share_log

Sun Summit Signs Definitive Option Agreement to Acquire the JD Project in the Toodoggone Gold-Copper District, North-Central B.C.

Sun Summit Signs Definitive Option Agreement to Acquire the JD Project in the Toodoggone Gold-Copper District, North-Central B.C.

Sun Summit 簽署了收購位於不列顛哥倫比亞省中北部圖多貢金銅區的京東項目的最終期權協議
newsfile ·  01/09 20:00

Vancouver, British Columbia--(Newsfile Corp. - January 9, 2024) - Sun Summit Minerals Corp. (TSXV: SMN) (OTCQB: SMREF) (the "Company" or "Sun Summit") is pleased to announce, further to the Company's news release dated November 9, 2023, that it has entered into a definitive option agreement (the "Option Agreement") with Victor F. Erickson, V.F. Erickson Consultants Limited and T. Cameron Scott (collectively, the "Optionors"), arm's length parties to the Company, to acquire a 100% interest in the JD Project in the Toodoggone gold-copper district in north-central British Columbia.

不列顛哥倫比亞省溫哥華--(Newsfile Corp.,2024年1月9日)——太陽山美礦業公司(TSXV:SMN)(場外交易代碼:SMREF)(“公司” 或 “太陽峯會”)欣然宣佈,繼公司於2023年11月9日發佈新聞稿之後,它已與埃裏克森顧問有限公司維克多·埃裏克森簽訂了最終期權協議(“期權協議”)和公司保持距離的T. Cameron Scott(統稱 “期權持有人”)將收購位於中北部Toodogone金銅區的京東項目的100%權益不列顛哥倫比亞省

Highlights:

亮點:

  • Significant mineralization in the prolific Toodoggone mining district: The 15,000 hectare JD Project contains numerous under-explored epithermal-related gold-silver targets as well as porphyry-related copper-gold targets.
  • High-grade gold and silver mineralization in historic drill holes: Results from historical drill programs highlight the high-grade gold and silver potential of near-surface epithermal systems. Select historical drilling results include the following:
    • 35.7 m* of 7.26 g/t Au including 1 m of 215.4 g/t Au (JD95-0471, Finn Zone),
    • 77 m of 2.4 g/t Au including 12.6 m of 10.8 g/t Au (JD12-0032, Finn Zone),
    • 22.0 m of 12.5 g/t Au including 0.8 m of 171.5 g/t Au (JD95-0641, Finn Zone),
    • 22.0 m of 11.7 g/t Au including 4.0 m of 61.2 g/t Au (CZ97-0083, Creek Zone).
  • Strong discovery potential at multiple targets: Historical rock sampling across the Finn to Creek corridor yielded encouraging high-grade gold-silver results, including:
    • 35.4 g/t Au and 44.8 g/t Ag at the Wolf target (sample 17102554),
    • 18.9 g/t Au and 300 g/t Ag at the Schmitt target (sample 17102564),
    • 14.8 g/t Au and 910 g/t Ag at the Ag Carbonate target (sample 17105294).
  • Porphyry-related copper-gold discovery potential: Numerous porphyry-related targets have been identified and represent significant potential for copper-gold mineralization, including one historic drill hole that bottomed in 0.46% Cu over 1.4 m (JD-13-0254).
  • Diversified and expanded project portfolio: The JD Project provides the Company with an exciting opportunity to explore two projects in a mining-friendly jurisdiction while providing shareholders exposure to new discoveries and ongoing value creation.
  • 多產的圖多貢礦區的顯著礦化: 佔地15,000公頃的京東項目包含許多未開發的與表熱相關的金銀目標以及與斑岩相關的銅金目標。
  • 歷史鑽孔中的高品位金銀礦化: 歷史鑽探計劃的結果突顯了近地表超熱系統的高品位金和銀潛力。選擇歷史鑽探結果包括以下內容:
    • 35.7 m* 的 7.26 g/t Au 包括 1 m 的 215.4 g/t Au (JD95-047)1,芬蘭區),
    • 77 m 的 2.4 g/t Au 包括 12.6 m 的 10.8 g/t Au (JD12-003)2,芬蘭區),
    • 22.0 m 的 12.5 g/t Au 包括 0.8 m 的 171.5 g/t Au (JD95-064)1,芬蘭區),
    • 22.0 m 的 11.7 g/t Au 包括 4.0 m 的 61.2 g/t Au (CZ97-0083,溪區)。
  • 在多個目標上有很強的發現潛力: 從芬蘭到克里克走廊的歷史岩石採樣得出了令人鼓舞的高品位金銀結果,包括:
    • 35.4 g/t Au 和 44.8 g/t Ag 在狼的目標處(樣本 1710255)4),
    • 18.9 g/t Au 和 300 g/t Ag 在施密特目標處(樣本 1710256)4),
    • 14.8 g/t Au 和 910 g/t Ag 在碳酸銀目標(樣本 1710529)處4)。
  • 與斑岩相關的銅金髮現潛力: 已經確定了許多與斑岩相關的目標,這些目標代表着銅金礦化的巨大潛力,其中包括一個歷史性的鑽孔 在 1.4 米以內以 0.46% 的銅量觸底 (JD-13-0254)。
  • 多元化和擴展的項目組合: 京東項目爲公司提供了一個激動人心的機會,可以在礦業友好型司法管轄區探索兩個項目,同時讓股東有機會接觸新發現和持續的價值創造。

