Francois Montreuil, P.Geo. and Vice President, Exploration of Red Pine and the Qualified Person, as defined by National Instrument 43-101, has reviewed and approved the technical information contained in this news release.

Red Pine公司的勘探副總裁、P.Geo. Jean-Francois Montreuil作爲根據43-101國家規定所定義的合格人員,已審核並批准了本新聞稿中包含的技術信息。

About Red Pine Exploration Inc.

關於Red Pine Exploration Inc。

Red Pine Exploration Inc. is a gold exploration company headquartered in Toronto, Ontario, Canada. The Company's shares trade on the TSX Venture Exchange under the symbol "RPX" and on the OTCQB Markets under the symbol "RDEXF".

Red Pine Exploration Inc.是一家總部位於加拿大安大略省多倫多的黃金勘探公司。該公司的股票在TSX Venture Exchange交易,股票代碼爲"RPX",在OTCQB Markets交易,股票代碼爲"RDEXF"。

The Wawa Gold Project is in the Michipicoten Greenstone Belt of Ontario, a region that has seen major investment by several producers in the last five years. Its land package hosts numerous historic gold mines and is over 7000 hectares in size. Red Pine is building a strong position as a major mineral exploration and development player in the Michipicoten region.

Wawa Gold項目位於安大略省的Michipicoten綠巖帶中,該地區在過去五年中已經得到了多個生產商的大量投資。其土地包裹括多個歷史金礦,並且總面積超過7,000公頃。Red Pine正在成爲Michipicoten地區重要的礦產勘探和開發公司。

For more information about the Company, visit

有關公司的更多信息,請訪問

Or contact:

或聯繫:

Michael Michaud, President and CEO, at (416) 364-7024 or mmichaud@redpineexp.com

請致電總裁兼首席執行官Michael Michaud(416)364-7024或mmichaud@redpineexp.com

Or

或者

Carrie Howes, Director Corporate Communications, at (416) 644-7375 or chowes@redpineexp.com

Carrie Howes,企業傳播總監,電話(416)644-7375,電子郵件chowes@redpineexp.com

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

TSX Venture Exchange及其監管服務提供者(如TSX Venture Exchange的政策中所定義的那樣)均不對本發佈的充分性或準確性承擔責任。

Cautionary Note Regarding Forward-Looking Information
This news release contains statements which constitute "forward-looking information" within the meaning of applicable securities laws, including statements regarding the plans, intentions, beliefs and current expectations of the Company with respect to future business activities and operating performance.

關於前瞻性信息的警示
本新聞稿包含構成適用證券法規定的“前瞻性信息”的聲明,包括關於公司未來業務活動和運營業績的計劃、意圖、信念和當前預期的聲明。該新聞稿中包含的前瞻信息通常可以通過諸如“可能”、“將”、“可能”、“應該”、“會”、“打算”、“計劃”、“預測”、“相信”、“估計”、“預期”或類似表達方式來識別。本新聞稿中所包含的前瞻性信息包括但不限於有關更新的礦產資源評估及43-101技術報告的時機的聲明。投資者應當注意,前瞻性信息並沒有基於歷史事實,而是反映了管理層在其考慮合理的管理意見、假設和估計的基礎上,對未來結果或事件的期望、估計或預測。這些意見、假設和估計必然會面臨各種各樣的風險和不確定性,可能會導致實際事件或結果與預期有所不同,應當不過度依賴此類信息,因爲未知或無法預測的因素可能對未來的業績、結果或成就產生實質性的負面影響。可能導致實際結果與前瞻性信息中所預期的結果有所不同的關鍵因素包括:公司在項目和勘探計劃方面的期望得到滿足,普適商業和經濟條件的影響,全球流動性和信貸可用性對基於預期未來條件估計的現金流量和資產負債表的價值的影響,金價波動、貨幣匯率(例如加元相對於美元的匯率)的變化、礦石品位或選礦回收率的變化、會計政策的變化、公司礦產儲量和資源的變化、項目參數隨着計劃的不斷完善而發生的變化、項目開發、建設、生產和投產時間的變化,可能會導致項目成本超支或出現意外費用和支出的風險,燃料、電力、勞動力和其他消耗品價格的上漲導致成本上升以及礦業行業的一般風險,工廠、設備或工藝無法按預期運行,礦山壽命出現意外變化、季節性和天氣影響、新礦牀開發的成本和時機,勘探活動的成功、許可時間表、政府對採礦活動的監管、環境風險、意外的整治費用、所有權爭議或索賠以及保險限制。

