share_log

Grid Battery Metals Exploration Team Completes Phase 1 of Its 2024 Exploration Plan on the Clayton Valley Lithium Project

Grid Battery Metals Exploration Team Completes Phase 1 of Its 2024 Exploration Plan on the Clayton Valley Lithium Project

Grid Battery Metals 勘探小組完成了其 2024 年克萊頓谷鋰項目勘探計劃的第一階段
Accesswire ·  05/30 19:30

COQUITLAM, BC / ACCESSWIRE / May 30, 2024 / Grid Battery Metals Inc. (the "Company" or "Grid") (TSXV:CELL)(OTCQB:EVKRF)(FRA:NMK2) announces that it has completed the first phase of its spring/summer exploration program at its Clayton Valley Lithium Property near Silver Peak, Nevada, which includes a detailed infill soil sampling program and a previously announced MT geophysical survey.

不列顛哥倫比亞省高貴林/ACCESSWIRE/2024年5月30日/Grid Battery Metals Inc.(“公司” 或 “電網”)(TSXV: CELL)(OTCQB: EVKRF)(FRA: NMK2)宣佈,它已經完成了位於內華達州銀峯附近的克萊頓谷鋰業的春夏勘探計劃的第一階段,其中包括詳細的填充土壤採樣計劃和先前宣佈的MT Geoperty 物理調查。

At the Clayton Valley Lithium Project, the Company contracted the services of Rangefront Geological ("Rangefront") to perform both a detailed infill soil sampling of the southern section of the claim block and to oversee a Magnetotelluric ("MT") geophysical survey to obtain information about subsurface resistivity and geology performed by KLM Geoscience LLC ("KLM") over the entire property. The infill soil sampling exploration work has now been completed and samples have been transported to the assay lab pending results. Together these geological techniques should help predict geological structure and possible locations for lithium accumulation. This is part of a methodical and systematic approach to high quality mineral exploration for this highly sought after metal in Nevada and will assist the Company in determining next steps for the overall exploration plan, including but not limited to a subsequent drilling program.

在克萊頓谷鋰項目,該公司與Rangefront Geological(“Rangefront”)簽訂了服務合同,負責對索賠區塊的南部進行詳細的填充土壤採樣,並監督大地電磁(“MT”)地球物理調查,以獲取荷航地球科學有限責任公司(“荷航”)對整個物業進行的地下電阻率和地質信息。填充土壤取樣勘探工作現已完成,樣本已運送到化驗實驗室等待結果。這些地質技術結合起來應該有助於預測地質結構和可能的鋰積聚地點。這是在內華達州對這種備受追捧的金屬進行高質量礦物勘探的有條不紊和系統的方法的一部分,將幫助該公司確定整體勘探計劃的後續步驟,包括但不限於隨後的鑽探計劃。

Recent Infill Soil Samples Taken (Clayton Valley Lithium Project)

最近採集的填充土壤樣本(克萊頓谷鋰項目)

The MT geophysical survey was performed by the KLM and was overseen by Grid's Qualified Professional, Mr. Steven McMillin P.G.

MT 地球物理調查由荷航進行,由電網的合格專業人員 Steven McMillin P.G. 先生監督。

MT survey profiles

機器翻譯調查概況

Mr. Steven McMillin P.G. comments "The MT survey was completed over eleven profiles. The results were plotted in horizontal slices at 250m, 500m and 750m with bedrock depths that range from 216 to 406 m within the Grid claims as announced on May 2, 2024. A major northeast fault interpreted from gravity bisects the claim block and is best apparent in the 500m slice even though the slice is below the basin floor. This suggests that the fault may be a fluid conduit at depth. The fault is less apparent in the strong near-surface anomaly in the 250m slice that may reflect a spread of fluids within the basin sediments away from the fault. The 750m depth slice is likely below the basin floor and conductivity is mostly focused near the basin bounding faults".

