High Tide Resources Announces Changes to the Board of Directors
High Tide Resources Announces Changes to the Board of Directors
Adds Significant Capital Markets Strength
增加了重要的資本市場實力
TORONTO, ON / ACCESSWIRE / June 25, 2024 / High Tide Resources Corp. ("High Tide" or the "Company") (CSE:HTRC) announces the appointment of Jean-François Meilleur to the Board of Directors ("the Board") replacing Serge Pelletier who is stepping down from the Board, effective immediately, but will remain with the Company as an Advisor.
TORONTO,ON / ACCESSWIRE / June 25,2024 / High Tide Resources Corp.(“High Tide”或“公司”)(CSE:HTRC)宣佈任命讓·弗朗索瓦·梅耶(Jean-François Meilleur)爲董事會成員(“董事會”),接替辭去董事會的Serge Pelletier,立即生效,但仍將繼續擔任公司顧問。
Steve Roebuck, Director & Interim CEO of High Tide states: We're excited to have Jean-François join our Board of Directors. His extensive capital markets experience and hands-on involvement in successful ventures within the junior exploration space make him a valuable addition to the team. Additionally, we express our gratitude to Serge for his significant contributions to High Tide since its inception and wish him all the best in his future endeavors."
High Tide董事和代理首席執行官Steve Roebuck表示:我們很高興讓·弗朗索瓦加入我們的董事會。他在資本市場方面的豐富經驗和在初創勘探領域內成功創業的實踐經歷使他成爲團隊中寶貴的補充。此外,我們對Serge在High Tide成立以來作出的重大貢獻表示感謝,並祝他在未來的事業中一切順利。
Jean-François Meilleur, Director of High Tide states: "I'm excited to join the High Tide team and contribute to advancing our Labrador West Iron Ore Project and low-carbon green-steel initiative. This reminds me of my early days at Critical Elements Corporation, when the lithium industry had a small audience. Today, there's no doubt about the demand and future growth in the lithium space. I'm confident our green-steel vision will lead us to similar success."
High Tide董事Jean-François Meilleur表示:“我很高興加入High Tide團隊,併爲推進我們的拉布拉多西部鐵礦石項目和低碳綠色鋼鐵計劃做出貢獻。這讓我想起了我在Critical Elements Corporation的早期日子,當時鋰礦行業的受衆很少。如今,鋰礦空間的需求和未來增長毫無疑問。我相信我們的綠色鋼鐵願景將引領我們取得類似的成功。
Jean-François Meilleur graduated from HEC Montréal in 2003 with a bachelor's degree in finance. For the past 18 years, he has been a Managing Director at P.E. Partners, a small-cap Capital Market boutique, supporting entrepreneurs in navigating the capital markets. In that role, he has worked with dozens of junior explorers and taken on significant executive roles with Critical Elements, Quebec Precious Metals, and Soma Gold Corp.
Jean-François Meilleur於2003年從HEC Montréal獲得金融學學士學位。在過去的18年中,他一直是P.E. Partners的董事總經理,這是一家支持企業家在資本市場中航行的小型資本市場精品公司。在這個角色中,他與許多初創公司合作,並在Critical Elements,Quebec Precious Metals和Soma Gold Corp擔任重要的執行角色。
About High Tide
關於High Tide
High Tide is focused on and committed to the development of mineral projects critical to infrastructure development using industry best practices combined with a strong social license from local communities. High Tide owns a 100% interest in the Labrador West Iron Project which hosts a NI 43-101 Inferred iron resource of 654.9 Mt @ 28.84% Fe and is located adjacent to IOCC's Carol Lake Mine in Labrador City, NL. This resource is exposed at surface and was pit constrained for an open-pit mining scenario. The Technical Report was filed on SEDAR on April 6, 2023 and was authored by Ryan Kressall M.Sc., P. Geo, Matthew Herrington, M.Sc., P. Geo, Catharine Pelletier, P. Eng. and Jeffrey Cassoff P. Eng.
High Tide專注於並致力於使用最佳實踐結合當地社區的強大社會許可證開發對基礎設施發展至關重要的礦業項目。High Tide擁有100%的Labrador West Iron項目權益,該項目擁有一個654.9Mt@28.84%Fe的NI 43-101推斷鐵礦資源,位於紐芬蘭與拉布拉多省的Labrador City附近,靠近IOCC的Carol Lake Mine。該資源暴露在地面上,並針對露天礦山場景進行了限制。技術報告於2023年4月6日在SEDAR上提交,並由Ryan Kressall M.Sc.,P. Geo,Matthew Herrington M.Sc.,P. Geo,Catharine Pelletier,P. Eng。和Jeffrey Cassoff P. Eng.所撰寫。
The Company also owns a 100% interest in the Lac Pegma copper-nickel-cobalt deposit located 50 kilometres southeast of Fermont, Quebec.
該公司還擁有位於魁北克省Fermont以東50公里處的Lac Pegma銅-鎳-鈷礦牀的100%權益。
Further details on the Company, including a NI 43-101 technical report on the Labrador West Iron property can be found on the Company's website at .
