Toronto, Ontario--(Newsfile Corp. - March 5, 2024) - Premium Nickel Resources Ltd. (TSXV: PNRL) (OTCQX: PNRLF) ("PNRL" or the "Company") is pleased to report additional assay results from drilling at its past-producing nickel-copper-cobalt sulphide ("Ni-Cu-Co") Selebi North underground ("SNUG") mine in Botswana. Previous results for 37 holes were released in seven separate news releases between November 14, 2023 and February 26, 2024. Results for a further five holes are released herein. To date a total of 42 holes have been released representing an aggregate of approximately 15,301 metres including the holes and metres released herein. Details of the assay results are shown below along with accompanying visuals (Figure 1, Figure 2 and Figure 3). Drill core photos for all highlighted holes released to date, including the holes reported herein, are accessible by Clicking Here and can also be found on the Company's website at . To view the 3D modeling, please visit the following link .

安大略省多倫多--(Newsfile Corp.-2024 年 3 月 5 日)- 優質鎳業資源有限公司(多倫多證券交易所股票代碼:PNRL)(場外交易所股票代碼:PNRL)(“PNRL” 或 “公司”) 很高興地報告在其過去生產的鎳-銅-鈷硫化物上鑽探的更多化驗結果(”鎳銅鈷“) 塞萊比北部地下 (”舒適“)我在博茨瓦納的。在2023年11月14日至2024年2月26日期間,在七份單獨的新聞稿中公佈了37個洞的先前結果。另外五個洞的結果將在此公佈。迄今爲止,共釋放了42個洞,總共約15,301米,包括此處發佈的洞和米。分析結果的詳細信息以及隨附的視覺效果如下所示(圖 1、圖 2 和圖 3)。迄今爲止發佈的所有重點孔洞的鑽芯照片,包括此處報告的孔,均可通過單擊此處獲取,也可以在公司的網站上找到,網址爲。要查看 3D 建模,請訪問以下鏈接。

Highlights include:

亮點包括:

  • SNUG-23-017 (drilled 180 metres down plunge and outside of the South Limb historic resource):
    18.15 metres of 2.25% NiEq (1.27% Ni; 1.65% Cu; 0.06% Co)
    incl. 6.25 metres of 3.28% NiEq (2.34% Ni; 1.40% Cu; 0.11% Co)
    and 3.50 metres of 3.31% NiEq (1.06% Ni; 4.08% Cu; 0.05% Co)
  • SNUG-23-017(在跳水處向下鑽探 180 米,位於南緣歷史資源之外):
    18.15 米的 2.25% NiEQ(1.27% 鎳;1.65% 銅;0.06% 鈷)
    包括 6.25 米的 3.28% NiEQ(2.34% Ni;1.40% Cu;0.11% Co)
    以及 3.50 米的 3.31% NiEQ(1.06% Ni;4.08% Cu;0.05% Co)
  • SNUG-24-089: Drilled 403 metres down-plunge and outside of the South Limb historic resource intersected massive sulphide mineralization (assays pending).
  • SNUG-24-089:在南緣歷史資源以外的403米處鑽探了塊狀硫化物礦化(化驗待定)。

Keith Morrison, CEO of PNRL, commented: "The underground drilling at Selebi North is successfully advancing our NI 43-101 compliant Mineral Resource Estimate ("MRE"). In addition, it is providing new structural, geochemical and geological information to integrate with our Borehole Electromagnetic ("BHEM") electrical conductivity imaging supporting drilling down plunge mineralization below the legacy Selebi North resource block model. The success of this process continues to be proven with the results in SNUG-23-017 180 metres down plunge and SNUG-24-089 403 metres down plunge. We will use the same process to target massive Ni-Cu-Co suphide mineralization in the 3,000 metre gap between the end of mine at Selebi and Selebi North - an area we refer to as the "southern hinge". The current underground drilling program is expected to be completed this month, allowing us to move one of our underground drill rigs for surface drilling and begin testing the southern hinge mineralization."

