share_log

Lithium Ionic Initiates Drilling at Four Properties Surrounding Bandeira Development Project and Expands Salinas Drilling Program to 30,000m in the Lithium Valley, Minas Gerais, Brazil

Lithium Ionic Initiates Drilling at Four Properties Surrounding Bandeira Development Project and Expands Salinas Drilling Program to 30,000m in the Lithium Valley, Minas Gerais, Brazil

鋰礦開始在巴西米納斯吉拉斯州的鋰谷,包圍班代拉發展項目周圍的四個財產進行鑽探,並將薩利納斯鑽探計劃擴大至3000000萬。
GlobeNewswire ·  07/06 06:34

TORONTO, July 05, 2024 (GLOBE NEWSWIRE) -- Lithium Ionic Corp. (TSXV: LTH; OTCQX: LTHCF; FSE: H3N) ("Lithium Ionic" or the "Company") is pleased to provide an update on expanded drilling activities at its extensive claim holdings, including the Itinga and Salinas area properties, located in the Lithium Valley, in Minas Gerais State, Brazil.

2024年7月5日多倫多(GLOBE NEWSWIRE) - 鋰離子公司(TSXV:LTH; OTCQX:LTHCF; FSE:H3N)(" 鋰離子 "或" 公司 ")很高興向廣大股東提供其廣泛聲明權的擴大鑽探活動更新,包括位於巴西米納斯吉拉斯州鋰谷的Itinga和Salinas區域的物業。

Regional Drilling at Itinga Area Properties

Itinga區域物業區域鑽探

A 4,000-metre drilling program has been initiated on four properties located between 2 to 10 kilometres from its flagship Bandeira Lithium Project (see Figure 1), for which a positive Feasibility Study was announced on May 29, 2024. This initial drilling program will aim to test lithium soil anomalies identified by systematic mapping and soil geochemistry exploration programs conducted in 2022 and 2023. This exploration method was successfully used to identify surveys and delineate the current NI 43-101 compliant mineral deposits, which totals 60.1 million tonnes* (32.51Mt grading 1.31% Li2O (1,052kt LCE) in the Measured & Indicated category and 27.57Mt grading 1.24% Li2O (848kt LCE) in the Inferred category).

在距離其旗艦Bandeira鋰項目2至10公里的四個物業上啓動了一項4000米的鑽探計劃(請參見圖1),該項目於2024年5月29日宣佈了積極的可行性研究。這個初步的鑽探項目將旨在測試2022年和2023年所進行的系統映射和土壤地球化探勘計劃所確定的鋰土壤異常。這種勘探方法已成功用於識別調查和勾勒目前符合NI 43-101標準的礦產礦牀,其中總計有6010萬噸 *(在已測和指示類別中爲32.51Mt,分級爲1.31%Li2O(1,052kt LCE),在推斷類別中爲27.57Mt分級1.24%Li2O(848kt LCE))。

Four drill rigs are currently operating, one on each of the four targeted properties: Afrodite (formerly "Area 2"), Phoenix (formerly "Area 3"), Apollo (formerly Area 4) and Gonçalves (formerly "Area 5").

目前有四臺鑽機正在運行,分別在四個目標物業上:阿弗洛狄忒(原名“區域2”),鳳凰(原名“區域3”),阿波羅(原名區域4)和甘卡爾維斯(原名“區域5”)。

Expanded Drilling Program at Salinas Properties

Salinas物業的擴大鑽探計劃

The Company has also initiated an expanded 30,000-metre drill program at its Salinas Lithium Project ("Salinas"), located within the lithium-rich Araçuaí Pegmatite District in the northern part of the Eastern Brazilian Pegmatite Province (see location map in Figure 1). This drill program will nearly double the amount of drilling at Salinas completed to date, aiming to expand and upgrade the current mineral resource estimate. Two drill rigs are currently operating at the property.

該公司還在Salinas鋰項目(“ Salinas”)啓動了一項擴大的3萬米鑽探計劃,該項目位於東北巴西鉀長石巖區的富鋰區域內(請參見圖1)。此鑽探計劃將近將在該物業完成的鑽探量加倍,旨在擴大和升級當前的礦產資源估算。目前該物業上有兩臺鑽機正在運行。

Salinas is located approximately 100km north of the Itinga group of properties and approximately 20 kilometres east of the Salinas municipality, a town of approximately 40,000 people.

