After nearly 20 years, the F-35 program moved into full-rate production after conducting its final simulated tests. At this milestone, DOD determined that the F-35 demonstrated an acceptable level of performance and reliability and could be manufactured faster.
近20年后,F-35计划在进行了最后的模拟测试后进入了全速生产。在这个里程碑上,国防部确定F-35表现出可接受的性能和可靠性水平,并且可以更快地制造。
However, contractors continue to deliver engines and aircraft late—a trend that has worsened in the last few years. The program also faces delays in updating the aircraft's software and has been slow to modernize the engine and other aircraft components.
但是,承包商继续延迟交付发动机和飞机,这种趋势在过去几年中有所恶化。该计划在更新飞机软件方面也面临延迟,发动机和其他飞机部件的现代化进展缓慢。
We previously made recommendations to help the F-35 program address these challenges, but DOD has only implemented some of them.
我们之前曾提出过帮助F-35计划应对这些挑战的建议,但国防部只实施了其中的一些建议。