share_log

Carlyle Completes Drill Program at Newton Gold Project

Carlyle Completes Drill Program at Newton Gold Project

凱雷完成牛頓黃金項目的鑽探計劃
newsfile ·  01/11 18:00

Vancouver, British Columbia--(Newsfile Corp. - January 11, 2024) - CARLYLE COMMODITIES CORP. (CSE: CCC) (FSE: BJ4) (OTCQB: CCCFF) ("Carlyle" or the "Company") is pleased to announce the completion of a new diamond drill program at the Newton Project. The drill program completed 840.3 metres of drilling across 7 (seven) drill holes, and successfully tested multiple high priority targets with aims of increasing both tonnage and ounces of gold and silver in the Company's current National Instrument 43-101 - Standards of Disclosure for Mineral Projects ("NI 43-101") Newton Project Resource Calculation. All seven holes have been sampled and sent to Bureau Veritas, an ISO 9001 certified independent lab for analysis. The Company expects to receive initial results in the coming weeks.

不列顛哥倫比亞省溫哥華--(Newsfile Corp.-2024 年 1 月 11 日)- 凱雷大宗商品公司(CSE: CCC) (FSE: BJ4) (OTCQB: CCFF) (”凱雷“或者”公司“)很高興地宣佈,牛頓項目的新金剛石鑽探計劃已經完成。該鑽探計劃在7(七)個鑽孔中完成了840.3米的鑽探,併成功測試了多個高優先級目標,目的是增加該公司目前的National Instrument 43-101的噸位和黃金和白銀的盎司- 礦產項目披露標準 (”在 43-101“) 牛頓項目資源計算。所有七個孔均已取樣並送交必維國際檢驗集團進行分析,這是一家通過ISO 9001認證的獨立實驗室。該公司預計將在未來幾周內獲得初步業績。

Drill Program Overview

鑽探計劃概述

The targets of this 7-hole drill program included surface geochemical gold anomalies, open mineralization, and mineralized volcanic and intrusive rocks from historic distal drilling, with the intention of increasing the NI 43-101 inferred mineral resource, expanding potential higher-grade areas near surface, and exploring potential new zones of mineralization on the property. At the Newton Project, gold is hosted in felsic volcanic, mafic volcanic, and quartz porphyry intrusive rocks. This drill program intersected all of these lithologies in varying degrees of alteration and associated sulphide deposition, and all holes successfully intersected their primary targets.

該7孔鑽探計劃的目標包括地表地球化學金異常、露天礦化以及歷史遠端鑽探產生的礦化火山岩和侵入性岩石,目的是增加NI 43-101推斷的礦產資源,擴大地表附近潛在的更高品位區域,並在該地產上探索潛在的新礦化區域。在牛頓項目,黃金存在於長英質火山、鎂鐵質火山和石英斑岩侵入岩中。該鑽探計劃在不同程度的變化和相關的硫化物沉積中與所有這些巖性相交,所有鑽孔都成功地與其主要目標相交。

Drill Program in Detail

詳細的鑽探計劃

Hole_ID Easting Northing Elevation Azimuth Dip Depth
N23-092 457108 5738816 1321 0 -90 258
N23-093 457130 5739235 1324 0 -90 105
N23-094 457086 5739318 1307 0 -90 109
N23-095 457142 5739312 1310 0 -90 92
N23-096 457218 5739009 1333 0 -90 87
N23-097 456925 5738660 1291 0 -50 135
N23-098 456430 5739111 1276 0 -90 54
hole_ID 向東 北方 海拔 方位角 深度
N23-092 457108 5738816 1321 0 -90 258
N23-093 457130 5739235 1324 0 -90 105
N23-094 457086 5739318 1307 0 -90 109
N23-095 457142 5739312 1310 0 -90 92
N23-096 457218 5739009 1333 0 -90 87
N23-097 456925 5738660 1291 0 -50 135
N23-098 456430 5739111 1276 0 -90 54

Table 1 - Drill collar table

表 1-鑽環表


Figure 1 - Drill Plan Map. Green dots are New Drill Holes, blue dots are Historic Drill Holes.


