ATEX Demonstrates Scalability and Discovers Overprinting High-Grade System in Phase IV Drill Program
ATEX Demonstrates Scalability and Discovers Overprinting High-Grade System in Phase IV Drill Program
Results for Partial Holes ATXD25A & ATXD26A Point to Further Expansion and High-grade in Phase V
ATXD25A 和 ATXD26A 局部鑽孔的結果表明第五階段的進一步擴張和更高的等級
Toronto, Ontario--(Newsfile Corp. - June 25, 2024) - ATEX Resources Inc. (TSXV: ATX) ("ATEX" or the "Company") is pleased to announce assay results for partial drill holes ATXD25A and ATXD26A, the seventh and eighth holes from its Phase IV drill campaign at the Valeriano Copper-Gold Project ("Valeriano" or the "Project") located in the Atacama Region, Chile.
安大略省多倫多--(Newsfile Corp.-2024 年 6 月 25 日)- ATEX Resources Inc.(多倫多證券交易所:ATX) (”ATEX“或者”公司“) 很高興地宣佈 ATXD25A 和 ATXD26A 部分鑽孔的化驗結果,這是 Valeriano 銅金項目第四階段鑽探活動的第七和第八個孔(”瓦萊里亞諾“或者”項目“) 位於智利阿塔卡馬地區。
Highlights from the Phase IV program include:
第四階段計劃的亮點包括:
-
A new conceptual geology model being confirmed through drilling at the end of Phase IV and setting up for an exciting Phase V drill program.
New model outlines increased continuity and size potential of the Early Porphyry ("EP") units along a strike length of 1.2km and a width of approximately 0.5km defined in drilling to date. The EP remains open along strike and associated wall rock mineralization remains open in all directions.
Within this EP body, additional drilling demonstrated potential for greater continuity and a strike length of >1.0% CuEq mineralization. ATXD16A, which intersected 594m grading 0.92% CuEq (0.67% Cu, 0.32 g/t Au, 1.13 g/t Ag and 71 g/t Mo) in the southeast remains open to the southeast and the trend continues northwest towards ATXD11B where it remains open.
Discovery of a new high-grade overprinting event indicated by ATXD26 which intersected 122.0m of 1.60% CuEq (1.11% Cu, 0.49 g/t Au, 2.71 g/t Ag and 348 g/t Mo) including 68m of 2.02% CuEq (1.39% Cu, 0.6 g/t Au, 3.81 g/t Ag and 473 g/t Mo) above the contact of the high-grade porphyry trend, and could represent a new discrete high-grade domain within the resource envelope and nearer to surface.
-
在第四階段結束時,通過鑽探確認了新的概念地質模型,併爲激動人心的第五階段鑽探計劃做好了準備。
新模型概述了Early Porphyry(“EP”)單元在迄今爲止鑽探中定義的走向長度爲1.2千米,寬度約爲0.5千米,寬度約爲0.5千米,其連續性和規模潛力都有所增加。EP 沿走向保持開放,相關的壁巖礦化向各個方向開放。
在這個 EP 礦體內,額外的鑽探顯示出更大連續性的潛力,走向長度大於 1.0% 的 CueQ 礦化。ATXD16A 在東南部橫穿了 5.94 米,CueQ(0.67% Cu,0.32 g/t Au,1.13 g/t Ag 和 71 g/t Mo),它仍然向東南開放,趨勢繼續向西北方向延伸,朝西北方向移動 ATXD11B,並保持開放狀態。
發現了一種由 ATXD26 指出的新的高品位疊印事件,該事件在高品位斑岩趨勢的接觸點上方與 1.60% CueQ(1.11% Cu、0.49 g/t Au、2.71 g/t Ag 和 348 g/t Mo)的 1.200 米(1.39% 銅、0.6 g/t Au、3.81 g/t Ag 和 473 g/t Mo)相交,並且可能代表了資源包絡內且更接近地表的新離散高等級域。
Highlights from partial holes ATXD25A and ATXD26A:
ATXD25A 和 ATXD26A 局部鑽孔的亮點:
-
ATXD25A intersected 224.2 metres of 0.47% CuEq (0.37% Cu, 0.07 g/t Au, 0.57 g/t Ag and 112 g/t Mo) from 1,230 metres downhole.
ATXD25A was targeting mineralization in hole ATXD25 which previously expanded the extent of the mineralized porphyry corridor to the west.
The drill hole was paused in mineralization associated with a contact between wall rock and Mineralized Porphyry units, expanding the known extent of this unit to the northwest and opening new space for further expansion along strike.
The drill hole was paused due to early seasonal storms and will be completed during Phase V drilling.
-
ATXD26A intersected 31.45 metres of 0.62% CuEq (0.45% Cu, 0.13 g/t Au, 1.31 g/t Ag and 175 g/t Mo) from 792 metres downhole.
ATXD26A, drilled out of ATXD26, will continue to follow up on mineralization intersected in ATXD26 and test continuity of high-grade mineralization above the intersection in ATXD24 (312.4 metres of 1.00% CuEq (0.73% Cu, 0.30 g/t Au and 77 g/t Mo). See Company news dated July 13, 2023.
Mineralization in this drill hole was associated with potassic altered Rock Milled Breccia ("RMB") containing fragments of earlier mineralized porphyry units.
The drill hole was paused short of target depth due to early seasonal storms and will be completed during Phase V drilling.
ATXD27 was paused with over 1,000m remaining to drill and will target the northern extension of mineralization intersected in ATXD26. ATXD27 will be completed during Phase V drilling.
-
ATXD25A 從 1,230 米的井下,穿過 224.2 米的 0.47% CueQ(0.37% 銅、0.07 g/t Au、0.57 g/t Ag 和 112 g/t Mo)。
ATXD25A 的目標是 ATXD25 孔的礦化,該孔此前曾將礦化斑岩走廊的範圍擴大到西部。
由於牆巖和礦化斑岩單元之間的接觸,鑽孔暫停了礦化,該單元的已知範圍向西北擴展,爲沿走向的進一步擴張開闢了新的空間。
由於早期的季節性暴風雨,鑽孔暫停,將在第五階段鑽探期間完成。
-
ATXD26A 從 792 米的井下,穿過 31.45 米的 0.62% CueQ(0.45% 銅、0.13 g/t Au、1.31 g/t Ag 和 175 g/t Mo)。
從 ATXD26 鑽出的 ATXD26A 將繼續跟蹤在 ATXD26 中相交的礦化情況,並測試 ATXD24 交叉點上方高品位礦化的連續性(312.4 米,1.00% CueQ(0.73% Cu,0.30 g/t Au 和 77 g/t Mo)。參見 2023 年 7 月 13 日的公司新聞。
該鑽孔中的礦化與鉀改巖磨角礫岩(“RMB”)有關,其中含有早期礦化斑岩單元的碎片。
由於早期的季節性暴風雨,鑽孔在目標深度之內暫停,將在第五階段鑽探期間完成。
ATXD27 已暫停,還有超過 1,000 米的鑽探時間,將瞄準與 ATXD26 相交的礦化區向北延伸。 ATXD27 將在第五階段鑽探期間完成。
"Phase IV exceeded our expectations and highlights the potential for more high-grade mineralization and provides first evidence for the presence of multiple overlapping systems yielding higher grades along the growing high-grade trend from ATXD16A through to ATXD26 representing a strike length of approximately 700m and open along strike in both directions, and at depth," stated Ben Pullinger, President and CEO of ATEX. "Equally exciting is that our understanding of the shape and size of the Valeriano Porphyry system and higher-grade EP component has increased dramatically through the Phase IV program. All holes so far in Phase IV have continued to intersect significant mineralized intervals within the yet to be defined limits of the system. Additionally, this program continues to return the highest grades seen at the Project to date and provides an exciting springboard to launch from in Phase V."