* Note intervals are downhole core lengths. True widths are unknown.

* 注意間隔是井下岩心長度。真實寬度未知。

Sharyn Alexander, Sun Summit's President, stated: "This acquisition provides the Company with an excellent opportunity to expand and diversify its position in district-scale gold and copper exploration in British Columbia. The JD Project shows notable epithermal gold and silver mineralization, as well as potential for porphyry-related copper and gold systems, in an area that has been underexplored. We look forward to beginning work on JD, which will include a robust data compilation and review to define and rank high-priority exploration targets. In addition, we look forward to advancing our flagship Buck Project, which we intend to advance to an initial Mineral Resource Estimate early next year."

Sun Summit總裁莎琳·亞歷山大表示:“此次收購爲公司提供了擴大和多元化其在不列顛哥倫比亞省地區規模金銅勘探中的地位的絕佳機會。京東項目顯示出顯著的超熱液金和銀礦化作用,以及與斑岩相關的銅和金系統的潛力,該地區還存在開發不足的區域。我們期待着開始京東方面的工作,這將包括健全的數據彙編和審查,以定義和排名高優先級的勘探目標。此外,我們期待推進我們的旗艦巴克項目,我們打算在明年初將其推進到初步的礦產資源估算。”

JD Project Overview

京東項目概述

The JD Project comprises over 15,000 hectares of contiguous mineral claims in the prolific Toodoggone gold-copper mineral district in north-central British Columbia. The project is adjacent to Thesis Gold's Lawyers and Ranch projects, north of TDG Gold's Baker project, and near the historic Kemess copper-gold mining camp controlled by Centerra Gold.

京東項目包括位於不列顛哥倫比亞省中北部多產的Toodogone金銅礦區超過15,000公頃的連續礦產主張。該項目毗鄰Thesis Gold的律師和牧場項目,位於TDG Gold的貝克項目以北,靠近由Centerra Gold控制的歷史悠久的Kemess銅金採礦營地。

The JD project is host to epithermal-related gold-silver systems and porphyry-related copper-gold systems (Figure 1). Historic exploration across the project has included drilling, soil geochemistry and project-wide geophysics. Numerous high-priority targets are under-explored.

