Fox Complex: Extending Mine Life; A New Mine at the Stock Property; Exploration Has Driven the Prospect of Earlier Cash Flow

Fox Complex: Extending Mine Life; A New Mine at the Stock Property; Exploration Has Driven the Prospect of Earlier Cash Flow

Fox綜合礦:延長礦山壽命;在Stock礦產中建立新礦;勘探促進了更早現金流的前景
McEwen Mining ·  06/20 12:00

TORONTO, June 20th, 2024 (GLOBE NEWSWIRE) -- McEwen Mining Inc. (NYSE: MUX) (TSX: MUX) is pleased to report on the progress at the Fox Complex, where we are advancing a new mine on the Stock Property. Production is planned to start in the second half of 2025. Pre-construction activities of the Stock portal have commenced, which will allow access to mining of the three gold zones, West, Main and East. In addition, the portal will provide cost-effective underground drill platforms to enable testing for expected depth extensions of these three zones. Recent exploration resulted in a 29% increase in the estimated gold resources for Stock's East Zone. The Fox Complex is comprised of several properties, including Stock, and has Measured and Indicated gold resources of 1,905,000 ounces at average grade of 4.20 g/t Au and Inferred gold resources of 549,000 ounces at average grade of 3.60 g/t Au.

多倫多,6月20日th,2024年(GLOBE NEWSWIRE)——麥克尤恩礦業公司(紐約證券交易所代碼:MUX)(多倫多證券交易所股票代碼:MUX)欣然報告福克斯綜合大樓的進展情況,我們正在該股票地產上建造一座新礦山。計劃於2025年下半年開始生產。Stock門戶網站的建設前活動已經開始,這將允許進入西部、主區和東部三個黃金區的採礦。此外,該門戶網站將提供具有成本效益的地下鑽探平台,以便對這三個區域的預期深度擴展進行測試。最近的勘探使斯托克東區的估計黃金資源增加了29%。福克斯綜合體由包括Stock在內的多個物業組成,其測得和指示的黃金資源爲190.5萬盎司,平均品位爲4.20克/噸金,推斷的黃金資源爲54.9萬盎司,平均品位爲3.60克/噸金。

Stock Ramp to Access Future Production

庫存增加以進入未來生產

The Stock Property hosts the Stock Mill and the former Stock Mine, which produced 137,000 ounces of gold from an underground operation between 1989 and 2005. Our exploration has successfully defined three deposits at Stock - the East, Main and West zones. This mineralization has been found on a three-kilometer-long mineralized trend situated along the prolific Destor-Porcupine Fault.

股票地產是斯托克磨坊和前斯托克礦的所在地,該礦在1989年至2005年期間通過地下開採生產了13.7萬盎司黃金。我們的勘探成功地確定了Stock的三個礦牀——東區、主區和西區。這種礦化是在多產的 Destor-Porcupine 斷層沿線長達三千米的礦化趨勢中發現的。

Pre-construction activities have commenced at the portal with the removal of overburden. Underground development is expected to begin in Q3. The Stock Ramp will connect the West Zone and the East Zone to the existing historical underground workings of the Main Zone.

隨着覆蓋層的拆除,入口處的施工前活動已經開始。地下開發預計將於第三季度開始。Stock Ramp將西區和東區與主區現有的歷史地下工程連接起來。

Stock is expected to provide increased gold production at a lower cost per ounce than our current production from the Froome Mine. The advantages of mining at Stock compared to Froome are significant and the reasons are three-fold: one, there is a significantly lower transportation or haulage cost. The Froome mine is deeper and located 35 kilometers from the Stock Mill, while the gold at Stock is at shallower depths and right next to the Mill; two, increased gold production due to expected higher mill throughput, as a result of the Stock material having a lower (softer) work index compared to what is currently being processed from the Froome Mine; and three, the bulk of Stock is free of royalties, whereas Froome is not.

