share_log

Copper Fox Provides Update for Mineral Mountain Project

Copper Fox Provides Update for Mineral Mountain Project

Copper Fox 为矿山项目提供最新信息
newsfile ·  04/11 18:00

Calgary, Alberta--(Newsfile Corp. - April 11, 2024) - Copper Fox Metals Inc. (TSXV: CUU) (OTCQX: CPFXF) (FSE: HPU) ("Copper Fox" or the "Company") and its wholly owned subsidiary, Desert Fox Mineral Mountain Co. ("Desert Fox"), are pleased to provide an update on its 100% owned Mineral Mountain porphyry copper property (2,692.4 ha) located in the Mineral Mountain Mining District, Arizona.

艾伯塔省卡尔加里--(新闻档案公司,2024年4月11日)-Copper Fox Metals Inc. (TSXV: CUU) (OTCQX: CPFXF) (FSE: HPU) (“Copper Fox” 或 “公司”) 及其全资子公司沙漠之狐矿山有限公司(”沙漠之狐“),很高兴提供其位于亚利桑那州矿山矿区的100%拥有的矿山斑岩铜矿产的最新情况(2,692.4公顷)。

The Mineral Mountain project is located on a northeast trending, regional scale, porphyry copper belt that hosts some of the largest porphyry copper deposits in Arizona including Santa Cruz and Resolution. The project is located approximately 25 kilometers ("km") (15 miles) southwest from Rio Tinto and BHP's giant Resolution porphyry copper-molybdenum deposit and approximately 25 km northeast of Taseko's Florence porphyry copper deposit.

Mineral Mountain项目位于东北朝向、区域规模的斑岩铜带,拥有亚利桑那州一些最大的斑岩铜矿床,包括圣克鲁斯和Resolution。该项目位于力拓和必和必拓巨型Resolution斑岩铜钼矿床西南约25千米(“千米”)(15英里)处,位于Taseko的佛罗伦萨斑岩铜矿床东北约25公里处。

Highlights:

亮点:

  • Three distinct areas of higher positive chargeability located within a larger 18 milliradians ("mrad") chargeability anomaly have been identified.
  • These areas of higher chargeability are interpreted to represent three potential porphyry copper centers.
  • Target #1, located in the central portion of the property, has been discussed in several previous news releases. Targets #2 and #3 are located northeast and southwest of Target #1 respectively.
  • The Plan of Operations submitted to the Bureau of Land Management ("BLM") contemplates drill testing the chargeability signature of Target #1 and Target #2, each with a 1,000-meter-deep hole.
  • An Environmental Review ("ER"), as required pursuant to the National Environmental Protection Act, ("NEPA"), and Solicitation of Public Comments on the Plan of Operations must be completed prior to receiving a final decision from the BLM on the drilling permit.
  • SWCA has been retained to assist Copper Fox to determine the scope and scale of the ER in conjunction with the BLM.
  • 已经确定了位于更大的 18 毫弧度(“mrad”)可充电性异常内的三个具有更高正电荷性的不同区域。
  • 这些可充电性更高的区域被解释为代表三个潜在的斑岩铜中心。
  • 位于该物业中心部分的目标 #1 已在之前的几份新闻稿中进行了讨论。目标 #2 和 #3 分别位于目标 #1 的东北和西南。
  • 提交给土地管理局(“BLM”)的运营计划考虑对目标 #1 和 Target #2 的可充电性特征进行钻探测试,每一个都有1,000米深的孔。
  • 在收到BLM关于钻探许可证的最终决定之前,必须完成根据《国家环境保护法》(“NEPA”)的要求进行环境审查(“ER”)和对运营计划的公众征求意见。
  • 聘请了SWCA,以协助Copper Fox与BLM一起确定急诊室的范围和规模。

Elmer B. Stewart, President, and CEO of Copper Fox, stated, "The geological setting, geophysical signatures and porphyry footprint represents a compelling example of a buried porphyry copper target, like the giant Resolution porphyry Cu-Mo deposit. The chargeability and associated magnetic signatures are interpreted to represent early stage potassic alteration associated with significant bodies of sulphide mineralization at depth. Copper Fox is working diligently assisting SWCA to determine the scope and scale of the ER and public consultation process with the objective of obtaining the BLM's approval to conduct drilling operations."