JD 項目是與表熱相關的金銀系統和與斑岩相關的銅金系統的宿主(圖 1)。整個項目的歷史勘探包括鑽探、土壤地球化學和整個項目的地球物理學。許多高度優先的目標尚未得到充分探索。


Figure 1: JD Project Overview


圖 1:京東項目概述

Most of the historic drilling was focused on the Finn target where a broad zone of near-surface, epithermal related gold-silver mineralization, hosted primarily in the hanging wall along a gently north-dipping fault, was defined. Highlights from historic drilling at the Finn target include:

歷史上的大部分鑽探都集中在芬蘭的目標上,該目標定義了廣闊的近地表、超熱液相關金銀礦化區域,主要位於緩向北傾斜的斷層沿線的懸壁中。芬蘭目標歷史性鑽探的亮點包括:

  • 35.7 m of 7.26 g/t Au including 1 m of 215.4 g/t Au (JD95-0471),
  • 77.0 m of 2.4 g/t Au including 12.6 m of 10.8 g/t Au (JD12-0032),
  • 22.0 m of 12.5 g/t Au including 0.8m of 171.5 g/t Au (JD95-0641),
  • 91 m of 1.0 g/t Au (JD12-0092) in the under-explored Finn zone foot wall.
  • 35.7 m 的 7.26 g/t Au 包括 1 m 的 215.4 g/t Au (JD95-047)1),
  • 77.0 m 的 2.4 g/t Au 包括 12.6 m 的 10.8 g/t Au (JD12-003)2),
  • 22.0 m 的 12.5 g/t Au 包括 0.8m 的 171.5 g/t Au (JD95-064)1),
  • 91 m 的 1.0 g/t Au (JD12-009)2) 在未開發的芬蘭地帶腳牆上。

Additional zones of epithermal-related gold and silver mineralization are dispersed along a 3.5 kilometre trend west of the Finn zone in the Finn to Creek mineralized corridor. These targets include Wolf, Schmitt, Ag Carbonate and Creek, where previous rock-chip sampling yielded encouraging high-grade results such as 35.4 g/t Au and 44.8 g/t Ag (sample 17102554, Wolf target), 27.30 g/t Au and 43 g/t Ag (sample 17105554, Wolf target), 14.8 g/t Au and 910 g/t Ag (sample 17105294, Ag Carbonate target) and 18.9 g/t Au and 300 g/t Ag (sample 17102564, Schmitt target).

在芬蘭到克里克的礦化走廊中,其他與表溫相關的金銀礦化區域分佈在芬蘭地區以西3.5公里的趨勢上。這些目標包括 Wolf、Schmitt、Ag Carbonate 和 Creek,之前的岩屑採樣得出了令人鼓舞的高等級結果,例如 35.4 g/t Au 和 44.8 g/t Ag (樣本 1710255)4,狼目標), 27.30 g/t Au 和 43 g/t Ag (樣本 1710555)4,狼目標), 14.8 g/t Au 和 910 g/t Ag (樣本 1710529)4,碳酸銀(目標)和 18.9 g/t Au 和 300 g/t Ag (樣本 1710256)4,施密特目標)。

Sparse drilling at the Creek target defined an open zone of high-grade gold-silver mineralization, highlighted by drill hole CZ97-0083 that intersected 87 m of 3.6 g/t Au including 22 m @ 11.7 g/t Au and including 4.0 m @ 61.2 g/t Au. These targets are open and have yet to be systematically drill tested.

在 Creek 目標的稀疏鑽探定義了一個高品位金銀礦化的空曠區域,CZ97-008 鑽孔突顯了這一點3 那個相交的 87 m 的 3.6 g/t Au 包括 22 m @ 11.7 g/t Au 和 4.0 m @ 61.2 g/t Au。 這些目標是開放的,尚未進行系統的鑽探測試。

Numerous porphyry-related copper-gold targets have also been defined and warrant follow-up exploration efforts. Many of the targets (e.g., McClair, Moosehorn, Ferricrete) are untested or poorly tested. Five drill holes spanning over a distance of 850 metres located east and topographically below the Finn zone intersected broad zones of strong porphyry-related alteration, including one hole that bottomed in 0.46% Cu over 1.4 m at 230 metres depth (JD-13-0254). These results suggest significant potential for porphyry-related systems below the epithermal targets and in the valley bottoms.