ATEX總裁兼首席執行官本·普林格表示:“第四階段超出了我們的預期,凸顯了更多高品位礦化的潛力,這爲從 ATXD16A 到 ATXD26 的高品位不斷增長的趨勢中存在多個重疊系統的第一個證據,其走向長度約爲700米,沿着走向和深度開放。”“同樣令人興奮的是,通過第四階段計劃,我們對Valeriano Porphyry系統和更高等級的EP成分的形狀和大小的了解已大大提高。到目前爲止,第四階段的所有鑽孔在尚未確定的系統界限內繼續與重要的礦化區間相交。此外,該項目繼續保持該項目迄今爲止的最高成績,併爲第五階段的啓動提供了令人興奮的跳板。”
Table 1 - Summary Results for ATXD25A, ATXD26A and ATXD27
表 1-ATXD25A、ATXD26A 和 ATXD27 的結果摘要
Hole ID(2,3) | From | To | Interval2 | Cu | Au | Ag | Mo | CuEq MRS(1) |
(m) | (m) | (m) | (%) | (g/t) | (g/t) | (g/t) | (%) | |
ATXD25A | 1,230.00 | 1,454.20 | 224.20 | 0.37 | 0.07 | 0.57 | 112 | 0.47 |
ATXD26A(4) | 791.85 | 823.30 | 31.45 | 0.45 | 0.13 | 1.31 | 175 | 0.62 |
ATXD27 | 0 | 944.3 | Incomplete |
洞 ID(2,3) | 來自 | 至 | 間隔2 | 銅 | Au | Ag | Mo | CueQ MRS(1) |
(m) | (m) | (m) | (%) | (g/t) | (g/t) | (g/t) | (%) | |
ATXD25A | 1,230.00 | 1,454.20 | 224.20 | 0.37 | 0.07 | 0.57 | 112 | 0.47 |
ATXD26A(4) | 791.85 | 823.30 | 31.45 | 0.45 | 0.13 | 1.31 | 175 | 0.62 |
ATXD27 | 0 | 944.3 | 不完整 |
-
CuEq calculated using recoveries assumed in 2023 MRE (90% Cu, 70% Au, 80% Ag and 60% Mo) (See Company news dated September 12, 2023) using the formula stated below:
- Copper Equivalent (CuEq) is calculated using the formula CuEq % = Cu % + (6,481.488523 * Au g/t /10,000) + (94.6503085864 * Ag g/t /10,000) + (4.2328042328 * Mo g/t /10,000).
- Drill holes were composited at a cut-off of 0.3% CuEq.
- Holes ATXD25A, ATXD26A and ATXD27 were paused at end of Phase IV.
- ATXD26A includes an interval of 3.2m from 801.3m to 804.5m where no core was recovered due to use of a directional drilling tool.
- CueQ 使用在 2023 年 MRE(90% 的銅、70% 的金、80% 的銀和 60% 的摩爾)(參見 2023 年 9 月 12 日的公司新聞)中假設的回收率計算得出,公式如下:
- 銅當量 (CueQ) 使用公式 cueQ% = Cu% + (6,481.488523 * Au g/t /10 ,000) + (94.6503085864 * Ag g/t /10 ,000) + (4.2328042328 * Mo g/t /10 ,000) + (4.2328042328 * Mo g/t /10 ,000) 計算。
- 鑽孔的合成截面值爲 0.3% CueQ。
- 在第四階段結束時,ATXD25A、ATXD26A 和 ATXD27 洞暫停。
- ATXD26A 包括從 801.3 米到 804.5 米之間的 3.2 米間隔,其中由於使用了定向鑽探工具,沒有回收岩心。
Due to the early onset of seasonal weather in the region, the Phase IV program has been concluded totalling approximately 12,000m of diamond drilling. Utilizing directional drilling for the completion of daughter holes out of existing parent holes drilled from surface, ATEX has been able to realize an effective total of 20,100m drilled in the event all holes had been drilled from surface. ATEX has announced assay results for completed holes, ATXD16A, ATXD17A, ATXD12A, ATXD25, AXTD17B, ATXD26 and partial holes ATXD25A, ATXD26A and ATXD27.
由於該地區較早出現季節性天氣,第四階段的鑽石鑽探總量約爲12,000米。利用定向鑽孔完成從地表鑽出的現有母孔中的子孔,如果所有孔都是從地表鑽出的,ATEX能夠實現有效總鑽孔20,100米。ATEX 公佈了已完成孔洞、ATXD16A、ATXD17A、ATXD12A、ATXD25、AXTD17B、ATXD26 和局部孔 ATXD25A、ATXD26A 和 ATXD27 的化驗結果。
Phase IV Exploration Program Summary
第四階段勘探計劃摘要
Phase IV has been another transformative exploration season, at Valeriano, during which ATEX has vastly improved the understanding of the geometry of the Valeriano system and demonstrated more continuity of the higher-grade core by intersecting the best grades seen on the Project to date. At the end of the campaign, the system remained open in all directions despite increasing the strike length on the mineralized intrusive units to over 1.2 kilometers demonstrating potential for scalability of the deposit. Additionally, the late-stage epithermal system overprinting wall rock mineralization that was intersected above the top of the porphyry units provides another exciting exploration target to follow up on in Phase V and represents potential optionality as a separate high-grade domain within the greater resource envelope and higher up in the system.