Salinas位於距Itinga物業集團約100公里以北,距Salinas市約20公里以東,該市約有40,000人口。

On April 4, 2024, the Company reported an initial mineral resource estimate ("MRE") at Salinas of 5.86Mt grading 1.09% Li2O (158,678t LCE) in the Measured and Indicated category, along with 8.90Mt grading 0.97% Li2O (214,572t LCE) in the Inferred category. This initial MRE was based on 27,030 metres of drilling completed between May and November 2023. As announced on April 4, 2024, a Preliminary Economic Assessment ("PEA") for Salinas is underway by independent Brazilian consultancy, GE21 Consultoria Mineral Ltda. ("GE21").

2024年4月4日,公司在Salinas報告了初步的礦產資源估算(“ MRE”),在經過2023年5月至11月之間完成的27,030米鑽掘基礎上,該估算得出在已測量和指示類別中爲5.86Mt,分級爲1.09%Li2O(158.678萬t LCE),以及在推論類別中爲8.90Mt,分級爲0.97%Li2O(214.572萬億t LCE)。正如2024年4月4日宣佈的,Salinas的初步經濟評估(“ PEA”)正在獨立的巴西諮詢公司GE21 Consultoria Mineral Ltda.(“ GE21”)進行中。

Blake Hylands, P.Geo., Chief Executive Officer of Lithium Ionic, commented, "We have delineated over 60Mt of spodumene-rich pegmatites since we began drilling just over two years ago, a testament to the strong capabilities of our team and the quality of the properties selected within the lithium district. The speed at which these deposits have been delineated showcases the Company's capabilities to execute efficiently. Based on our success at Bandeira, we are highly encouraged by the potential of the regional targets we are currently testing. We are equally excited about the expanded drilling program at Salinas, which aims to significantly scale-up this project. With drilling initiated just over a year ago, Salinas has evolved and grown rapidly, reflecting its substantial future potential."

Lithium Ionic的首席執行官Blake Hylands(P.Geo。)表示:“自兩年多以來開始鑽探以來,我們已經勾畫出超過60Mt的含透亮石質鉀長石巖,這證明了我們團隊的強大能力和鋰區內所選物業的質量。我們勾勒這些礦牀的速度展示了公司高效執行的能力。根據我們在Bandeira的成功經驗,我們對我們目前測試的區域目標的潛力感到非常鼓舞。我們對Salinas的擴大鑽探計劃同樣充滿期待,該鑽探計劃旨在顯着擴大該項目。自一年多以前開始鑽探以來,Salinas已經迅速發展和擴大,反映出其巨大的未來潛力。"

Figure 1. Lithium Ionic Properties in the Lithium Valley Showing Active Drilling Sites

圖1。鋰離子物業在鋰谷中顯示活動鑽探現場

View Figure 1 here:

在這裏查看圖1:

*See NI 43-101 compliant technical report related to the Bandeira Bandeira MRE titled "NI 43-101 Technical Report – Mineral Resource Update on Bandeira Project, Araçuaí and Itinga, Minas Gerais State, Brazil" (effective date of March 5, 2024; QP: Leonardo Soares of GE21); See NI 43-101 compliant technical report related to the Salinas MRE titled "Independent Technical Report on Mineral Resources Estimate" (effective date of January 4, 2024; QP: Leonardo Soares, P.Geo., M.Sc., of GE21); and the NI 43-101 compliant technical reports related to the Outro Lado deposit titled "Mineral Resource Estimate for Lithium Ionic, Itinga Project" (effective date of June 24, 2023; authored by Maxime Dupéré, B. Sc., P.Geo. and Faisal Sayeed, B. Sc., P.Geo).

*有關Bandeira Bandeira MRE的NI 43-101合規技術報告標題爲" NI 43-101技術報告 - 關於巴西米納斯吉拉斯州的Bandeira項目,Araçuaí和Itinga的礦產資源更新"(有效日期爲2024年3月5日;QP:GE21的Leonardo Soares);有關Salinas MRE的NI 43-101合規技術報告標題爲“獨立技術報告”,有關鋰電池,有關於礦物資源估算"(2024年1月4日的有效日期;QP:Leonardo Soares,P.Geo.億. Sc.,GE21);以及有關Outro Lado堆積的NI 43-101合規技術報告標題爲"鋰離子,Itinga項目的礦物資源估算"(2023年6月24日的有效日期;由Maxime Dupéré億. Sc.,P.Geo.,和Faisal Sayeed億. Sc.,P.Geo.編寫)

Advance Notice Policy

提前知會方針

The Company has an advance notice by-law (the "Advance Notice Policy"), establishing a framework for advance notice of nominations of directors by shareholders of the Company.