還確定了許多與斑岩相關的銅金目標,需要進行後續勘探。許多目標(例如 McClair、Moosehorn、Ferricrete)未經測試或測試不佳。五個橫跨850米的鑽孔位於芬蘭地帶的東部和地形下方,與廣闊的斑岩相關的強烈變化區域相交,其中包括一個洞 在 1.4 米以內以 0.46% 的銅量觸底 在 230 米深處 (JD-13-025)4)。這些結果表明,超熱目標下方和山谷底部存在與斑岩相關的系統的巨大潛力。

Option Agreement

期權協議

Pursuant to the terms of the Option Agreement, in order to exercise the option, Sun Summit must make cash payments, issue post-Consolidation (as defined below) common shares of Sun Summit (each, a "Post-Consolidation Share") to the Optionors and incur expenditures on the JD Project over six years as follows:

根據期權協議的條款,爲了行使期權,Sun Summit必須支付現金,向期權人發行合併後(定義見下文)的Sun Summit普通股(均爲 “合併後股份”),並在六年內在京東項目上產生支出如下:

  • complete cash payments in the aggregate amount of $1,175,000, consisting of $175,000 in installments in the first year of the Option Agreement ($25,000 of which has been paid to date), and $200,000 by each of the first through fifth anniversaries of the Option Agreement;
  • 完成現金支付,總額爲1,175,000美元,包括期權協議第一年的17.5萬美元分期付款(迄今已支付25,000美元),以及期權協議一至五週年每20萬美元的分期付款;
  • issue an aggregate of 8,000,000 Post-Consolidation Shares to the Optionors, consisting of 2,000,000 Post-Consolidation Shares issued following TSX Venture Exchange ("TSXV") approval of the Option Agreement and the Consolidation, and 1,000,000 Post-Consolidation Shares by each of the first through sixth anniversaries of the Option Agreement; and
  • 向期權人共發行8,000,000股合併後股票,包括在多倫多證券交易所(“TSXV”)批准期權協議和合並後發行的2,000,000股合併後股票,以及期權協議一至六週年之際發行的1,000,000股合併後股票;以及
  • incur an aggregate of $22,500,000 in exploration expenditures on the JD Project, starting at $2,500,000 by the first anniversary of the Option Agreement, and increasing by $500,000 each year, until which $5,000,000 being required in the sixth year.
  • 京東項目共產生22,500,000美元的勘探支出,到期權協議簽訂一週年之時起價爲250萬美元,每年增加50萬美元,在此之前,第六年需要500萬美元。

The Option Agreement is subject to a prior consolidation of Sun Summit's outstanding common shares on the basis of one post-consolidation common share for every three pre-consolidation common shares (the "Consolidation"). For more details about the Consolidation, please refer to the Company's news release dated November 9, 2023.

期權協議需要事先合併Sun Summit的已發行普通股,其基礎是合併後每三股合併前的普通股(“合併”)獲得一股普通股。有關合並的更多詳細信息,請參閱公司2023年11月9日的新聞稿。

In the event of a change of control of Sun Summit, the Optionors may accelerate the issuance of remaining Post-Consolidation Shares issuable under the Option Agreement.

如果Sun Summit的控制權發生變化,期權人可以加快期權協議下剩餘的合併後可發行股份的發行。

Upon exercise of the option, Sun Summit will grant net smelter returns ("NSR") royalties on the JD Project to the Optionors as follows:

行使期權後,Sun Summit將向期權人發放京東項目的淨冶煉廠回報(“NSR”)特許權使用費,具體如下:

  • a 2.0% NSR royalty on the JD claims comprising the JD Project, which can be reduced by 50% to a 1.0% NSR royalty by Sun Summit making the payment to the Optionors of $7,500,000 no later than the receipt of production financing for the JD Project or $10,000,000 on or before commercial production being achieved on the JD Project;
  • 對包括京東項目的京東索賠收取2.0%的NSR特許權使用費,Sun Summit在收到京東項目的生產融資之前向期權人支付750萬美元或在京東項目實現商業生產時或之前支付1,000,000,000美元,即可將其減少50%至1.0%的NSR特許權使用費;
  • a 1.0% NSR royalty on the Belle claims comprising the JD Project; and
  • 對包括京東項目在內的Belle索賠收取1.0%的NSR特許權使用費;以及
  • a 1.0% NSR royalty on any interest acquired by Sun Summit in an area of interest north of the JD Project.
  • Sun Summit在京東項目以北利益區收購的任何權益均需支付1.0%的NSR特許權使用費。

The Belle claims are also subject to a 2.0% NSR royalty in favour of a third party, which royalty obligation will be assumed by Sun Summit and can be reduced by 50% to a 1.0% NSR royalty by the payment of $2,000,000 to the third party.

