share_log

North Shore Uranium Reports Drill Program Results: Uranium Mineralization Confirmed at Two Targets

North Shore Uranium Reports Drill Program Results: Uranium Mineralization Confirmed at Two Targets

北岸铀业报告钻探计划结果:两个目标证实了铀矿化
Accesswire ·  05/16 19:00

VANCOUVER, BC / ACCESSWIRE / May 16, 2024 / North Shore Uranium Ltd. (TSXV:NSU) ("North Shore" or the "Company") is pleased to announce that multiple samples collected from two of the first three uranium prospects drilled by the Company at its 55,699-hectare Falcon Property ("Falcon" or the "Property") at the eastern margin of the Athabasca Basin in Saskatchewan have returned anomalous uranium values of greater than 300 ppm U3O8 and up to a maximum of 572 ppm U3O8 (Table 1). The Company is now planning for future exploration programs on the Property.

不列颠哥伦比亚省温哥华/ACCESSWIRE/2024年5月16日/北岸铀业有限公司(多伦多证券交易所股票代码:NSU)(“北岸” 或 “公司”)欣然宣布,该公司在其位于萨斯喀彻省阿萨巴斯卡盆地东缘的占地55,699公顷的猎鹰地产(“猎鹰” 或 “财产”)的前三个铀矿勘探区中采集了多个样本 WAN 返回的异常铀值大于 300 ppm U3O8 最高可达 572 ppm U3O8 (表 1)。该公司目前正在计划该物业的未来勘探计划。

As reported on March 20, 2024, three targets were drilled along a strong, dominantly northeast-trending electromagnetic ("EM") conductor system, P03, P08 and P12 (Figure 1). These results confirmed the encouraging field findings for P03 and P08 that were based on downhole gamma probe readings and geologic observations. Uranium mineralization was confirmed at P03 and P08 with the most significant intersection being at P08, 316 ppm U3O8 over a 4.7 metre interval with a peak value of 572 ppm U3O8. The following summarizes the Company's drilling results and future plans:

据2024年3月20日报道,沿着一个坚固的、以东北方向为主的电磁(“EM”)导体系统P03、P08和P12钻探了三个目标(图1)。这些结果证实了基于井下伽玛探测器读数和地质观测结果的P03和P08令人鼓舞的实地发现。在 P03 和 P08 处证实了铀矿化,最重要的交叉点位于 P08,316 ppm U3O8 间隔超过 4.7 米,峰值为 572 ppm U3O8。以下总结了公司的钻探结果和未来计划:

  • P03. A blocky fracture zone and interpreted brittle fault with graphite-rich gouge was encountered between 193.5-196.0m coincident with the projected location of the modelled EM conductor. Below this fault zone from 196.6 to 209.0m, multiple samples had elevated uranium content including two samples with greater than 300 ppm U3O8.
  • P08. A 4.7m interval between 42.3-47.0m returned 316 ppm U3O8 with one sample in the interval returning the highest reading from the program, 572 ppm between 42.3-42.8-m. From 102.3-105.5m, a brittle pegmatitic and graphitic fault zone was intersected at the projected depth of the EM conductor.
  • Next Steps. Given these encouraging results, the Company will evaluate potential options for further evaluation of the uranium-bearing structures associated with targets P03 and P08, including drilling deeper and/or shallower and/or along strike of the interpreted EM conductor. As the modelled target at P12 was not reached, the Company will consider re-testing this target. In addition, multiple high-priority target zones that have been identified at Falcon have not yet been evaluated by drilling. The Company is currently planning a field program to investigate the highest priority targets by mapping and prospecting and continues to prioritize targets for field evaluation and future drilling.
  • P03。在193.5-196.0米之间,遇到了块状断裂带和用富石墨气刨解释的脆性断层,该断层与建模电磁导体的投影位置重合。在该断层带下方(从 196.6 到 209.0 米),多个样本的铀含量升高,其中包括两个铀含量大于 300 ppm 的样品3O8
  • P08。42.3-47.0m 之间的 4.7 米间隔返回 316 ppm U3O8 在这段时间内,一个样本返回了程序的最高读数,在42.3-42.8米之间,为572 ppm。从 102.3-105.5 米处,脆弱的伟晶岩和石墨岩断层带在电磁导体的投射深度处相交。
  • 下一步。鉴于这些令人鼓舞的结果,该公司将评估进一步评估与目标P03和P08相关的含铀结构的潜在选择,包括钻探更深和/或更浅的钻探和/或沿解释后的电磁导体的走向。由于未达到P12的建模目标,该公司将考虑重新测试该目标。此外,在Falcon确定的多个高优先目标区域尚未通过钻探进行评估。该公司目前正在计划一项实地计划,通过测绘和勘探来调查最优先的目标,并将继续优先考虑实地评估和未来钻探的目标。