公司的更多詳細信息,包括有關Labrador West Iron資產的NI 43-101技術報告,請訪問公司的網站。
Iron Ore and the Labrador Trough Infrastructure Advantage
鐵礦石和Labrador槽基礎設施優勢
The Labrador Trough of western Labrador and adjoining Quebec constitutes Canada's primary iron producing district and is host to world-class deposits that have been mined for more than sixty years. The high quality of the deposits in the region allows for a wide range in product diversity, which includes premium fines, concentrate and pellet grades. Importantly, the low-carbon emission future will require Direct Reduction quality concentrate and pellets, two products that the Trough is producing and is considered to have significant growth potential to help support a "Green Iron and Steel" future.
西部Labrador和鄰近的魁北克阿迪郎杜克地堡構成加拿大主要的鐵礦生產區,是世界級礦牀的宿主已經開採了60多年。該地區沉積物的高質量可實現廣泛的產品多樣性,包括優質細粉,濃縮物和球團級別。重要的是,低碳排放的未來將需要直接還原質量的濃縮和球團,這是槽生產並被認爲具有支持“綠色鐵和鋼”未來的顯着增長潛力的兩種產品。
The Property (see location map appended to this press release) is strategically located near the mining communities of Wabush and Labrador City in the province of Newfoundland & Labrador and Fermont in Quebec. The area is home to Champion Iron Ore's Bloom Lake Mine, ArcelorMittal's Mont-Wright Mine, Tacora Resources' Scully Mine, and Rio Tinto IOC's Carol Lake Mine.
該資產(請參閱附加到此新聞稿的位置圖)位於紐芬蘭與拉布拉多省的Wabush和Labrador City礦業社區以及魁北克省的Fermont。該地區是Champion Iron Ore的Bloom Lake Mine,ArcelorMittal的Mont-Wright Mine,Tacora Resources的Scully Mine和Rio Tinto IOC的Carol Lake Mine的所在地。
The Wabush and Labrador City region is very well served with skilled labour, a highway, as well as access to abundant low-cost hydroelectricity and a common carrier railway. The railway has an estimated ~80 million tonnes per year of capacity for transport of iron products to the deep-water port of Sept Isles, Quebec, which provides year-round access to global markets.
Wabush和Labrador City地區的熟練勞動力、公路以及充足的廉價水電和普通運輸鐵路的服務非常好。該鐵路的裝載量估計約爲每年80萬噸,可將鐵製品運往魁北克的Sept Isles深水港,爲全年訪問全球市場提供便利。
Qualified Person
合格人士
The technical information contained in this news release has been approved by Michael Zurowski, P.Eng., Executive Vice President of High Tide, who is a Qualified Person as defined in "National Instrument 43-101, Standards of Disclosure for Mineral Projects."
此新聞稿中的技術信息已獲得High Tide執行副總裁Michael Zurowski,P.Eng.的批准,他是“公開披露礦物項目的國家43-101標準”中定義的合格人士。
For further information, please contact:
如需更多信息,請聯繫:
Steve Roebuck, P. Geo Director, President & Interim CEO Mobile: (905) 741-5458 Email: sroebuck@hightideresources.com |
Michael Zurowski, P. Eng Executive Vice President Mobile: (416) 357-9753 Email: mtz@hightideresources.com |
Steve Roebuck,P. Geo 董事,總裁兼代理首席執行官 移動電話:(905)741-5458 電子郵件:sroebuck@hightideresources.com |
Michael Zurowski,P. Eng 執行副總裁 電話:(416)357-9753 電子郵件:mtz@hightideresources.com |
Neither Canadian Securities Exchange nor its Regulation Services Provider (as that term is defined in the policies of the Canadian Securities Exchange) accepts responsibility for the adequacy or accuracy of this news release.