圖 1-鑽探計劃圖。綠點是新鑽孔,藍點是歷史鑽孔。

Hole N23-092

洞 N23-092

Hole N23-092 was drilled 50 metres north of hole 10016 where the inferred mineral resource remains open to the northwest along a broad corridor. The hole was drilled to a depth of 258 m and intersected strongly altered quartz feldspar porphyries intruding altered felsic volcanic rocks with disseminated and fracture-controlled pyrite.

N23-092 洞是在 10016 號洞以北 50 米處鑽出的,那裏推斷出的礦產資源沿着一條寬闊的走廊向西北開放。鑽孔深度爲 258 m,與強烈變化的石英長石斑岩相交,這些斑岩侵入了經過浸染和裂縫控制的黃鐵礦,侵入了變化的長英質火山岩。

Holes N23-093, N23-094, and N23-095

N23-093、N23-094 和 N23-095 孔

Holes N23-093, 94, and 95 were drilled approximately 350 - 450m north of the NI 43-101 inferred mineral resource boundary, around historical hole 10030. Hole 10030 intersected 24 metres of 0.83 g/t Au from 18.0 - 42.0 metres in propylitic altered mafic volcanics associated with an IP chargeability anomaly. As such, this area represents a potential higher grade near surface area of significant interest.

在 NI 43-101 推斷的礦產資源邊界以北大約 350 至 450 米處,在歷史上的 10030 號洞附近,鑽探了 N23-093、94 和 95 號洞。在與氣相電荷性異常相關的丙質巖蝕變基質火山岩中,10030號洞從18.0至42.0米處與24米的0.83克/噸金相交。因此,該區域代表着潛在的更高品位的近地表區域,具有重大意義。

The Company drilled three holes around hole 10030, triangulating 50m step outs to the northeast, southwest, and northwest of this hole to investigate possible continuation of this mineralization. These holes were also plotted based on gold-in-soil geochemical anomalies and elevated IP chargeability anomalies proximal to hole 10030. All three holes intersected propylitic altered mafic volcanics with disseminated and fracture-controlled sulphides from surface to the approximate total depth of 100m in each hole.

該公司在10030號孔周圍鑽了三個洞,在該洞的東北、西南和西北方向對50米的臺階進行了三角測量,以調查這種礦化的可能延續。這些孔洞也是根據土壤中的金地球化學異常和10030號孔附近高的 IP 可充電性異常繪製的。所有三個孔洞都與丙質巖改變的鐵質火山岩相交,從地表到每個孔的總深度約爲100米。

Hole N23-096

洞 N23-096

Hole N23-096 was drilled more than 100 meters north of the inferred mineral resource where historic trenching, rock and soil sampling all returned significant gold values at surface. The hole was drilled to 87 metres and intersected very strongly altered felsic volcanics with disseminated and fracture-controlled sulphides to a depth of 24 metres. The hole cut altered mafic volcanics from 24 to the total length of 87 metres, including small metre scale felsic intrusive.

N23-096 洞是在推斷的礦產資源以北 100 多米處鑽探的,那裏的歷史挖溝、岩石和土壤採樣均在地表返回了可觀的金值。該洞鑽至87米,與變化非常強烈的長英質火山岩與浸染和裂縫控制的硫化物相交,深度爲24米。該洞切口使黑鐵質火山岩的總長度從24米變爲87米,包括小米尺度的長英質侵入體。

Hole N23-097

洞 N23-097

Hole N23-097 was drilled immediately west of the inferred mineral resource where mineralization is open and begins at surface, demonstrated in historic trenching and drilling. The hole was drilled to a depth of 135 metres and intersected strongly altered quartz feldspar porphyry with disseminated and fracture-controlled sulphides as pyrite - chalcopyrite ± sphalerite veinlets.