第四階段是瓦萊里亞諾的又一個變革性探索季節,在此期間,ATEX極大地提高了對瓦萊里亞諾系統幾何形狀的理解,並通過與該項目迄今爲止的最佳等級相交,展現了更高等級的核心更大的連續性。在戰役結束時,儘管將礦化侵入單元的走向長度增加到1.2公里以上,但該系統仍然向四面八方開放,這表明了礦牀的擴展潛力。此外,晚期超熱系統覆蓋了斑岩單元頂部上方的壁巖礦化,這爲第五階段的後續勘探提供了另一個令人興奮的勘探目標,也代表了在更大資源包圍內和系統更高處作爲獨立的高品位域的潛在選擇。
Table 2 - Phase IV Drill Program Results
表 2-第四階段鑽探計劃結果
Hole ID (2,4) | From | To | Interval | Cu | Au | Ag | Mo | CuEq MRS(1) | Drilled | Comment | ||||||||||
(m) | (m) | (m) | (%) | (g/t) | (g/t) | (g/t) | (%) | (m) | ||||||||||||
ATXD12A | 864.00 | 1,986.00 | 1,122.00 | 0.37 | 0.14 | 0.97 | 57 | 0.48 | 1,395.75 | Daughter hole from VALDD12-012. Expanded early porphyry corridor to along southern margin of Western trend. | ||||||||||
incl. | 1,500.00 | 1,986.00 | 486.00 | 0.36 | 0.17 | 1.40 | 21 | 0.49 | ||||||||||||
Also incl. | 1,648.00 | 1,682.00 | 34.00 | 0.48 | 0.22 | 2.60 | 44 | 0.65 | ||||||||||||
and | 1,890.00 | 1,924.00 | 34.00 | 0.48 | 0.25 | 2.02 | 5 | 0.65 | ||||||||||||
ATXD16A(5) | 950.00 | 1,802.00 | 852.00 | 0.60 | 0.28 | 0.98 | 72 | 0.82 | 1,221.65 | Daughter hole from VALDD13-016. Intersected EP between Central and Eastern trends confirming continuity between previously modeled trends and expanded southeastern extents of high-grade trend. Remains open to SE along strike below existing drill holes. | ||||||||||
incl. | 1,168.00 | 1,762.00 | 594.00 | 0.67 | 0.32 | 1.13 | 71 | 0.92 | ||||||||||||
incl. | 1,616.00 | 1,728.00 | 112.00 | 1.01 | 0.57 | 2.06 | 46 | 1.42 | ||||||||||||
ATXD17A(6) | 1,052.00 | 1,976.00 | 924.00 | 0.45 | 0.17 | 0.88 | 99 | 0.61 | 1,555.65 | Daughter hole from ATXD17. Drilled over top of porphyry contact into mineralized wall rock, proximal to projected southern porphyry extents. | ||||||||||
incl. | 1,062.00 | 1,555.00 | 493.00 | 0.50 | 0.21 | 0.82 | 113 | 0.69 | ||||||||||||
incl. | 1,216.00 | 1,314.00 | 98.00 | 0.56 | 0.28 | 0.90 | 103 | 0.79 | ||||||||||||
ATXD25 | 1,346.00 | 2,208.20 | 862.20 | 0.42 | 0.27 | 1.72 | 26 | 0.62 | 2,208.20 | Significantly expanded western extent of EP corridor and confirmed continuity of EP in previously modeled gap between Central and Westen trends. | ||||||||||
incl. | 1,550.00 | 2,208.20 | 658.20 | 0.42 | 0.33 | 2.09 | 7 | 0.66 | ||||||||||||
And incl. | 1,858.00 | 2,208.20 | 350.20 | 0.45 | 0.42 | 2.60 | 3 | 0.75 | ||||||||||||
And incl. | 2,084.00 | 2,198.00 | 114.00 | 0.54 | 0.48 | 2.95 | 6 | 0.88 | ||||||||||||
ATXD17B | 750.00 | 1,254.00 | 504.00 | 0.42 | 0.17 | 0.96 | 51 | 0.56 | 1,203.10 | Daughter hole from ATXD17. Deviated outside of porphyry corridor and intersected sporadic high-grade intervals indicative of deeper porphyry mineralization below. | ||||||||||
ATXD26(7) | 586.00 | 1,564.00 | 978.00 | 0.54 | 0.21 | 1.26 | 145 | 0.75 | 1,565.40 | A high-grade, copper, gold and silver enriched low sulphidation epithermal system, overprinting existing mineralization was intersected above projected porphyry target. Porphyry target below remains untested for Phase V follow-up. | ||||||||||
Incl. | 1,010.00 | 1,366.00 | 356.00 | 0.70 | 0.29 | 1.49 | 180 | 0.98 | ||||||||||||
And incl. | 1,086.00 | 1,208.00 | 122.00 | 1.11 | 0.49 | 2.71 | 348 | 1.60 | ||||||||||||
And incl. | 1,100.00 | 1,168.00 | 68.00 | 1.39 | 0.60 | 3.81 | 473 | 2.02 | ||||||||||||
ATXD25A(3,9) | 1,230.00 | 1,454.20 | 224.20 | 0.37 | 0.07 | 0.57 | 112 | 0.47 | 824.64 | Drill hole paused in mineralization, proximal to intrusive contact inferred from ATXD25, and to be completed in Phase V. | ||||||||||
ATXD26A(3,8,9) | 791.85 | 823.30 | 31.45 | 0.45 | 0.13 | 1.31 | 175 | 0.62 | 133.64 | Drill hole paused in mineralization, as in ATXD26, and to be completed in Phase V. | ||||||||||
ATXD27(3,9) | 0 | 944.3 | Incomplete | 944.30 | Drill hole paused in host rock with over 1,000m to be completed. |
洞 ID (2,4) | 來自 | 至 | 間隔 | 銅 | Au | Ag | Mo | CueQ MRS(1) | 已鑽孔 | 評論 | ||||||||||
(m) | (m) | (m) | (%) | (g/t) | (g/t) | (g/t) | (%) | (m) | ||||||||||||
ATXD12A | 864.00 | 1,986.00 | 1,122.00 | 0.37 | 0.14 | 0.97 | 57 | 0.48 | 1,395.75 | 來自 VALDD12-012 的女兒洞。將早期的斑岩走廊擴展到西部趨勢的南緣。 | ||||||||||
包括。 | 1,500.00 | 1,986.00 | 486.00 | 0.36 | 0.17 | 1.40 | 21 | 0.49 | ||||||||||||
還包括 | 1,648.00 | 1,682.00 | 34.00 | 0.48 | 0.22 | 2.60 | 44 | 0.65 | ||||||||||||
和 | 1,890.00 | 1,924.00 | 34.00 | 0.48 | 0.25 | 2.02 | 5 | 0.65 | ||||||||||||
ATXD16A(5) | 950.00 | 1,802.00 | 852.00 | 0.60 | 0.28 | 0.98 | 72 | 0.82 | 1,221.65 | 來自 VALDD13-016 的女兒洞。中部和東部趨勢之間的交叉EP證實了先前建模的趨勢與擴展的高等級趨勢的東南範圍之間的連續性。沿現有鑽孔下方的走向繼續向東南開放。 | ||||||||||
包括。 | 1,168.00 | 1,762.00 | 594.00 | 0.67 | 0.32 | 1.13 | 71 | 0.92 | ||||||||||||
包括。 | 1,616.00 | 1,728.00 | 112.00 | 1.01 | 0.57 | 2.06 | 46 | 1.42 | ||||||||||||
ATXD17A(6) | 1,052.00 | 1,976.00 | 924.00 | 0.45 | 0.17 | 0.88 | 99 | 0.61 | 1,555.65 | 來自 ATXD17 的女兒洞。在斑岩接觸面頂部鑽入礦化壁巖,靠近預計的南部斑岩範圍。 | ||||||||||
包括。 | 1,062.00 | 1,555.00 | 493.00 | 0.50 | 0.21 | 0.82 | 113 | 0.69 | ||||||||||||
包括。 | 1,216.00 | 1,314.00 | 98.00 | 0.56 | 0.28 | 0.90 | 103 | 0.79 | ||||||||||||
ATXD25 | 1,346.00 | 2,208.20 | 862.20 | 0.42 | 0.27 | 1.72 | 26 | 0.62 | 2,208.20 | 顯著擴大了EP走廊的西部範圍,並證實了EP在先前建模的中部和西部趨勢之間的差距中的連續性。 | ||||||||||
包括。 | 1,550.00 | 2,208.20 | 658.20 | 0.42 | 0.33 | 2.09 | 7 | 0.66 | ||||||||||||
而且包括 | 1,858.00 | 2,208.20 | 350.20 | 0.45 | 0.42 | 2.60 | 3 | 0.75 | ||||||||||||
而且包括 | 2,084.00 | 2,198.00 | 114.00 | 0.54 | 0.48 | 2.95 | 6 | 0.88 | ||||||||||||
ATXD17B | 750.00 | 1,254.00 | 504.00 | 0.42 | 0.17 | 0.96 | 51 | 0.56 | 1,203.10 | 來自 ATXD17 的女兒洞。偏離斑岩走廊外,有零星的高品位間隔相交,表明下方斑岩礦化程度更深。 | ||||||||||
ATXD26(7) | 586.00 | 1,564.00 | 978.00 | 0.54 | 0.21 | 1.26 | 145 | 0.75 | 1,565.40 | 一個高品位、富含銅、金和銀的低硫化超熱系統,覆蓋現有礦化,與預計斑岩目標上方相交。以下斑岩目標仍未進行第五階段隨訪測試。 | ||||||||||
包括。 | 1,010.00 | 1,366.00 | 356.00 | 0.70 | 0.29 | 1.49 | 180 | 0.98 | ||||||||||||
而且包括 | 1,086.00 | 1,208.00 | 122.00 | 1.11 | 0.49 | 2.71 | 348 | 1.60 | ||||||||||||
而且包括 | 1,100.00 | 1,168.00 | 68.00 | 1.39 | 0.60 | 3.81 | 473 | 2.02 | ||||||||||||
ATXD25A(3,9) | 1,230.00 | 1,454.20 | 224.20 | 0.37 | 0.07 | 0.57 | 112 | 0.47 | 824.64 | 鑽孔在礦化過程中暫停,從 ATXD25 推斷出接近侵入性接觸,將在第 V 階段完成。 | ||||||||||
ATXD26A(3,8,9) | 791.85 | 823.30 | 31.45 | 0.45 | 0.13 | 1.31 | 175 | 0.62 | 133.64 | 像 ATXD26 一樣,鑽孔在礦化過程中暫停,將在第五階段完成。 | ||||||||||
ATXD27(3,9) | 0 | 944.3 | 不完整 | 944.30 | 在主巖中鑽孔暫停,有超過1,000米的鑽孔尚待完成。 |
-
CuEq calculated using recoveries assumed in 2023 MRE (90% Cu, 70% Au, 80% Ag and 60% Mo) (See Company news dated September 12, 2023) using the formula stated below:
- Copper Equivalent (CuEq) is calculated using the formula CuEq % = Cu % + (6,481.488523 * Au g/t /10,000) + (94.6503085864* Ag g/t /10,000) + (4.2328042328 * Mo g/t /10,000).
