share_log

Boron One Holdings Inc. Advances the Licensing Process for Its Piskanja Boron Project

Boron One Holdings Inc. Advances the Licensing Process for Its Piskanja Boron Project

Boron One Holdings公司推進其Piskanja硼項目的許可流程。
Accesswire ·  07/02 20:30

- Boron One Applies for Exploitation Field Approval -

- Boron One申請採礦場批准 -

VICTORIA, BC / ACCESSWIRE / July 2, 2024 / Boron One Holdings Inc. ("Boron One", the "Company") (TSXV:BONE), a company committed to the decarbonization of Planet Earth through the responsible utilization of its boron assets, is pleased to announce that it has applied to the Serbian Mining Ministry for an "Approval of the Exploitation Field", for the Company's wholly owned Piskanja Boron Project. This submission marks a fundamental step forward in the mine licensing process.

2024年7月2日,BC省Victoria / ACCESSWIRE / - Boron One Holdings Inc.(“Boron One”,“公司”)(TSXV:BONE)致力於通過負責任地利用其硼資產實現地球脫碳,欣然宣佈已向塞爾維亞採礦部門申請“開採場批准”,申請的項目爲該公司全資擁有的Piskanja Boron Project。這次提交標誌着礦業許可過程的基本進展。

Once granted, an "Approval of the Exploitation Field" provides exclusive rights to develop and monetize a mineral deposit in Serbia. Boron One's submission for this Approval includes a Serbian compliant Feasibility Study, an Environmental Impact Assessment Synopsis, the "Certificate of Reserves" for Piskanja, and required permits from various Serbian Governmental Ministries, all in accordance with Serbian mining regulations.

一旦獲得“開採場批准”,就有獨家權利在塞爾維亞開發和貨幣化礦產儲存。Boron One的申請包括一項符合塞爾維亞要求的可行性研究,一個環境影響評估簡述, Piskanja的 “儲量證書”,以及符合塞爾維亞採礦法規的各種塞爾維亞政府部門的許可證。

Tim Daniels, President of Boron One, stated, "Applying for the Exploitation Field Approval is a significant milestone for us as we progress in the development of Piskanja." Daniels added, "While we await the Ministry's approval, we are actively pursuing other critical tasks, such as securing strategic partners, sourcing engineering groups for the design and construction of our mining and processing facilities, and establishing relationships with off-takers who require our boron."

Boron One的總裁Tim Daniels表示:“申請採礦場批准是我們在Piskanja開發中進展的重要里程碑。”Daniels補充道:“雖然我們等待部委的批准,但我們正在積極追求其他重要任務,例如尋找戰略合作伙伴,爲礦山和加工設施的設計和建造尋找工程團隊,並與需要我們的硼的工業用戶建立關係。”

Following the granting of the Approval of the Exploitation Field, Boron One will continue with the licensing and development processes by completing and submitting blueprinted mine and processing designs for approval, the final requisite step before commencing the construction of the facilities.

獲得“開採場批准”後, Boron One將通過完成和提交藍圖礦山和處理設計以獲得批准,然後開始建設設施。這是開發進程的最終要求步驟。

###

###

About the Piskanja Boron Project

關於Piskanja硼項目

Piskanja is Boron One Holdings Inc.'s wholly owned boron deposit with a Measured Mineral Resource of 1.39 million tonnes (averaging 35.59% B2O3), an Indicated Mineral Resource of 5.48 million tonnes (averaging 34.05% B2O3), and an Inferred Mineral Resource of 284.7 thousand tonnes (averaging 39.59% B2O3), calculated in accordance with the Canadian Institute of Mining Definition Standards on Mineral Resources and Reserves (CIM Standards), as disclosed in the Company's report titled, "Technical Report and Preliminary Economic Assessment For The Piskanja Borate Project, Serbia, June 24, 2022". The responsible person for the PEA and the Mineral Resource Estimate contained within, is Prof. Miodrag Banješević PhD. P.Geo, EurGeol, a Qualified Person in accordance with the CIM Definition Standards on Mineral Resources and Reserves (CIM Standards), and independent of Boron One Holdings Inc.