Steven McMillin P.G. 先生評論說:“MT調查共完成了11份概況。結果是在250米、500米和750米的水平切片中繪製的,基岩深度在2024年5月2日公佈的電網索賠範圍內,基岩深度在216至406米之間。從重力解釋的東北主要斷層將主張區塊一分爲二,儘管該斷層位於盆地底以下,但在 500 米的切片中最爲明顯。這表明故障可能是深處的流體管道。該斷層在250米長的切片中強烈的近地表異常中不那麼明顯,該異常可能反映出流體在遠離斷層的盆地沉積物中的擴散。750米深的切片可能位於盆地底部以下,電導率主要集中在盆地邊界斷層附近”。

Tim Fernback, Grid President & CEO comments "Now that the infill detailed soil sampling and MT geophysical survey programs are complete at Clayton Valley, we will gather as a group to interpret the geological data and assay lab results to plan our next steps at Clayton Valley. This next step will likely include a 3D Leapfrog model of the subsurface to identify additional drilling targets, and a subsequent drilling program later in the year to test the depth of the lithium bearing claystone. We are very excited about the results to date on the property."

電網總裁兼首席執行官蒂姆·費恩巴克評論說:“現在,克萊頓谷的填充詳細土壤採樣和地質地球物理調查計劃已經完成,我們將聚集在一起解釋地質數據和化驗實驗室結果,以規劃我們在克萊頓谷的下一步行動。下一步可能包括一個用於確定其他鑽探目標的地下三維Leapfrog模型,以及隨後在今年晚些時候進行的鑽探計劃,以測試含鋰粘土巖的深度。我們對該物業迄今爲止的結果感到非常興奮。”

Prior Exploration Programs

先前的勘探計劃

This current work associated with the first phase of the 2024 exploration plan compliments prior exploration work on the Clayton Valley Lithium Project which includes a soil sampling program over the entire property and an initial prior drilling program consisting of three reverse circulation holes totaling 356 meters (1155 feet). The holes were intended to test the presence of lithium bearing clay members of the lakebed sediments. Drillhole RCV-01, drilled to a depth of 130m (425 feet), was designed to twin a geothermal gradient hole drilled by a previous explorer. Results of this hole correlated with the log of the previous hole including intervals of volcanic ash and dark green clay. Hole RCV-02, located approximately 1260 meters north of RCV-01 was drilled to a depth of 135.6m (445 ft) and penetrated a section consisting primarily of rhyolitic volcanic ash and interbedded sediments. It penetrated a 4.5-meter section of dark green clay before entering the metamorphic alluvium. Poor drilling conditions and high-water flows ended the hole before reaching the target depth but after successfully evaluating the lake sediment section. Hole RCV-03, located 3,890m (12,762 ft) north from Hole RCV-01, was designed to look for a perched section of volcanoclastic sediments beneath an alluvial fan. Previous water well logs indicated a layer of clay, ash, and silt beneath the alluvium and above the bedrock. Apparently, this hole was located too close to the pediment and encountered metamorphosed dolomite at a depth of 56 meters (185 feet) and about the projected elevation of the sedimentary section. The hole lost circulation in an apparent karst horizon at 68.5 meters (225 feet) and was terminated at 79.2 meters (260 ft) without regaining sample return.

目前與2024年勘探計劃第一階段相關的這項工作補充了克萊頓谷鋰項目先前的勘探工作,其中包括對整個地產進行土壤採樣計劃,以及先前的初步鑽探計劃,該計劃由三個總長356米(1155英尺)的反循環孔組成。這些洞旨在測試湖牀沉積物中是否存在含鋰的粘土構件。鑽孔深度爲 130 米(425 英尺)的 RCV-01 鑽孔旨在將前探險家鑽出的地熱梯度孔配對。該洞的結果與前一個洞穴的記錄相關,包括火山灰和深綠色粘土的間隔。RCV-02 洞位於 RCV-01 以北約 1260 米處,鑽孔深度爲 135.6 米(445 英尺),穿透了主要由流紋岩火山灰和層間沉積物組成的部分。在進入變質沖積層之前,它穿透了 4.5 米長的深綠色粘土。惡劣的鑽探條件和高水流在到達目標深度之前,但在成功評估了湖泊沉積物部分之後,鑽孔就結束了。RCV-03 洞位於 RCV-01 洞以北 3,890 米(12,762 英尺)處,旨在在沖積扇下尋找火山碎屑沉積物的棲息部分。先前的水井記錄顯示,沖積層下方和基岩上方有一層粘土、灰和淤泥。顯然,這個洞離山牆太近了,在深度爲56米(185英尺)、大約沉積部分的預計海拔高度處遇到了變質白雲岩。該洞在68.5米(225英尺)的明顯岩溶地平線上失去了循環,在79.2米(260英尺)處終止,但沒有恢復樣本返回。