Belle索賠還需繳納2.0%的NSR特許權使用費,該特許權使用費將由Sun Summit承擔,通過向第三方支付2,000,000美元,可以將該特許權使用費減少50%至1.0%。

If the option is exercised, Sun Summit will make, until the commencement of any commercial production on the JD Project, advance royalty payments of $250,000 to the Optionors on each anniversary of such exercise. Such payments will be credited against any royalty payments due to the Optionors after the commencement of commercial production. In the event that Sun Summit purchases one-half of the 2.0% NSR on the JD claims, 50% of the cumulative amount of the advance royalty payments will be credited towards the purchase of one-half of the 2.0.% NSR. Within 30 days following the commencement of commercial production on the JD Project, Sun Summit will make an additional one-time payment of $1,000,000 to the Optionors.

如果行使期權,在京東項目開始任何商業生產之前,Sun Summit將在行使的每個週年紀念日向期權人預付25萬美元的特許權使用費。此類款項將從開始商業生產後應付給期權人的任何特許權使用費中記入。如果Sun Summit購買了京東索賠中2.0%的NSR的一半,則預付特許權使用費累計金額的50%將用於購買2.0.%NSR中的一半。在京東項目開始商業生產後的30天內,Sun Summit將向期權人額外一次性支付100萬美元。

Sun Summit intends to pay a finder's fee to Dr. Christopher Leslie (the "Finder"), an arm's length party of the Company and the Optionors, of up to $28,750 cash and 200,000 Post-Consolidation Shares over two years, equal to 5% of the cash and share amounts payable by the second anniversary under the Option Agreement, in consideration of his efforts in the Company being granted the option to acquire the JD Project.

Sun Summit打算在兩年內向公司和期權人的獨立方克里斯托弗·萊斯利博士(“發現者”)支付高達28,750美元的現金和20萬股合併後股票的發現費,相當於期權協議兩週年前應付現金和股票金額的5%,以考慮他在公司獲得收購京東項目的選擇權。

The Post-Consolidation Shares to be issued under the Option Agreement and to the Finder will be subject to a hold period ending four months and one day after the date of issuance in accordance with applicable securities laws.

根據適用的證券法,根據期權協議和向Finder發行的合併後股票的持有期將自發行之日起四個月零一天結束。

The Option Agreement, the finder's fee and the Consolidation are subject to approval by the TSXV.

期權協議、發現費和合並須經多倫多證券交易所批准。

National Instrument 43-101 Disclosure

美國國家儀器 43-101 披露

This news release has been reviewed and approved by Sun Summit's Vice President Exploration, Ken MacDonald, P. Geo., a "Qualified Person" as defined in National Instrument 43-101 Standards of Disclosure for Mineral Projects of the Canadian Securities Administrators. He has not been able to verify the historical exploration data disclosed, including sampling, analytical and test data, underlying the technical information in this news release since such data is historical and the original drill core is not readily available. Technical information contained in this release is historical in nature and has been compiled from public sources believed to be accurate. The technical information has not been verified by Sun Summit and may in some instances be unverifiable dependent on the existence of historical drill core and grab samples.