Mr. Brooke Clements, President and CEO of North Shore stated: "We are very encouraged to have confirmed near-surface uranium mineralization at two of the first three targets drilled at Falcon during our maiden drill program. These results affirm our belief that Falcon has great uranium exploration potential, emphasizing the importance of following up on these results as well as testing other compelling untested EM conductor zones that we have identified. We believe that we have just scratched the surface at Falcon and we look forward to future exploration programs on the Property."

北岸总裁兼首席执行官布鲁克·克莱门茨先生表示:”在我们首次钻探计划中,在Falcon钻探的前三个目标中有两个已经确认了近地表铀矿化,这令我们深受鼓舞。这些结果证实了我们的信念,即猎鹰具有巨大的铀勘探潜力,这突显了跟踪这些结果以及测试我们已经确定的其他引人注目的未经测试的电磁导体区域的重要性。我们认为,我们在Falcon刚刚浮出水面,我们期待着该物业的未来勘探计划。”

TABLE 1: FALCON PROPERTY DRILLING RESULTS

表 1:猎鹰属性钻探结果

Drillhole Information

Anomalous Uranium U3O8 (ppm)1

ID

Target

Dip

(°)

Azi

(°)

Cover

(m)

Total

Depth (m)

# Samples

From

(m)

To

(m)

Interval

(m)

Interval

Value

Max.

Value

FN24001 P03 -50 135 5.8 230 120 5.8 196.6

NAR

36

196.6 197.1 0.5

378

378

197.1 199.5

NAR

86

199.5 201.1 1.6

182

321

201.1 203.1

NAR

27

203.1 203.8 0.7

105

105

203.8 205.7

NAR

61

205.7 206.3 0.6

345

345

206.3 208.5

NAR

42

208.5 209.0 0.5

130

130

209.0 230

NAR

8

FN24002 P08 -47 120 30.5 144 46 34.0 40.6

NAR

51

40.6 41.2 0.5

103

103

41.2 42.3

NAR

98

42.3 47.0 4.7

316

572

47.0 67.6

NAR

49

67.6 68.4 0.8

110

110

68.4 69.4

NAR

22

69.4 71.0 1.6

128

132

71.0 109.5

NAR

96

FN240032 P12 -47 315 2.5 106 39 2.5 94.0

NAR

11

钻孔信息

异常铀 U3O8 (ppm)1

身份证

目标

(°)

Azi

(°)

封面

(m)

总计

深度 (m)

# 示例

来自

(m)

(m)

间隔

(m)