預計庫存將以比我們目前在弗魯姆礦的產量更低的每盎司成本增加黃金產量。與弗魯姆相比,Stock採礦的優勢顯著,原因有三方面: 一, 運輸或運輸成本要低得多。弗魯姆礦更深,距離斯托克磨坊35千米,而斯托克的黃金位於較淺的深度,就在磨坊旁邊; ,黃金產量增加,原因是與弗魯姆礦目前加工的材料相比,庫存材料的工作指數較低(較軟);以及 ,大部分股票免收特許權使用費,而弗魯姆不是。

Mining will start in the East Zone, with a recently increased resource, and provide early production and cash flow. Our plan for the Stock development is to concurrently drive the Stock Ramp to the East Zone along with the ramps to the Main and West Zones. This approach will allow for multiple sources of mineralization to be accessed from the Stock Ramp.

採礦將從東區開始,最近增加了資源,並提供了早期的生產和現金流。我們的Stock開發計劃是同時將Stock坡道與通往主區和西區的坡道一起駛向東區。這種方法將允許從 Stock Ramp 訪問多種礦化來源。

Figure 1 is a project wide longitudinal section at Stock, illustrating the proposed ramp development (shown as purple straight lines) and mining horizons (shapes in blue) associated with the West, Main and East Zones.

圖 1 是Stock的項目縱向剖面圖,說明了擬議的坡道開發項目(以紫色直線顯示)以及與西區、主區和東區相關的採礦視野(藍色形狀)。

Figure 1. Longitudinal Section for the Stock Deposit (Looking North)

Figure 1. Longitudinal Section for the Stock Deposit (Looking North)

圖 1。股票存款的縱向截面(向北看)

Figure 1 illustrates three principal plunge directions for mineralization at the Stock Zones. The following historic drill intercepts located towards the lower end of these plunges suggest the gold mineralization could continue at depth: 6.1 g/t Au over 5.6 m (S23-291), 4.3 g/t Au over 20.4 m (S21-202) and 2.7 g/t Au over 11.2 m (S19-31).

圖 1 說明了儲量區礦化的三個主要跌落方向。位於這些暴跌點下端的以下歷史鑽探截距表明,金礦化可能會在深度繼續下去:6.1 g/t Au 超過 5.6 m (S23-291)、超過 20.4 m 的 4.3 g/t Au (S21-202) 以及 11.2 m 以上的 2.7 g/t Au (S19-31)。

Fox Complex's Large Resource Base

Fox Complex 的大型資源庫

Total Fox Complex Resources are now at 1,905,000 gold ounces of Measured and Indicated mineralization at an average grade of 4.20 g/t Au and 549,000 gold ounces of Inferred mineralization at an average grade of 3.60 g/t Au. These resources are sourced from several deposits, as listed in Figure 2.

Fox Complex Resources目前的測定和指示礦化量爲190.5萬盎司,平均品位爲4.20克/噸金,推斷礦化量爲54.9萬盎司,平均品位爲3.60克/噸金。這些資源來自幾筆存款,如圖 2 所示。

Table 1. Fox Complex Resources (May 20, 2024)

表 1。福克斯綜合資源(2024 年 5 月 20 日)

Fox Complex Resources
(May 20, 2024)
Measured Indicated Inferred
Tonnes
(000s t)
Grade
(g/t)
Contained Au
(oz)
Tonnes
(000s t)
Grade
(g/t)
Contained Au
(oz)
Tonnes
(000s t)
Grade
(g/t)
Contained Au
(oz)
Black Fox 304 5.80 57,000 91 5.44 16,000 149 5.33 26,000
Froome 568 3.99 73,000 284 3.95 36,000 143 3.44 16,000
Grey Fox - - - 7,566 4.80 1,168,000 1,685 4.35 236,000
Stock - West & Main - - - 1,938 3.31 206,000 1,386 2.96 132,000
Stock - East Zone - - - 866 2.70 75,000 579 2.66 50,000
Stock Project Total - - - 2,804 3.12 281,000 1,965 2.87 181,000
Tamarack - - - 1,055 1.63 55,000 -
-
-
Davidson-Tisdale 200 7.25 47,000 75 6.42 15,000 105 4.35 15,000
Fuller - - - 1,149 4.25 157,000 693 3.41 76,000
Total Fox Complex Resources 1,072 5.11 176,000 13,024 4.13 1,729,000 4,740 3.60 549,000
福克斯綜合資源
(2024年5月20日)
已測量 已指明 推斷