公司具有提前通知的章程("Advance Notice Policy"),爲公司的股東提前通知董事提名制定了框架。

The purpose of this Advance Notice Policy is to provide shareholders, directors and management of the Company with direction on the nomination of directors. The Advance Notice Policy is the framework by which the Company seeks to fix a deadline by which holders of record of common shares of the Company must submit director nominations to the Company prior to any annual or special meeting of shareholders and sets forth the information that a shareholder must include in the notice to the Company for the notice to be in proper written form.

該提前通知政策的目的是爲公司的股東,董事和管理層提供有關董事提名的方向。提前通知政策是公司尋求在任何年度股東大會或特別股東大會之前確定普通股持有人必須向公司提交董事提名的截止日期的框架,並規定股東必須在通知中包含有關股東提名的信息才能符合適當的書面形式。

With respect to the annual and special meeting of shareholders of the Company to be held on July 26, 2024 (the "Meeting"), notice of any proposed nominations must be provided to the Corporate Secretary of the Company at the principal executive offices of the Company no later than 5:00 p.m. (Toronto time) on July 15, 2024. For details in respect of the notice requirements for proposed nominations at all subsequent meetings of shareholders, please refer to the Advance Notice Policy, a copy of which is available under the Company's profile at and on the Company's website.

在2024年7月26日舉行的公司年度股東大會和特別股東大會("會議")方面,任何提議的提名通知必須在2024年7月15日的下午5:00(多倫多時間)之前提交給公司的總部辦事處公司秘書。有關所有後續股東大會上擬議提名的通知要求的詳細信息,請參閱提前通知政策,該政策的副本可在公司在和公司網站的文件中找到。

The Advance Notice Policy is effective immediately. At the Meeting, the Company will seek shareholder approval and ratification of the Advance Notice Policy.

提前通知政策立即生效。在會議上,公司將尋求股東批准和確認提前通知政策。

On behalf of the Board of Directors of Lithium Ionic Corp.

鋰離子公司董事會謹此代表。

Blake Hylands
Chief Executive Officer, Director

布萊克•海蘭茲
首席執行官,董事

About Lithium Ionic Corp.

關於鋰離子公司

Lithium Ionic is a Canadian mining company exploring and developing its lithium properties in Brazil. Its flagship Itinga and Salinas projects cover ~17,000 hectares in the northeastern part of Minas Gerais state, a mining-friendly jurisdiction that is quickly emerging as a world-class hard-rock lithium district. The Itinga Project is situated in the same region as CBL's Cachoeira lithium mine, which has produced lithium for +30 years, as well as Sigma Lithium Corp.'s Grota do Cirilo project, which hosts the largest hard-rock lithium deposit in the Americas.

Lithium Ionic是一家加拿大礦業公司,正在探索和開發其在巴西的鋰地產。其旗艦項目Itinga和Salinas項目,佔據米納斯吉拉斯州東北部的約17,000公頃,這是一個礦業友好的司法轄區,正在迅速崛起爲世界級硬巖鋰地區。Itinga項目位於CBL的Cachoeira鋰礦一帶,該礦已生產+30年的鋰,並位於Sigma Lithium Corp.的Grota do Cirilo項目所在的地區,後者擁有美洲地區最大的硬巖鋰儲量。

Qualified Persons

合格人員

The scientific and technical information in this news release has been reviewed and approved by Carlos Costa, Vice President Exploration of Lithium Ionic and Blake Hylands, CEO and director of Lithium Ionic, and both are "qualified persons" as defined in NI 43-101.