N23-097 孔是在推斷的礦產資源以西鑽探的,那裏的礦化是開放的,始於地表,歷史上的挖溝和鑽探就證明了這一點。鑽孔深度達到 135 米,與強烈變化的石英長石斑岩相交,其中浸染和裂縫控制的硫化物如黃鐵礦——黃銅礦 ± 閃鋅礦脈。

Hole N23-098

洞 N23-098

Hole N23-098 was drilled 750 meters northwest of the inferred mineral resource targeting a gold-in-soil geochemical anomaly proximal to historic drill holes that intersected felsic volcanics and quartz feldspar porphyry. This hole was drilled to 54.0 metres and intersected altered quartz feldspar porphyry with disseminate and vein hosted pyrite.

N23-098 洞是在推斷的礦產資源西北 750 米處鑽探的,目標是與長英質火山岩和石英長石斑岩相交的歷史鑽孔附近的土壤中的金地球化學異常。這個洞鑽到了 54.0 米,與經過變化的石英長石斑岩與擴散和礦脈託管的黃鐵礦相交。

Management Comments

管理層評論

Mr. Morgan Good, President and Chief Executive Officer, commented: "We are very pleased with this efficient 7-hole drill program and the professional work of our team. All holes successfully intersected our primary targets. We look forward to our results and continuing to advance the Newton project in 2024."

總裁兼首席執行官摩根·古德先生評論說: “我們對這種高效的7孔鑽探計劃和我們團隊的專業工作感到非常滿意。所有洞都成功地穿過了我們的主要目標。我們期待取得成果,並在2024年繼續推進牛頓項目。

Mr. Jeremy Hanson, VP of Exploration, stated: "We are excited about the holes we completed, there was a lot of productive activity completed in a short time frame. The drill team tested a variety of high potential targets where much of the core contained strongly altered rocks, disseminated and veined sulphides. We are certainly looking forward to our results and getting back on the ground."

勘探副總裁傑里米·漢森先生表示: “我們對自己完成的鑽孔感到興奮,在短時間內完成了許多富有成效的活動。鑽探小組測試了各種高潛力目標,其中大部分岩心含有強烈變化的岩石、浸染和脈狀硫化物。我們當然期待取得成績並重返實地。”

Newton Gold Project Summary

牛頓黃金項目摘要

The Newton Gold Project contains a current NI 43-101 resource calculation effective June 13, 2022 (the "Updated Newton Resource Calculation"), which utilizes optimized pit shell constraints to fulfil the requirement for "reasonable prospects for eventual economic extraction". The inferred mineral resource contains 861,400 oz of Au, and 4,678,000 oz of Ag with an average grade of 0.63 g/t Au, a cut off of 0.25 g/t Au throughout 42,396,600 tonnes.

牛頓黃金項目包含自2022年6月13日起生效的最新NI 43-101資源計算結果(”更新了牛頓資源計算“),它利用優化的礦殼限制來滿足 “最終經濟開採的合理前景” 的要求。推斷出的礦產資源含有861,400盎司的金和4,678,000盎司的銀,平均品位爲0.63克/噸金,在42,396,600噸中,截止金爲0.25克/噸。

The Newton Gold Project deposit remains open in multiple directions with potential for increased size, grade, and additional mineralized areas. The current inferred mineral resources occupy only approximately 7% of the area of an underlying broad induced polarization ("IP") anomaly. Immediate areas for follow up include south and southwest of the current inferred mineral resource, where historic drilling has intercepted mineralized volcanics, which are not part of the Updated Newton Resource Calculation, as well as down dip to the southwest, where the mineralization remains open. Much of the large Newton Gold Project sulphide-bearing alteration zone, as defined by Amarc Resources Ltd.'s ("Amarc") 2010 IP survey, has not been thoroughly explored. The Newton Gold Project gold deposit lies within a northwest trending total field magnetic low that extends approximately 500 m to the northwest beyond the deposit as defined by the densest drilling, to an area where the few exploration holes returned geologically important intersections of greater than 100 ppb (0.1 g/t) Au, such as hole 92-03 that returned 54 m grading 0.50 g/t Au including 30 m grading 0.70 g/t Au, and hole 10023 that returned 39 m at 1.21 Au, indicating potential to host additional resources. In addition, to the north, mineralization in hole 12076 has not been fully explored and in the south, the mineralized intervals in hole 12086 are indicative of resource potential in this vicinity.