(000 秒 t)
等級
(g/t)
含金
(盎司)

(000 秒 t)
等級
(g/t)
含金
(盎司)

(000 秒 t)
等級
(g/t)
含金
(盎司)
黑狐 304 5.80 57,000 91 5.44 16,000 149 5.33 26,000
弗魯姆 568 3.99 73,000 284 3.95 36,000 143 3.44 16,000
灰狐狸 - - - 7,566 4.80 1,168,000 1,685 4.35 236,000
股票-西部和美因州 - - - 1,938 3.31 206,000 1,386 2.96 132,000
股票-東區 - - - 866 2.70 75,000 579 2.66 5萬個
股票項目總計 - - - 2,804 3.12 281,000 1,965 2.87 181,000
塔瑪拉克 - - - 1,055 1.63 55,000 -
-
-
戴維森-提斯代爾 200 7.25 47,000 75 6.42 15,000 105 4.35 15,000
富勒 - - - 1,149 4.25 157,000 693 3.41 76,000
Fox 綜合資源總數 1,072 5.11 176,000 13,024 4.13 1,729,000 4,740 3.60 549,000

Note:
These resource estimates conform with the CIM (Canadian Institute of Mining, Metallurgy and Petroleum) guidelines for Reasonable Prospects for Eventual Economic Extraction (RPEEE), ensuring that only material that has a realistic potential to be mined economically is reported as a resource.

注意:
這些資源估算符合 CIM(加拿大礦業、冶金和石油研究所)的《最終經濟開採的合理前景指南》(RPEEE),確保只有具有經濟開採潛力的材料才被報告爲資源。

Stock: Growing the Gold Resource Base

股票:擴大黃金資源基礎

Table 1 shows that the overall Stock resource (West Zone + Main Zone + East Zone) now contains 281,000 gold ounces of Indicated mineralization at a grade of 3.12 g/t Au and 181,000 gold ounces of Inferred mineralization at a grade of 2.87 g/t Au, an increase in total gold ounces of nearly 7% from the Dec 31, 2023 resource.

表 1 顯示,總儲量資源(西區 + 主區 + 東區)現在包含28.1萬盎司的指示礦化物,金品位爲3.12 克/噸,以及18.1萬盎司的推斷礦化,金品位爲2.87 克/噸,金盎司總量比 2023 年 12 月 31 日增加了近 7%。

Recent Drill Results From the East Zone

東區最近的鑽探結果

The 2024 infill drilling campaign at the East Zone was mainly executed within the two previously identified plunge directions (see Figure 2), yielding positive results and showing strong continuity between drillhole intercepts. Mineralization associated with the steeper of the two plunge directions below the 250 meters elevation will be more accessible for drilling from future underground drill platforms, at a lower cost per meter.

2024 年東區的填充鑽探活動主要在先前確定的兩個墜落方向(見圖 2)內進行,取得了積極的結果,並顯示出鑽孔截獲之間的強勁連續性。與海拔250米以下兩個俯衝方向中更陡峭相關的礦化將更便於在未來的地下鑽探平台上進行鑽探,而且每米成本更低。

The intercepts highlighted in yellow in Figure 2, including: 5.9 g/t Au over 13.5 m (SEZ24-108), 6.1 g/t Au over 7.8 m (SEZ24-105), 6.7 g/t Au over 6.3 m (SEZ24-111), are well above the East Zone's current average Indicated resource grade of about 2.7 g/t Au.