Copper Fox总裁兼首席执行官埃尔默·斯图尔特表示:“地质背景、地球物理特征和斑岩足迹代表了埋藏斑岩铜靶的令人信服的例子,例如巨型Resolution斑岩铜钼矿床。可充电性和相关的磁特征被解释为代表与深度大量硫化物矿化相关的早期钾蚀变。Copper Fox正在努力协助SWCA确定ER和公众咨询过程的范围和规模,目的是获得BLM的批准进行钻探作业。”

Update On Drilling Permit
In response to the Plan of Operations to drill test Targets #1 and #2, the BLM have advised that:

钻探许可证最新情况
在回应钻探测试目标 #1 和 #2 的行动计划时,BLM 建议:

  1. consistent with Federal and State surface management regulations, the filed Plan of Operations and Reclamation Cost Estimate meets the content requirements for the Plan of Operations.
  2. Solicitation of Public Comment on the Plan of Operations under 43 CFR 3809.411(c) is required.
  3. An ER pursuant to NEPA, the scope and scale of which must be agreed to by the BLM prior to commencing the field work.
  4. The Solicitation of Public Comment and ER must be completed before the BLM would decide to either approved or not approved the Plan of Operations.
  1. 根据联邦和州地面管理法规,提交的运营计划和回收成本估算符合运营计划的内容要求。
  2. 需要就43 CFR 3809.411(c)下的运营计划征求公众意见。
  3. 根据NEPA设立的急诊室,其范围和规模必须得到BLM的同意,然后才能开始实地工作。
  4. 在BLM决定批准或不批准运营计划之前,必须完成公众意见征询和急诊的征集。

SWCA Environmental Consultants, an Arizona based firm specializing in environmental, regulatory, and natural and cultural resources management services, has been retained to act on behalf of Copper Fox to determine the scope and scale of the ER in conjunction with the BLM.

SWCA Environmental Consultants是一家总部位于亚利桑那州的专门从事环境、监管以及自然和文化资源管理服务的公司,已受聘代表Copper Fox行事,与BLM一起确定急诊室的范围和规模。

Project Review
Dr. Timothy Marsh, PhD., P.Eng., was retained to complete an independent review of the project data. Dr. Marsh has over 35 years of experience in the exploration of porphyry copper systems in Arizona. Dr. Marsh concluded:
"The overlapping mineralogical, lithological, geochemical, and geophysical signatures at Mineral Mountain is most easily reconciled in a model where a Laramide age, copper-mineralized porphyry body is present beneath the heart of a region measuring 3400 meters by 1600 meters and apexing at a depth 400-500 meters below surface."

项目审查
聘请蒂莫西·马什博士(P.Eng.)完成对项目数据的独立审查。Marsh 博士在亚利桑那州斑岩铜系统的勘探方面拥有超过 35 年的经验。马什博士得出结论:
在模型中,最容易调和矿物山重叠的矿物学、岩性、地球化学和地球物理特征,在该模型中,拉拉米德时代的铜矿化斑岩体位于一个尺寸为3400米乘1600米、位于地表以下400-500米深度的区域的心脏之下。”

Chargeability Targets
The chargeability component of a geophysical survey measures the relative concentration of disseminated, vein and fracture-controlled sulphide minerals, such as chalcopyrite, bornite and pyrite. Figures 1 and 2 show the locations of three areas of higher chargeability (>20 mrads) at a depth of 600m below surface (designated Target #1, #2 and #3). These targets occur within the northeast trending chargeability anomaly (>14 mrads) that remains open below the +/- 600-700m level below surface.

可充电性目标
地球物理调查的可充电性部分用于测量浸染、矿脉和裂缝控制的硫化物矿物的相对浓度,例如黄铜矿、硼石和黄铁矿。图 1 和图 2 显示了位于地表以下 600 米深度的三个可充电性更高的区域(>20 mrad)的位置(指定为目标 #1、#2 和 #3)。这些目标发生在东北趋势充电异常(>14 mrads)内,该异常在地表下方+/-600-700m处仍处于开放状态。


Figure-1: Correlation between copper values and interpreted porphyry centers.


图 1:铜值与解释的斑岩中心之间的相关性。


Figure-2: Correlation between molybdenum values and interpreted porphyry centers.


图 2:钼值与解释的斑岩中心之间的相关性。

Note: The contouring of the copper and molybdenum values was completed using Micromine software.

注意:铜和钼值的轮廓是使用Micromine软件完成的。

Target #1 has been discussed in several news releases (see news release dated November 22, 2023) and displays a prominent "leakage" halo estimated to be approximately 1,200m long by up to 900m wide, characterized by abundant secondary copper mineralization, (malachite-chrysocolla-chalcocite-covellite) alteration patterns, intrusive rocks indicative of a buried porphyry copper system and strong associated molybdenum signature.

目标 #1 已在多个新闻稿中进行了讨论(见2023年11月22日的新闻稿),其中显示了一个突出的 “泄漏” 光环,估计长约1200米,宽度可达900米,其特征是丰富的二次铜矿化、(孔雀石-chrysocolla-chalcocite-covellite)的蚀变模式、表明斑岩系统埋藏的侵入性岩石以及强烈的相关钼特征。

Target #2 represents the top of a chargeability anomaly that is estimated to occur at 300m below surface and extends below the 600m depth of geophysical investigation. The chargeability signature (20 mrads) measures 1,300m by 1,000m within the larger open-ended chargeability signature. The surface geology consists of porphyritic quartz monzonite, granodiorite, and late stage granodioritic, hornblende dacite and aplite dikes. Secondary copper minerals (malachite-chrysocolla-chalcocite) hosted in quartz veins, quartz veinlets and in copper-hematite filled fractures occur along the northern and western portions of the target. The molybdenum signature in this target is restricted in extent and subdued compared to Target #1 and #3.