本新聞稿已由Sun Summit的勘探副總裁肯·麥克唐納(P.Geo.)的審查和批准,他是《國家儀器43-101》中定義的 “合格人士” 礦產項目披露標準 加拿大證券管理局的。他無法驗證披露的歷史勘探數據,包括採樣、分析和測試數據,這些數據是本新聞稿中技術信息的基礎,因爲這些數據是歷史數據,而且原始鑽芯不容易獲得。本新聞稿中包含的技術信息本質上是歷史性的,是從被認爲準確的公共來源彙編而成的。技術信息尚未經過 Sun Summit 的驗證,在某些情況下可能無法覈實,具體取決於歷史鑽芯和採集樣本的存在。

Community Engagement

社區參與

Sun Summit is engaging with First Nations on whose territory our projects are located and is discussing their interests and identifying contract and work opportunities, as well as opportunities to support community initiatives. The Company looks forward to continuing to work with local and regional First Nations with ongoing exploration.

Sun Summit 正在與我們的項目所在的原住民接觸,並正在討論他們的利益,確定合同和工作機會,以及支持社區舉措的機會。該公司期待繼續與當地和地區的原住民合作,進行持續的勘探。

About the Buck Project

關於 Buck Project

The Buck Project is situated in a historic mining district near Houston, B.C., with excellent nearby infrastructure that allows for year-round, road-accessible exploration. The project is 60 kilometres southeast of Smithers and is located west of the past producing Equity Silver Mine (Newmont) and north of the Huckleberry copper mine (Imperial Metals).

Buck Project位於不列顛哥倫比亞省休斯敦附近一個歷史悠久的礦區,附近基礎設施完善,可以全年進行道路通行勘探。該項目位於史密瑟斯東南60公里處,位於過去生產的Equity Silver Mine(紐蒙特)以西,哈克貝利銅礦(帝國金屬)以北。

The project is host to the Buck Main intermediate-sulfidation, epithermal-related, gold-silver-zinc system characterized by continuous zones of disseminated and breccia-hosted, bulk tonnage-style mineralization. Vein-hosted, high-grade mineralization has also been intersected near the center of Buck Main.

該項目是Buck Main中間硫化、表溫相關金銀鋅系統的所在地,其特徵是連續的彌散區和角礫岩承載的散裝噸位式礦化區域。在 Buck Main 中心附近,還發現了以礦脈爲主的高品位礦化。

Exploration at the Buck Project is focused on investigating the lateral and vertical extent of gold-silver-zinc mineralization at the Buck Main system, and also defining additional drill targets across the entire land package through systematic exploration programs.

Buck Project的勘探重點是調查Buck Main系統中金銀鋅礦化的橫向和垂直範圍,並通過系統的勘探計劃在整個土地上確定額外的鑽探目標。

About the JD Project

關於京東項目

The JD Project is located in the Toodoggone mining district in north-central British Columbia, a highly prospective deposit-rich mineral trend. The project covers an area of over 15,000 hectares and is in close proximity to active exploration and development projects, such as Thesis Gold's Lawyers and Ranch projects, TDG Gold's Baker-Shasta projects, Centerra's Gold's Kemess East and Underground projects, as well as the past-producing Kemess open pit copper-gold mine.

京東項目位於不列顛哥倫比亞省中北部的Toodogone礦區,這是一個極具前景的富含礦牀的礦產趨勢。該項目佔地超過15,000公頃,緊鄰活躍的勘探和開發項目,例如Thesis Gold的律師和牧場項目、TDG Gold的Baker-Shasta項目、Centerra的Kemess東部和地下項目,以及過去生產的Kemess露天銅金礦。

The project is 450 kilometres northwest of the city of Prince George, and 25 kilometres north of the Sturdee airstrip. It is proximal to existing infrastructure in place to support the past-producing Kemess mine, including roads and a hydroelectric power line.

該項目位於喬治王子市西北450公里處,斯特迪機場以北25公里處。它靠近支持過去生產的凱梅斯礦的現有基礎設施,包括道路和水力發電線。

The JD Project is in a favourable geological environment characterized by both high-grade epithermal gold and silver mineralization, as well as porphyry-related copper and gold mineralization. Some historic exploration, including drilling, geochemistry and geophysics, has been carried out on the property, however the project area is largely underexplored.