圖 2 中以黃色突出顯示的截距,包括:超過 13.5 m 的 5.9 g/t Au(SEZ24-108)6.1 g/t Au 超過 7.8 m (SEZ24-105)、6.7 g/t Au 超過 6.3 m (SEZ24-111),遠高於東區目前的平均指示資源品位約2.7 g/t Au。

Figure 2. Longitudinal Section for the East Zone at Stock (Looking North)

Figure 2. Longitudinal Section for the East Zone at Stock (Looking North)

圖 2。東區的縱向截面圖(向北看)

The 2024 drilling campaign at the East Zone was completed in early Q2. The intercepts highlighted in Figure 2 are included in Table 2 below.

2024 年東區的鑽探活動已於第二季度初完成。圖 2 中突出顯示的截距包含在下表 2 中。

Table 2. Key Results From Recent Drilling at the East Zone

表 2.最近在東區鑽探的主要結果

Hole ID From
(m)
To
(m)
Core Length
(m)
True Width
(m)
Au Uncapped
(g/t)
Au x TW Uncapped
(Gxm)
SEZ24-104 82.1 89.8 7.6 6.7 3.0 20.1
SEZ24-105 106.6 116.8 10.1 7.8 6.1 47.6
SEZ24-107 227.4 252.0 24.7 18.0 3.1 55.8
SEZ24-108 113.8 134.4 20.7 13.4 5.9 79.2
SEZ24-109 109.6 117.4 7.8 6.4 3.9 24.8
SEZ24-111 72.2 79.0 6.8 6.3 6.7 42.4
SEZ24-115 127.8 134.9 7.1 5.1 5.2 26.8
SEZ24-116 211.4 219.2 7.8 6.8 3.3 22.4
SEZ24-117 227.1 233.9 6.7 5.5 3.1 17.1
SEZ24-118A 198.3 205.3 6.9 6.3 4.2 26.6
SEZ24-124 257.0 264.1 7.1 5.2 3.0 15.7
SEZ24-125 221.1 230.0 8.9 6.1 3.1 18.9
And 259.0 270.3 11.3 7.8 4.5 35.2
洞 ID 來自
(m)

(m)
核心長度
(m)
真實寬度
(m)
Au Uncapped
(g/t)
Au x TW 無上限
(Gxm)
SEZ24-104 82.1 89.8 7.6 6.7 3.0 20.1
SEZ24-105 106.6 116.8 10.1 7.8 6.1 47.6
SEZ24-107 227.4 252.0 24.7 18.0 3.1 55.8
SEZ24-108 113.8 134.4 20.7 13.4 5.9 79.2
SEZ24-109 109.6 117.4 7.8 6.4 3.9 24.8
SEZ24-111 72.2 79.0 6.8 6.3 6.7 42.4
SEZ24-115 127.8 134.9 7.1 5.1 5.2 26.8
SEZ24-116 2114 219.2 7.8 6.8 3.3 22.4
SEZ24-117 227.1 233.9 6.7 5.5 3.1 17.1
SEZ24-118A 198.3 205.3 6.9 6.3 4.2 26.6
SEZ24-124 257.0 264.1 7.1 5.2 3.0 15.7
SEZ24-125 221.1 230.0 8.9 6.1 3.1 18.9
而且 259.0 270.3 11.3 7.8 4.5 35.2

The above results were incorporated into the East Zone resource estimate dated May 20, 2024, and amounted to 75,000 gold ounces Indicated and 50,000 gold ounces Inferred, as shown in Table 3 below.

上述結果已納入2024年5月20日的東區資源估算中,指示金盎司爲7.5萬盎司,推斷金量爲50,000盎司,如下表3所示。

Table 3. East Zone Resource Update (from Dec 31, 2023 to May 20, 2024)

表 3東區資源更新(從 2023 年 12 月 31 日到 2024 年 5 月 20 日)

Resource Dates for East Zone Category Tonnes
(000s t)
Au Grade
(g/t)
Gold
(oz)
Dec 31, 2023
Indicated 1,232 2.40 95,000
Inferred 21 2.32 2,000
May 20, 2024
Indicated 866 2.70 75,000
Inferred 579 2.66 50,000
東區的資源日期 類別
(000 秒 t)
金級
(g/t)

(盎司)
2023年12月31日
已指明 1,232 2.40 95,000
推斷 21 2.32 2,000
2024年5月20日
已指明 866 2.70 75,000
推斷 579 2.66 5萬個

"The start of production at Stock will coincide with production decreasing at the Froome mine. Permit applications to mine the Grey Fox deposit will follow the start of mining at Stock. The growth of our gold resources and the prospect of a long mine life are becoming clear and are a direct result of our intense focus and large investments in exploration," said Rob McEwen, Chairman and Chief Owner.

