share_log

Metal Energy Starts Drilling at SourceRock Lithium Brine Project

Metal Energy Starts Drilling at SourceRock Lithium Brine Project

金屬能源開始在SourceRock鋰鹽水項目進行鑽探
newsfile ·  01/16 19:00

Toronto, Ontario--(Newsfile Corp. - January 16, 2024) - Metal Energy Corp. (TSXV: MERG) (OTCQB: MEEEF) (the "Company" or "Metal Energy") is pleased to announce that the planned diamond drill and brine testing program has started at the SourceRock lithium brine project near Thunder Bay, Ontario.

安大略省多倫多--(Newsfile Corp.,2024年1月16日)——金屬能源公司(TSXV:MERG)(場外交易代碼:MEEEF)(the”公司“或”金屬能量“)很高興地宣佈,計劃中的金剛石鑽探和鹽水測試計劃已在安大略省桑德貝附近的SourceRock鋰鹽水項目啓動。

"This is an exciting time for us as we've officially started drilling SourceRock, Ontario's first lithium brine project. Scientific evidence supports the concept that SourceRock has lithium brine potential. We know we have brine; we need to confirm if this brine is enriched with lithium. We will be doing detailed downhole geophysical studies and brine sampling to test for the presence of lithium in solution, while learning the fluid conditions within the rocks that could help us vector into enriched lithium fluid sources. We plan to release results and interpretations as soon as they are available," commented James Sykes, CEO of Metal Energy.

“這對我們來說是一個激動人心的時刻,因爲我們已經正式開始鑽探安大略省的第一個鋰鹽水項目SourceRock。科學證據支持SourceRock具有鋰鹽水潛力的觀點。我們知道我們有鹽水;我們需要確認這種鹽水中是否富含鋰。我們將進行詳細的井下地球物理研究和鹽水採樣,以測試溶液中是否存在鋰,同時了解岩石中的流體狀況,這可能有助於我們進入富集的鋰流體來源。我們計劃在結果和解釋出來後儘快發佈。” 金屬能源首席執行官詹姆斯·賽克斯評論道。

SourceRock Drill Program Details

SourceRock 鑽探計劃詳情

The drill program has been planned for one initial drill hole down to 700 metres to assess the brine and rock characteristics using a suite of downhole geophysical surveys to qualify the brine system within the sedimentary rocks. Water sampling and other tests will then be performed to determine fluid constituents and water flow parameters. Pending the initial drill hole results, the Company is funded for an additional one to two drill holes on the Project.

該鑽探計劃計劃首先鑽一個700米的鑽孔,以評估鹽水和岩石的特徵,使用一系列井下地球物理調查來評估沉積岩中的鹽水系統。然後將進行水採樣和其他測試,以確定流體成分和水流參數。在初步鑽孔結果出來之前,公司將獲得資金在該項目上再進行一到兩個鑽孔。

About the SourceRock Lithium Brine Project

關於 SourceRock 鋰鹽水項目

SourceRock is highly prospective for lithium brines in the Thunder Bay-Nipigon area of northwestern Ontario. The Project is exceptionally large, covering 915 square kilometres (91,477 ha.) within an area measuring approximately 10 to 20 km wide by 95 km long (Figure 1) of the Proterozoic Sibley sedimentary basin, a size equivalent to the World's second largest lithium producing jurisdiction; Chile's Salar de Atacama's Central Salt Belt.

SourceRock在安大略省西北部的桑德貝-尼皮貢地區對鋰鹽水的開發前景非常有希望。該項目規模極大,佔地915平方千米(91,477公頃),位於元古代西布利沉積盆地寬約10至20千米,長95千米(圖1)的區域內,面積相當於世界第二大鋰生產管轄區:智利的阿塔卡馬鹽帶。

The Project has excellent access to infrastructure and capacity that has supported previous exploration programs and mine development, including year-round highway, railroad, and seaport access, with power and natural gas lines crossing the Project.

該項目擁有良好的基礎設施和容量,爲先前的勘探計劃和礦山開發提供了支持,包括全年通用的公路、鐵路和海港通道,以及橫穿該項目的電力和天然氣管線。

For the latest videos from Metal Energy and other Ore Group companies, subscribe to our YouTube channel: youtube.com/@theoregroup.

如需了解來自金屬能源和其他礦石集團公司的最新視頻,請訂閱我們的 YouTube 頻道: youtube.com/ @theoregroup。

About Metal Energy Corp.

關於金屬能源公司

Metal Energy is a battery metal exploration company with two projects in politically stable Canadian jurisdictions; Manibridge (Ni-Cu-Co-PGE) in Manitoba, and SourceRock (Li-Na-K) in Ontario. The Manibridge Project is 85% owned by Metal Energy and 15% owned by Mistango River Resources Inc. (CSE: MIS). SourceRock is subject to earn-in agreement where the Company can acquire 100% exploration rights to the project.