Grid's Clayton Valley Lithium Project (RC Drilling Locations Identified)

電網的克萊頓谷鋰項目(已確定RC鑽探地點)

Tim Fernback, Grid President & CEO comments "Clayton Valley Nevada is home to North America's only lithium brine producer (Albemarle Corporation's Silver Peak Mine) and our property is immediately to the west of their lithium property and production facility. Recently, Century Lithium (our neighbor to the east of the Silver Peak Mine) has just released their Positive Feasibility Study by T. Lane et al. (2024). Measured and Indicated resources totaling 1,207.33 million tonnes (Mt) at an average grade of 957 parts per million (ppm) lithium (Li) containing 1.155 Mt of Li or 6.148 Mt of lithium carbonate equivalent (LCE), a 40-year mine life and an after-tax NPV8 of $3.01 billion. Additional information is in Century Lithium's NI-43-101 byFayram et al. (2020) 43-101 Report.

電網總裁兼首席執行官蒂姆·費恩巴克評論說:“內華達州克萊頓谷是北美唯一的鋰鹽水生產商(雅寶公司的銀峯礦)的所在地,我們的地產位於其鋰礦產和生產設施以西。最近,世紀鋰業(我們在銀峯礦以東的鄰居)剛剛發佈了T. Lane等人(2024年)的積極可行性研究。測得和指示的資源總計 12.0733 億噸 (Mt),平均品位爲百萬分之957 (ppm) 鋰 (Li),含有 11.55 萬噸鋰或碳酸鋰當量 (LCE),礦山壽命爲 40 年,稅後淨現值8 爲30.1億美元。更多信息見世紀鋰業發佈的 NI-43-101 byFayram等人(2020)43-101報告。

With the MT survey that has just been completed, together with the results of the planned detailed soil sampling program in the southern area of our Clayton Valley claim block, these results will allow us to determine next steps for our exploration programs later in the year."

隨着MT調查剛剛完成,加上計劃在Clayton Valley索賠區塊南部地區進行的詳細土壤採樣計劃的結果,這些結果將使我們能夠在今年晚些時候確定勘探計劃的下一步行動。”

It should be noted that results from any adjacent property(s) are not an indication of what may be found on the Company's property(s).

應注意的是,任何相鄰財產的業績都不能表明公司財產上可能存在什麼。

About Rangefront Geological

關於 Rangefront 地質學

Elko Nevada-based Rangefront Geological has combined in-depth expertise with cutting-edge technology to provide mining consulting services, contract labor, field crew services, and vehicular support to the mining industry. With services available across North America, Rangefront works closely with its clients to provide high-quality mineral exploration services.

總部位於內華達州埃爾科的Rangefront Geological將深厚的專業知識與尖端技術相結合,爲採礦業提供採礦諮詢服務、合同工、現場工作人員服務和車輛支持。憑藉遍佈北美的服務,Rangefront與客戶密切合作,提供高質量的礦產勘探服務。

About KLM Geoscience LLC

荷航地球科學有限責任公司簡介

KLM ( is an industry leading, Nevada-based geophysical exploration company. Established in 2014, KLM specializes in a wide array of geophysical methods. Using state of the art equipment, KLM's services include induced polarization (IP), natural-source magnetotellurics (MT, AMT), controlled-source audio-frequency magnetotellurics (CSAMT), passive seismic and magnetic potential field surveys. With a head office location in Nevada, this allows KLM to rapidly mobilize and begin work at a moment's notice throughout the Western United States and beyond. KLM has been a preferred vendor for Grid and its management team for many years.

KLM(是一家行業領先的、總部位於內華達州的地球物理勘探公司。荷航成立於 2014 年,專門研究各種地球物理方法。使用最先進的設備,荷航的服務包括感應極化 (IP)、自然源大地電磁(MT、AMT)、受控源音頻大地電磁(CSAMT)、被動地震和磁勢場測量。由於總部設在內華達州,這使荷航能夠快速調動並在美國西部及其他地區立即開始工作。多年來,荷航一直是Grid及其管理團隊的首選供應商。

Qualified Person

合格人員

Mr. Steven McMillin, P.G. is a Qualified Person as defined by National Instrument 43-101 and has approved the technical information contained within this news release.

