share_log

Baselode Starts Drill Program on Bear Uranium Project : Begins Fleet Space Technologies' ANT Survey Over ACKIO

Baselode Starts Drill Program on Bear Uranium Project : Begins Fleet Space Technologies' ANT Survey Over ACKIO

Baselode啓動熊鈾項目的鑽探計劃:開始艦隊太空技術公司ANT對ACKIO的調查
newsfile ·  05/01 18:11
  • 1,500 metre inaugural Bear drill program has started targeting 3 areas with 6 to 8 drill holes
  • Bear 的首個 1,500 米鑽探計劃已開始瞄準 3 個區域,有 6 到 8 個鑽孔
  • Fleet Space Technologies' Ambient Noise Tomography ("ANT") survey, a passive, seismic method for generating 3D subsurface models is being deployed over ACKIO
  • Fleet Space Technologies的環境噪聲斷層掃描(“ANT”)測量正在ACKIO上部署,這是一種用於生成三維地下模型的被動地震方法

Toronto, Ontario--(Newsfile Corp. - May 1, 2024) - Baselode Energy Corp. (TSXV: FIND) (OTCQB: BSENF) ("Baselode" or the "Company") is pleased to announce the starts of an inaugural drill program and ANT geophysical survey on its Bear ("Bear") and Hook ("Hook") uranium projects, respectively, in the Athabasca Basin area, northern Saskatchewan (see Figure 1).

安大略省多倫多--(Newsfile Corp.,2024 年 5 月 1 日)——Baselode Energy Corp.(TSXV:FIND)(OTCQB:BSENF)(”Baselode“或者”公司“)很高興地宣佈其Bear的首個鑽探計劃和ANT地球物理調查已經開始(”“) 和 Hook (”掛鉤“) 分別位於薩斯喀徹溫省北部阿薩巴斯卡盆地地區的鈾項目(見圖1)。

"We're excited to start this drill campaign on Bear. Our target generation has identified areas of potential structural disruption and hydrothermal fluid alteration along the uranium-fertile Wollaston-Mudjatik transition zone that hosts numerous high-grade uranium deposits. We've identified 3 main targets areas we'll be drilling at the intersection points of NE-SW-trending layers and cross-cutting NW-SE-oriented structures (Figure 2). We believe the latter structures may have controlled anomalous uranium intersected in historic drill holes.

“我們很高興能在Bear上開始這次演習活動。我們的目標一代已經確定了擁有大量高品位鈾礦牀的鈾肥沃拉斯頓-穆賈蒂克過渡區潛在的結構破壞和熱液流體蝕變區域。我們已經確定了三個主要目標區域,我們將在NE-SW趨勢層和麪向NWSE的橫向結構的交叉點處進行鑽探(圖 2)。我們認爲,後一種結構可能控制了歷史鑽孔中相交的異常鈾。

We're also happy to announce we've started laying out and acquiring data from Fleet Space Technologies' ANT survey deployed over ACKIO. We hope to map out the extent of ACKIO's Athabasca sandstone outlier and the deep structural roots of the uranium mineralization system. We believe ACKIO continues at depth, including mineralization along the sandstone-basement fault zone. We look forward to testing these targets when we begin our next ACKIO drill program in June," stated James Sykes, CEO, President, and Director of Baselode.

我們還高興地宣佈,我們已經開始規劃和獲取艦隊太空技術公司在ACKIO上部署的ANT調查的數據。我們希望繪製出ACKIO的阿薩巴斯卡砂岩異常值的範圍以及鈾礦化系統的深層結構根源。我們認爲,ACKIO仍在深度上繼續,包括沿砂岩基底斷層帶的礦化。我們期待在6月份開始下一個ACKIO鑽探計劃時測試這些目標。” Baselode首席執行官、總裁兼董事James Sykes表示。

Please watch the Company's video (below) to understand the target generation ideas for the Bear drill program.

請觀看公司的視頻(見下文),了解Bear鑽探計劃的目標生成想法。

Bear - 2024 Exploration Targets Defined

Bear-2024 年勘探目標已確定

Bear Drill Program Details
The recently started Bear drill program is planned for 1,500 metres with 6 to 8 drill holes targeting 2 to 3 different target areas. The helicopter-support program allows expedient drill targeting and lessens environment impacts. The Company has received the necessary permits to complete the program.

Bear Drill 計劃詳情
最近啓動的 Bear 鑽探計劃在 1,500 米處鑽探 6 到 8 個鑽孔,目標區域爲 2 到 3 個不同的目標區域。直升機支持計劃允許快速進行演習,並減少對環境的影響。該公司已獲得完成該計劃的必要許可。

Hook ANT Program Details
"Fleet Space Technologies has developed an innovative high-resolution, ground-based, satellite-connected ambient noise tomography ("ANT") survey to produce a 3D model of the subsurface. The survey will be completed over ACKIO and other areas of interest, with data expected to be received and interpreted prior to starting diamond drilling on Hook in June. The Company has received the necessary permits to complete the program.

Hook ANT 計劃詳情
“Fleet Space Technologies開發了一種創新的高分辨率、地基、衛星連接的環境噪聲斷層掃描(”螞蟻“) 進行調查以生成地下三維模型。該調查將在ACKIO和其他感興趣的領域完成,預計將在6月開始胡克鑽石鑽探之前收到和解釋數據。該公司已獲得完成該計劃的必要許可。

About Baselode Energy Corp.
Baselode controls 100% of approximately 272,804 hectares for exploration in the Athabasca Basin area of northern Saskatchewan, Canada. The land package is free of any option agreements or underlying royalties.