JD 項目處於有利的地質環境中,其特點是高品位的淺熱液金和銀礦化,以及與斑岩相關的銅和金礦化。已經對該物業進行了一些歷史性勘探,包括鑽探、地球化學和地球物理學,但是該項目區域基本上沒有得到充分開發。

About Sun Summit

關於太陽峯會

Sun Summit Minerals (TSXV: SMN) (OTCQB: SMREF) is a mineral exploration company focused on expansion and discovery of district scale gold and copper assets in British Columbia. The Company's diverse portfolio includes the Buck Project in central B.C, and the JD Project in the Toodoggone region of north-central B.C.

Sun Summit Minerals(多倫多證券交易所股票代碼:SMN)(場外交易代碼:SMREF)是一家礦產勘探公司,專注於在不列顛哥倫比亞省擴張和發現區域規模的黃金和銅資產。該公司的多元化投資組合包括位於不列顛哥倫比亞省中部的巴克項目和位於不列顛哥倫比亞省中北部圖多貢地區的京東項目。

Sun Summit is committed to environmental and social responsibility, with a focus on accountable development and building respectful and beneficial relationships with Indigenous and local communities.

Sun Summit 致力於履行環境和社會責任,重點是負責任的發展以及與土著和當地社區建立相互尊重和有益的關係。

Further details are available at .

更多詳情請見。

References

參考文獻

  1. JD95-047 and -064 data: Krause, R.G. (1996), 1995 Geological Report on the JD Gold Silver Property, Toodoggone River Area, Omineca Mining Division, British Columbia, Assessment Report Indexing System, Report 24284, .
  2. CZ97-008 data: Hawkins, P.A. (1998), Exploration report on the Creek Zone, Toodoggone River Area, BC., for Antares Mining and Exploration Corporation and AGC Americas Gold Corp, (private report); reported in Assessment Report Indexing System, Report 25757, .
  3. JD12-003, JD12-009 data: McBride, S. (2013), 2012 Geological, geochemical and diamond drilling report on the JD Property, Assessment Report Indexing System, Report 33556, .
  4. JD13-025 and rock sampling data: McBride, S. and Leslie, C. (2014), 2013 Geological, geophysical and diamond drilling report on the JD Property, Assessment Report Indexing System, Report 34762, .
  1. JD95-047 和 -064 數據:克勞斯,R.G.(1996),《不列顛哥倫比亞省奧米內卡礦業部圖多貢河地區京東金銀礦業地質報告》,評估報告索引系統,第24284號報告,。
  2. CZ97-008 數據:賓夕法尼亞州霍金斯(1998),安塔雷斯礦業與勘探公司和AGC Americas Gold Corp關於不列顛哥倫比亞省圖多貢河地區溪區的勘探報告,(私人報告);報告載於評估報告索引系統,第25757號報告,。
  3. JD12-003,JD12-009 數據:McBride,S.(2013),《2012年京東地產地質學、地球化學和鑽石鑽探報告》,評估報告索引系統,33556號報告,。
  4. JD13-025 和岩石採樣數據:S. 麥克布賴德和萊斯利,C.(2014),《京東地產2013年地質、地球物理和鑽石鑽探報告》,評估報告索引系統,第34762號報告,。

Link to Figure
Figure 1:

鏈接到圖
圖 1:

On behalf of the board of directors

代表董事會

Brian Lock

布萊恩·洛克

For further information, contact:

欲了解更多信息,請聯繫:

Sharyn Alexander
President
info@sunsummitminerals.com

莎琳·亞歷山大
主席
info@sunsummitminerals.com

Matthew Benedetto
Simone Capital
mbenedetto@simonecapital.ca

馬修·貝內代託
西蒙妮資本
mbenedetto@simonecapital.ca

Tel. 416-817-1226

電話 416-817-1226

Forward-Looking Information

前瞻性信息

Statements contained in this news release that are not historical facts may be forward-looking statements, which involve risks, uncertainties and other factors that could cause actual results to differ materially from those expressed or implied by such forward-looking statements. In addition, the forward-looking statements require management to make assumptions and are subject to inherent risks and uncertainties. There is significant risk that the forward-looking statements will not prove to be accurate, that the management's assumptions may not be correct and that actual results may differ materially from such forward-looking statements. Accordingly, readers should not place undue reliance on the forward-looking statements. Generally forward-looking statements can be identified by the use of terminology such as "anticipate", "will", "expect", "may", "continue", "could", "estimate", "forecast", "plan", "potential" and similar expressions. Forward-Looking statements contained in this press release may include, but are not limited to, potential mineralization on the JD Project and the Buck Project, obtaining regulatory approval for the Option Agreement, Consolidation and finder's fee, completing the Consolidation, acquiring the JD Project under the Option Agreement, exploration plans on the JD Project and engagement with First Nations communities. These forward-looking statements are based on a number of assumptions which may prove to be incorrect which, without limiting the generality of the following, include: risks inherent in exploration activities; the impact of exploration competition; unexpected geological or hydrological conditions; changes in government regulations and policies, including trade laws and policies; failure to obtain necessary permits and approvals from government authorities; volatility and sensitivity to market prices; volatility and sensitivity to capital market fluctuations; the ability to raise funds through private or public equity financings; environmental and safety risks including increased regulatory burdens; weather and other natural phenomena; and other exploration, development, operating, financial market and regulatory risks. The forward-looking statements contained in this press release are made as of the date hereof or the dates specifically referenced in this press release, where applicable. Except as required by applicable securities laws and regulation, Sun Summit disclaims any intention or obligation to update or revise any forward-looking statement, whether as a result of new information, future events or otherwise, except as required by applicable securities laws. All forward-looking statements contained in this press release are expressly qualified by this cautionary statement.

本新聞稿中包含的非歷史事實的陳述可能是前瞻性陳述,其中涉及風險、不確定性和其他因素,這些因素可能導致實際業績與此類前瞻性陳述所表達或暗示的業績存在重大差異。此外,前瞻性陳述要求管理層做出假設,並受固有風險和不確定性的影響。存在很大的風險,即前瞻性陳述無法被證明是準確的,管理層的假設可能不正確,實際業績可能與此類前瞻性陳述存在重大差異。因此,讀者不應過分依賴前瞻性陳述。通常,前瞻性陳述可以通過使用 “預期”、“將”、“預期”、“可能”、“繼續”、“可能”、“估計”、“預測”、“計劃”、“潛力” 等術語來識別。本新聞稿中包含的前瞻性陳述可能包括但不限於京東項目和巴克項目的潛在礦化、期權協議獲得監管部門的批准、合併和發現者費用、完成合並、根據期權協議收購京東項目、京東項目的勘探計劃以及與原住民社區的接觸。這些前瞻性陳述基於許多可能被證明是不正確的假設,這些假設在不限制以下內容的一般性的前提下,包括:勘探活動固有的風險;勘探競爭的影響;意想不到的地質或水文條件;包括貿易法和政策在內的政府法規和政策的變化;未能獲得政府當局的必要許可和批准;市場價格的波動和敏感性;波動性和對資本市場波動的敏感性;通過私募或公開股權融資籌集資金的能力;環境和安全風險,包括監管負擔的增加;天氣和其他自然現象;以及其他勘探、開發、運營、金融市場和監管風險。本新聞稿中包含的前瞻性陳述是截至本新聞稿發佈之日或本新聞稿中特別提及的日期(如果適用)作出的。除非適用的證券法律法規要求,否則除非適用的證券法要求,否則Sun Summit不打算或義務更新或修改任何前瞻性陳述,無論是由於新信息、未來事件還是其他原因。本新聞稿中包含的所有前瞻性陳述均受本警示聲明的明確限制。

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

多倫多證券交易所風險交易所及其監管服務提供商(該術語在多倫多證券交易所風險交易所的政策中定義)均不對本新聞稿的充分性或準確性承擔責任。

To view the source version of this press release, please visit

要查看本新聞稿的源版本,請訪問

譯文內容由第三人軟體翻譯。


以上內容僅用作資訊或教育之目的,不構成與富途相關的任何投資建議。富途竭力但無法保證上述全部內容的真實性、準確性和原創性。
    搶先評論