- Drill holes were composited at a cut-off of 0.3% CuEq.
- Holes ATXD25A, ATXD26A and ATXD27 were paused at end of Phase IV.
-
Please see Company releases noted below for full details on Phase IV results:
- ATXD12A - Released January 18, 2024.
- ATXD16A and ATXD17A - Released February 22, 2024.
- ATXD25 - Released April 30, 2024.
- ATXD17B and ATXD26 - Released May 15, 2024.
- ATXD16A includes an interval of 10.8m from 996.2m to 1,006.9m where no core was recovered due to use of directional drilling tool.
- ATXD17A includes intervals of 16.85m from 1,554.8 to 1,571.65m and 13.85m from 1,580.95 to 1,594.8m where no core was recovered due to use of directional drilling tool.
- ATXD26 includes intervals of 22.2m from 804.3m to 826.5m and 8.0m from 854.7m to 862.7m where no core was recovered due to use of a directional drilling tool.
- ATXD26A includes an interval of 3.2m from 801.3m to 804.5m where no core was recovered due to use of directional drilling tool.
- The three uncompleted holes (ATXD25A, ATXD26A and ATXD27) will be completed during the Phase V campaign.
- CueQ 使用在 2023 年 MRE(90% 的銅、70% 的金、80% 的銀和 60% 的摩爾)(參見 2023 年 9 月 12 日的公司新聞)中假設的回收率計算得出,公式如下:
- 銅當量 (CueQ) 使用公式 cueQ% = Cu% + (6,481.488523 * Au g/t /10 ,000) + (94.6503085864* Ag g/t /10 ,000) + (4.2328042328 * Mo g/t /10 ,000) + (4.2328042328 * Mo g/t /10 ,000) 計算。
- 鑽孔的合成截面值爲 0.3% CueQ。
- 在第四階段結束時,ATXD25A、ATXD26A 和 ATXD27 洞暫停。
- 有關第四階段業績的完整詳情,請參閱下述公司新聞稿:
- ATXD12A-2024 年 1 月 18 日發佈。
- ATXD16A 和 ATXD17A-於 2024 年 2 月 22 日發佈。
- ATXD25-於 2024 年 4 月 30 日發佈。
- ATXD17B 和 ATXD26-於 2024 年 5 月 15 日發佈。
- ATXD16A 包括從 996.2 米到 1,006.9 米之間的 10.8 米間隔,其中由於使用了定向鑽探工具,沒有回收岩心。
- ATXD17A 包括從 1,554.8 到 1,571.65 米的 16.85 米間隔以及從 1,580.95 米到 1,594.8 米的 13.85 米的間隔,其中由於使用定向鑽探工具,沒有開採巖芯。
- ATXD26 包括從 804.3m 到 826.5m 的 22.2m 間隔以及從 854.7m 到 862.7m 的 8.0m 的間隔,其中由於使用了定向鑽探工具,沒有回收岩心。
- ATXD26A 包括從 801.3 米到 804.5 米之間的 3.2 米間隔,其中由於使用了定向鑽探工具,沒有回收岩心。
- 三個未完工的洞(ATXD25A、ATXD26A 和 ATXD27)將在第五階段戰役期間完成。
Figure 1. Long-section through Trends with 2023 MRE Copper Grade Shell
圖 1。使用 2023 年 MRE 銅級外殼縱覽趨勢
Table 3 - Detailed Results for ATXD25A and ATXD26A
表 3-ATXD25A 和 ATXD26A 的詳細結果
Hole ID(4,6) | From | To | Interval2 | Cu | Au | Ag | Mo | CuEq MRS(1) | CuEq In Situ(2) | CuEq Met Results(3) |
(m) | (m) | (m) | (%) | (g/t) | (g/t) | (g/t) | (%) | (%) | (%) | |
ATXD25A | 1,230.00 | 1,454.20 | 224.20 | 0.37 | 0.07 | 0.57 | 112 | 0.47 | 0.51 | 0.50 |
ATXD26A(5) | 791.85 | 823.30 | 31.45 | 0.45 | 0.13 | 1.31 | 175 | 0.62 | 0.68 | 0.66 |
洞 ID(4,6) | 來自 | 到 | 間隔2 | 銅 | Au | Ag | Mo | CueQ MRS(1) | CueQ 原位(2) | CueQ Met結果(3) |
(m) | (m) | (m) | (%) | (g/t) | (g/t) | (g/t) | (%) | (%) | (%) | |
ATXD25A | 1,230.00 | 1,454.20 | 224.20 | 0.37 | 0.07 | 0.57 | 112 | 0.47 | 0.51 | 0.50 |
ATXD26A(5) | 791.85 | 823.30 | 31.45 | 0.45 | 0.13 | 1.31 | 175 | 0.62 | 0.68 | 0.66 |
-
CuEq calculated using recoveries assumed in 2023 MRE (90% Cu, 70% Au, 80% Ag and 60% Mo) (See Company news dated September 12, 2023) using the formula stated below:
- Copper Equivalent (CuEq) is calculated using the formula CuEq % = Cu % + (6,481.488523 * Au g/t /10,000) + (94.6503085864 * Ag g/t /10,000) + (4.2328042328 * Mo g/t /10,000).
-
CuEq reported in-situ assuming 100% recovery for component metals assuming metal prices of US$1,800 /oz Au, US$3.15 /lb Cu, US$23 /oz Ag, and US$20.00 /lb Mo and using the formula stated below:
- Copper Equivalent (CuEq) is calculated using the formula CuEq % = (((Cu % * 3.15 * 22.0462)) + (Au g/t * (1,800/31.1034768)) + (Ag g/t * (23/31.1034768)) + ((Mo g/t / 10,000) * (20*22.0462))) / (3.15*22.0462).