牛頓金礦項目礦牀仍向多個方向開放,有可能擴大規模、品位並增加礦化區域。目前推斷的礦產資源僅佔潛在廣泛誘導極化面積的7%左右(”IP“) 異常。需要後續關注的直接區域包括當前推斷的礦產資源的南部和西南部,那裏的歷史鑽探已經攔截了礦化火山,這些火山岩不屬於更新後的牛頓資源計算的一部分,以及向西南傾角,那裏的礦化區仍處於開放狀態。根據Amarc Resources Ltd.的定義,牛頓黃金項目的大部分含硫化物蝕變帶。”s (”Amarc“) 2010年知識產權調查,尚未得到徹底探討。Newton Gold Project金礦位於西北方向的總磁場磁低點內,該低點向西北延伸約500米,超出最密集的鑽探所定義的礦牀,到達該區域,少數勘探孔返回了超過100 ppb(0.1 g/t)金的重要地質交叉點,例如返回54米金品位爲0.50 g/t Au的92-03號洞,含金品位爲0.70 g/t 的30 m,以及返回39克/噸金的10023號孔 m 爲1.21 Au,表明有可能容納更多資源。此外,在北部,12076號孔的礦化尚未得到充分勘探,在南部,12086號孔的礦化間隔表明了該附近的資源潛力。

Project Highlights

項目亮點

  • The Newton Gold Project is a large, bulk tonnage, low - to intermediate-sulphidation, epithermal gold deposit with nearly 35,000 m of drilling exploring and developing the historical resource, primarily between 2009-2012.
  • Updated pit-constrained inferred mineral resource contains 861,400 oz of Au, and 4,678,000 oz of Ag with an average grade of 0.63 g/t Au, a cut off of 0.25 g/t Au throughout 42,396,600 tonnes.
  • The Newton Gold Project encompasses more than 24,000 ha.
  • The Updated Newton Resource Calculation occurs within an 800 x 400 m area defined by drilling to depths of approximately 500 m with majority of the holes not exceeding 300 m depth.
  • Underlying the deposit, a large IP anomaly measures 4 km x 2 km and covers an area greater than 7 km2 - yet the existing inferred mineral resource occupies slightly over 0.5 km2 or just 7% of the anomaly.
  • Gold and associated base metal mineralization precipitated in extensive zones of strong quartz-sericite alteration as well as in mafic volcanic and clastic sedimentary rocks and along fault and fracture zones.
  • The alteration assemblages and metal associations at the Newton Gold Project are similar to the Blackwater gold project deposit of Artemis Gold Inc. ("Artemis"). The Blackwater gold project, which is in construction phase, is located approximately 185 km northeast of Newton, where it is one of Canada's largest open-pitable gold deposits and one of the world's largest environmental assessment approved gold development projects. Blackwater has a measured + indicated resource estimated at 11.7 million ounces Au and 122 million ounces of Ag (see Artemis' "Blackwater Gold Project British Columbia NI 43-101 Technical Report on Updated Pre-Feasibility Study", authored by Robin Kalanchey, et al., September 10, 2021; ).
  • 牛頓金礦項目是一個大型散裝噸位、低至中度硫化的超成熱液金礦牀,有近 35,000 米的鑽探 探索和開發歷史資源,主要是在2009-2012年之間。
  • 更新的礦坑限制推斷礦產資源含有861,400盎司的金和4,678,000盎司的銀,平均品位爲0.63克/噸金,在42,396,600噸中,截止金爲0.25克/噸。
  • 牛頓黃金項目佔地超過24,000公頃。
  • 更新的牛頓資源計算在 800 x 400 m 的區域內進行 其定義是鑽到大約 500 米的深度,大多數孔的深度不超過 300 米。
  • 在礦牀下方,一個大型 IP 異常面積爲 4 km x 2 km,覆蓋面積大於 7 km2 -然而,現有的推斷礦產資源佔地略超過0.5千米2 或者只是 7% 的異常現象。
  • 金和相關的賤金屬礦化沉澱在廣闊的強石英-絲綢巖蝕變區以及鎂鐵質火山和碎屑沉積岩中以及斷層和斷裂帶沿線。
  • 牛頓金礦項目的蝕變組合和金屬關聯與Artemis Gold Inc.的黑水金礦項目礦牀相似。(”阿耳忒彌斯“)。Blackwater黃金項目處於施工階段,位於牛頓東北約185公里處,是加拿大最大的露天金礦牀之一,也是世界上最大的環境評估批准的黃金開發項目之一。Blackwater的測定+指示資源量估計爲1170萬盎司金和1.22億盎司銀(見Artemis的””Blackwater Gold Project 不列顛哥倫比亞省 NI 43-101 最新預可行性研究的技術報告“,由羅賓·卡蘭奇等人撰寫,2021年9月10日;)。