目标 #2 代表可充电性异常的顶部,该异常估计发生在地表以下 300 米,延伸到地球物理调查深度以下 600 米以下。在较大的开放式可充电性签名中,可充电性签名(20 mrads)的尺寸为1300米乘1,000米。地表地质包括斑状石英蒙长石、花岗闪长岩,以及晚期花岗闪长岩、角闪长岩和阿普利特堤坝。次生铜矿物(孔雀石-chrysocolla-chalcocite)存在于石英脉、石英脉和充满铜赤铁矿的裂缝中,位于目标的北部和西部。与目标 #1 和 #3 相比,该靶标中的钼特征在范围上受到限制和抑制。

Target #3 is a circular (300m by 300m) chargeability anomaly (>18 mrads) located at the southwest end of the project. This area is underlain by porphyritic and non-porphyritic fine and coarse-grained granodiorite, quartz monzonite and late-stage, hornblende dacite, granodiorite and aplite dikes. Alteration minerals (tremolite) suggest the inner portion of the propylitic zone. Secondary copper minerals (malachite-chrysocolla-chalcocite) hosted in quartz veins, quartz veinlets and copper-hematite filled fractures occur along the northern and western portion of this target. This target exhibits a strong molybdenite association with the copper mineralization.

目标 #3 是位于项目西南端的圆形(300米乘300米)充电异常(>18 mrads)。该区域的下层是斑岩和非卟啉质细颗粒和粗粒花岗闪长岩、石英单柱石和晚期、角闪石达克岩、花岗闪长岩和阿普利特堤岩。蚀变矿物(透闪石)提示丙质区的内部。次生铜矿物(孔雀石-chrysocolla-chalcocite)存在于石英脉、石英脉和充满铜赤铁矿的裂缝中,位于该目标的北部和西部。该目标显示出辉钼矿与铜矿化密切相关。

Elmer B. Stewart, MSc. P.Geo., President, and CEO of Copper Fox, is the Company's non-independent, nominated Qualified Person pursuant to National Instrument 43-101, Standards for Disclosure for Mineral Projects, and has reviewed and approves the scientific and technical information disclosed in this news release.

埃尔默·斯图尔特,理学硕士Copper Fox总裁兼首席执行官P.Geo. 是该公司的非独立人士,根据National Instrument 43-101《矿业项目披露标准》提名的合格人士,并已审查并批准了本新闻稿中披露的科学和技术信息。

About Copper Fox
Copper Fox is a Tier 1 Canadian resource company focused on copper exploration and development in Canada and the United States. The principal assets of Copper Fox and its wholly owned subsidiaries being Northern Fox Copper Inc. and Desert Fox Copper Inc., are the 100% ownerships of the Van Dyke ISCR project, and the Mineral Mountain and Sombrero Butte porphyry copper exploration projects all located in Arizona, the 25% interest in the Schaft Creek Joint Venture with Teck Resources Limited on the Schaft Creek copper-gold-molybdenum-silver project and the 100% owned Eaglehead polymetallic porphyry copper project each located in northwestern British Columbia. For more information on Copper Fox's mineral properties and investments visit the Company's website at .

关于 Copper Fox
Copper Fox是一家加拿大一级资源公司,专注于加拿大和美国的铜矿勘探和开发。Copper Fox及其全资子公司为北狐铜业公司和沙漠狐铜业公司的主要资产是范戴克ISCR项目、矿山和Sombrero Butte斑岩铜勘探项目的100%所有权,与泰克资源有限公司在沙夫特溪铜金钼银项目上合资的沙夫特溪合资企业的25%权益以及100%拥有的Eaglehead Polyhead Polybute项目金属斑岩铜项目均位于不列颠哥伦比亚省西北部。有关Copper Fox矿产和投资的更多信息,请访问该公司的网站,网址为。

On behalf of the Board of Directors

代表董事会

Elmer B. Stewart
President and Chief Executive Officer

埃尔默 B. 斯图尔特
总裁兼首席执行官

For additional information contact:
Fidel Montagu at investor@copperfoxmetals.com or 1-844-464-2820