“Stock的開始生產將與弗魯姆礦的產量下降同時發生。開採Grey Fox礦牀的許可證將在Stock開採開始後申請。我們黃金資源的增長和礦山壽命長的前景越來越明朗,這是我們高度關注和大量勘探投資的直接結果,” 董事長兼首席所有者羅布·麥克尤恩說。

Technical Information

技術信息

Technical information pertaining to the Fox Complex exploration contained in this news release has been prepared under the supervision of Sean Farrell, P.Geo., Chief Exploration Geologist, who is a Qualified Person as defined by Canadian Securities Administrators National Instrument 43-101 "Standards of Disclosure for Mineral Projects."

本新聞稿中包含的與Fox Complex勘探有關的技術信息是在首席勘探地質學家肖恩·法雷爾的監督下編寫的,他是加拿大證券管理局國家儀器43-101 “礦產項目披露標準” 所定義的合格人士。

The technical information related to resource estimates in this news release has been reviewed and approved by Luke Willis, P.Geo., McEwen Mining's Director of Resource Modelling and a Qualified Person as defined by SEC S-K 1300 and Canadian Securities Administrators National Instrument 43-101 "Standards of Disclosure for Mineral Projects."

本新聞稿中與資源估算相關的技術信息已由Luke Willis、P.Geo.、McEwen Mining的資源建模董事和SEC S-K 1300 和加拿大證券管理局國家儀器43-101 “礦業項目披露標準” 所定義的合格人員進行了審查和批准。

Exploration drill core samples at the Stock Complex were submitted as 1/2 core. Analyses reported herein were performed by the photon assay method at the accredited laboratory MSA Labs in Timmins, Ontario, Canada (ISO 9001 & ISO 10725).

儲備綜合體的勘探鑽芯樣本以 1/2 岩心形式提交。此處報告的分析是在加拿大安大略省蒂明斯的認可實驗室MSA實驗室(ISO 9001和ISO 10725)通過光子分析方法進行的。

Notes on the Updated Resource at the East Zone:

關於東區更新資源的注意事項:

  1. Effective date of the updated Mineral Resource estimate is 20 May 2024. The QP for the estimate is Mr. Carson Cybolsky, P.Geo, an employee of McEwen Mining.
  2. Mineral Resources are reported using the 2014 CIM Definition Standards and in accordance with the CIM Best Practice Guidelines (2019). Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability.
  3. Mineral Resources are reported above an economic cut-off grade of 1.95 g/t gold assuming underground extraction methods and based on costs per tonne of US$60.80 for mining, US$18.50 for process, US$7.98 for G&A, metallurgical recovery of 94%, and a gold price of US$1,725/oz.
  4. Mineral Resources include the 'must take' minor material below cut-off grade which is interlocked with blocks above the cut-off grade within the mineable shape optimizer stopes.
  5. Figures may not sum due to rounding.
  1. 更新的礦產資源估算的生效日期爲2024年5月20日。估算的QP是麥克尤恩礦業的僱員P.Geo的卡森·西博爾斯基先生。
  2. 礦產資源是使用2014年的CIM定義標準和CIM最佳實踐指南(2019年)報告的。不屬於礦產儲量的礦產資源沒有顯示出經濟可行性。
  3. 據報道,假設地下開採方法,礦產資源的經濟臨界值高於1.95克/噸黃金,每噸採礦成本爲60.80美元,加工成本爲18.50美元,G&A爲7.98美元,冶金回收率爲94%,金價爲1,725美元/盎司。
  4. 礦產資源包括低於臨界等級的 “必須採集” 的次要物質,這些材料與可開採形狀優化器停靠點內高於截止品位的區塊互鎖。
  5. 由於四捨五入,數字可能不相和。