根據美國國家儀器43-101的定義,P.G. Steven McMillin先生是合格人士,並已批准本新聞稿中包含的技術信息。

About Grid Battery Metals Inc.

關於格網電池金屬公司

Grid Battery Metals Inc. is a Canadian based exploration company whose primary listing is on the TSX Venture Exchange. The Company's maintains a focus on exploration for high value battery metals required for the electric vehicle (EV) market.

Grid Battery Metals Inc.是一家總部位於加拿大的勘探公司,主要在多倫多證券交易所風險交易所上市。該公司一直專注於勘探電動汽車(EV)市場所需的高價值電池金屬。

.

.

About Texas Springs Property

關於德州斯普林斯房產

The Company owns a 100% interest in the Texas Spring Property which consists of mineral lode claims located in Elko County, Nevada. The Property is in the Granite Range southeast of Jackpot, Nevada, about 73 km north-northeast of Wells, Nevada. The target is a lithium clay deposit in volcanic tuff and tuffaceous sediments of the Humbolt Formation. A Phase 1 exploration program at the Texas Springs Property (Fall 2023) yielded average lithium grades of 2010 ppm, applying a 1,000 ppm cut-off, and up to 5,610 ppm Lithium.

該公司擁有德克薩斯斯普林地產的100%權益,該地產包括位於內華達州埃爾科縣的礦脈索賠。該物業位於內華達州傑克波特東南部的花崗岩山脈,內華達州韋爾斯東北偏北約73公里處。目標是洪堡組的火山凝灰岩和凝灰岩沉積物中的鋰粘土沉積物。德州斯普林斯地產的第一階段勘探計劃(2023年秋季)得出的鋰平均品位爲2010年 ppm,採用了1,000ppm的臨界值,鋰的平均品位爲5,610 ppm。

The Texas Spring property adjoins the southern border of the Nevada North Lithium Project - owned by Surge Battery Metals Inc. ("Surge") (TSXV: NILI, OTC: NILIF) and comprised of 725 mineral claims. Surge's first round of drilling identified strongly mineralized lithium bearing clays. The average lithium content within all near surface clay zones intersected in the 2022 drilling program, applying a 1000 ppm cut-off, was 3254 ppm. (Press release March 29, 2023). More recent results have shown higher grade lithium up to 8070 ppm on this property after initial drilling (Press release September 12, 2023). Our exploration results are on-trend with these results.

德克薩斯斯普林的房產毗鄰內華達州北部鋰項目的南部邊境,該項目由Surge Battery Metals Inc.(“Surge”)(多倫多證券交易所股票代碼:NILI,場外交易代碼:NILIF)擁有,包括725份礦產索賠。Surge的第一輪鑽探發現了強礦化的含鋰粘土。2022年鑽探計劃中相交的所有近地表粘土區域的平均鋰含量爲3254 ppm,截止值爲1000 ppm。(2023年3月29日新聞稿)。最近的結果顯示,在首次鑽探後,該地產的鋰等級更高,最高可達8070 ppm(2023年9月12日新聞稿)。這些結果使我們的勘探結果符合趨勢。

About Clayton Valley Lithium Project

關於克萊頓谷鋰項目

The Company owns a 100% interest in 113 lithium lode and placer claims covering over 640 hectares in Clayton Valley. Clayton Valley is a down-dropped closed basin formed by the Miocene age Great Basin extension and is still active due to movement along the Walker Lane structural zone. As a result, the basin has preserved multiple layers of lithium bearing volcanic ash, resulting from multiple eruptive events over the past 6 million years including eruptions from the 700,000-year-old Long Valley Caldera system and related events. These ash layers are thought to contribute to the lithium brines extracted by Albemarle and are also likely involved in the formation of the exposed lithium rich clay deposits on the east side of Clayton Valley.

