share_log

Red Pine Intercepts 2.39 G/t Gold Over 39.07 M Including 7.99 G/t Gold Over 6.99 M at the Wawa Gold Project

Red Pine Intercepts 2.39 G/t Gold Over 39.07 M Including 7.99 G/t Gold Over 6.99 M at the Wawa Gold Project

紅松公司在Wawa金礦項目攔截到了平均2.39克/噸,包括在390.7萬公尺處攔截到平均7.99克/噸的黃金。
GlobeNewswire ·  07/18 19:30

TORONTO, July 18, 2024 (GLOBE NEWSWIRE) -- Red Pine Exploration Inc. (TSXV: RPX, OTCQB: RDEXF) ("Red Pine" or the "Company") is pleased to announce the most recent assay results from 5 additional drill holes representing 1,211 metres ("m") as part of the completed 2022-2024 resource expansion drill program at the Wawa Gold Project, Ontario.

2024年7月18日,(全球新聞通訊社)紅松勘探公司(Red Pine),(TSXV: RPX, OTCQB: RDEXF),很高興宣佈,作爲完成2022-2024年資源拓展鑽探計劃的一部分,在Wawa金礦項目的進一步5個鑽孔中,共計鑽探了1,211米,最新的化驗結果出爐。

Since 2022, Red Pine has completed approximately 67,000 m of diamond drilling. Of this total, approximately 60,300 m of drilling will be used to update the mineral resource estimate with an effective database cut-off date of June 21, 2024. The independent 43-101 resource estimate is expected to be completed in August. The results being announced today, in addition to the remaining results yet to be released from approximately 5,000 m of drill core in 22 drill holes, will not be included in the mid-August resource update, but at a later date.

自2022年以來,紅松已完成了大約670萬米的金剛石鑽探。其中,約603萬米的鑽探將用於更新礦產資源估算數據庫。截至2024年6月21日,獨立43-101礦產資源估算預計將於8月完成。今天公佈的這些結果,加上尚未公佈的來自大約22個鑽孔中約50萬米的鑽孔結果,將不會被包括在8月中旬的資源更新中,而是在以後的某個日期公佈。

Drilling Highlights and Discussion of Results (Tables 1-2, Figures 1-2):

鑽探亮點及結果討論(表1-2,圖1-2):

  • 2.39 grams per tonne ("g/t") gold over 39.07 m, including 7.99 g/t gold over 6.99 m in SD-24-497 in the Jubilee Shear System.
  • 千禧業 剪切系統內 SD-24-497 中,在3907萬處含金量爲2.39克/噸(“g/t”),其中包括在699萬處含金量爲7.99 g/t。

The results indicate:

結果表明:

  • The presence of thick zones of significant gold mineralization within the Jubilee Shear;
  • Drilling has continued to increase the size and confirm the continuity of gold mineralization > 2.00 g/t gold in the main segment of the Jubilee Shear;
  • Gold mineralization remains open at depth in the Jubilee Shear down-dip and down-plunge of the existing mineral resource and to a lesser extent within areas of the former mineral resource where gaps in drilling remain; and
  • Drilling continues to better define gold mineralization in both the Hanging Wall ("HW") and Foot Wall ("FW") of the Jubilee Shear.
  • 千禧業 剪切帶厚的顯著含金礦化帶的存在;
  • 鑽探繼續增加千禧業剪切帶主區域內大於2.00 g/t黃金的礦化體的大小和連續性;
  • 在千禧業 剪切的深部、向下傾角和現有礦產資源的向下走向以及鑽孔缺口區域內,金礦化仍然存在;
  • 鑽探繼續更好地定義千禧業剪切區域Hanging Wall ("HW")和Foot Wall("FW")中的黃金礦化。

Mike Michaud, President and CEO of Red Pine commented: "I am pleased to have now joined, and am looking forward to leading the Red Pine team. Exploration success over the past several years has not only identified high grade mineralization outside of the previously mined zones, but has also confirmed the potential to host a sizeable gold deposit near surface.