For a list of drilling results at Stock since Feb 28, 2024, including hole location and alignment, click here:
https://www.mcewenmining.com/files/doc_news/archive/2024/2024_06_StockDrillResults.xlsx

有關自2024年2月28日以來Stock的鑽探結果清單,包括鑽孔位置和對齊方式,請點擊此處:
https://www.mcewenmining.com/files/doc_news/archive/2024/2024_06_StockDrillResults.xlsx

CAUTION CONCERNING FORWARD-LOOKING STATEMENTS

謹慎對待前瞻性陳述

This news release contains certain forward-looking statements and information, including "forward-looking statements" within the meaning of the Private Securities Litigation Reform Act of 1995. The forward-looking statements and information expressed, as at the date of this news release, McEwen Mining Inc.'s (the "Company") estimates, forecasts, projections, expectations or beliefs as to future events and results. Forward-looking statements and information are necessarily based upon a number of estimates and assumptions that, while considered reasonable by management, are inherently subject to significant business, economic and competitive uncertainties, risks and contingencies, and there can be no assurance that such statements and information will prove to be accurate. Therefore, actual results and future events could differ materially from those anticipated in such statements and information. Risks and uncertainties that could cause results or future events to differ materially from current expectations expressed or implied by the forward--looking statements and information include, but are not limited to, effects of the COVID-19 pandemic, fluctuations in the market price of precious metals, mining industry risks, political, economic, social and security risks associated with foreign operations, the ability of the corporation to receive or receive in a timely manner permits or other approvals required in connection with operations, risks associated with the construction of mining operations and commencement of production and the projected costs thereof, risks related to litigation, the state of the capital markets, environmental risks and hazards, uncertainty as to calculation of mineral resources and reserves, and other risks. Readers should not place undue reliance on forward-looking statements or information included herein, which speak only as of the date hereof. The Company undertakes no obligation to reissue or update forward-looking statements or information as a result of new information or events after the date hereof except as may be required by law. See McEwen Mining's Annual Report on Form 10-K for the fiscal year ended December 31, 2023, and other filings with the Securities and Exchange Commission, under the caption "Risk Factors", for additional information on risks, uncertainties and other factors relating to the forward-looking statements and information regarding the Company. All forward-looking statements and information made in this news release are qualified by this cautionary statement.

本新聞稿包含某些前瞻性陳述和信息,包括1995年《私人證券訴訟改革法》所指的 “前瞻性陳述”。截至本新聞發佈之日,前瞻性陳述和信息表達了McEwen Mining Inc.'s(“公司”)對未來事件和結果的估計、預測、預測、預期或信念。前瞻性陳述和信息必然基於許多估計和假設,儘管管理層認爲這些估計和假設是合理的,但本質上會受到重大的業務、經濟和競爭不確定性、風險和突發事件的影響,無法保證此類陳述和信息會被證明是準確的。因此,實際結果和未來事件可能與此類聲明和信息中的預期有重大差異。可能導致業績或未來事件與前瞻性聲明和信息所表達或暗示的當前預期存在重大差異的風險和不確定性包括但不限於 COVID-19 疫情的影響、貴金屬市場價格的波動、採礦業風險、與外國業務相關的政治、經濟、社會和安全風險、公司及時獲得或獲得運營所需許可證或其他批准的能力、相關風險包括採礦業務的建設和投產及其預計成本、與訴訟相關的風險、資本市場狀況、環境風險和危害、礦產資源和儲量計算的不確定性以及其他風險。讀者不應過分依賴此處包含的前瞻性陳述或信息,這些陳述或信息僅代表截至本文發佈之日。除非法律要求,否則公司沒有義務在本協議發佈之日之後因新信息或事件而重新發布或更新前瞻性陳述或信息。有關與公司前瞻性陳述和信息相關的風險、不確定性和其他因素的更多信息,請參閱McEwen Mining截至2023年12月31日財年的10-K表年度報告,以及其他向美國證券交易委員會提交的標題爲 “風險因素” 的文件。本新聞稿中的所有前瞻性陳述和信息均受本警示聲明的限制。

The NYSE and TSX have not reviewed and do not accept responsibility for the adequacy or accuracy of the contents of this news release, which has been prepared by management of McEwen Mining Inc.