該公司擁有克萊頓谷超過640公頃的113塊鋰礦和砂礦索賠的100%權益。克萊頓谷是一個向下傾斜的封閉盆地,由中新世時代的大盆地延伸部分形成,由於沿着沃克巷結構帶移動,該盆地仍然活躍。因此,該盆地保留了多層含鋰的火山灰,這些火山灰是由過去600萬年來的多次噴發事件造成的,包括擁有70萬年曆史的長谷火山口系統的噴發和相關事件。人們認爲,這些灰層是雅寶提取的鋰鹽水的原因,也可能參與克萊頓谷東側裸露的富鋰粘土礦牀的形成。

Volt Canyon Lithium Property

Volt Canyon 鋰地產

The Company owns a 100% interest in 80 placer claims covering approximately 635 hectares of alluvial sediments and clays located 122 km northeast of Tonopah, Nevada.

該公司擁有80份砂礦索賠的100%權益,涉及位於內華達州託諾帕東北122公里處的約635公頃的沖積沉積物和粘土。

References

參考文獻

Prefeasibility Study Clayton Valley Lithium Project, Esmerelda County, Nevada, August 5, 2020, Amended March 15, 2021, Todd Fayram MMSA-QP (CMS), Terre A. Lane MMSA-QP (GRE), J.J. Brown, SME-RM (GRE), NI43-101 Technical Report for Century Lithium

預可行性研究,內華達州埃斯梅爾達縣克萊頓谷鋰項目,2020年8月5日,2021年3月15日修訂,Todd Fayram MMSA-QP(CMS),Terre A. Lane MMSA-QP(GRE),J.J. Brown,SME-RM(GRE), Century Lithium NI43-101 技術報告

Century Lithium Announces Positive Feasibility Study for the Clayton Valley Lithium Project, Nevada, April 29, 2024, Terre A Lane MMSA-QP (GRE), Hamid Samari, Principal Geologist, Todd-Fayram, Sr. V.P Metallurgy-Century Lithium, Alan Drake, Process Engineering, Haiming (Peter)Yuan Principal Geotechnical Engineer, Paul Blauch, Technical Director, Farza Kossari, Cost Estimating Engineer, Century Lithium Press Release.

世紀鋰業宣佈對內華達州克萊頓谷鋰項目進行積極的可行性研究,2024年4月29日,Terre A Lane MMSA-QP(GRE),首席地質學家哈米德·薩馬裏,冶金世紀鋰業高級副總裁,艾倫·德雷克,工藝工程,海明(彼得)首席岩土工程師保羅·布勞赫,Farza Kossari技術總監,成本估算工程師, 世紀鋰業新聞稿。

On Behalf of the Board of Directors

代表董事會

"Tim Fernback"

“蒂姆·弗恩巴克”

Tim Fernback, President & CEO

蒂姆·芬巴克,總裁兼首席執行官

Contact Information:
Email: info@gridbatterymetals.com
Phone: 604-428-5690

聯繫信息:
電子郵件:info@gridbatterymetals.com
電話:604-428-5690

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release. This news release may contain forward-looking statements which include, but are not limited to, comments that involve future events and conditions, which are subject to various risks and uncertainties. Except for statements of historical facts, comments that address resource potential, upcoming work programs, geological interpretations, receipt and security of mineral property titles, availability of funds, and others are forward-looking. Forward-looking statements are not guarantees of future performance and actual results may vary materially from those statements. General business conditions are factors that could cause actual results to vary materially from forward-looking statements. It should be noted that results from any adjacent property(s) are not an indication of what may be found on the Company's property(s).

多倫多證券交易所風險交易所及其監管服務提供商(該術語在多倫多證券交易所風險交易所的政策中定義)均不對本新聞稿的充分性或準確性承擔責任。本新聞稿可能包含前瞻性陳述,包括但不限於涉及未來事件和狀況的評論,這些評論受各種風險和不確定性的影響。除歷史事實陳述外,有關資源潛力、即將到來的工作計劃、地質解釋、礦產所有權的獲得和保障、資金可用性等的評論都是前瞻性的。前瞻性陳述並不能保證未來的表現,實際結果可能與這些陳述存在重大差異。總體業務狀況是可能導致實際業績與前瞻性陳述存在重大差異的因素。應注意的是,任何相鄰財產的業績都不能表明公司財產上可能存在什麼。

SOURCE: Grid Battery Metals Inc.

來源:Grid Battery Metals Inc


譯文內容由第三人軟體翻譯。


以上內容僅用作資訊或教育之目的,不構成與富途相關的任何投資建議。富途竭力但無法保證上述全部內容的真實性、準確性和原創性。
    搶先評論