Red Pine總裁兼CEO Mike Michaud表示:"我很高興現在加入並期待領導Red Pine團隊。在過去的幾年中,勘探取得的成功,不僅發現了在以前開採區域之外的高品位礦化體,而且也確認了在近地表處寄生一座規模可觀的金礦牀的潛力。

The latest drill results not only highlight the potential of the Jubilee Shear to host significant gold mineralization over thick sections, but drilling has also confirmed that gold mineralization remains open down dip and down plunge, a priority for future drilling.

最新的鑽孔結果不僅突顯了千禧業剪切區域在厚礦化區段上寄生顯著黃金礦化的潛力,而且鑽探還確認了金礦化向下傾斜和向下傾角的存在,這是未來鑽探的優先事項。

In addition, we are targeting the updated National Instrument 43-101 Technical Report to be completed in August 2024 and expect the Mineral Resource Estimate component of that report to be press released in advance of that date. Once completed, we will be able to use this resource estimate to better assess various underground and open pit mining and processing scenarios to guide next steps on the project."

此外,我們的目標是在2024年8月完成更新的43-101技術報告,並預計該報告的礦產資源估算組成部分將在該日期之前發佈。完成後,我們將能夠使用此資源估算更好地評估各種地下和露天採礦和處理方案,以指導該項目的下一步計劃。"

Quality Assurance/Quality Control ("QA/QC") Measures

質量保證/質量控制("QA / QC")措施:

Drill core samples are transported in security sealed bags for analyses to Actlabs in Ancaster, Ontario. Individual samples are labelled, placed in plastic sample bags and sealed. Groups of samples are then placed into durable rice bags and shipped. HQ core assays were obtained by 50-gram fire-assaying-AA finish or by 1-kilogram screen fire assay. The 1-kilogram screen assay method is selected for samples anticipated to contain coarse gold and when the fire-assay-AA finish return results greater or equal to 2.25 g/t gold. The residual coarse reject portions of the samples remain in storage for a minimum 90-day period if further work or verification is needed.

鑽孔樣品被運送至安大略省Ancaster的Actlabs檢驗實驗室時,被封裝在安全密封袋中。每個樣本單獨貼有標籤,並被裝在塑料樣品袋中進行密封。一組樣本被放入耐用的大米袋中進行運輸。HQ岩心的化驗是通過50克火試- AA法或1公斤篩網火試化驗得出的。對於預計含有粗金且火試- AA法回歸結果大於等於2.25g/t黃金的樣品,選擇1公斤篩網化驗方法。樣品的殘存粗含量被存儲,以防需要進一步驗證或作額外的工作,存放期限最短爲90天。

As part of its updated and independently reviewed QA/QC program, Red Pine inserts external gold standards (low to high grade) and blanks every 20 samples, and routinely insert blanks immediately after samples with visible gold. Quarter core duplicates are routinely inserted to evaluate the natural variability of gold mineralization. Assay certificates are sent to at least two members of the senior management team, and they are directly accessible from the WebLIMS portal of Actlabs.

作爲其全面更新並獨立評審的QA/QC程序的一部分,Red Pine每20個樣本插入一次外部黃金標準(低到高品位)和空白樣品,並在可見黃金樣品後立即插入空白樣品。每隔一段時間,會插入岩心的四分之一樣本以評估黃金礦化的自然變異性。化驗證書將發送至高級管理團隊的至少兩名成員,他們可以直接從Actlabs的WebLIMS門戶訪問這些證書。

Table 1 –Jubilee Shear System (Figures 1 to 2)

表1-千禧業 構造帶(圖1至2)