-
CuEq calculated using recoveries reported from metallurgical test work results reported in Company news dated October 18, 2023 (95% Cu, 94% Au, 89% Ag and 83% Mo) using the formula stated below:
- Copper Equivalent (CuEq) is calculated using the formula CuEq % = (((Cu % * 3.15 * 22.0462)) + ((0.94/0.95 * Au g/t) * (1,800/31.1034768)) + ((0.89/0.95 * Ag g/t) * (23/31.1034768)) + ((0.83/0.95 * Mo g/t / 10000) * (20*22.0462))) / (3.15*22.0462).
- Drill holes were composited at a cut-off of 0.3% CuEq.
- ATXD26A includes an interval of 3.2m from 801.3m to 804.5m where no core was recovered due to use of directional drilling tool.
- Holes ATXD25A and ATXD26A were paused at end of Phase IV.
- CueQ 使用在 2023 年 MRE(90% 的銅、70% 的金、80% 的銀和 60% 的摩爾)(參見 2023 年 9 月 12 日的公司新聞)中假設的回收率計算得出,公式如下:
- 銅當量 (CueQ) 使用公式 cueQ% = Cu% + (6,481.488523 * Au g/t /10 ,000) + (94.6503085864 * Ag g/t /10 ,000) + (4.2328042328 * Mo g/t /10 ,000) + (4.2328042328 * Mo g/t /10 ,000) 計算。
- CueQ報告稱,假設金屬價格爲1,800美元/盎司金、3.15美元/磅銅、23美元/盎司銀和20.00美元/磅摩並使用下述公式,成分金屬的回收率爲100%:
- 銅當量 (CueQ) 使用公式 cueQ% = (((Cu% * 3.15 * 22.0462)) + (Au g/t * (1,800/31.1034768)) + (Ag g/t * (23/31.1034768)) + ((Mo g/t/10,000) * (20*22.0462))/(3.15*22.0462))/(3.15*22.0462))/(3.15*22.0462))/(3.15*22.0462))/(3.15*22.0462)) 計算得出。
- CueQ 使用公司在 2023 年 10 月 18 日的新聞中報告的冶金測試工作結果(95% 銅、94% 的金、89% 的銀和 83% 的鉬)中報告的回收率計算得出,公式如下:
- 銅當量 (CueQ) 使用公式 cueQ% = (((Cu% * 3.15 * 22.0462)) + ((0.94/0.95 * Au g/t) * (1,800/31.1034768)) + ((0.89/0.95 * Ag g/t) * (23/31.1034768)) + ((0.83/0.95 * Mo g/t/10t/10t) 計算 000) * (20*22.0462))/(3.15*22.0462)。
- 鑽孔的合成截面值爲 0.3% CueQ。
- ATXD26A 包括從 801.3 米到 804.5 米之間的 3.2 米間隔,其中由於使用了定向鑽探工具,沒有回收岩心。
- ATXD25A 和 ATXD26A 孔在第四階段結束時暫停。
Outlook
外表
With the early arrival of seasonal storms affecting many operators in the region, ATEX has executed a staged shut down of the Phase IV program to safely demobilize personnel and equipment, marking the end of the Phase IV program. The Phase V drill program, which will follow on from the success of Phase IV, is anticipated to commence in H2 2024.
隨着季節性風暴的提前到來影響了該地區的許多運營商,ATEX已分階段關閉了第四階段計劃,以安全地遣散人員和設備,這標誌着第四階段計劃的結束。第五階段鑽探計劃將繼第四階段的成功之後,預計將於2024年下半年開始。
Final drill results from the remaining Phase IV drill holes have been received. These results and the associated geological information will be integrated into planning for Phase V. The success of this drill program has positively impacted the Company's understanding of the Valeriano porphyry system. Specifically, results from the Phase IV program have led to an increase in the target size for the EP component through demonstrating continuity along a 1.2km strike length and proving that the three previously modelled trends are likely to be connected.
已收到剩餘第四階段鑽孔的最終鑽探結果。這些結果和相關的地質信息將整合到第五階段的規劃中。該鑽探計劃的成功對公司對瓦萊里亞諾斑岩系統的理解產生了積極影響。具體而言,第四階段計劃的結果證明了沿1.2公里走向長度的連續性,並證明了先前建模的三種趨勢可能相互關聯,從而擴大了EP組件的目標尺寸。
The Phase V program is expected to focus on drilling within the EP trend to confirm continuity of the higher-grade corridor within the larger EP target and on significant step-outs to the northwest and southeast where the EP trend remains open. ATEX believes this program could continue to grow the deposit significantly and provide the foundation for an eventual preliminary economic study.
第五階段計劃預計將側重於在EP趨勢範圍內進行鑽探,以確認更大EP目標內更高等級的走廊的連續性,以及向西北和東南的重大跨越,EP趨勢仍處於開放狀態。ATEX認爲,該計劃可能會繼續大幅增加礦牀,併爲最終的初步經濟研究提供基礎。
Table 4 - Phase IV Detailed Copper Equivalent Results Summary
表 4-第四階段詳細銅當量結果摘要
Hole ID(4,6) | From | To | Interval2 | Cu | Au | Ag | Mo | CuEq MRS(1) | CuEq In Situ(2) | CuEq Met Results(3) |
(m) | (m) | (m) | (%) | (g/t) | (g/t) | (g/t) | (%) | (%) | (%) | |
ATXD12A | 864.00 | 1,986.00 | 1,122.00 | 0.37 | 0.14 | 0.97 | 57 | 0.48 | 0.50 | 0.50 |
incl. | 1,500.00 | 1,986.00 | 486.00 | 0.36 | 0.17 | 1.40 | 21 | 0.49 | 0.53 | 0.52 |
Also incl. | 1,648.00 | 1,682.00 | 34.00 | 0.48 | 0.22 | 2.60 | 44 | 0.65 | 0.70 | 0.69 |
and | 1,890.00 | 1,924.00 | 34.00 | 0.48 | 0.25 | 2.02 | 5 | 0.65 | 0.71 | 0.70 |
ATXD16A(7) | 950.00 | 1,802.00 | 852.00 | 0.60 | 0.28 | 0.98 | 72 | 0.82 | 0.89 | 0.88 |
incl. | 1,168.00 | 1,762.00 | 594.00 | 0.67 | 0.32 | 1.13 | 71 | 0.92 | 1.00 | 0.99 |
incl. | 1,616.00 | 1,728.00 | 112.00 | 1.01 | 0.57 | 2.06 | 46 | 1.42 | 1.53 | 1.52 |
ATXD17A(8) | 1,052.00 | 1,976.00 | 924.00 | 0.45 | 0.17 | 0.88 | 99 | 0.61 | 0.66 | 0.65 |
incl. | 1,062.00 | 1,555.00 | 493.00 | 0.50 | 0.21 | 0.82 | 113 | 0.69 | 0.75 | 0.74 |
incl. | 1,216.00 | 1,314.00 | 98.00 | 0.56 | 0.28 | 0.90 | 103 | 0.79 | 0.87 | 0.85 |
ATXD25 | 1,346.00 | 2,208.20 | 862.20 | 0.42 | 0.27 | 1.72 | 26 | 0.62 | 0.68 | 0.68 |
incl. | 1,550.00 | 2,208.20 | 658.20 | 0.42 | 0.33 | 2.09 | 7 | 0.66 | 0.73 | 0.72 |