Piskanja是Boron One控股公司擁有的硼礦牀,其測得礦產資源爲139萬噸(平均含35.59%的B2O3),指標礦產爲548萬噸(平均含34.05%的B2O3),推測礦產爲28.47萬噸(平均含39 .59%的B2O3),按照加拿大采礦協會制定的礦產和儲備定義標準(CIM標準)計算,如該公司的報告《塞爾維亞Piskanja硼酸鹽項目技術報告和初步經濟評估,2022年6月24日》所披露。PEA和包含其中的礦產資源評估的責任人是擁有資歷的Miodrag Banješević博士P.Geo,EurGeol ,根據CIM採礦資源和儲量定義標準(CIM標準)而獨立於Boron One控股公司。

On behalf of the Board of Directors,
Tim Daniels

代表董事會,
蒂姆·丹尼爾斯

About Boron One Holdings Inc. (formerly known as Erin Ventures Inc.)

Boron One Holdings Inc.(原Erin Ventures Inc.)是一家領先的公司,致力於通過負責任地利用其全資擁有的硼資源來推進我們星球的脫碳化。Boron One致力於環境保護和可持續性,並旨在在減少碳排放並支持更加清潔綠色的未來方面發揮關鍵作用。Boron One總部位於加拿大BC省,股票在TSX Venture Exchange上交易,股票代碼爲“BONE”。有關詳細信息,請參見Boron One的網站或公司的文件。

Boron One Holdings Inc. is a leading company dedicated to advancing the decarbonization of our planet through the responsible utilization of its wholly owned boron assets in Serbia. With a commitment to environmental stewardship and sustainability, Boron One aims to play a crucial role in reducing the world's carbon footprint and supporting a cleaner, greener future for us all.

Boron One Holdings Inc.是一家領先的公司,致力於通過在塞爾維亞全資擁有的硼資產的負責任利用推動地球脫碳。Boron One致力於環境保護和可持續性,並旨在在減少世界碳足跡和支持我們所有人的更爲清潔、綠色的未來中發揮關鍵作用。

Headquartered in Victoria, B.C., Canada, Boron One's shares are traded on the TSX Venture Exchange under the symbol "BONE". For detailed information please see Boron One's website at or the Company's filed documents at

Blake Fallis,總經理

For further information, please contact:

Boron's Public Quotations:

Blake Fallis, General Manager

TSX Venture: BONE

Phone: 1-250- 384-1999 or 1-888-289-3746

Berlin: EKV

info@boronone.com

US: SEC 12G3-2(B) #82-4432ERVFF

OTCBB:ERVFF

如需更多信息,請聯繫:

Boron的公共行情:

TSX Venture:BONE

TSX Venture:BONE

電話:1-250-384-1999或1-888-289-3746

Berlin:EKV

info@boronone.com

美國:SEC 12G3-2(B)#82-4432ERVFF

OTCBB:ERVFF

Qualified Persons

合格人員

Nenad Rakic, EurGeol, Piskanja Project Field Manager, a qualified person as defined by NI 43-101, has reviewed the technical information that forms the basis for this news release, and has approved the disclosure herein.

依據NI 43-101的定義,Piskanja項目現場經理Nenad Rakic,EurGeol是一名有資格的人員,已經審核了構成本新聞稿基礎的技術信息,並已批准此處的披露。