如需更多信息,请联系:
菲德尔·蒙塔古致电 investor@copperfoxmetals.com 或 1-844-464-2820

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

多伦多证券交易所风险投资交易所及其监管服务提供商(该术语在多伦多证券交易所风险投资交易所的政策中定义)均不对本新闻稿的充分性或准确性承担责任。

Cautionary Note Regarding Forward-Looking Information
This news release contains forward-looking statements within the meaning of the Section 27A of the Securities Act of 1933 and Section 21E of the Securities Exchange Act of 1934, and forward-looking information within the meaning of the Canadian securities laws (collectively, "forward-looking information"). Forward-looking information is generally identifiable by use of the words "believes," "may," "plans," "will," "anticipates," "intends," "budgets," "could", "estimates", "expects", "forecasts", "projects" and similar expressions, and the negative of such expressions. Forward-looking information in this news release includes statements regarding; a regional scale mineral trend; several chargeability targets; positive magnetic features; potential targets; Plan of Operation and planned exploration activities.

关于前瞻性信息的警示说明
本新闻稿包含1933年《证券法》第27A条和1934年《证券交易法》第21E条所指的前瞻性陈述,以及加拿大证券法所指的前瞻性信息(统称为 “前瞻性信息”)。前瞻性信息通常可以通过使用 “相信”、“可能”、“计划”、“将”、“预期”、“打算”、“预算”、“可能”、“估计”、“预期”、“预测”、“项目” 等词语以及此类表达的否定词来识别。本新闻稿中的前瞻性信息包括以下方面的陈述:区域规模的矿产趋势;几个可充电性目标;积极的磁性特征;潜在目标;运营计划和计划勘探活动。

In connection with the forward-looking information contained in this news release, Copper Fox and its subsidiaries have made numerous assumptions regarding, among other things: the geological advice that Copper Fox has received is reliable and is based upon practices and methodologies which are consistent with industry standards; and the reliability of historical reports. While Copper Fox considers these assumptions to be reasonable, these assumptions are inherently subject to significant uncertainties and contingencies.

关于本新闻稿中包含的前瞻性信息,Copper Fox及其子公司对以下方面做出了许多假设:Copper Fox收到的地质建议是可靠的,基于符合行业标准的做法和方法;以及历史报告的可靠性。尽管Copper Fox认为这些假设是合理的,但这些假设本质上会受到重大的不确定性和突发性的影响。

Additionally, there are known and unknown risk factors which could cause Copper Fox's actual results, performance, or achievements to be materially different from any future results, performance or achievements expressed or implied by the forward-looking information contained herein. Known risk factors include, among others: the chargeability targets may not represent porphyry centers, the chargeability targets may not contain significant porphyry style copper mineralization; the positive magnetic features may not be as interpreted; further exploration of the property may not be completed as planned or at all; the surface mineralization may not represent porphyry or supergene style mineralization; uncertainties relating to interpretation of the chargeability results; the Solicitation of Public Comment may not occur as planned or at all; the Environmental Review may not be completed as planned or at all; and the Plan of Operation may not be approved as contemplated or at all; the financial markets and the overall economy may deteriorate; the need to obtain additional financing and uncertainty as to timely availability of permits and other governmental approvals.

此外,还有一些已知和未知的风险因素可能导致Copper Fox的实际业绩、业绩或成就与本文所包含的前瞻性信息所表达或暗示的任何未来业绩、业绩或成就存在重大差异。已知的风险因素包括:可充电性目标可能不代表斑岩中心,可充电性目标可能不包含显著的斑岩型铜矿化;正磁特征可能与解释不符;对该地产的进一步勘探可能无法按计划完成或根本无法完成;地表矿化可能不代表斑岩或超基因式矿化;与可充电性结果解释有关的不确定性;征集公众意见可能无法按计划进行,也可能根本无法按计划进行;环境审查可能无法按计划完成或根本无法完成;运营计划可能未按设想或根本没有获得批准;金融市场和整体经济可能会恶化;需要获得额外资金,以及能否及时获得许可证和其他政府批准的不确定性。

A more complete discussion of the risks and uncertainties facing Copper Fox is disclosed in Copper Fox's continuous disclosure filings with Canadian securities regulatory authorities at . All forward-looking information herein is qualified in its entirety by this cautionary statement, and Copper Fox disclaims any obligation to revise or update any such forward-looking information or to publicly announce the result of any revisions to any of the forward-looking information contained herein to reflect future results, events, or developments, except as required by law.

Copper Fox向加拿大证券监管机构提交的持续披露文件中披露了对Copper Fox面临的风险和不确定性的更全面的讨论。除非法律要求,否则此处的所有前瞻性信息均受本警示声明的全部限制,Copper Fox不承担修改或更新任何此类前瞻性信息或公开宣布对本文包含的任何前瞻性信息进行任何修订以反映未来业绩、事件或发展的结果的义务。

译文内容由第三方软件翻译。


以上内容仅用作资讯或教育之目的,不构成与富途相关的任何投资建议。富途竭力但不能保证上述全部内容的真实性、准确性和原创性。
    抢沙发