间隔

价值

马克斯。

价值

FN24001 P03 -50 135 5.8 230 120 5.8 196.6

NAR

36

196.6 197.1 0.5

378

378

197.1 1995

NAR

86

1995 201.1 1.6

182

321

201.1 203.1

NAR

27

203.1 203.8 0.7

105

105

203.8 205.7

NAR

61

205.7 206.3 0.6

345

345

206.3 208.5

NAR

42

208.5 209.0 0.5

130

130

209.0 230

NAR

8

FN24002 P08 -47 120 30.5 144 46 34.0 40.6

NAR

51

40.6 41.2 0.5

103

103

41.2 42.3

NAR

98

42.3 47.0 4.7

316

572

47.0 67.6

NAR

49

67.6 68.4 0.8

110

110

68.4 69.4

NAR

22

69.4 71.0 1.6

128

132

71.0 109.5

NAR

96

FN240032 P12 -47 315 2.5 106 39 2.5 94.0

NAR

11

1ICP-MS uranium total digestion analysis results were converted to U3O8 ppm values. The cutoff and anomalous U3O8 value is defined as 100 ppm for this news release. Minimum sample interval, 0.5 m. NAR= no anomalous results. All reported sample depths are drill hole depths and intervals and do not reflect true thicknesses.

1ICP-MS 铀总消化分析结果转换为 U3O8 ppm 值。截止值和异常 U3O8 本新闻稿的值定义为 100 ppm。最小采样间隔为 0.5 m。NAR= 无异常结果。所有报告的样品深度均为钻孔深度和间隔,并不反映真实厚度。

2The drillhole was abandoned at 106m owing to unstable ground conditions prior to reaching the target depth of 125m.

2在达到目标深度125m之前,由于地质条件不稳定,钻孔在106米处被废弃。

Target P03
An interpreted section from drillhole FN24001, which was drilled to a depth of 230m at target P03 is shown in Figure 2.

目标 P03
图 2 显示了钻孔 FN24001 的解释部分,该钻孔在目标 P03 处钻到了 230 米的深度。

Underneath six metres of overburden, an alternating succession of metasedimentary rocks comprised of variably garnet-rich graphitic pelitic gneisses crosscut by numerous pegmatites was encountered to 222.5m. A blocky fracture zone and interpreted brittle fault with graphite-rich gouge was encountered within the graphitic gneiss unit between 193.5-196.0m; the projected EM conductor intersection depth was 195.0m. The key interval is just below this fault zone from 196.6-209.0m where multiple samples had elevated uranium content including three samples with greater than 300 ppm U3O8 with the highest value being 378 ppm U3O8 (Table 1). Strong localized chlorite and silica alteration and multiple pegmatite intrusions were observed in this zone. Anomalous nickel values between 275 and 527 ppm were reported between 193.0- 197.1m. Anomalous molybdenum values between 140 and 193 ppm were reported in three samples between 200.6-203.1m. The combination of the spatial relationship between anomalous uranium content, the graphitic horizon, the structure and alteration are exploration criteria that are important when exploring for a basement-hosted uranium deposit. The Company will consider further investigation of this structure at depth and/or along the strike of the associated EM conductor system.

在六米的覆盖层下方,在222.5米处遇到了由大量伟晶岩横切而成的交替沉积岩,这些岩由富含石榴石的石墨质薄片麻岩组成。在193.5-196.0m的石墨片麻岩单元内遇到了块状断裂带和用富石墨气刨解释的脆性断层;投射的电磁导体交叉深度为195.0m。关键间隔在196.6-209.0m的断层带下方,其中多个样本的铀含量升高,包括三个样品的铀含量大于300 ppm3O8 其中最高值为 378 ppm U3O8 (表 1)。在该区域观察到强烈的局部亚氯酸盐和二氧化硅蚀变以及多次伟晶岩侵入。据报道,在193.0万至197.1亿分之间,镍值异常介于275至527ppm之间。据报道,在200.6-203.1m之间的三个样本中,钼的异常值在140至193 ppm之间。异常铀含量、石墨地平线、结构和变化之间的空间关系相结合,是勘探地下室铀矿床时非常重要的勘探标准。该公司将考虑在相关电磁导体系统的深度和/或走向沿线对该结构进行进一步研究。

Figure 1: Electromagnetic map showing strong EM conductors and the three targets drilled in March 2024. Processing by Condor North Consulting ULC using 2006 and 2007 airborne survey data.