And incl. | 1,858.00 | 2,208.20 | 350.20 | 0.45 | 0.42 | 2.60 | 3 | 0.75 | 0.83 | 0.82 |
And incl. | 2,084.00 | 2,198.00 | 114.00 | 0.54 | 0.48 | 2.95 | 6 | 0.88 | 0.97 | 0.97 |
ATXD17B | 750.00 | 1,254.00 | 504.00 | 0.42 | 0.17 | 0.96 | 51 | 0.56 | 0.61 | 0.60 |
ATXD26(9) | 586.00 | 1,564.00 | 978.00 | 0.54 | 0.21 | 1.26 | 145 | 0.75 | 0.82 | 0.81 |
Incl. | 1,010.00 | 1,366.00 | 356.00 | 0.70 | 0.29 | 1.49 | 180 | 0.98 | 1.07 | 1.05 |
And incl. | 1,086.00 | 1,208.00 | 122.00 | 1.11 | 0.49 | 2.71 | 348 | 1.60 | 1.77 | 1.73 |
And incl. | 1,100.00 | 1,168.00 | 68.00 | 1.39 | 0.60 | 3.81 | 473 | 2.02 | 2.23 | 2.19 |
ATXD25A(5) | 1,230.00 | 1,454.20 | 224.20 | 0.37 | 0.07 | 0.57 | 112 | 0.47 | 0.51 | 0.50 |
ATXD26A(5,10) | 791.85 | 823.30 | 31.45 | 0.45 | 0.13 | 1.31 | 175 | 0.62 | 0.68 | 0.66 |
洞 ID(4,6) | 來自 | 至 | 間隔2 | 銅 | Au | Ag | Mo | CueQ MRS(1) | CueQ 原位(2) | CueQ Met結果(3) |
(m) | (m) | (m) | (%) | (g/t) | (g/t) | (g/t) | (%) | (%) | (%) | |
ATXD12A | 864.00 | 1,986.00 | 1,122.00 | 0.37 | 0.14 | 0.97 | 57 | 0.48 | 0.50 | 0.50 |
包括。 | 1,500.00 | 1,986.00 | 486.00 | 0.36 | 0.17 | 1.40 | 21 | 0.49 | 0.53 | 0.52 |
還包括 | 1,648.00 | 1,682.00 | 34.00 | 0.48 | 0.22 | 2.60 | 44 | 0.65 | 0.70 | 0.69 |
和 | 1,890.00 | 1,924.00 | 34.00 | 0.48 | 0.25 | 2.02 | 5 | 0.65 | 0.71 | 0.70 |
ATXD16A(7) | 950.00 | 1,802.00 | 852.00 | 0.60 | 0.28 | 0.98 | 72 | 0.82 | 0.89 | 0.88 |
包括。 | 1,168.00 | 1,762.00 | 594.00 | 0.67 | 0.32 | 1.13 | 71 | 0.92 | 1.00 | 0.99 |
包括。 | 1,616.00 | 1,728.00 | 112.00 | 1.01 | 0.57 | 2.06 | 46 | 1.42 | 1.53 | 1.52 |
ATXD17A(8) | 1,052.00 | 1,976.00 | 924.00 | 0.45 | 0.17 | 0.88 | 99 | 0.61 | 0.66 | 0.65 |
包括。 | 1,062.00 | 1,555.00 | 493.00 | 0.50 | 0.21 | 0.82 | 113 | 0.69 | 0.75 | 0.74 |
包括。 | 1,216.00 | 1,314.00 | 98.00 | 0.56 | 0.28 | 0.90 | 103 | 0.79 | 0.87 | 0.85 |
ATXD25 | 1,346.00 | 2,208.20 | 862.20 | 0.42 | 0.27 | 1.72 | 26 | 0.62 | 0.68 | 0.68 |
包括。 | 1,550.00 | 2,208.20 | 658.20 | 0.42 | 0.33 | 2.09 | 7 | 0.66 | 0.73 | 0.72 |
而且包括 | 1,858.00 | 2,208.20 | 350.20 | 0.45 | 0.42 | 2.60 | 3 | 0.75 | 0.83 | 0.82 |
而且包括 | 2,084.00 | 2,198.00 | 114.00 | 0.54 | 0.48 | 2.95 | 6 | 0.88 | 0.97 | 0.97 |
ATXD17B | 750.00 | 1,254.00 | 504.00 | 0.42 | 0.17 | 0.96 | 51 | 0.56 | 0.61 | 0.60 |
ATXD26(9) | 586.00 | 1,564.00 | 978.00 | 0.54 | 0.21 | 1.26 | 145 | 0.75 | 0.82 | 0.81 |
包括。 | 1,010.00 | 1,366.00 | 356.00 | 0.70 | 0.29 | 1.49 | 180 | 0.98 | 1.07 | 1.05 |
而且包括 | 1,086.00 | 1,208.00 | 122.00 | 1.11 | 0.49 | 2.71 | 348 | 1.60 | 1.77 | 1.73 |
而且包括 | 1,100.00 | 1,168.00 | 68.00 | 1.39 | 0.60 | 3.81 | 473 | 2.02 | 2.23 | 2.19 |
ATXD25A(5) | 1,230.00 | 1,454.20 | 224.20 | 0.37 | 0.07 | 0.57 | 112 | 0.47 | 0.51 | 0.50 |
ATXD26A(5,10) | 791.85 | 823.30 | 31.45 | 0.45 | 0.13 | 1.31 | 175 | 0.62 | 0.68 | 0.66 |
-
CuEq calculated using recoveries assumed in 2023 MRE (90% Cu, 70% Au, 80% Ag and 60% Mo) (See Company news dated September 12, 2023) using the formula stated below:
- Copper Equivalent (CuEq) is calculated using the formula CuEq % = Cu % + (6,481.488523 * Au g/t /10,000) + (94.6503085864* Ag g/t /10,000) + (4.2328042328 * Mo g/t /10,000).
-
CuEq reported in situ assuming 100% recovery for component metals assuming metal prices of US$1,800 /oz Au, US$3.15 /lb Cu, US$23 /oz Ag, and US$20.00 /lb Mo and using the formula stated below:
- Copper Equivalent (CuEq) is calculated using the formula CuEq % = (((Cu % * 3.15 * 22.0462)) + (Au g/t * (1,800/31.1034768)) + (Ag g/t * (23/31.1034768)) + ((Mo g/t / 10,000) * (20*22.0462))) / (3.15*22.0462).
-
CuEq calculated using recoveries reported from metallurgical test work results reported in Company news Oct, 18 2023 (95% Cu, 94% Au, 89% Ag and 83% Mo) using the formula stated below:
- Copper Equivalent (CuEq) is calculated using the formula CuEq % = (((Cu % * 3.15 * 22.0462)) + ((0.94/0.95 * Au g/t) * (1,800/31.1034768)) + ((0.89/0.95 * Ag g/t) * (23/31.1034768)) + ((0.83/0.95 * Mo g/t / 10000) * (20*22.0462))) / (3.15*22.0462).
- Drill holes were composited at a cut-off of 0.3% CuEq.
- Holes ATXD25A and ATXD26A were paused at end of Phase IV.
-
Please see Company releases noted below for full details on Phase IV results:
- ATXD12A - Released January 18, 2024.
- ATXD16A and ATXD17A - Released February 22, 2024.
- ATXD25 - Released April 30, 2024.
- ATXD17B and ATXD26 - Released May 15, 2024.
- ATXD16A includes an interval of 10.8m from 996.2m to 1,006.9m where no core was recovered due to use of directional drilling tool.
- ATXD17A includes intervals of 16.85m from 1,554.8 to 1,571.65m and 13.85m from 1,580.95 to 1,594.8m where no core was recovered due to use of directional drilling tool.