PNRL 首席執行官基思·莫里森評論說: “北塞萊比的地下鑽探成功推進了我們符合北愛爾蘭43-101標準的礦產資源估算(”更多“)。此外,它還提供了新的結構、地球化學和地質信息,可與我們的鑽孔電磁學整合(”BHEM“) 電導率成像支持在傳統的Selebi North資源區塊模型下方向下鑽探墜落礦化。SNUG-23-017 180 米向下跳水和 SNUG-24-089 403 米向下跳水的結果繼續證明了這一過程的成功。我們將使用同樣的工藝在塞萊比礦山盡頭和北塞萊比之間的3000米間隙中瞄準大規模的鎳銅鈷超硬礦化區——我們稱之爲 “南鉸鏈”。當前的地下鑽探計劃預計將於本月完成,這使我們能夠移動一臺地下鑽機進行露天鑽探,並開始測試南鉸礦化。”

The primary focus of this drill program is to define mineralization down plunge of the existing workings that will be used to complete a MRE prepared in accordance with National Instrument 43-101 - Standards of Disclosure for Mineral Projects ("NI 43-101"). Assay results are given below in Table 1 and hole collar details are given in Table 2. Figures 1 through 3 show the location of the holes relative to the historic resource and underground infrastructure.

該鑽探計劃的主要重點是確定現有礦井向下傾斜的礦化作用,這些礦化作用將用於完成根據國家儀器43-101製備的MRE- 礦產項目披露標準 (”在 43-101“)。化驗結果如下表 1 所示,孔環細節見表 2。圖 1 至圖 3 顯示了洞穴相對於歷史資源和地下基礎設施的位置。

The various mineralized zones have been historically mined and subsequently named N2 Limb, N3 Limb and South Limb to demarcate their location on the folded mineralized horizon. Additional drilling is needed to properly determine true width of mineralization on each limb and define the folded mineralization.

歷史上曾開採過各種礦化帶,隨後將其命名爲 N2 Limb、N3 Limb 和 South Limb,以劃定它們在摺疊的礦化地平線上的位置。需要進行額外的鑽探,以正確確定每條邊緣上礦化的真實寬度並定義摺疊礦化。

Table 1: Assay Results Selebi North Deposit

表 1:化驗結果 Selebi North Deposit

Hole-ID From
(m)
To
(m)
*Length
(m)
Ni
(%)
Cu
(%)
Co
(%)
Limb **NiEq
(%)
SNUG-23-017 464.55 471.90 7.35 0.75 0.53 0.04 South 1.11
incl. 467.65 471.90 4.25 1.21 0.28 0.06 South 1.46
SNUG-23-017 505.45 523.60 18.15 1.27 1.65 0.06 South/N2 2.25
incl. 507.40 513.65 6.25 2.34 1.40 0.11 South/N2 3.28
and 519.70 523.20 3.50 1.06 4.08 0.05 South /N2 3.31
SNUG-23-071 276.60 279.90 3.30 1.60 0.58 0.08 N3 2.05
SNUG-23-072 188.05 190.85 2.80 1.40 1.39 0.06 N2 2.25
SNUG-23-073 305.40 308.24 2.84 1.34 1.87 0.07 N3 2.45
SNUG-23-074 190.85 201.15 10.30 0.59 0.31 0.03 N2 0.82
incl. 190.85 196.40 5.55 0.93 0.54 0.05 N2 1.31
Hole-ID 來自
(m)

(m)
*長度
(m)
Ni
(%)

(%)
有限公司
(%)
四肢 **nieQ
(%)
SNUG-23-017 464.55 471.90 7.35 0.75 0.53 0.04 南方 1.11
包括。 467.65 471.90 4.25 1.21 0.28 0.06 南方 1.46
SNUG-23-017 505.45 523.60 18.15 1.27 1.65 0.06 南方/N2 2.25
包括。 507.40 513.65 6.25 2.34 1.40 0.11 南方/N2 3.28
519.70 523.20 3.50 1.06 4.08 0.05 南方 /N2 3.31
SNUG-23-071 276.60 279.90 3.30 1.60 0.58 0.08 N3 2.05
SNUG-23-072 188.05 190.85 2.80 1.40 1.39 0.06 N2 2.25
SNUG-23-073 305.40 308.24 2.84 1.34 1.87 0.07 N3 2.45
SNUG-23-074 190.85 201.15 10.30 0.59 0.31 0.03 N2 0.82
包括。 190.85 196.40 5.55 0.93 0.54 0.05 N2 1.31

*Length refers to drillhole length and not true width. True widths of the South Limb are unknown but interpreted to be between 5 and 20 metres. True widths of the N2 Limb and N3 Limb are unknown.
**NiEq was calculated assuming a price of $US 7.25/lb for Ni, $US 3.82/lb for Cu and $US 13.22/lb for Co with no adjustments for recoveries and payabilities.