本新聞稿中的科學技術信息已由鉀離子公司的勘探副總裁Carlos Costa和首席執行官兼董事Blake Hylands進行了審查和批准,兩者都是“合格人員”,如NI 43-101所定義。

Investor and Media Inquiries:

投資者和媒體諮詢:

+1 647.316.2500
info@lithiumionic.com

+1 647.316.2500
info@lithiumionic.com

Cautionary Note Regarding Forward-Looking Statements

關於前瞻性聲明的警示

This press release contains statements that constitute "forward-statements." Such forward looking statements involve known and unknown risks, uncertainties and other factors that may cause the Company's actual results, performance or achievements, or developments to differ materially from the anticipated results, performance or achievements expressed or implied by such forward-looking statements. Although the Company believes, in light of the experience of its officers and directors, current conditions and expected future developments and other factors that have been considered appropriate that the expectations reflected in this forward-looking information are reasonable, undue reliance should not be placed on them because the Company can give no assurance that they will prove to be correct. When used in this press release, the words "estimate", "project", "belief", "anticipate", "intend", "expect", "plan", "predict", "may" or "should" and the negative of these words or such variations thereon or comparable terminology are intended to identify forward-looking statements and information. The forward-looking statements and information in this press release include information relating to the prospectivity and development of the Company's mineral properties, the timing and results of the Company's exploration program, the Company's ability to complete a PEA, the Advance Notice Policy, the Company's ability to obtain adequate financing and the Company's future plans. Such statements and information reflect the current view of the Company. Risks and uncertainties that may cause actual results to differ materially from those contemplated in those forward-looking statements and information. By their nature, forward-looking statements involve known and unknown risks, uncertainties and other factors which may cause our actual results, performance or achievements, or other future events, to be materially different from any future results, performance or achievements expressed or implied by such forward-looking statements. The forward-looking information contained in this news release represents the expectations of the Company as of the date of this news release and, accordingly, is subject to change after such date. Readers should not place undue importance on forward-looking information and should not rely upon this information as of any other date. The Company undertakes no obligation to update these forward-looking statements in the event that management's beliefs, estimates or opinions, or other factors, should change.

本新聞發佈中包含構成"向前聲明"的聲明。這種前瞻性陳述涉及已知和未知的風險,不確定性和其他因素,可能會導致公司的實際結果,績效或成就或發展與預期的結果,績效或成就表達或暗示的成果不同。 儘管受到其官員和董事的經驗,當前條件和預期未來發展以及已被視爲適當的其他因素的影響,公司認爲本前瞻性信息反映了合理的預期,但不應過於依賴該信息,因爲公司無法保證其將證明是正確的。 在本新聞發佈中使用以下術語:"估計","項目","信仰","預期","打算","期望","計劃","預測","可能"或"應"及其負面形式或其中的變體或可比的術語,旨在識別前瞻性陳述和信息。本新聞發佈中的前瞻性聲明和信息包括有關公司礦產物業前景和發展,公司勘探計劃的時間和結果,公司完成PEA的能力,提前通知政策,公司獲得充足融資的能力以及公司未來計劃的有關信息。此類聲明和信息反映了公司的當前觀點。可能會導致實際結果與本前瞻性陳述和信息中未來考慮的預期結果或表達或暗示的成果存在差異的風險和不確定性。按照其本質,前瞻性聲明涉及已知和未知的風險,不確定性和其他因素,這可能導致我們的實際結果,績效或成就或其他未來事件與任何此類前瞻性聲明中表達或暗示的任何未來結果,績效或成就實際上存在重大差異陳述或暗示。本新聞發佈中的前瞻性信息反映了公司於本新聞發佈日期的期望,因此可能會在此日期之後發生變化。讀者不應將前瞻性信息視爲任何其他日期的信息,並且不應給予此信息過高的重視。鑑於管理層的信念,估計或意見或其他因素可能會發生變化,公司無義務在未來更新這些前瞻性聲明。

Information and links in this press release relating to other mineral resource companies are from their sources believed to be reliable, but that have not been independently verified by the Company.

本新聞稿中有關其他礦產資源公司的信息和鏈接來自於其來源被信認爲可靠,但未經公司進行獨立驗證。

Neither the TSXV nor its Regulation Services Provider (as that term is defined in the policies of the TSXV) accepts responsibility for the adequacy or accuracy of this press release.

TSX Venture Exchange ("TSXV")和其監管服務供應商(根據TSXV政策的定義)均不對本新聞稿的充分性或準確性承擔責任。


譯文內容由第三人軟體翻譯。


以上內容僅用作資訊或教育之目的,不構成與富途相關的任何投資建議。富途竭力但無法保證上述全部內容的真實性、準確性和原創性。
    搶先評論