图 1:电磁图显示了强电磁导体和 2024 年 3 月钻探的三个目标。Condor North Consulting ULC 使用 2006 年和 2007 年的机载调查数据进行处理。

Figure 2. Drill section from drillhole FN24001 and drill core photo from anomalous interval which returned 378 ppm U3O8.

图 2。钻孔 FN24001 的钻探部分和异常间隔的钻芯照片,返回了 378 ppm U3O8

Target P08
An interpreted section from drillhole FN24002, which was drilled to a depth of 144m at target P08 is shown in Figure 3.

目标 P08
钻孔 FN24002 的解释部分如图 3 所示,该钻孔在目标 P08 处钻到了 144 米的深度。

After intersecting 30.5 metres of overburden, an alternating succession of metasedimentary rocks comprised of variably garnetiferous and graphitic pelitic gneiss and schist cross-cut by numerous plagioclase and K-feldspar granitic pegmatites was encountered to 132.3m. Granitic gneiss intersected by K-feldspar granitic pegmatites is present until the end of hole at 144m. The graphitic units were host to up to 30 percent graphite, with localized patches up to 60 percent. Two zones with elevated uranium were encountered. Within a zone from 40.6-49.0 m, a 4.7m interval between 42.3-47.0m returned 316 ppm U3O8 with the highest reading in the interval being 572 ppm between 42.3-42.8m. This interval is associated with an interpreted brittle fault zone between 43.9-49.0m. Between 67.6-71.0 m, a pegmatite-rich brittle fault zone comprised of fractured pegmatites and blocky and rubbly graphitic metasediments was encountered. A 3.4m interval between 67.6-71.0m had uranium values in samples ranging from 110-128 ppm U3O8. The entire graphitic schist upper portion of the hole displayed very strong patchy chlorite-cordierite-hematite-illite alteration to 102.3m. From 102.3-105.6m, a brittle pegmatitic and graphitic fault zone was intersected at the projected depth of the EM conductor along with strong bleaching (illite+/-sericite) clay alteration, strong hematite and chlorite along fractures and patchy silica alteration. The alteration minerals associated with the interpreted structure can be indicative of a proximal hydrothermal system and significant uranium was encountered associated with pegmatites in the upper brittle fault zone. The Company will consider further investigation of these interesting features in the future.

在穿过 30.5 米的覆盖层后,在 132.3 米处遇到了一系列交替的变沉积岩,这些岩石由可变的石榴石和石墨状的片麻岩以及由大量斜长石和 K-Feldspar 花岗岩伟晶岩横切的片岩组成。与 K-Feldspar 花岗岩伟晶岩相交的花岗岩片麻岩一直存在到 144 米处的孔洞尽头。石墨单元中石墨含量高达 30%,局部斑块高达 60%。遇到了两个铀浓度较高的区域。在 40.6-49.0 m 的区域内,42.3-47.0m 之间的 4.7 米间隔返回 316 ppm U3O8 间隔内的最高读数为572 ppm,介于42.3-42.8m之间。该间隔与解释后的脆性断层带有关,介于 43.9-49.0m 之间。在67.6-71.0 m之间,遇到了一个富含伟晶岩的脆性断层带,该断层由断裂的伟晶岩以及块状和橡胶状石墨岩变沉积物组成。67.6-71.0m 之间的间隔为 3.4 米,样品中的铀值介于 110-128 ppm U 之间3O8。该洞的整个石墨片岩上部显示出非常强烈的片状亚氯酸盐-堇青石-赤铁矿-伊利石向102.3m的变化。从102.3到105.6m处,脆性伟晶岩和石墨岩断层带在电磁导体的投射深度处相交,还有强烈的漂白(伊利特+/-sericite)粘土蚀变、裂缝处的强赤铁矿和亚氯酸盐以及片状二氧化硅蚀变。与解释结构相关的蚀变矿物可以表明存在近端热液系统,并且在脆性断层上部遇到了与伟晶岩相关的大量铀。该公司将考虑在将来对这些有趣的功能进行进一步研究。

FN24002 SRC306574 102.27-103.65m

FN24002 SRC306574 102.27-103.65m

Figure 3. Drill section from drillhole FN24002 and drill core photo showing part of the altered fault zone that corresponded with the EM conductor.