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

tsxv的監管服務提供商(在其政策中定義該術語)對本公告的充分性或準確性不承擔責任。

For Boron One Holdings Inc. Investors

對於Boron One Holdings Inc.投資者

Certain statements made in this press release that are not based on historical information are forward-looking statements that involve substantial known and unknown risks and uncertainties. This press release contains express or implied forward-looking statements relating to, among other things, Boron One's expectations concerning management's plans, objectives and strategies, including its plans for advancing the Company's Piskanja Project. These statements are neither promises nor guarantees but are subject to a variety of risks and uncertainties, many of which are beyond the Company's control, and which could cause actual results to differ materially from those contemplated in these forward-looking statements. Existing and prospective investors are cautioned not to place undue reliance on these forward-looking statements, which speak only as of the date hereof. Factors that could cause actual results to differ materially from any forward-looking statement include, but are not limited to, failure to convert estimated mineral resources to reserves, capital and operating costs varying significantly from estimates, the preliminary nature of metallurgical test results, delays in obtaining or failures to obtain required governmental, environmental or other project approvals, political risks, uncertainties relating to the availability and costs of financing needed in the future, changes in equity markets, inflation, changes in exchange rates, fluctuations in commodity prices, delays in the development of projects and the other risks involved in the mineral exploration and development industry.

本新聞稿中包含的,非基於歷史信息的前瞻性聲明,存在着包括已知風險和未知風險的重大風險和不確定性。本新聞稿明確或暗示的前瞻性聲明涉及到Boron One有關管理層的計劃、目標和策略,包括其推進公司 Piskanja Project 的計劃。這些聲明既不是承諾也不是保證,而是受到各種風險和不確定性的影響,其中許多超出公司的控制範圍,可能會導致實際結果與這些前瞻性聲明中所考慮的結果大相徑庭。現有和潛在的投資者被警告不要對這些前瞻性聲明抱有過多的依賴,這些聲明僅於此時此刻有效。可能導致實際結果大相徑庭的因素包括但不限於:未能將預估的礦物資源轉化爲儲量,資本和運營成本與估計值的差異顯著,冶金測試結果初步性質,未能獲得或未能獲得所需的政府,環境或其他項目批准,政治風險,與未來所需融資的可用性和成本有關的不確定性,股市變化、通貨膨脹、匯率變動、商品價格波動、項目開發的延遲以及涉及礦產開發和開發行業的其他風險。

Boron One Holdings Inc. undertakes no obligation to update or revise the information contained in this press release, whether as a result of new information, future events or circumstances or otherwise except as expressly required by applicable securities law. Further information regarding the uncertainties and risks can be found in the disclosure documents filed by Boron One with the securities regulatory authorities, available at . These and other factors made in public disclosures and filings by the Company should be considered carefully.

Boron One Holdings Inc.不對此新聞稿中包含的信息進行更新或修改,除非受適用證券法明確規定的以外。有關不確定性和風險的進一步信息可以在Boron One向證券監管機構提交的披露文件中找到,可在網站上獲得。公司的公共披露和申報文件中涉及的這些因素應該仔細考慮。

Mineral resources are not mineral reserves and do not have demonstrated economic viability. "Inferred Resources" have a great amount of uncertainty as to their existence, and economic and legal feasibility. Investors are cautioned not to assume that all or any part of an inferred mineral resource reported in this news release will ever be upgraded to a higher category or to reserves. U.S. persons are advised that while mineral resources are recognized under Canadian regulations, the U.S. Securities and Exchange Commission does not recognize them. U.S. persons are also cautioned not to assume that all or any part of an inferred mineral resource is economically or legally mineable.

礦產資源不是礦產儲備,沒有經濟可行性證明。"推測資源"在其存在性以及經濟和法律可行性上的不確定性很大。投資者應當注意,本新聞稿中報告的推測礦物資源的全部或部分將提升至更高的類別或儲備層並不自然。美國人應當注意,儘管加拿大的法規承認礦產資源,但美國證券交易委員會不承認它們。美國人還應謹慎,不要認爲推測礦物資源的全部或部分是經濟或合法的可採掘。

SOURCE: Boron One Holdings Inc.

來源:Boron One Holdings Inc。


譯文內容由第三人軟體翻譯。


以上內容僅用作資訊或教育之目的,不構成與富途相關的任何投資建議。富途竭力但無法保證上述全部內容的真實性、準確性和原創性。
    搶先評論