Financial Performance:

財務業績:

  • Ivanhoe Mines reported the highest-ever revenue of $2.7 billion in 2023, up from $2.4 billion in 2022.

  • The year-on-year EBITDA growth of 22% due to increased production and higher realized copper prices resulted in a strong EBITDA of $1.7 billion.

  • The company's net profit for 2023 was $388 million, indicating a 30% increase from the previous year.

  • Ivanhoe maintains a strong financial position with $574 million in cash and low current debt.

  • Despite power issues, the company achieved a robust production of 393,500 tonnes of copper.

  • 艾芬豪礦業報告稱,2023年收入爲27億美元,高於2022年的24億美元,創歷史新高。

  • 由於產量增加和已實現銅價的上漲,息稅折舊攤銷前利潤同比增長22%,從而實現了17億美元的強勁息稅折舊攤銷前利潤。

  • 該公司2023年的淨利潤爲3.88億美元,比上年增長了30%。

  • 艾芬豪保持強勁的財務狀況,擁有5.74億美元的現金和較低的流動債務。

  • 儘管存在電力問題,但該公司還是實現了393,500噸銅的強勁產量。

Business Progress:

業務進展:

  • Kamoa-Kakula generated a commendable $3.5 billion within 15 months of an initial investment of more than $2 billion, marking its third consecutive year of outperformance.

  • With the commissioning of the on-site smelter expected in Q4 of 2024, the company is projecting a decrease in average cash cost over the next five years.

  • The development of Platreef and Kipushi is on track with significant anticipated growth, a testament to the $2 billion invested in growth in 2023.

  • Ivanhoe Mines achieved operational milestones with copper recovery rates at a solid 87% and has launched Project 95 aimed at further increasing the recovery rates.

  • With corrective measures in place to address power issues, the company anticipates a capacity increase from 400,000 tonnes to about 500,000 in the next 4 or 5 years.

  • Ivanhoe Mines is advancing with Phase 3 of their project, significantly ahead of schedule, with the Phase 1 and 2 concentrators already exceeding 10 million tonnes per annum.

  • As part of their future plans, the company is expanding exploration efforts and exploring joint venture partnerships on downstream processing.

  • Kamoa-Kakula在初始投資超過20億美元的15個月內創造了值得稱讚的35億美元,這是其連續第三年表現出色。

  • 預計現場冶煉廠將於2024年第四季度投入使用,該公司預計未來五年的平均現金成本將下降。

  • Platreef和Kipushi的發展已步入正軌,預期將實現可觀的增長,這證明了2023年投資20億美元用於增長。

  • 艾芬豪礦業實現了運營里程碑,銅回收率穩步達到87%,並啓動了旨在進一步提高回收率的95項目。

  • 通過採取糾正措施來解決電力問題,該公司預計在未來四到五年內產能將從40萬噸增加到約50萬噸。

  • 艾芬豪礦業正在大大提前推進其項目的第三階段,第一和第二階段的濃縮廠年產量已超過1,000萬噸。

  • 作爲未來計劃的一部分,該公司正在擴大勘探工作,並探索下游加工方面的合資夥伴關係。

More details: IVANHOE MINES LTD IR

Tips: For more comprehensive details, please refer to the IR website. The article is only for investors' reference without any guidance or recommendation suggestions.

提示:欲了解更多詳情,請訪問投資者關係網站。本文僅供投資者參考,不構成任何投資建議。

譯文內容由第三人軟體翻譯。


以上內容僅用作資訊或教育之目的,不構成與富途相關的任何投資建議。富途竭力但無法保證上述全部內容的真實性、準確性和原創性。
    搶先評論