图 3.钻孔 FN24002 的钻孔部分和钻芯照片显示了与 EM 导体相对应的部分变化的断层区域。

Laboratory Analyses, Quality Control, Quality Assurance and Analytical Procedures
The analyses were performed by the Saskatchewan Research Council Geoanalytical Laboratories in Saskatoon, Saskatchewan ("the SRC") and 205 samples from the three holes were analyzed. All samples were prepared by crush & grind (PREP-01) then analyzed by ICP-MS total and partial digestion (ICP-MS2: Basement), Boron by fusion/ICP-OES and Gold by Lead fusion Fire Assay (Au1). Select radioactive samples (>600CPS, RS125 SRC scintillometer) were analyzed with the ICP1 partial and total digestion method instead of the ICP-MS2 method due to high radioactivity.

实验室分析、质量控制、质量保证和分析程序
分析由位于萨斯喀彻温省萨斯卡通的萨斯喀彻温省研究委员会地球分析实验室(“SRC”)进行,并分析了来自三个洞的205个样本。所有样品均通过粉碎和研磨(PREP-01)制备,然后通过ICP-MS全消化和部分消化(ICP-MS2:地下室)进行分析,硼由聚变/ICP-OES进行分析,通过铅聚变火焰试验(Au1)对金进行分析。由于放射性高,选定的放射性样品(>600CPS,RS125 SRC 闪烁计)使用 ICP1 部分和全部消化法进行分析,而不是 ICP-MS2 方法。

The drill program was managed by TerraLogic Exploration Inc, ("TerraLogic") including the selection of samples for analysis in the field and shipment of the samples to the SRC. TerraLogic adheres to best management exploration practices, including Quality Assurance and Quality Control (QA/QC). All standard operating procedures have been developed and overseen by Jarrod Brown M.Sc., P.Geo. of TerraLogic, a Qualified Person as defined by National Instrument 43-101 - Standards of Disclosure for Mineral Projects.

该钻探计划由TerraLogic Exploration Inc(“TerraLogic”)管理,包括选择样本进行实地分析以及将样品运送到SRC。TerraLogic坚持最佳管理探索实践,包括质量保证和质量控制(QA/QC)。所有标准操作程序均由美国国家仪器43-101定义的合格人员、TerraLogic的P.Geo. Jarrod Brown制定和监督- 矿产项目披露标准。

QA/QC protocols were maintained through the random insertion of blanks and certified reference material (standards) throughout the drill core sampling process. The drill core was split in half with a manual splitter in the field, select split sample intervals were then placed in a sealed bag and transported by TerraLogic personnel to the SRC; the remainder of the core was stored on site. Upon receipt of the results from the SRC, the program, TerraLogic compiled and assessed all of the analytical data including the QAQC standard and blank data collected during the 2024 season. All standards returned acceptable values based on the following protocol: Failure Limit = Accepted CRM value +/- 3x standard deviations.

在整个钻芯取样过程中,通过随机插入空白和经过认证的参考材料(标准)来维持质量保证/质量控制协议。在现场使用手动分离器将钻芯分成两半,然后将选定的分离采样间隔放入密封袋中,由TerraLogic人员运送到SRC;剩余的岩心存放在现场。在收到该项目SRC的结果后,TerraLogic汇编并评估了所有分析数据,包括QAQC标准和2024赛季收集的空白数据。所有标准均根据以下协议返回可接受的值:失效限制 = 可接受的 CRM 值 +/-3 倍标准差。