*長度是指鑽孔長度,而不是真實寬度。南緣的真實寬度尚不清楚,但解釋爲介於 5 到 20 米之間。N2 肢體和 N3 肢體的真實寬度尚不清楚。
**NieQ的計算假設鎳的價格爲7.25美元/磅,銅的價格爲3.82美元/磅,鈷的價格爲13.22美元/磅,未對回收和應付能力進行調整。

Table 2: Drill Collar Information Selebi North Deposit

表 2:Selebi North Deposit 的鑽環信息

HOLE ID Mine East Mine North Elevation Dip Mine
Azimuth
Hole Length Comment
SNUG-23-017 35094.6 84759.5 -52.8 -35.3 155.3 548.8 Rig #1 935mL
SNUG-23-071 34918.0 84908.7 -8.9 -26.2 258.7 320.4 Rig #3 895mL
SNUG-23-072 35083.7 84841.7 -8.9 -21.4 209.9 231.6 Rig #2 880mL
SNUG-23-073 34918.1 84908.6 -8.9 -39.6 260.0 341.3 Rig #3 895mL
SNUG-23-074 35084.2 84842.6 -8.9 -30.9 211.1 257.1 Rig #2 880mL
洞號 Mine East 我的北方 海拔 我的
方位角
孔長 評論
SNUG-23-017 35094.6 84759.5 -52.8 -35.3 155.3 548.8 鑽機 #1 935mL
SNUG-23-071 34918.0 84908.7 -8.9 -26.2 258.7 320.4 鑽機 #3 895mL
SNUG-23-072 35083.7 84841.7 -8.9 -21.4 209.9 231.6 鑽機 #2 880mL
SNUG-23-073 34918.1 84908.6 -8.9 -39.6 260.0 341.3 鑽機 #3 895mL
SNUG-23-074 35084.2 84842.6 -8.9 -30.9 211.1 257.1 鑽機 #2 880mL

The highlighted results from SNUG-23-017, drilled from 935mL, intersected South Limb mineralization 180 metres down plunge of the historic resource. Recent holes, drilled from the 810mL Exploration Drift and targeting South Limb at depth, have demonstrated that South Limb mineralization extends over 400 metres beyond the historic resource in the down plunge direction (240 metres vertically). Photos of core from SNUG-24-089, the deepest of these holes, can be found here. A hole is planned to target 500 metres down plunge of the historic resource.

從 935mL 鑽探的 SNUG-23-017 的重點結果與歷史資源墜落 180 米處的 South Limb 礦化區相交。最近從810mL勘探漂移處鑽出的鑽孔深度瞄準了南邊,這些鑽孔表明,南緣礦化向下潛方向(垂直240米)延伸到歷史資源以外400米以上。可以在這裏找到來自這些洞中最深的 SNUG-24-089 的岩心照片。計劃開一個洞,目標是將歷史資源向下墜落500米。

Drillholes SNUG-23-071 and SNUG-23-073, also reported in this release, intercepted mineralization down dip of the historic resource at N3.

本新聞稿中同樣報道的 SNUG-23-071 和 SNUG-23-073 鑽孔截獲了歷史資源向下傾斜的 N3 礦化。

As reported in the news release on February 26, 2024, SNUG-23-035 intersected mineralization 130 metres along strike of the Selebi North historic resource.

正如 2024 年 2 月 26 日新聞稿中所報道的那樣,SNUG-23-035 沿着塞萊比北部歷史資源走向 130 米處與礦化區相交。

Drilling and BHEM Continues

鑽探和 BHEM 仍在繼續

Three drills are currently active, two on the 810mL Exploration Drift and one drilling from the 925mL South Limb development drive. The two drills on the 810mL Exploration Drift allow for the evaluation of areas further down plunge and outside of the known historic resource estimate.