A copy of Carlyle's NI 43-101 compliant "Technical Report on the Updated Mineral Resources Estimate for the Newton Project, Central British Columbia, Canada" dated June 13, 2022 authored by Michael F. O'Brien, P.Geo., and Douglas Turnbull, P.Geo., which contains the Updated Newton Resource Calculation, is available under Carlyle's profile on SEDAR+.

由P.Geo的邁克爾·奧布賴恩和P.Geo的道格拉斯·特恩布爾於2022年6月13日撰寫的符合北愛爾蘭43-101標準的《加拿大不列顛哥倫比亞省中部牛頓項目最新礦產資源估算技術報告》的副本可在凱雷在SEDAR上的簡介下查閱+

Quality Assurance/Quality Control

質量保證/質量控制

Carlyle Commodities has applied a rigorous quality assurance/quality control program at the Newton Project using best industry practice. All core was logged by a geoscientist. The Newton Project drill core was drilled at NQ diameter. The drill core was split in half using a core saw and each sample half was placed in a marked sample bag with corresponding sample tag then sealed. The remaining half core is retained in core boxes that are stored in a secure facility. The chain of custody of samples was recorded and maintained for all samples from the drill to the laboratory. All samples were shipped to an ISO 9001 certified independent laboratory. A minimum of 5% of certified reference samples and duplicates were inserted into the sample sequence.

凱雷商品使用最佳行業實踐在牛頓項目中應用了嚴格的質量保證/質量控制計劃。所有核心都是由一位地球科學家記錄的。牛頓項目的鑽芯鑽孔直徑爲 NQ。使用巖芯鋸將鑽芯分成兩半,並將每個樣品一半放入帶有相應樣品標籤的有標記的樣品袋中,然後密封。剩餘的一半核心保留在存儲在安全設施中的核心盒中。記錄並維持了從鑽機到實驗室的所有樣本的監管鏈。所有樣品均運往經ISO 9001認證的獨立實驗室。在樣本序列中插入了至少 5% 的認證參考樣本和副本。

Qualified Person

合格人員

Jeremy Hanson, P.Geo. a Qualified Person, as such term is defined by NI 43-101, has reviewed the scientific and technical information that forms the basis for this news release and has approved the disclosure herein. Historical information contained in this news release cannot be relied upon. Mr. Hanson has not prepared nor verified the historical information.

