share_log

Nexus Announces Grant of Stock Options

Nexus Announces Grant of Stock Options

Nexus 宣佈授予股票期權
newsfile ·  05/02 07:18

Vancouver, British Columbia--(Newsfile Corp. - May 1, 2024) - Nexus Uranium Corp. (CSE: NEXU) (OTCQB: GIDMF) (FSE: 3H1) (the "Company" or "Nexus Uranium") announces that it has granted an aggregate of 1,000,000 stock options ("Options") to its directors, officers and consultants.

溫哥華,卑詩省 - (新聞稿 - 2024年5月1日)- Nexus Uranium Corp. (CSE:NEXU)(OTCQB:GIDMF)(FSE:3H1)(下稱"Nexus Uranium")宣佈已向其董事,高管及顧問授予合共1,000,000股期權(下稱"期權").公司計劃議程Nexus Uranium,"Options")

Each Option is exercisable to acquire one common share at an exercise price of $0.55 for five years. The Options are subject to a one-year vesting period, with 25% of the Options vesting on August 1, 2024 and 25% vesting every three months thereafter.

每個期權的行權價爲0.55美元,有效期爲五年。期權設有爲期一年的分配期,2024年8月1日開始分期分配,之後每三個月分期分配25%。

About Nexus Uranium Corp.

Nexus Uranium提醒投資者,初步經濟評估具有初步性質,包括被認爲地質上過於投機的推測礦物資源,無法將其應用於使其歸類爲礦物儲量所需的經濟考慮,並且沒有確保初步經濟評估會實現。該公司進一步提醒投資者,未經證實的礦產資源不具備經濟可行性,同時提醒投資者報告的推測金資源的數量和品位具有不確定性,且未進行足夠的勘探以確定其爲明示金資源。

Nexus Uranium is a multi-commodity development company focused on advancing the Cree East uranium project in the Athabasca Basin and the Wray Mesa uranium-vanadium project in Utah in addition to its precious metals portfolio that includes the development-stage Independence mine located adjacent to Nevada Gold Mine's Phoenix-Fortitude mine in Nevada, the Napoleon gold project in British Columbia, and a package of gold claims in the Yukon. The Cree East project is one of the largest projects within the Athabasca Basin of Saskatchewan spanning 57,752 hectares (142,708 acres) and has seen over $20 million in exploration to date. The Wray Mesa project covers 6,282 acres within the heart of the prolific Uruvan mining district in Utah and has extensive historical drilling of over 500 holes defining multiple mineralized zones. The Independence project hosts an M&I (measured and indicated) resource of 334,300 ounces of gold (28M tonnes at 0.41 g/t gold) and an inferred resource of 847,000 ounces (9M tonnes at 3.22 g/t gold) of gold with a substantial silver credit. A 2022 Preliminary Economic Assessment (PEA) outlined a low-cost heap leach operation focusing on the near-surface resource with total production of 195,443 ounces of gold at an all-in sustaining cost of $1,078 (U.S.) per ounce of gold. The Napoleon project comprises over 1,000 hectares and prospective for multiple forms of gold mineralization, with exploration in the area dating back to the 1970s with the discovery of high-grade gold. The Yukon gold projects are comprised of almost 8,000 hectares of quartz claims prospective for high-grade gold mineralization with historical grab sampling highlights of 144 g/t gold.

Nexus Uranium 是一家多商品發展公司,專注於推進 Athabasca Basin 的 Cree East 鈾項目以及猶他州的 Wray Mesa 鈾-釩項目,同時擁有一系列貴金屬項目,包括位於內華達州金礦內菲尼克斯-堅毅礦旁邊的開發階段的 Independence 礦山,不列顛哥倫比亞省的 Napoleon 金礦項目以及育空地區的一組金礦權。Cree East 項目是 Sasakatchewan Athabasca Basin 內最大的項目之一,面積達 57,752 公頃(142,708 英畝),迄今爲止已進行了超過 2,000 萬美元的勘探。Wray Mesa 項目位於猶他州豐富的 Uruvan 礦區,佔地面積 6,282 英畝,並進行了超過 500 個鑽孔的大規模鑽探,定義了多個含礦帶。Independence 項目覈算了 334,300 盎司金(2,800 萬噸,金品位 0.41 g/t)和 847,000 盎司金(9,000 萬噸,金品位 3.22 g/t)紅色估量資源,並配有大量的銀資源。2022 年初步經濟評估(PEA)闡明瞭一項低成本堆浸法生產工藝,集中在靠近地表的資源上,總產量爲 195,443 盎司金,成本爲每盎司 1,078 美元。Napoleon 項目包括超過 1,000 公頃的土地,有多種金礦化類型的勘查記錄,勘探工作始於上世紀 70 年代,現已發現了高品級金礦。育空金礦項目由近 8,000 公頃石英礦和多種高品位金礦化類型組成,歷史上的採樣結果最高可達 144 克/噸金。

Nexus Uranium cautions investors the preliminary economic assessment is preliminary in nature, it includes inferred mineral resources that are considered too speculative geologically to have the economic considerations applied to them that would enable them to be categorized as mineral reserves, and there is no certainty that the preliminary economic assessment will be realized. The Company further cautions investors Mineral Resources which are not Mineral Reserves do not have demonstrated economic viability and further cautions investors the quantity and grade of the reported inferred Mineral Resources are uncertain in nature ‎and there has been insufficient exploration to define these inferred Mineral Resources as ‎indicated Mineral Resources.