目前有三臺鑽機正在進行中,兩臺在 810mL Exploration Drift 上鑽探,另一次在 925mL South Limb 開發區鑽探。810mL Exploration Drift 上的兩次鑽孔可以評估下沉更遠且超出已知歷史資源估計值的區域。

BHEM surveys are currently underway, with surveys completed in a total of nineteen underground drillholes including six 2024 holes drilled from the 810mL Exploration Drift evaluating the down plunge potential of the South Limb. Results from these surveys indicate that the mineralized zones continue down plunge of current drilling, permitting larger step-out intervals.

BHEM的調查目前正在進行中,共完成了對19個地下鑽孔的調查,其中包括從810mL勘探漂移中鑽出的6個2024個洞,評估了南緣的向下潛潛力。這些調查的結果表明,當前鑽探的礦化區繼續向下傾斜,允許更長的跨出間隔。

As of March 3, 2024, a total of 25,109 metres in seventy-three (73) drillholes have been completed from six underground drill bays with three of those drillholes currently in-progress. Assay results for completed holes will be released as they are received and confirmed by the Company.

截至 2024 年 3 月 3 日,六個地下鑽孔共完成了七十三 (73) 個鑽孔中的 25,109 米,其中三個鑽孔目前正在進行中。已完成孔的化驗結果將在公司收到並確認後公佈。

Quality Control

質量控制

The underground drilling program is being carried out through an agreement with Forage Fusion Drilling Ltd. of Hawkesbury, Ontario, Canada, who have provided three Zinex U-5 drills for purchase and training of local operators. Drill core samples are BQTK (40.7 mm diameter). All samples are 1⁄2 core cut by a diamond saw on site. Half of the core is retained for reference purposes. Samples are generally 1.0 to 1.5 metre intervals or less at the discretion of the site geologists. Sample preparation and lab analysis was completed at ALS Chemex in Johannesburg, South Africa. Commercially prepared blank samples and certified Cu/Ni sulphide analytical control standards with a range of grades are inserted in every batch of 20 samples or a minimum of one set per sample batch. Analyses for Ni, Cu and Co are completed using a peroxide fusion preparation and ICP-AES finish (ME-ICP81).

地下鑽探計劃是通過與加拿大安大略省霍克斯伯裏的Forage Fusion Drilling Ltd.簽訂的協議進行的,該公司提供了三臺Zinex U-5鑽機,用於購買和培訓當地操作員。鑽芯樣品爲 BQTK(直徑 40.7 毫米)。所有樣品均由現場金剛石鋸切割的 1⁄2 芯。保留了一半的核心以供參考。樣本間隔通常在 1.0 到 1.5 米之間,由現場地質學家自行決定。樣本製備和實驗室分析已在南非約翰內斯堡的ALS Chemex完成。商業製備的空白樣品和不同等級的經過認證的銅/鎳硫化物分析控制標準被插入每批20個樣品中,或者每批樣品至少放入一組。鎳、銅和鈷的分析是使用過氧化物熔融製備和 ICP-AES 表面處理 (ME-ICP81) 完成的。

Holes are numbered as follows: SNUG (Selebi North Underground) + year + hole number starting at 013.

球洞編號如下:SNUG(Selebi North Underground)+ 年份 + 洞號從 013 開始。

BHEM Surveys

BHEM 調查

The BHEM surveys at Selebi utilize the Crone PEM system operated by local Batswana staff. Survey data is collected using a 3 component fluxgate probe collecting full waveform data. Surveys have been collected using timebases between 50 and 1000ms (0.25 Hz to 5 Hz). The data has been processed to a calculated residual step response to better quantify the conductive sources. This added processing has proven to be invaluable because of the size of the highly conductive mineralized system.