Falcon Property Background Information
Falcon is a highly prospective uranium exploration project with a limited exploration history at the eastern margin of the Athabasca Basin in an area of Saskatchewan that is seeing increased exploration activity and recent discoveries. Reinterpretation of EM data complemented by geophysical data acquired in 2022 has allowed the Company to identify high priority uranium targets in areas with limited previous drilling. The Property is located approximately 35 kilometres east of the active Key Lake uranium mill and former mine. The new uranium discovery potential at Falcon is significant including shallow basement-hosted unconformity-style mineralization and pegmatite-hosted mineralization similar to that discovered at the Fraser Lakes Zone B uranium resource located just three kilometres south of the Property.

猎鹰地产背景信息
Falcon是一个极具前景的铀勘探项目,在萨斯喀彻温省阿萨巴斯卡盆地东缘的勘探活动有所增加,最近的发现也有所增加。对电磁数据的重新解释,再加上2022年获得的地球物理数据,使该公司能够在先前钻探有限的地区确定高优先级的铀目标。该物业位于活跃的基湖铀厂和前矿山以东约35公里处。Falcon的新铀发现潜力巨大,包括浅层地下室的非整合型矿化和伟晶岩承载的矿化,类似于在地产以南仅三公里处的弗雷泽湖B区铀资源中发现的矿化。

Falcon consists of 15 mineral claims; four of the claims comprising 12,791 hectares are 100 percent-owned by the Company and the remaining 11 claims totaling 42,908 hectares are subject to an option agreement with Skyharbour Resources Ltd. Under the terms of the option agreement, North Shore can earn an 80% interest in the 11 claims and has the option to purchase the remaining 20% interest after it has earned its initial 80% interest.

猎鹰由15份矿产索赔组成;包括12,791公顷的4份索赔由公司100%拥有,其余11份总面积为42,908公顷的索赔受与Skyharbour Resources Ltd的期权协议约束。根据期权协议的条款,北岸可以在11项索赔中获得80%的权益,并在获得最初的80%权益后可以选择购买剩余的20%的利息。

About North Shore Uranium
The near-term business objectives of North Shore Uranium are to become a major force in exploration for economic uranium deposits at the eastern margin of Saskatchewan's Athabasca Basin, a tier-one jurisdiction for discovering new mineable high-grade uranium deposits. The Company will work to achieve those objectives by conducting exploration programs on its two properties, Falcon and the West Bear Property, which is located 90 kilometres northeast of Falcon, and by evaluating opportunities to increase its portfolio of properties in the region.

关于北岸铀矿
北岸铀矿的近期业务目标是成为萨斯喀彻温省阿萨巴斯卡盆地东缘勘探经济铀矿床的主要力量,阿萨巴斯卡盆地是发现新的可开采高品位铀矿床的一级司法管辖区。该公司将通过对其位于猎鹰东北90公里处的两处房产——Falcon和West Bear地产——进行勘探计划,并评估增加其在该地区房地产投资组合的机会,努力实现这些目标。

Qualified Person
Mr. Brooke Clements, MSc, P.Geol., a Qualified Person as defined by National Instrument 43-101 - Standards of Disclosure for Mineral Projects and the President and CEO of North Shore, has reviewed and approved the scientific and technical disclosure in this press release.

合格人员
Brooke Clements先生,理学硕士,P.Geol.,美国国家仪器43-101定义的合格人士- 矿产项目披露标准 以及North Shore总裁兼首席执行官已经审查并批准了本新闻稿中的科学和技术披露。

ON BEHALF OF THE BOARD
Brooke Clements,
President, Chief Executive Officer and Director

代表董事会
布鲁克·克莱门茨,
总裁、首席执行官兼董事

For further information:
Please contact: Brooke Clements, President, Chief Executive Officer and Director
Telephone: 604.536.2711
Email: b.clements@northshoreuranium.com

欲了解更多信息:
请联系:总裁、首席执行官兼董事布鲁克·克莱门茨
电话:604.536.2711
电子邮件:b.clements@northshoreuranium.com