- ATXD26 includes intervals of 22.2m from 804.3m to 826.5m and 8.0m from 854.7m to 862.7m where no core was recovered due to use of a directional drilling tool.
- ATXD26A includes an interval of 3.2m from 801.3m to 804.5m where no core was recovered due to use of directional drilling tool.
- CueQ 使用在 2023 年 MRE(90% 的銅、70% 的金、80% 的銀和 60% 的摩爾)(參見 2023 年 9 月 12 日的公司新聞)中假設的回收率計算得出,公式如下:
- 銅當量 (CueQ) 使用公式 cueQ% = Cu% + (6,481.488523 * Au g/t /10 ,000) + (94.6503085864* Ag g/t /10 ,000) + (4.2328042328 * Mo g/t /10 ,000) + (4.2328042328 * Mo g/t /10 ,000) 計算。
- CueQ現場報告稱,假設金屬價格爲1,800美元/盎司金、3.15美元/磅銅、23美元/盎司銀和20.00美元/磅摩並使用下述公式,成分金屬的回收率爲100%:
- 銅當量 (CueQ) 使用公式 cueQ% = (((Cu% * 3.15 * 22.0462)) + (Au g/t * (1,800/31.1034768)) + (Ag g/t * (23/31.1034768)) + ((Mo g/t/10,000) * (20*22.0462))/(3.15*22.0462))/(3.15*22.0462))/(3.15*22.0462))/(3.15*22.0462))/(3.15*22.0462)) 計算得出。
- CueQ 使用公司新聞 2023 年 10 月 18 日報道的冶金測試工作結果中報告的回收率(95% 銅、94% 的金、89% 的銀和 83% 的鉬)計算得出,公式如下:
- 銅當量 (CueQ) 使用公式 cueQ% = (((Cu% * 3.15 * 22.0462)) + ((0.94/0.95 * Au g/t) * (1,800/31.1034768)) + ((0.89/0.95 * Ag g/t) * (23/31.1034768)) + ((0.83/0.95 * Mo g/t/10t/10t) 計算 000) * (20*22.0462))/(3.15*22.0462)。
- 鑽孔的合成截面值爲 0.3% CueQ。
- ATXD25A 和 ATXD26A 孔在第四階段結束時暫停。
- 有關第四階段業績的完整詳情,請參閱下述公司新聞稿:
- ATXD12A-2024 年 1 月 18 日發佈。
- ATXD16A 和 ATXD17A-於 2024 年 2 月 22 日發佈。
- ATXD25-於 2024 年 4 月 30 日發佈。
- ATXD17B 和 ATXD26-於 2024 年 5 月 15 日發佈。
- ATXD16A 包括從 996.2 米到 1,006.9 米之間的 10.8 米間隔,其中由於使用了定向鑽探工具,沒有回收岩心。
- ATXD17A 包括從 1,554.8 到 1,571.65 米的 16.85 米間隔以及從 1,580.95 米到 1,594.8 米的 13.85 米的間隔,其中由於使用定向鑽探工具,沒有開採巖芯。
- ATXD26 包括從 804.3m 到 826.5m 的 22.2m 間隔以及從 854.7m 到 862.7m 的 8.0m 的間隔,其中由於使用了定向鑽探工具,沒有回收岩心。
- ATXD26A 包括從 801.3 米到 804.5 米之間的 3.2 米間隔,其中由於使用了定向鑽探工具,沒有回收岩心。
QAQC
QAQC
Drill holes are collared with a PQ drill bit, reduced to HQ and, sequentially, to NQ as the drill holes progressed deeper. Drill core produced by the drill rigs was extracted from the core tubes by the drill contractor under the supervision of ATEX employees, marked for consistent orientation and placed in core boxes with appropriate depth markers added. Full core boxes were then sealed before being transported by ATEX personnel to the Valeriano field camp. Core at the field camp is processed, quick logged, checked for recovery, photographed, and marked for specific gravity, geotechnical studies and for assays. From camp, the core is transferred to a secure core-cutting facility in Vallenar, operated by IMG, a third-party consultant. Here, the core trays are weighed before being cut using a diamond saw under ATEX personnel oversight. ATEX geologists working at this facility double-check the selected two-metre sample intervals, placing the samples in seal bags and ensuring that the same side of the core is consistently sampled. Reference numbers are assigned to each sample and each sample is weighed. The core trays with the remaining half-core are weighed and photographed. Additionally, core logs are updated, and specific gravity and geotechnical samples are collected. The remaining core is stored in racks at the Company's secure facility in Vallenar.
鑽孔用 PQ 鑽頭開孔,鑽孔縮小到總部,隨着鑽孔的深入,依次縮減到 NQ。鑽機生產的鑽芯由鑽探承包商在ATEX員工的監督下從岩心管中提取,標記方向一致,然後放入岩心盒中,並添加了適當的深度標記。然後,完整的核心箱被密封,然後由ATEX人員運送到瓦萊里亞諾野戰營地。野戰營地的岩心經過處理、快速記錄、檢查是否恢復、拍照,並標記用於比重、岩土工程研究和化驗。核心資源從營地轉移到位於瓦萊納爾的一個安全的切芯設施,該設施由第三方顧問IMG運營。在這裏,在ATEX人員的監督下使用金剛石鋸切割巖芯托盤之前,先對芯盤進行稱重。在該設施工作的ATEX地質學家仔細檢查選定的兩米採樣間隔,將樣品放入密封袋中,並確保岩心同一側的採樣始終如一。爲每個樣本分配參考編號,並對每個樣本進行稱重。對帶有剩餘半芯的核心托盤進行稱重並拍照。此外,還更新了岩心日誌,收集了比重和岩土工程樣本。剩餘的核心存儲在公司位於瓦萊納爾的安全設施的機架中。
From Vallenar samples are sent to an ALS preparation facility in La Serena. ALS is an accredited laboratory which is independent of the Company. The prepared samples were sent to the ALS assay laboratories in either Santiago, Chile and Lima, Peru for gold (Au-AA24), copper (Cu-AA62), molybdenum (Mo-AA62) and silver (Ag-AA62) assays as well as and multi-element ICP (ME-MS61) analysis. No data quality problems were indicated by the QA/QC program.
來自瓦萊納爾的樣本被送到拉塞雷納的肌萎縮性側索硬化症製備設施。ALS 是一家獨立於公司的經認證的實驗室。準備好的樣本被送往智利聖地亞哥和秘魯利馬的肌萎縮性側索硬化症分析實驗室進行金(Au-AA24)、銅(cu-aa62)、鉬(mo-aa62)和銀(Ag-AA62)的測定以及多元素ICP(ME-MS61)分析。質量保證/質量控制計劃未發現任何數據質量問題。
Qualified Person
合格人員
Mr. Ben Pullinger, P.Geo., registered with the Professional Geoscientists Ontario, is the Qualified Person, as defined by National Instrument 43-101 - Standards for Disclosure for Mineral Projects, for the Valeriano Copper Gold Porphyry Project. Mr. Pullinger is not considered independent under NI 43-101 as he is President and CEO of ATEX. He has reviewed and approved the disclosure of the scientific and technical information contained in this press release.