塞萊比的BHEM調查使用了由博茨瓦納當地工作人員運營的Crone PEM系統。使用三分量磁通門探頭收集完整波形數據,收集測量數據。調查是使用介於 50 到 1000 毫秒(0.25 赫茲到 5 赫茲)之間的時基收集的。數據已根據計算出的殘差階躍響應進行處理,以更好地量化傳導源。由於高導電性礦化系統的規模,這種額外的加工已被證明是無價的。

Qualified Person

合格人員

The scientific and technical content of this news release has been reviewed and approved by Sharon Taylor, Vice President Exploration of the Company, who is a "qualified person" for the purposes of NI 43-101.

本新聞稿的科學和技術內容已經過公司勘探副總裁莎朗·泰勒的審查和批准,就NI 43-101而言,他是 “合格人士”。

Technical Report

技術報告

Scientific and technical information relating to the Selebi Mine is supported by the technical report titled "Technical Report on the Selebi Mines, Central District, Republic of Botswana, Report for NI 43-101", dated June 16, 2022 (effective date of March 1, 2022) (the "Selebi Technical Report"), and prepared by SLR Consulting (Canada) Ltd. for PNRL. Reference should be made to the full text of the Selebi Technical Report, including the assumptions, limitations and data verification therein relating to the historic data compilation presented in this news release, which was prepared in accordance with NI 43-101 and is available electronically on SEDAR+ () under PNRL's issuer profile.

與塞萊比礦有關的科學和技術信息得到題爲 “的技術報告” 的支持 “博茨瓦納共和國中區塞萊比礦山技術報告,NI 43-101報告”,日期爲 2022 年 6 月 16 日(生效日期爲 2022 年 3 月 1 日)(”Selebi 技術報告“),由SLR諮詢(加拿大)有限公司爲PNRL編寫。應參考Selebi技術報告的全文,包括其中與本新聞稿中提供的歷史數據彙編相關的假設、侷限性和數據驗證。該報告根據NI 43-101編寫,可在SEDAR+ () 上以電子方式在PNRL的發行人概況下查閱。

Historic Resource Estimate

歷史資源估算

The historical mineral resource estimate referenced herein (the "Historic Resource") was calculated for the Selebi North, Selebi Main, Phikwe South and Southeast Extension deposits in accordance with SAMREC, in 2016, and does not comply with NI 43-101. To that end, the Historic Resource is considered to be historical in nature and should not be relied upon as a current mineral resource estimate. While management believes that the Historic Resource could be indicative of the presence of mineralization on the deposits, a qualified person for purposes of NI 43-101 has not completed sufficient work to classify the historical mineral estimates as current mineral resource estimates and PNRL is not treating the historical mineral estimates as current mineral resource estimates.

此處引用的歷史礦產資源估計(”歷史資源“)是根據SAMREC在2016年根據SAMREC對塞萊比北部、塞萊比主幹線、皮克威南部和東南延伸區的礦牀計算得出的,不符合北愛爾蘭43-101的規定。爲此,歷史資源本質上被視爲歷史資源,不應作爲當前的礦產資源估算。儘管管理層認爲歷史資源可能表明礦牀上存在礦化作用,但就NI 43-101而言,合格人員尚未完成足夠的工作,無法將歷史礦產估算值歸類爲當前的礦產資源估計值,PNRL沒有將歷史礦產估算值視爲當前的礦產資源估計。

About Premium Nickel Resources Ltd.

關於優質鎳資源有限公司

PNRL is a mineral exploration and development company that is focused on the redevelopment of the previously producing nickel, copper and cobalt resources mines owned by the Company in the Republic of Botswana. We are driven by our belief that the demand for these metals will continue to grow in the medium to long term, as a result of global urbanization and the increasing adoption of electric motors over internal combustion engines. These metals are vital for achieving a low-carbon future.

PNRL是一家礦產勘探和開發公司,專注於重建該公司在博茨瓦納共和國擁有的先前生產的鎳、銅和鈷資源礦。我們堅信,由於全球城市化以及越來越多地採用電動機而不是內燃機,對這些金屬的需求將在中長期內繼續增長。這些金屬對於實現低碳未來至關重要。

PNRL is committed to governance through transparent accountability and open communication within our team and our stakeholders. Our skilled team has worked over 100 projects collectively, accumulating over 400 years of resource discoveries, mine development and mine re-engineering experience on projects like the Company's Selebi and Selkirk mines. PNRL's senior team members have on average more than 20 years of experience in every single aspect of mine discovery and development, from geology to operations.