Hole From To Length Gold Zone
(#) (m) (m) (m)* (g/t) (name)
SD-24-497 181.00 220.07 39.07 2.39 Jubilee Shear
including 191.01 198.00 6.99 7.99
Including 191.01 193.01 2.00 11.29
and 194.03 196.04 2.01 8.43
and 197.00 198.00 1.00 13.20
including 218.15 219.00 0.85 5.49
SD-24-503A 397.36 400.21 2.85 1.54 FW Jubilee Shear
424.66 426.00 1.34 2.00
SD-24-507 239.90 247.29 7.39 1.14 Jubilee Shear
Including 241.09 242.32 1.23 4.40
SD-24-513 164.00 168.08 4.08 1.05 Jubilee Shear
Including 164.00 165.38 1.38 2.21
SD-24-516 146.00 150.00 4.00 0.57 Jubilee Shear
209.75 210.75 1.00 1.03 FW Jubilee Shear
*Intercepts are calculated using a 0.40 g/t gold cut-off and a maximum of 6 m of internal dilution with no capping applied and are reported over core lengths. True widths are estimated to vary between 75 to 95% of the reported core length.
版權所有©2022 Business Wire。保留所有權利。 長度 黃金 區域
(#) (m) (米) (中單)* (g/t) (名稱)
SD-24-497 181.00 220.07 39.07 2.39 千禧業 工藝
包括 191.01 198.00 6.99 7.99
包括 191.01 193.01 2.00 11.29
194.03 196.04 2.01 8.43
197.00 198.00 1.00 13.20
包括 218.15 219.00 0.85 5.49
SD-24-503A 397.36 400.21 2.85 1.54 FW Jubilee Shear 千禧業 工藝 剪
424.66 426.00 1.34 2.00
SD-24-507 239.90 247.29 7.39 1.14 千禧業 工藝
包括 241.09 242.32 1.23 4.40
SD-24-513 164.00 168.08 4.08 1.05 千禧業 工藝
包括 164.00 165.38 1.38 2.21
SD-24-516 146.00 150.00 4.00 0.57 千禧業 工藝
209.75 210.75 1.00 1.03 FW Jubilee Shear 千禧業 工藝 剪
*攔截值是使用0.40g/t的金切割值計算的,內部稀釋最多600萬,未應用任何上限,並報告了核心長度。真實寬度估計在所報告的核心長度的75-95%之間變化。


Table 2 – Drill hole location


表2- 鑽孔位置

Hole (#) UTM E
(m)
UTM N
(m)
Elevation
(masl)
Azimuth
(°)
Inclination (°) Length (m)
SD-24-497 668168 5316127 366 346 52 345.00
SD-24-503A 668585 5316354 380 332 58 465.00
SD-24-507 668146 5315995 363 125 77 380.50
SD-24-513 668254 5316414 373 141 81 307.71
SD-24-516 668262 5316408 372 315 54 258.00
孔(#) UTM東座標。
(米)
UTM北座標。
(米)
海拔高度(masl)
(米以上海拔)
方位角(度)
(度)
傾角(°) 長度(米)
SD-24-497 668168 5316127 366 346 52 345.00
SD-24-503A 668585 5316354 380 332 58 465.00
SD-24-507 668146 5315995 363 125 77 380.50
SD-24-513 668254 5316414 373 141 81 307.71
SD-24-516 668262 5316408 372 315 54 258.00


Qualified Person


合格人士

Jean-Francois Montreuil, P.Geo. and Vice President, Exploration of Red Pine and the Qualified Person, as defined by National Instrument 43-101, has reviewed and approved the technical information contained in this news release.

Red Pine公司的勘探副總裁、P.Geo. Jean-Francois Montreuil作爲根據43-101國家規定所定義的合格人員,已審核並批准了本新聞稿中包含的技術信息。

About Red Pine Exploration Inc.

關於Red Pine Exploration Inc。

Red Pine Exploration Inc. is a gold exploration company headquartered in Toronto, Ontario, Canada. The Company's shares trade on the TSX Venture Exchange under the symbol "RPX" and on the OTCQB Markets under the symbol "RDEXF".