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

多伦多证券交易所风险投资交易所及其监管服务提供商(该术语在多伦多证券交易所风险投资交易所的政策中定义)均不对本新闻稿的充分性或准确性承担责任。

Forward-Looking Statements
This news release contains forward-looking statements that are based on the Company's current expectations and estimates. Forward-looking statements are frequently characterized by words such as "plan", "project", "appear", "interpret", "coincident", "potential", "confirm", "suggest", "evaluate", "encourage", "likely", "anomaly", "continuous" and variations of these words as well as other similar words or statements that certain events or conditions "could", "may", "should", "would" or "will" occur. Such forward-looking statements involve known and unknown risks, uncertainties and other factors that could cause actual events or results to differ materially from estimated or anticipated events or results implied or expressed in such forward-looking statements. Such factors include, among others: the actual results of current and planned exploration activities including the potential for the definition of a mineral deposit of potential economic value within Falcon; that drilling results, geophysical survey results and/or interpretations thereof are defining potentially mineralized corridors; results from future exploration programs including drilling; interpretation and meaning of completed and future geophysical surveys; conclusions of future economic evaluations; changes in project parameters as plans to continue to be refined; possible variations in grades of mineralization and/or future actual recovery rates; accidents, labour disputes and other risks of the mining industry; the availability of sufficient funding on terms acceptable to the Company to complete the planned work programs; delays in obtaining governmental approvals or financing; and fluctuations in metal prices. There may be other factors that cause actions, events or results not to be as anticipated, estimated, or intended. Any forward-looking statement speaks only as of the date on which it is made and, except as may be required by applicable securities laws, the Company disclaims any intent or obligation to update any forward-looking statement, whether as a result of new information, future events, or results or otherwise. Forward-looking statements are not guarantees of future performance and accordingly undue reliance should not be put on such statements due to the inherent uncertainty therein.

前瞻性陈述
本新闻稿包含基于公司当前预期和估计的前瞻性陈述。前瞻性陈述通常以 “计划”、“项目”、“出现”、“解释”、“重合”、“潜在”、“确认”、“建议”、“评估”、“鼓励”、“可能”、“异常”、“持续” 等词语和这些词语的变体以及某些事件或条件 “可能”、“应该”、“会发生” 的其他类似词语或陈述为特征或 “将” 发生。此类前瞻性陈述涉及已知和未知的风险、不确定性和其他因素,这些因素可能导致实际事件或结果与此类前瞻性陈述中暗示或表达的估计或预期事件或结果存在重大差异。除其他外,这些因素包括:当前和计划中的勘探活动的实际结果,包括在Falcon内部定义具有潜在经济价值的矿床的可能性;钻探结果、地球物理调查结果和/或其解释正在定义潜在的矿化走廊;包括钻探在内的未来勘探计划的结果;对已完成和未来地球物理调查的解释和意义;未来经济评估的结论;计划中项目参数的变化精制;矿化等级和/或未来实际回收率可能发生的变化;采矿业的事故、劳资纠纷和其他风险;按公司可接受的条件提供足够的资金以完成计划的工作计划;延迟获得政府批准或融资;以及金属价格的波动。可能还有其他因素导致行动、事件或结果不符合预期、估计或预期。任何前瞻性陈述仅代表其发表之日,除非适用的证券法另有要求,否则公司不承担任何更新任何前瞻性陈述的意图或义务,无论是由于新信息、未来事件、业绩还是其他原因。前瞻性陈述并不能保证未来的表现,因此,由于其内在的不确定性,不应过度依赖此类陈述。

SOURCE: North Shore Uranium Ltd.

来源:北岸铀业有限公司


译文内容由第三方软件翻译。


以上内容仅用作资讯或教育之目的,不构成与富途相关的任何投资建议。富途竭力但不能保证上述全部内容的真实性、准确性和原创性。
    抢沙发