PNRL致力於通過透明的問責制以及我們團隊和利益相關者內部的公開溝通來進行治理。我們熟練的團隊共參與了100多個項目,在公司的Selebi和Selkirk礦等項目上積累了400多年的資源發現、礦山開發和礦山再造經驗。從地質學到運營,PNRL的高級團隊成員在礦山發現和開發的各個方面平均擁有超過20年的經驗。

ON BEHALF OF THE BOARD OF DIRECTORS

代表董事會

Keith Morrison
Director and Chief Executive Officer
Premium Nickel Resources Ltd.

基思·莫里森
董事兼首席執行官
優質鎳資源有限公司

For further information about Premium Nickel Resources Ltd., please contact:
Jaclyn Ruptash
Vice President, Communications and Government and Investor Relations
+1 (604) 770-4334

有關Premium Nickel Resources Ltd. 的更多信息,請聯繫:
Jaclyn Ruptash
溝通、政府和投資者關係副總裁
+1 (604) 770-4334

Cautionary Note Regarding Forward-Looking Statements:

關於前瞻性陳述的警示說明:

This news release contains "forward-looking information" within the meaning of applicable Canadian securities legislation based on expectations, estimates and projections as at the date of this news release. Forward-Looking information involves risks, uncertainties and other factors that could cause actual events, results, performance, prospects and opportunities to differ materially from those expressed or implied by such forward-looking information. Forward-Looking information in this news release includes, but is not limited to: the ability of the Company to implement its drilling, geoscience and metallurgical work on its properties and work plans generally; the implementation of the objectives, goals and future plans of the Company including the proposed advancement of the Selebi Mines as currently contemplated; the ability of exploration activities (including drill results) to accurately predict mineralization; management's belief that the Selebi and Selebi North deposits may be connected at depth; the timing to release of the remaining assay results; the ability of the Company to implement its drilling, geoscience and metallurgical work on its properties and work plans generally; the implementation of the objectives, goals and future plans of the Company including the proposed advancement of the Selebi Mines as currently contemplated; the ability of the Company to define mineral resource estimates on the Selebi Mines in accordance with NI 43-101 and/or obtain an updated MRE in respect of the Selebi Mines; the productivity rates for underground drilling at Selebi North; drilling results confirming the legacy fold pattern continues at depth; the effective targeting activities proposed by the Company; the ability to identify mineralization down plunge of existing workings and the ability of such findings to be used to complete a MRE; the ability and timing of advancing the underground drilling program at Selebi North as contemplated (if at all); the results of the drill program on Selebi North and the timing and disclosures of the Company regarding same; the relationships between, and continuity of, the various deposits (if any); the benefits of the Company's approach to exploration; management's belief that the Historic Resource could be indicative of the presence of mineralization on the deposits; and the anticipated benefits of the Company's approach to the resource development plan. These forward-looking statements, by their nature, require the Company to make certain assumptions and necessarily involve known and unknown risks and uncertainties that could cause actual results to differ materially from those expressed or implied in these forward-looking statements. Factors that could cause actual results to differ materially from such forward-looking information include, but are not limited to, capital and operating costs varying significantly from estimates; the preliminary nature of metallurgical test results; the ability of exploration results to predict mineralization or the feasibility of mine production; delays in obtaining or failures to obtain required governmental, environmental or other project approvals; uncertainties relating to the availability and costs of financing needed in the future; changes in equity markets; inflation; fluctuations in commodity prices; delays in the development of projects; the other risks involved in the mineral exploration and development industry; and those risks set out in the Company's public disclosure record on SEDAR+ () under PNRL's issuer profile. Although the Company believes that the assumptions and factors used in preparing the forward-looking information in this news release are reasonable, undue reliance should not be placed on such information, which only applies as of the date of this news release, and no assurance can be given that such events will occur in the disclosed time frames or at all. The Company disclaims any intention or obligation to update or revise any forward-looking information, whether as a result of new information, future events or otherwise, other than as required by law.