Red Pine Exploration Inc.是一家總部位於加拿大安大略省多倫多的黃金勘探公司。該公司的股票在TSX Venture Exchange交易,股票代碼爲"RPX",在OTCQB Markets交易,股票代碼爲"RDEXF"。

The Wawa Gold Project is in the Michipicoten Greenstone Belt of Ontario, a region that has seen major investment by several producers in the last five years. The Company's land package hosts numerous historic gold mines and is over 7000 hectares in size. Red Pine is building a strong position as a major mineral exploration and development player in the Michipicoten region.

瓦瓦黃金項目位於安大略省的米希皮科滕綠巖帶,這個地區在過去的五年裏吸引了幾家礦業公司的重大投資。公司的土地包括多個具有歷史意義的金礦,總面積超過7000公頃。Red Pine正在該地區建立一個強大的礦產勘探和開發單位的地位。

For more information about the Company, visit

有關公司的更多信息,請訪問

Or contact:

或聯繫:

Michael Michaud, President and Chief Executive Officer, at (416) 364-7024 or mmichaud@redpineexp.com

總裁兼首席執行官邁克爾·米肖 (Michael Michaud) 電話:(416) 364-7024 或電郵:mmichaud@redpineexp.com

Or

或者

Carrie Howes, Director Corporate Communications, at (416) 644-7375 or chowes@redpineexp.com

Carrie Howes,企業傳播總監,電話(416)644-7375,電子郵件chowes@redpineexp.com

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

TSX Venture Exchange及其監管服務提供者(如TSX Venture Exchange的政策中所定義的那樣)均不對本發佈的充分性或準確性承擔責任。

Cautionary Note Regarding Forward-Looking Information

關於前瞻性信息的注意事項

This news release contains statements which constitute "forward-looking information" within the meaning of applicable securities laws, including statements regarding the plans, intentions, beliefs and current expectations of the Company with respect to future business activities and operating performance.

本新聞稿包含構成適用證券法規定的“前瞻性信息”的聲明,包括關於公司未來業務活動和運營業績的計劃、意圖、信念和當前預期的聲明。該新聞稿中包含的前瞻信息通常可以通過諸如“可能”、“將”、“可能”、“應該”、“會”、“打算”、“計劃”、“預測”、“相信”、“估計”、“預期”或類似表達方式來識別。本新聞稿中所包含的前瞻性信息包括但不限於有關更新的礦產資源評估及43-101技術報告的時機的聲明。投資者應當注意,前瞻性信息並沒有基於歷史事實,而是反映了管理層在其考慮合理的管理意見、假設和估計的基礎上,對未來結果或事件的期望、估計或預測。這些意見、假設和估計必然會面臨各種各樣的風險和不確定性,可能會導致實際事件或結果與預期有所不同,應當不過度依賴此類信息,因爲未知或無法預測的因素可能對未來的業績、結果或成就產生實質性的負面影響。可能導致實際結果與前瞻性信息中所預期的結果有所不同的關鍵因素包括:公司在項目和勘探計劃方面的期望得到滿足,普適商業和經濟條件的影響,全球流動性和信貸可用性對基於預期未來條件估計的現金流量和資產負債表的價值的影響,金價波動、貨幣匯率(例如加元相對於美元的匯率)的變化、礦石品位或選礦回收率的變化、會計政策的變化、公司礦產儲量和資源的變化、項目參數隨着計劃的不斷完善而發生的變化、項目開發、建設、生產和投產時間的變化,可能會導致項目成本超支或出現意外費用和支出的風險,燃料、電力、勞動力和其他消耗品價格的上漲導致成本上升以及礦業行業的一般風險,工廠、設備或工藝無法按預期運行,礦山壽命出現意外變化、季節性和天氣影響、新礦牀開發的成本和時機,勘探活動的成功、許可時間表、政府對採礦活動的監管、環境風險、意外的整治費用、所有權爭議或索賠以及保險限制。