金屬能源是一家電池金屬勘探公司,在政治穩定的加拿大司法管轄區有兩個項目:曼尼托巴省的Manibridge(NI-CU-CO-PGE)和安大略省的SourceRock(Li-Na-K)。Manibridge項目由金屬能源公司持有85%的股權,米斯坦戈河資源公司(CSE:MIS)擁有15%的股權。SourceRock受盈利協議的約束,根據該協議,公司可以獲得該項目的100%的勘探權。

QP Statement

QP 聲明

The technical information contained in this news release has been reviewed and approved by Mike Sweeny, P.Geo., Technical Advisor for Metal Energy, and a Qualified Person as defined in "National Instrument 43-101, Standards of Disclosure for Mineral Projects."

本新聞稿中包含的技術信息已經過金屬能源技術顧問Mike Sweeny的審查和批准,P.Geo.,以及 “National Instrument 43-101,礦業項目披露標準” 中定義的合格人士。

For further information, please contact:

欲了解更多信息,請聯繫:

Metal Energy Corp.
MERG on the TSXV
info@metalenergy.ca

金屬能源公司
在多倫多證券交易所上市 MERG
info@metalenergy.ca

James Sykes, CEO
jsykes@oregroup.ca
306-221-8717

首席執行官詹姆斯·賽克斯
jsykes@oregroup.ca
306-221-8717

Reader Advisory

讀者諮詢

Certain information set forth in this news release contains forward-looking statements or information ("forward-looking ‎statements"), including details about the business of the Company. By their nature, forward-looking statements are subject to numerous risks ‎and uncertainties, some of which are beyond the Company's control, including the impact of general economic conditions, ‎industry conditions, volatility of commodity prices, currency fluctuations, environmental risks, operational risks, competition from ‎other industry participants, stock market volatility. Although the ‎Company believes that the expectations in its forward-looking statements are reasonable, its forward-looking statements have ‎been based on factors and assumptions concerning future events which may prove to be inaccurate. Those factors and ‎assumptions are based upon currently available information. Such statements are subject to known and unknown risks, ‎uncertainties and other factors that could influence actual results or events and cause actual results or events to differ materially ‎from those stated, anticipated or implied in the forward-looking statements. Accordingly, readers are cautioned not to place undue ‎reliance on the forward-looking statements, as no assurance can be provided as to future results, levels of activity or achievements. ‎Risks, uncertainties, material assumptions and other factors that could affect actual results are discussed in our public disclosure ‎documents available at including the Filing Statement dated November 15, 2021. Furthermore, the forward-looking statements contained in this document are made as of ‎the date of this document and, except as required by applicable law, the Company does not undertake any obligation to publicly ‎update or to revise any of the included forward-looking statements, whether as a result of new information, future events or ‎otherwise. The forward-looking statements contained in this document are expressly qualified by this cautionary statement.‎

本新聞稿中列出的某些信息包含前瞻性陳述或信息(”前瞻性陳述“),包括有關公司業務的詳細信息。就其性質而言,前瞻性陳述受許多風險‎and 不確定性影響,其中一些是公司無法控制的,包括總體經濟狀況的影響、‎industry 狀況、大宗商品價格的波動、貨幣波動、環境風險、運營風險、來自‎other 行業參與者的競爭、股市波動。儘管‎Company 認爲其前瞻性陳述中的預期是合理的,但其前瞻性陳述的‎been 是基於有關未來事件的因素和假設,這些因素和假設可能被證明是不準確的。這些因素和‎assumptions 基於目前可用的信息。此類陳述受已知和未知風險、‎uncertainties 和其他因素的影響,這些因素可能會影響實際業績或事件,並導致實際業績或事件與前瞻性陳述中陳述、預期或暗示的結果或事件存在重大差異‎from。因此,提醒讀者不要在前瞻性陳述中使用過度的‎reliance,因爲無法對未來的業績、活動水平或成就提供保證。‎Risks,我們的公開披露中討論了不確定性、重大假設和其他可能影響實際業績的因素‎documents,網址爲 包括日期爲2021年11月15日的申報聲明。此外,本文件中包含的前瞻性陳述自本文件發佈之日起作出,除非適用法律要求,否則公司不承擔任何公開更新或修改所含任何前瞻性陳述的義務,無論是由於新信息、未來事件還是其他原因。本警示聲明對本文件中包含的前瞻性陳述進行了明確限定。

Neither the TSX Venture Exchange Inc. nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

多倫多證券交易所風險交易所及其監管服務提供商(該術語在多倫多證券交易所風險交易所的政策中定義)均不對本新聞稿的充分性或準確性承擔責任。


FIGURE 1 - SourceRock project location map


圖 1-SourceRock 項目位置圖

To view the source version of this press release, please visit

要查看本新聞稿的源版本,請訪問

譯文內容由第三人軟體翻譯。


以上內容僅用作資訊或教育之目的,不構成與富途相關的任何投資建議。富途竭力但無法保證上述全部內容的真實性、準確性和原創性。
    搶先評論