Forward-looking information is often identified by the words "may", "would", "could", "should", "will", "intend", "plan", "anticipate", "believe", "estimate", "expect" or similar expressions. Forward-looking information contained in this news release includes, but may not be limited to, statements regarding the timing of its updated resource estimate release and the presence of significant gold mineralization on the Wawa Gold Project continuing to see the untested exploration potential of the property. Investors are cautioned that forward-looking information is not based on historical facts but instead reflects management's expectations, estimates or projections concerning future results or events based on the opinions, assumptions and estimates of management considered reasonable at the date the statements are made. Such opinions, assumptions and estimates are inherently subject to a variety of risks and uncertainties that could cause actual events or results to differ materially from those projected and undue reliance should not be placed on such information, as unknown or unpredictable factors could have material adverse effects on future results, performance or achievements. Among the key factors that could cause actual results to differ materially from those projected in the forward-looking information are: the Company's expectations in connection with the projects and exploration programs being met, the impact of general business and economic conditions, global liquidity and credit availability on the timing of cash flows and the values of assets and liabilities based on projected future conditions, fluctuating gold prices, currency exchange rates (such as the Canadian dollar versus the United States Dollar), variations in ore grade or recovery rates, changes in accounting policies, changes in the Company's mineral reserves and resources, changes in project parameters as plans continue to be refined, changes in project development, construction, production and commissioning time frames, the possibility of project cost overruns or unanticipated costs and expenses, higher prices for fuel, power, labour and other consumables contributing to higher costs and general risks of the mining industry, failure of plant, equipment or processes to operate as anticipated, unexpected changes in mine life, seasonality and weather, costs and timing of the development of new deposits, success of exploration activities, permitting time lines, government regulation of mining operations, environmental risks, unanticipated reclamation expenses, title disputes or claims, and limitations on insurance.

"前瞻性信息"經常被識別爲"可能","將","可以","應該","將要","打算","計劃","預期"或類似表達。本新聞稿中包含的前瞻性信息包括,但不限於,關於其更新的資源估算髮布時間以及華甌金礦項目重要金礦化的存在和該物業勘探潛力的持續性。投資者應注意,前瞻性信息不是基於歷史事實,而是反映管理層在發表該聲明時認爲合理的未來結果或事件的預期、估計或投影,而這些預期、估計或投影是基於管理層的意見、假設和估計而進行的。這樣的意見、假設和估計固有地受到各種風險和不確定性的影響,這些風險和不確定性可能導致實際事件或結果與預期的事件或結果有實質性的不同,因此不應依賴這些信息,因爲未知或不可預測的因素可能對未來的結果、性能或成就產生重大的不良影響。導致實際結果與前瞻性信息所預示的結果有實質性差異的關鍵因素包括:公司在項目和勘探計劃方面的期望得到滿足,一般業務和經濟條件的影響,全球流動性和信貸可用性對現金流提供時間和基於預期未來條件的資產和負債價值的影響,金價波動,貨幣匯率(如加元對美元的匯率),礦石品位或回收率的變化,會計政策的變化,公司的礦產儲量和資源的變化,隨着計劃不斷完善而發生的項目參數變化、項目開發、建設、生產和投產時間框架的變化,項目成本超支或意外費用和支出,燃料、電力、勞動力和其他消耗品價格的上漲導致成本上升以及礦業行業的一般風險,工廠、設備或過程按預期進行的失敗,礦畝生命的意外改變、季節性和天氣、新儲層的開發成本和時間、探礦活動的成功、覈准時間線、政府對採礦作業的監管、環境風險、意外復墾費用、所有權糾紛或索賠以及保險的限制。

This information contained in this news release is qualified in its entirety by cautionary statements and risk factor disclosure contained in filings made by the Company, including the Company's financial statements and related MD&A for the year ended July 31, 2023, and the interim financial reports and related MD&A for the periods ended October 31, 2023, January 31, 2024 and April 30, 2024, filed with the securities' regulatory authorities in certain provinces of Canada and available at .

本新聞稿中包含的信息在加拿大某些省份的證券監管機構註冊,並可通過進行查閱包括公司財務報表和有關截至2023年7月31日的財務報表和中期財務報告以及有關截至2023年7月31日及截至2024年10月31日、2024年1月31日和2024年4月30日的中期財務報告和有關摘要。

Should one or more of these risks or uncertainties materialize, or should assumptions underlying the forward-looking information prove incorrect, actual results may vary materially from those described herein as intended, planned, anticipated, believed, estimated or expected. Although the Company has attempted to identify important risks, uncertainties and factors which could cause actual results to differ materially, there may be others that cause results not to be as anticipated, estimated or intended. The Company does not intend, and does not assume any obligation, to update this forward-looking information except as otherwise required by applicable law.

如果其中一個或多個這些風險或不確定性發生,或前瞻性信息的基本假設被證明不正確,則實際結果可能與擬定、計劃、預期、信賴、估計或預期的結果有所不同。儘管公司已試圖確定導致實際結果與前瞻性信息所反映的預期差異的重要風險、不確定性和可能的因素,但可能仍有其他因素導致結果不如擬定、預計或意圖的那樣。公司沒有意圖,並且不承擔任何義務,根據適用法律以外的其他方面更新此前瞻性信息。

Appendix 1 – Drill core assay results from the independent verification sampling of Red Pine drill core samples by WSP

附錄1-經WSP對Red Pine鑽孔樣品進行獨立驗證採樣的鑽孔樣品測定結果

Appendix 2 – Drill core assay results from the independent verification sampling of historical drill core samples by WSP

附錄2-經WSP對歷史鑽孔樣品進行獨立驗證採樣的鑽孔樣品測定結果


Photos accompanying this announcement are available at


附帶的照片可在以下網址獲取


譯文內容由第三人軟體翻譯。


以上內容僅用作資訊或教育之目的,不構成與富途相關的任何投資建議。富途竭力但無法保證上述全部內容的真實性、準確性和原創性。
    搶先評論