Forward-looking information is often identified by the words "may", "would", "could", "should", "will", "intend", "plan", "anticipate", "believe", "estimate", "expect" or similar expressions. Forward-looking information contained in this news release includes, but may not be limited to, statements regarding the timing of an updated mineral resource estimate and National Instrument 43-101 Technical Report. Investors are cautioned that forward-looking information is not based on historical facts but instead reflects management's expectations, estimates or projections concerning future results or events based on the opinions, assumptions and estimates of management considered reasonable at the date the statements are made. Such opinions, assumptions and estimates are inherently subject to a variety of risks and uncertainties that could cause actual events or results to differ materially from those projected and undue reliance should not be placed on such information, as unknown or unpredictable factors could have material adverse effects on future results, performance or achievements. Among the key factors that could cause actual results to differ materially from those projected in the forward-looking information are: the Company's expectations in connection with the projects and exploration programs being met, the impact of general business and economic conditions, global liquidity and credit availability on the timing of cash flows and the values of assets and liabilities based on projected future conditions, fluctuating gold prices, currency exchange rates (such as the Canadian dollar versus the United States Dollar), variations in ore grade or recovery rates, changes in accounting policies, changes in the Company's mineral reserves and resources, changes in project parameters as plans continue to be refined, changes in project development, construction, production and commissioning time frames, the possibility of project cost overruns or unanticipated costs and expenses, higher prices for fuel, power, labour and other consumables contributing to higher costs and general risks of the mining industry, failure of plant, equipment or processes to operate as anticipated, unexpected changes in mine life, seasonality and weather, costs and timing of the development of new deposits, success of exploration activities, permitting time lines, government regulation of mining operations, environmental risks, unanticipated reclamation expenses, title disputes or claims, and limitations on insurance.

貨幣匯率兌換

This information contained in this news release is qualified in its entirety by cautionary statements and risk factor disclosure contained in filings made by the Company, including the Company's financial statements and related MD&A for the year ended July 31, 2023, and the interim financial reports and related MD&A for the period ended October 31, 2023, January 31, 2024 and April 30, 2024, filed with the securities' regulatory authorities in certain provinces of Canada and available at .

本新聞稿中所包含的信息在某些加拿大省份的證券監管當局提交的包含了公司財務報表、截至2023年7月31日的財務報表和相關管理討論及分析報告以及截至2023年10月31日、2024年1月31日和4月30日的中期財務報表和相關管理討論及分析報告中包含了謹慎聲明和風險因素披露,並且可以在 。

Should one or more of these risks or uncertainties materialize, or should assumptions underlying the forward-looking information prove incorrect, actual results may vary materially from those described herein as intended, planned, anticipated, believed, estimated or expected. Although the Company has attempted to identify important risks, uncertainties and factors which could cause actual results to differ materially, there may be others that cause results not to be as anticipated, estimated or intended. The Company does not intend, and does not assume any obligation, to update this forward-looking information except as otherwise required by applicable law.

如果其中一個或多個這些風險或不確定性發生,或前瞻性信息的基本假設被證明不正確,則實際結果可能與擬定、計劃、預期、信賴、估計或預期的結果有所不同。儘管公司已試圖確定導致實際結果與前瞻性信息所反映的預期差異的重要風險、不確定性和可能的因素,但可能仍有其他因素導致結果不如擬定、預計或意圖的那樣。公司沒有意圖,並且不承擔任何義務,根據適用法律以外的其他方面更新此前瞻性信息。

Figure 1 - Location of Diamond Drilling Results

圖1 - 鑽探結果位置

A photo accompanying this announcement is available at

此公告附帶的照片

Figure 2 - 3D View of Diamond Drilling Results

圖2-金剛石鑽探成果的三維視圖

A photo accompanying this announcement is available at

此公告附帶的照片


譯文內容由第三人軟體翻譯。


以上內容僅用作資訊或教育之目的,不構成與富途相關的任何投資建議。富途竭力但無法保證上述全部內容的真實性、準確性和原創性。
    搶先評論