本新聞稿包含適用的加拿大證券立法所指的 “前瞻性信息”,這些信息基於截至本新聞發佈之日的預期、估計和預測。前瞻性信息涉及風險、不確定性和其他因素,這些因素可能導致實際事件、結果、業績、前景和機會與此類前瞻性信息所表達或暗示的內容存在重大差異。本新聞稿中的前瞻性信息包括但不限於:公司就其地產和工作計劃實施鑽探、地球科學和冶金工作的能力;公司宗旨、目標和未來計劃的實施情況,包括目前考慮的塞萊比礦業的擬議進度;勘探活動(包括鑽探結果)準確預測礦化的能力;管理層認爲塞萊比和北塞萊比礦業的看法沉積物可能在深處相連;公佈剩餘化驗結果的時機;公司就其地產和工作計劃開展鑽探、地球科學和冶金工作的能力;公司宗旨、目標和未來計劃的實施情況,包括目前考慮的塞萊比礦業的擬議開發;公司根據NI 43-101確定塞萊比礦山礦產資源估算值和/或獲取有關塞萊比礦的最新MRE報告的能力 Ebi Mines;地下鑽探的生產率爲Selebi North;鑽探結果證實了傳統的深度摺疊模式仍在繼續;公司提議的有效瞄準活動;識別現有工作礦物向下墜落的礦化情況以及利用此類發現完成地下鑽探計劃的能力;按設想推進北塞萊比地下鑽探計劃的能力和時機(如果有的話);Selebi North鑽探計劃的結果以及公司的時間和披露關於相同的;各種之間的關係和連續性礦牀(如果有);公司勘探方法的好處;管理層認爲歷史資源可能表明礦牀上存在礦化作用;以及公司資源開發計劃方法的預期收益。就其性質而言,這些前瞻性陳述要求公司做出某些假設,並且必然涉及已知和未知的風險和不確定性,這些風險和不確定性可能導致實際業績與這些前瞻性陳述中表達或暗示的業績存在重大差異。可能導致實際結果與此類前瞻性信息存在重大差異的因素包括但不限於與估計值相差很大的資本和運營成本;冶金測試結果的初步性質;勘探結果預測礦化或礦山生產可行性的能力;延遲獲得或未能獲得所需的政府、環境或其他項目批准;與未來所需融資的可得性和成本有關的不確定性;權益變動市場;通貨膨脹;大宗商品價格波動;項目開發延遲;礦產勘探和開發行業涉及的其他風險;以及公司根據PNRL發行人簡介在SEDAR+()上的公開披露記錄中列出的風險。儘管公司認爲在本新聞稿中準備前瞻性信息時使用的假設和因素是合理的,但不應過分依賴此類信息,這僅適用於本新聞稿發佈之日,也無法保證此類事件將在披露的時間範圍內發生或根本無法保證。除非法律要求,否則公司不打算或義務更新或修改任何前瞻性信息,無論這些信息是由於新信息、未來事件還是其他原因造成的。

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this news release.

多倫多證券交易所風險投資交易所及其監管服務提供商(該術語在多倫多證券交易所風險投資交易所的政策中定義)均不對本新聞稿的充分性或準確性承擔責任。

Follow Us
X (formally Twitter):
Linked in:
Facebook:

關注我們
X(前身爲推特):
鏈接於:
臉書:


Figure 1: Selebi North: Location of Reported Drill Holes with Underground Infrastructure, Historic Resources, Exploration Targets and modeled BHEM plates.


圖 1:北塞萊比:報告的鑽孔位置,包括地下基礎設施、歷史資源、勘探目標和建模的 BHEM 板塊。


Figure 2: Selebi North: Location of Reported Drill Holes with Underground Infrastructure, Historic Resources and Exploration Targets


圖 2:北塞萊比:報告的鑽孔位置,包括地下基礎設施、歷史資源和勘探目標


Figure 3: Detailed view showing location of drillholes reported and mentioned in this release.


圖 3:顯示本版本中報告和提及的鑽孔位置的詳細視圖。

譯文內容由第三人軟體翻譯。


以上內容僅用作資訊或教育之目的,不構成與富途相關的任何投資建議。富途竭力但無法保證上述全部內容的真實性、準確性和原創性。
    搶先評論