關於基洛德能源公司
加拿大薩斯喀徹溫省北部阿薩巴斯卡盆地約272,804公頃的勘探用地,Baselode完全控制着。土地一攬子計劃不含任何期權協議或基礎特許權使用費。

The Company discovered the ACKIO near-surface, uranium prospect in September 2021. ACKIO measures greater than 375 m along strike, greater than 150 m wide, comprised of at least 9 separate uranium Pods, with mineralization starting as shallow as 28 m and 32 m beneath the surface in Pods 1 and 7, respectively, and down to approximately 300 m depth beneath the surface with the bulk of mineralization occurring in the upper 120 m. ACKIO remains open at depth, and to the north, south and east.

該公司於2021年9月發現了ACKIO近地表鈾礦勘探區。ACKIO 的走向長度超過 375 米,寬度大於 150 米,由至少 9 個獨立的鈾艙組成,1 號和第 7 號艙的礦化區分別從地表以下 28 米和 32 米處開始,一直到地表下約 300 米的深度,大部分礦化發生在 120 米以上。ACKIO 在深度、向北、向南和向東仍處於開放狀態。

Baselode's Athabasca 2.0 exploration thesis focuses on discovering near-surface, basement-hosted, high-grade uranium orebodies outside the Athabasca Basin. The exploration thesis is further complemented by the Company's preferred use of innovative and well-understood geophysical methods to map deep structural controls to identify shallow targets for diamond drilling.

Baselode的Athabasca 2.0勘探論文側重於發現阿薩巴斯卡盆地以外的近地表、地下室託管的高品位鈾礦體。該公司首選使用創新且廣爲人知的地球物理方法繪製深層結構控制圖,以確定鑽石鑽探的淺層目標,進一步補充了勘探論點。

QP Statement
The technical information contained in this news release has been reviewed and approved by Cameron MacKay, P.Geo., Vice-President, Exploration & Development for Baselode Energy Corp., who is considered to be a Qualified Person as defined in "National Instrument 43-101, Standards of Disclosure for Mineral Projects."

QP 聲明
本新聞稿中包含的技術信息已由Baselode Energy Corp. 勘探與開發副總裁P.Geo. 審查和批准,他被認爲是 “國家儀器43-101,礦業項目披露標準” 中定義的合格人員。

For further information, please contact:

欲了解更多信息,請聯繫:

James Sykes, CEO, President and Director
Baselode Energy Corp.
jsykes@oregroup.ca
306-221-8717

James Sykes,首席執行官、總裁兼董事
Baselode Energy
jsykes@oregroup.ca
306-221-8717

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the TSX Venture Exchange policies) accepts responsibility for the adequacy or accuracy of this release.

多倫多證券交易所風險交易所及其監管服務提供商(該術語在多倫多證券交易所風險交易所政策中定義)均不對本新聞稿的充分性或準確性承擔責任。

Certain information in this press release may contain forward-looking statements. This information is based on current expectations that are subject to significant risks and uncertainties that are difficult to predict. Actual results might differ materially from results suggested in any forward-looking statements. Baselode Energy Corp. assumes no obligation to update the forward-looking statements, or to update the reasons why actual results could differ from those reflected in the forward looking-statements unless and until required by securities laws applicable to Baselode Energy Corp. Additional information identifying risks and uncertainties is contained in the Company's filings with Canadian securities regulators, which filings are available under Baselode Energy Corp. profile at .

本新聞稿中的某些信息可能包含前瞻性陳述。這些信息基於當前的預期,這些預期受到難以預測的重大風險和不確定性的影響。實際結果可能與任何前瞻性陳述中建議的結果存在重大差異。除非適用於Baselode Energy Corp. 的證券法有要求,否則Baselode Energy Corp. 沒有義務更新前瞻性陳述或更新實際業績可能與前瞻性陳述中反映的結果不同的原因。其他識別風險和不確定性的信息包含在公司向加拿大證券監管機構提交的文件中,這些文件可在Baselode Energy Corp. 的簡介下查閱。

This news release does not constitute an offer to sell or a solicitation of an offer to buy any of the securities in the United States. The securities have not been and will not be registered under the United States Securities Act of 1933, as amended (the "U.S. Securities Act") or any state securities laws and may not be offered or sold within the United States or to, or for the account or benefit of, U.S. Persons unless registered under the U.S. Securities Act and applicable state securities laws, unless an exemption from such registration is available.

本新聞稿不構成在美國出售或徵求購買任何證券的要約。這些證券過去和將來都不會根據經修訂的1933年《美國證券法》(“美國證券法”)或任何州證券法進行註冊,除非根據美國證券法和適用的州證券法註冊,否則不得在美國境內發行或出售,也不得向美國人發行或出售,或爲美國人提供賬戶或利益,除非此類註冊可獲得豁免。

FIGURE 1 - Baselode projects location map. ACKIO uranium prospect identified with yellow circle.

圖 1-Baselode 項目位置圖。ACKIO 鈾礦前景用黃色圓圈確定。



FIGURE 2 – Bear Project Compilation Map.



圖 2 — Bear 項目編譯圖。

譯文內容由第三人軟體翻譯。


以上內容僅用作資訊或教育之目的,不構成與富途相關的任何投資建議。富途竭力但無法保證上述全部內容的真實性、準確性和原創性。
    搶先評論