鈾聯合提醒投資者,初步經濟評估具有初步性質,包括被認爲地質上過於投機,不能將經濟考慮應用於它們的推斷礦產資源,並且沒有確定初步經濟評估將可以實現。公司進一步提醒投資者,未經證實的礦物資源不具備經濟可行性,進一步提醒投資者所報告的推斷礦物資源的數量和品位在本質上是不確定的,未經充分的勘探將這些推斷礦物資源定義爲指示礦物資源。

The Company cautions investors it has yet to verify the historical data and further cautions investors grab samples are selective by nature and are unlikely to represent average grades of sampling on the entire property.

公司提醒投資者,公司尚未覈實歷史數據,並要進一步提醒投資者,樣品是有選擇性的,不太可能代表整個物業的平均品位。

The technical content of this news release has been reviewed and approved by Warren D. Robb, P.Geo. (BC), a Director and VP Exploration of Nexus Uranium Corp. and a Qualified Person under National Instrument 43-101.

本新聞稿的技術內容已由Warren D. Robb、P.Geo.(BC)、鈾聯合股份有限公司董事和副總裁檢查和批准,併成爲《43-101全國儀器》下的一位合格的人員。

----

----

FOR FURTHER INFORMATION PLEASE CONTACT:
Jeremy Poirier
Chief Executive Officer
info@nexusuranium.com

欲了解更多信息請聯繫:
Jeremy Poirier
首席執行官
info@nexusuranium.com

This news release includes certain statements and information that may constitute "forward-looking information" within the meaning of applicable Canadian securities laws. Generally, forward-looking statements and information can be identified by the use of forward-looking terminology such as "intends" or "anticipates", or variations of such words and phrases or statements that certain actions, events or results "may", "could", "should", "would" or "occur". All statements in this news release, other than statements of historical facts, including statements regarding future estimates, plans, objectives, timing, assumptions or expectations of future performance are forward-looking statements and contain forward-looking information.

本新聞稿包含可能構成適用的加拿大證券法規中"前瞻性信息"的某些聲明和信息。通常而言,前瞻性聲明和信息可通過"意圖"或"預期"等前瞻性詞彙,或者這些詞彙的變體或陳述某些情況、事件或結果"可能","可能會","應該","將會"或"發生"。除了歷史事實陳述外,本新聞稿中的所有陳述都是前瞻性陳述,都包含前瞻性信息。

Forward-looking statements are based on certain material assumptions and analysis made by the Company and the opinions and estimates of management as of the date of this news release. These forward-looking statements are subject to known and unknown risks, uncertainties and other factors that may cause the actual results, level of activity, performance or achievements of the Company to be materially different from those expressed or implied by such forward-looking statements or forward-looking information, including, but not limited to general market and industry conditions, as well as those risk factors discussed in the Company's most recently filed management's discussion & analysis.

前瞻性聲明基於公司的某些基本假設和分析,以及管理層截至本新聞稿日期的意見和估計。這些前瞻性聲明受已知和未知的風險、不確定因素和其他因素的影響,這些因素可能導致公司的實際結果、活動水平、績效或業績與此類前瞻性聲明或前瞻性信息所表達或暗示的預期結果顯著不同,包括但不限於普遍市場和行業情況,以及在公司最近提交的管理層討論和分析中討論的風險因素。

Although management of the Company has attempted to identify important factors that could cause actual results to differ materially from those contained in forward-looking statements or forward-looking information, there may be other factors that cause results not to be as anticipated, estimated or intended. There can be no assurance that such statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on forward-looking statements and forward-looking information. Readers are cautioned that reliance on such information may not be appropriate for other purposes. The Company does not undertake to update any forward-looking statement, forward-looking information or financial outlook that are incorporated by reference herein, except in accordance with applicable securities laws.

儘管公司的管理層已經嘗試識別可能導致實際結果與前瞻性聲明或前瞻性信息所暗示、估計或打算的結果有所不同的重要因素,但可能還存在其他因素導致結果不如預期、估計或打算。因此,讀者不應該過分依賴前瞻性聲明和前瞻性信息。讀者應當注意,依賴此類信息可能不適合其他目的。公司不承諾更新任何已被引用的前瞻性聲明、前瞻性信息或財務前景,除非符合適用的證券法規定。

譯文內容由第三人軟體翻譯。


以上內容僅用作資訊或教育之目的,不構成與富途相關的任何投資建議。富途竭力但無法保證上述全部內容的真實性、準確性和原創性。
    搶先評論