加拿大證券交易所及其監管服務提供者(如加拿大證券交易所政策中所定義的)不對本新聞稿的充分性或準確性承擔責任。
Forward looking information
本新聞稿中包含的某些聲明可能構成"前瞻性信息"。前瞻性信息一般可以通過語言如"預期"、"期望"、"估計"、"預測"、"計劃"或類似詞語表達其對未來結果或事件的暗示。前瞻性信息基於管理層目前的預期,然而,它受到已知和未知風險、不確定性和其他因素的影響,這些風險、不確定性和其他因素可能導致本新聞稿中的前瞻性信息與實際情況不符,其中包括但不限於與認購的完成、超額認購選擇權的行使以及認購結束日期有關的聲明。請注意,本新聞稿中的前瞻性信息基於許多關鍵的預期和假設,包括但不限於公司將繼續實現其聲明的業務目標,以及公司能夠籌集額外資本以繼續前進。雖然公司管理層試圖確定可能導致實際結果與本新聞稿中前瞻性信息不符的重要因素,但可能有其他因素會導致結果與預期、估計或意圖不符。對於公司的前瞻性信息,讀者應保持謹慎,公司不承擔就執行與之相應的任何義務。閱讀者應該注意,依賴這種信息可能不適用於其他用途。有關風險和不確定性的補充信息請參見公司截至2023年11月30日的管理討論和分析,以及公司截至2023年11月30日的年度信息表,拷貝可在SEDAR+上獲得。
This news release includes certain "forward-looking statements" which are not comprised of historical facts. Forward-looking statements include estimates and statements that describe the Company's future plans, objectives or goals, including words to the effect that the Company or management expects a stated condition or result to occur. Forward-looking statements may be identified by such terms as "believes", "anticipates", "expects", "estimates", "may", "could", "would", "will", or "plan". Since forward-looking statements are based on assumptions and address future events and conditions, by their very nature they involve inherent risks and uncertainties. Although these statements are based on information currently available to the Company, the Company provides no assurance that actual results will meet management's expectations. Risks, uncertainties and other factors involved with forward-looking information could cause actual events, results, performance, prospects and opportunities to differ materially from those expressed or implied by such forward-looking information. Forward looking information in this news release includes, but is not limited to, developing the Labrador West Iron Project into the next producer , the acquisition of low cost and potentially high reward lithium projects, the ability to keep exploration costs low, expected access to regional lithium processing hubs, the Company's objectives, goals or future plans, statements, exploration results, potential mineralization, the estimation of mineral resources, exploration and mine development plans, timing of the commencement of operations and estimates of market conditions. Factors that could cause actual results to differ materially from such forward-looking information include, but are not limited to: the ability to anticipate and counteract the effects of COVID-19 pandemic on the business of the Company, including without limitation the effects of COVID-19 on the capital markets, commodity prices supply chain disruptions, restrictions on labour and workplace attendance and local and international travel, failure to receive requisite approvals in respect of the foregoing, failure to identify mineral resources, failure to convert estimated mineral resources to reserves, the inability to complete a feasibility study which recommends a production decision, the preliminary nature of metallurgical test results, delays in obtaining or failures to obtain required governmental, environmental or other project approvals, political risks, inability to fulfill the duty to accommodate First Nations and other indigenous peoples, uncertainties relating to the availability and costs of financing needed in the future, changes in equity markets, inflation, changes in exchange rates, fluctuations in commodity prices, delays in the development of projects, capital and operating costs varying significantly from estimates and the other risks involved in the mineral exploration and development industry, and those risks set out in the Company's public documents filed on SEDAR. Although the Company believes that the assumptions and factors used in preparing the forward-looking information in this news release are reasonable, undue reliance should not be placed on such information, which only applies as of the date of this news release, and no assurance can be given that such events will occur in the disclosed time frames or at all. The Company disclaims any intention or obligation to update or revise any forward-looking information, whether as a result of new information, future events or otherwise, other than as required by law.
本新聞稿包含某些“前瞻性聲明”,不包含歷史事實。前瞻性聲明包括描述公司未來計劃、目標或目標的估計和陳述,包括表明公司或管理層預期出現某種狀態或結果的詞語。前瞻性聲明可能會被識別爲“相信”、“預測”、“期望”、“估計”、“可能”、“可能”、“將”或“計劃”等術語。由於前瞻性聲明是基於假設並涉及未來事件和狀況,因其本質的風險和不確定性而自然存在。儘管這些聲明基於目前對公司的信息,但公司無法保證實際結果將符合管理層的預期。因涉及前瞻性信息的風險、不確定性和其他因素可能導致實際事件、結果、表現、前景和機會與該前瞻性信息所表達或暗示的情況有所不同。本新聞稿中的前瞻性信息包括但不限於將Labrador West Iron項目開發爲下一個生產者,獲得成本低廉、潛在回報高的鋰項目,保持探勘成本低廉,預期獲得區域鋰加工中心的接入以及公司的目標、計劃、陳述、探勘結果、潛在礦化、礦物資源估計、探勘和礦山開發計劃、運營開始時間和市場條件估計。可能導致實際結果與此類前瞻性信息有所不同的因素包括但不限於:預測和抵消COVID-19大流行對公司業務的影響的能力,包括但不限於COVID-19對資本市場、商品價格、供應鏈中斷、勞動力和工作場所出勤以及本地和國際旅行的影響,在上述方面未收到必要批准,未能識別礦物資源,未能將估計的礦物資源轉化爲儲量,未能完成建議產品決策的可行性研究,冶金測試結果初步性質,延遲獲得或未能獲得所需的政府、環境或其他項目批准,政治風險,未能履行須容納第一民族和其他土著人民的責任,有關未來所需的融資的可用性和成本的不確定性,股權市場的變化,通貨膨脹,匯率變化,商品價格波動,項目開發延遲,成本和運營成本與估計值相差很大,以及礦業探勘和開發行業所涉及的其他風險,以及在SEDAR提交的公司公共文件中所列的那些風險。儘管公司認爲本新聞稿中提供的前瞻性信息的假設和因素是合理的,但不應將過度的依賴放在該信息上,因爲它僅適用於本新聞稿發佈之日,並且不能保證此類事件將在披露的時間範圍內或根本發生。除法律規定外,公司不承擔任何更新或修訂任何前瞻性信息的意向或義務。
Labrador West Iron Ore Deposit Location Map
Labrador West鐵礦石存儲位置地圖
SOURCE: High Tide Resources Corp.
來源:High Tide Resources Corp.
譯文內容由第三人軟體翻譯。