紐約證券交易所和多倫多證券交易所尚未審查本新聞稿內容的充分性或準確性,也不承擔任何責任,該新聞稿由McEwen Minining Inc.的管理層編寫。

ABOUT MCEWEN MINING

關於 MCEWEN 礦業

McEwen Mining is a gold and silver producer with operations in Nevada, Canada, Mexico and Argentina. In addition, it owns approximately 47.7% of McEwen Copper which owns the large, advanced-stage Los Azules copper project in Argentina. Rob McEwen, Chairman and Chief Owner, has a personal investment in the company of US$220 million.

McEwen Mining是一家黃金和白銀生產商,業務遍及內華達州、加拿大、墨西哥和阿根廷。此外,它擁有McEwen Copper約47.7%的股份,該公司擁有阿根廷大型的後期Los Azules銅礦項目。董事長兼首席所有者羅布·麥克尤恩對該公司的個人投資爲2.2億美元。

Want News Fast?

想快速獲得新聞嗎?

Subscribe to our email list by clicking here:
https://www.mcewenmining.com/contact-us/#section=followUs

點擊此處訂閱我們的電子郵件列表:
https://www.mcewenmining.com/contact-us/#section=followUs

and receive news as it happens!

並在發生時接收新聞!

WEB SITE SOCIAL MEDIA
www.mcewenmining.com McEwen Mining
Facebook: facebook.com/mcewenmining
LinkedIn: linkedin.com/company/mcewen-mining-inc-
CONTACT INFORMATION Twitter: twitter.com/mcewenmining
150 King Street West Instagram: instagram.com/mcewenmining
Suite 2800, PO Box 24
Toronto, ON, Canada McEwen Copper
Facebook: facebook.com/ mcewencopper
M5H 1J9 LinkedIn: linkedin.com/company/mcewencopper
Twitter: twitter.com/mcewencopper
Relationship with Investors: Instagram: instagram.com/mcewencopper
(866)-441-0690 - Toll free line
(647)-258-0395 Rob McEwen
Facebook: facebook.com/mcewenrob
Mihaela Iancu ext. 320 LinkedIn: linkedin.com/in/robert-mcewen-646ab24
info@mcewenmining.com Twitter: twitter.com/robmcewenmux
網站 社交媒體
www.mcewenmining.com 麥克尤恩礦業
臉書: facebook.com/mcewenmin
領英: linkedin.com/公司/mcewen-mining-inc-
聯繫信息 推特: twitter.com/mcew
國王街西 150 號 Instagram instagram.com/mcewenmin
2800 套房,PO Box 24
加拿大安大略省多倫多 McEwen Copper
臉書: facebook.com/ mcewencopper
M5H 1J9 領英: linkedin.com/cewencopper
推特: .com/mcewencopper
與投資者的關係: Instagram instagram.com/mcewencopper
(866) -441-0690-免費熱線
(647) -258-0395 Rob McEwen
臉書: facebook.com/mcewenrob
Mihaela Iancu 分機 320 領英: linkedin.com/in/robert-mcewen-646ab24
info@mcewenmining.com 推特: twitter.com/robmcewenmu

Primary Logo

Figure 1. Longitudinal Section for the Stock Deposit (Looking North)
圖 1。股票存款的縱向截面(向北看)
big
Figure 2. Longitudinal Section for the East Zone at Stock (Looking North)
圖 2。東區的縱向截面圖(向北看)
big

Source: McEwen Mining

來源:麥克尤恩礦業