根據國家儀器 43-101 的定義,在安大略省專業地球科學家協會註冊的 P.Geo. Ben Pullinger 先生是合格人員- 礦產項目披露標準,用於瓦萊里亞諾銅金斑岩項目。根據NI 43-101,普林格先生不被視爲獨立人士,因爲他是ATEX的總裁兼首席執行官。他已經審查並批准了本新聞稿中包含的科學和技術信息的披露。
About ATEX
關於 ATEX
ATEX is exploring the Valeriano Copper Gold Project which is located within the emerging copper gold porphyry mineral belt linking the prolific El Indio High-Sulphidation Belt to the south with the Maricunga Gold Porphyry Belt to the north. This emerging belt, informally referred to as the Link Belt, hosts several copper gold porphyry deposits at various stages of development including, Filo del Sol (Filo Mining), Josemaria (Lundin Mining), Los Helados (NGEX Minerals/JX Nippon), La Fortuna (Teck Resources/Newmont) and El Encierro (Antofagasta/Barrick Gold).
ATEX正在探索瓦萊里亞諾銅金項目,該項目位於新興的銅金斑岩礦帶內,將多產的埃爾印第奧高硫化帶與北部的馬裏昆加金斑岩帶連接起來。這個新興的礦帶被非正式地稱爲鏈接帶,擁有多個處於不同開發階段的銅金斑岩礦牀,包括Filo del Sol(Filo Mining)、Josemaria(倫丁礦業)、洛斯赫拉多斯(NGEX Minerals/Jx Nippon)、La Fortuna(Teck Resources/Newmont)和El Encierro(Antofagasta/Barrick Gold)。
Valeriano hosts a large copper gold porphyry resource: 1.41 billion tonnes at 0.67% CuEq (0.50% Cu, 0.20 g/t Au, 0.96 g/t Ag and 63.80 g/t Mo), which includes a higher-grade core totaling 200 million tonnes at 0.84% CuEq (0.62% Cu, 0.29 g/t Au 1.25 g/t Ag and 55.7 g/t Mo), reported in September 20231.
瓦萊里亞諾擁有大量銅金斑岩資源:14.1億噸,銅當量爲 0.67%(0.50% 銅、0.20 克/噸金、0.96 克/噸銀和 63.80 克/噸 Mo),其中包括總量爲 0.84% cueQ(0.62% 銅、0.29 g/t Au、1.25 g/t Mo 和 55.7 g/t Mo)的更高品位岩心,2023 年 9 月公佈1。
For further information, please contact:
欲了解更多信息,請聯繫:
Ben Pullinger,
President and CEO
Email: bpullinger@atexresources.com
本·普林格,
總裁兼首席執行官
電子郵件:bpullinger@atexresources.com
Aman Atwal,
Vice President, Business Development and Investor Relations
Email: aatwal@atexresources.com
阿曼·阿特瓦爾,
業務發展和投資者關係副總裁
電子郵件:aatwal@atexresources.com
1-647-287-3778
or visit ATEX's website at .
1-647-287-3778
或訪問ATEX的網站,網址爲。
CAUTIONARY NOTE REGARDING FORWARD-LOOKING STATEMENTS:
關於前瞻性陳述的警示性說明:
This news release contains forward-looking statements, including predictions, projections, and forecasts. Often, but not always, forward-looking statements can be identified by the use of words such as "plans", "planning", "expects" or "does not expect", "continues", "scheduled", "estimates", "forecasts", "intends", "potential", "anticipates", "does not anticipate", or describes a "goal", or variation of such words and phrases or state that certain actions, events or results "may", "could", "would", "might" or "will" be taken, occur or be achieved. Forward-looking statements involve known and unknown risks, future events, conditions, uncertainties and other factors which may cause the actual results, performance or achievements to be materially different from any future results, prediction, projection, forecast, performance or achievements expressed or implied by the forward-looking statements.
本新聞稿包含前瞻性陳述,包括預測、預測和預測。通常,但並非總是如此,前瞻性陳述可以通過使用 “計劃”、“規劃”、“預期” 或 “不期望”、“繼續”、“預期”、“估計”、“預測”、“打算”、“潛在”、“預期”、“未預期” 等詞語來識別,或者描述 “目標”,或此類詞語和短語的變體,或陳述某些行動、事件或結果 “” 可能”、“可能”、“將”、“可能” 或 “將” 被採取、發生或實現。前瞻性陳述涉及已知和未知的風險、未來事件、條件、不確定性和其他因素,這些因素可能導致實際業績、業績或成就與前瞻性陳述所表達或暗示的任何未來業績、預測、預測、業績或成就存在重大差異。
Such forward-looking statements include, among others: plans for the evaluation of exploration properties including the Project; the success of evaluation plans; the success of exploration activities especially to the significant expansion of the high-grade corridor; mine development prospects; potential for future metals production; changes in economic parameters and assumptions; all aspects related to the timing and extent of exploration activities including the Phase IV and Phase V drill programs contemplated in this press release; the timing or nature of a preliminary economic study; timing of receipt of exploration results; the interpretation and actual results of current exploration activities and mineralization; changes in project parameters as plans continue to be refined; the results of regulatory and permitting processes; future metals price; possible variations in grade or recovery rates; failure of equipment or processes to operate as anticipated; labour disputes and other risks of the mining industry; the results of economic and technical studies; delays in obtaining governmental and local approvals or financing or in the completion of exploration; timing of assay results; as well as those factors disclosed in ATEX's publicly filed documents.
此類前瞻性陳述包括:包括項目在內的勘探財產評估計劃;評估計劃的成功;勘探活動的成功,尤其是高品位走廊的大幅擴建的勘探活動的成功;礦山開發前景;未來金屬生產的潛力;經濟參數和假設的變化;與勘探活動時間和範圍有關的所有方面,包括本新聞稿中考慮的第四階段和第五階段鑽探計劃;時間或性質初步經濟研究;收到勘探結果的時間;當前勘探活動和礦化的解釋和實際結果;隨着計劃的不斷完善,項目參數的變化;監管和許可程序的結果;未來金屬價格;品位或回收率可能的變化;設備或工藝未能按預期運行;採礦業的勞資糾紛和其他風險;經濟和技術研究的結果;延遲獲得政府和地方批准或融資或完成勘探;化驗結果的時機;以及ATEX公開提交的文件中披露的因素。
Although ATEX has attempted to identify important factors that could cause actual actions, events or results to differ materially from those described in forward-looking statements, there may be other factors that cause actions, events or results not to be as anticipated, estimated or intended. There can be no assurance that forward-looking statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on forward-looking statements.
儘管ATEX試圖確定可能導致實際行動、事件或結果與前瞻性陳述中描述的重大差異的重要因素,但可能還有其他因素導致行動、事件或結果與預期、估計或預期不符。無法保證前瞻性陳述會被證明是準確的,因爲實際結果和未來事件可能與此類陳述中的預期存在重大差異。因此,讀者不應過分依賴前瞻性陳述。
Neither the TSX Venture Exchange nor its regulation services provider has reviewed or accepts
responsibility for the adequacy or accuracy of the content of this news release.
多倫多證券交易所風險交易所及其監管服務提供商均未審查或接受
對本新聞稿內容的充分性或準確性負責。
________________________
1 Please see NI 43-101 technical report titled "Independent Technical Report for the Valeriano Copper-Gold Project, Atacama Region, Chile" by Joled Nur, CCCRRM-Chile, and David Hopper, CGeol, with an effective date of September 1, 2023, available at and for additional details on the 2023 Mineral Resource Estimate for the Valeriano project.
______________________
1 請參閱智利CCCRRM的Joled Nur和CGeol的David Hopper撰寫的題爲 “智利阿塔卡馬地區瓦萊里亞諾銅金項目獨立技術報告” 的NI 43-101技術報告,生效日期爲2023年9月1日,網址爲 以及有關瓦萊里亞諾項目2023年礦產資源估算的更多詳細信息。
譯文內容由第三人軟體翻譯。