傑里米·漢森,P.Geo. “合格人士”,該術語由NI 43-101定義,他審查了構成本新聞稿基礎的科學和技術信息,並批准了此處的披露。本新聞稿中包含的歷史信息不可信賴。漢森先生沒有準備或覈實歷史信息。

About Carlyle

關於凱雷

Carlyle is a mineral exploration company focused on the exploration and development of its 100% owned Newton Gold Project, located in the Clinton Mining Division of B.C. The Company is listed on the CSE under the symbol "CCC".

凱雷是一家礦產勘探公司,專注於勘探和開發其100%股權的牛頓金礦項目,該項目位於不列顛哥倫比亞省克林頓礦業部。該公司在CSE上市,股票代碼爲 “CCC”。

ON BEHALF OF THE BOARD OF DIRECTORS OF
CARLYLE COMMODITIES CORP.

代表董事會
凱雷大宗商品公司

"Morgan Good"

“摩根古德”

Morgan Good

摩根古德

President and Chief Executive Officer

總裁兼首席執行官

For more information regarding this news release, please contact:

有關本新聞稿的更多信息,請聯繫:

Morgan Good, CEO and Director
T: 604-715-4751
E: morgan@carlylecommodities.com
W:

摩根·古德,首席執行官兼董事
T: 604-715-4751
E: morgan@carlylecommodities.com
W:

Cautionary Note Regarding Forward-Looking Statements

關於前瞻性陳述的警示說明

This release includes certain statements and information that may constitute forward-looking information within the meaning of applicable Canadian securities laws. All statements in this news release, other than statements of historical facts, including statements regarding future estimates, plans, objectives, timing, assumptions or expectations of future performance, including without limitation, statements regarding the impact of the drilling program on the current inferred mineral resource for the Newton Gold Project, the Company's expected timeline for receipt of the initial results of the lab analysis of the drill program and the Company's plans to continue to advance the Newton project in 2024 are forward-looking statements and contain forward-looking information. Generally, forward-looking statements and information can be identified by the use of forward-looking terminology such as "intends" or "anticipates", or variations of such words and phrases or statements that certain actions, events or results "may", "could", "should" or "would" or occur.

本新聞稿包括某些陳述和信息,這些陳述和信息可能構成適用的加拿大證券法所指的前瞻性信息。除歷史事實陳述外,本新聞稿中的所有陳述,包括有關未來估計、計劃、目標、時機、假設或未來業績預期的陳述,包括但不限於關於鑽探計劃對牛頓金礦項目當前推斷礦產資源的影響、公司收到鑽探計劃實驗室分析初步結果的預期時間表以及公司在2024年繼續推進牛頓項目的計劃的陳述,均具有前瞻性陳述幷包含前瞻性信息。通常,前瞻性陳述和信息可以通過使用諸如 “打算” 或 “預期” 之類的前瞻性術語來識別,或者某些行爲、事件或結果 “可能”、“應該” 或 “將” 或發生的此類詞語和短語的變體或陳述。

Forward-Looking statements are based on certain material assumptions and analysis made by the Company and the opinions and estimates of management as of the date of this press release, including, without limitation, that the phase 2 drill program will impact the inferred mineral resource calculation for the Newton Gold Project as anticipated, that there will be no adverse changes in legislation, policies, or rules that impact the Company's ability to continue to pursue its business objectives as expected, that the Company will not come across any land access, environmental or social issues that impact its business plans, that the Company will have access to the resources required to continue to advance the Newton project in 2024 and to complete the lab analysis for the drill program and that the Company will receive the initial results of the lab analysis in the expected timeframe.

前瞻性陳述基於公司做出的某些重大假設和分析,以及管理層截至本新聞稿發佈之日的觀點和估計,包括但不限於第二階段鑽探計劃將影響牛頓金礦項目的推斷礦產資源計算,立法、政策或規則不會發生影響公司繼續按預期實現其業務目標的能力的不利變化,公司不會遇到任何此類變化陸地准入,影響其業務計劃的環境或社會問題,公司將獲得在2024年繼續推進牛頓項目所需的資源,完成鑽探計劃的實驗室分析,以及公司將在預期的時間範圍內收到實驗室分析的初步結果。

These forward-looking statements are subject to known and unknown risks, uncertainties and other factors that may cause the actual results, level of activity, performance, or achievements of the Company to be materially different from those expressed or implied by such forward-looking statements or forward-looking information. Important factors that may cause actual results to vary, include, without limitation: that the drill program will not impact the Company's current inferred mineral resource estimate as anticipated or at all; that managements hypotheses for mineralization on the Newton Gold Project is incorrect; general business, economic and social uncertainties; the Company's failure to secure the resources required to continue to advance the Newton Project as currently planned or to complete the lab analysis of the drill program as anticipated, or at all; unanticipated delays in the completion of the lab analysis of the drill program; the loss of key personnel; unanticipated costs; adverse litigation, legislative, environmental, and other judicial, regulatory, political, and competitive developments; and other risks outside of the Company's control. Further, labour shortages, high energy costs, inflationary pressures, rising interest rates, the global financial climate and the conflict in Ukraine, Israel and Palestine and surrounding regions are some additional factors that are affecting current economic conditions and increasing economic uncertainty, which may impact the Company's operating performance, business plans, financial position, and future prospects. Although management of the Company has attempted to identify important factors that could cause actual results to differ materially from those contained in forward-looking statements or forward-looking information, there may be other factors that cause results not to be as anticipated, estimated, or intended. There can be no assurance that such statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on forward-looking statements and forward-looking information. These forward-looking statements are made as of the date of this news release and, unless required by applicable law, the Company assumes no obligation to update these forward-looking statements.

這些前瞻性陳述受已知和未知風險、不確定性和其他因素的影響,這些因素可能導致公司的實際業績、活動水平、業績或成就與此類前瞻性陳述或前瞻性信息所表達或暗示的結果存在重大差異。可能導致實際結果變化的重要因素包括但不限於:鑽探計劃不會像預期的那樣影響公司目前推斷的礦產資源估計;管理層對牛頓金礦項目的礦化假設不正確;總體業務、經濟和社會不確定性;公司未能獲得繼續按目前計劃推進牛頓項目所需的資源或按預期完成鑽探計劃的實驗室分析,或全部;意想不到的延遲完成對鑽探計劃的實驗室分析;關鍵人員的流失;意外成本;不利訴訟、立法、環境和其他司法、監管、政治和競爭發展;以及公司無法控制的其他風險。此外,勞動力短缺、高能源成本、通貨膨脹壓力、利率上升、全球金融環境以及烏克蘭、以色列和巴勒斯坦及周邊地區的衝突是影響當前經濟狀況和增加經濟不確定性的其他因素,可能會影響公司的經營業績、商業計劃、財務狀況和未來前景。儘管公司管理層試圖確定可能導致實際業績與前瞻性陳述或前瞻性信息中包含的業績存在重大差異的重要因素,但可能還有其他因素導致業績與預期、估計或預期不符。無法保證此類陳述會被證明是準確的,因爲實際結果和未來事件可能與此類陳述中的預期存在重大差異。因此,讀者不應過分依賴前瞻性陳述和前瞻性信息。這些前瞻性陳述自本新聞稿發佈之日起作出,除非適用法律要求,否則公司沒有義務更新這些前瞻性陳述。

Neither the CSE nor its Market Regulator (as that term is defined in the policies of the CSE) accepts responsibility for the adequacy or accuracy of this release.

CSE及其市場監管機構(該術語在CSE的政策中定義)均不對本新聞稿的充分性或準確性承擔責任。

To view the source version of this press release, please visit

要查看本新聞稿的源版本,請訪問

譯文內容由第三人軟體翻譯。


以上內容僅用作資訊或教育之目的,不構成與富途相關的任何投資建議。富途竭力但無法保證上述全部內容的真實性、準確性和原創性。
    搶先評論