share_log

ACME Lithium Announces Option Agreement on Its Manitoba Lithium Project With Snow Lake Lithium and Provides Saskatchewan Update

ACME Lithium Announces Option Agreement on Its Manitoba Lithium Project With Snow Lake Lithium and Provides Saskatchewan Update

ACME Lithium宣佈與Snow Lake Lithium就其曼尼托巴省鋰項目達成期權協議,並提供薩斯喀徹溫省的最新情況
newsfile ·  2023/12/20 19:30

Vancouver, British Columbia--(Newsfile Corp. - December 20, 2023) - ACME Lithium Inc. (CSE: ACME) (OTCQX: ACLHF) (the "Company", or "ACME") is pleased to announce that it has entered into a binding Letter of Intent ("LOI)" with Snow Lake Resources Ltd., d/b/a Snow Lake Lithium (NASDAQ:LITM) ("Snow Lake") pursuant to which ACME will grant Snow Lake the option to earn up to a 90% undivided interest in the mineral claims held by ACME Lithium at its Manitoba lithium pegmatite project areas, located in southeastern Manitoba, Canada.

不列顛哥倫比亞省溫哥華--(新聞文件公司-2023 年 12 月 20 日)- ACME Lithium Inc (案例:ACME) (OTCQX:ACLHF) (“公司” 或 “ACME”)欣然宣佈,它已與雪湖資源有限公司簽訂了具有約束力的意向書(“LOI)”,d/b/a Snow Lake Lithium(納斯達克股票代碼:LITM)(“Snow Lake”),根據該意向書,ACME將授予Snow Lake從其曼尼托巴省鋰礦業索賠中賺取高達90%的不可分割權益項目區域,位於加拿大曼尼托巴省東南部。

ACME's Manitoba lithium group is comprised of 37 mineral claims located over three project areas - Shatford Lake, Birse Lake, and Cat-Euclid Lake, totaling approximately 17,000 acres. The projects are located in the Bird River Greenstone Belt in southeastern Manitoba. The region hosts hundreds of individual pegmatite bodies, many of which are classified as complex rare-element Lithium-Cesium-Tantalum ("LCT") pegmatites. The Shatford-Birse claim area is contiguous to the south of Sinomine Corporation's world class Tanco Mine, a LCT producer since 1969.

ACME的曼尼托巴省鋰集團由37個礦產索賠組成,分佈在三個項目區——沙特福德湖、比爾斯湖和貓歐幾里得湖,總面積約爲17,000英畝。這些項目位於曼尼托巴省東南部的伯德河綠石帶。該地區擁有數百個單獨的偉晶岩體,其中許多被歸類爲複雜的稀有元素鋰-銫-鉭(“LCT”)偉晶岩。沙特福德-比爾斯索賠區毗鄰中礦集團世界一流的坦科礦以南,該礦自1969年以來一直是LCT生產商。

Snow Lake may exercise the Option by paying a total of CAD$500,000 and incurring a total of CAD$1,800,000 in exploration and development expenditures over a two-year period.

Snow Lake可以在兩年內通過支付總額爲50萬加元並承擔總額爲1800,000加元的勘探和開發支出來行使期權。

Date for Completion Cash Payment Minimum Exploration and Development Expenditures Earn In
Initial Payment CAD $20,000

Upon Execution CAD $130,000

First Year CAD $150,000 CAD $600,000 51%
Second Year CAD $200,000 CAD $1,200,000 90%
完成日期 現金支付 最低勘探和開發支出 賺錢
首期付款 加元 20,000 美元

執行後 加元 130,000 美元

第一年 15萬加元 600,000 加元 51%
第二年 200 萬加元 120萬加元 90%

Once Snow Lake has earned a 90% undivided interest in the Project, and completed a positive feasibility study, a joint venture (the "Joint Venture") between Snow Lake and ACME will be formed for further development, the detailed market standard terms and conditions of which will be agreed at the time of formation of the joint venture.

一旦Snow Lake獲得了該項目90%的不可分割權益,並完成了積極的可行性研究,合資企業(合資企業“)將在Snow Lake和ACME之間組建以進一步發展,其詳細的市場標準條款和條件將在合資企業成立時商定。

Upon formation of the Joint Venture:

合資企業成立後:

  • Snow Lake will hold a 90% interest, and ACME will hold 10% interest in the Joint Venture;
  • Snow Lake's interest will be a 90% participating interest in the Joint Venture, and Snow Lake will fund 100% of all expenditures until the completion of a feasibility study.
  • ACME will retain a 10% free carried interest, without the need to contribute to expenditures until the completion of a feasibility study on the Shatford Lithium Project.
  • 雪湖將持有合資企業90%的權益,ACME將持有合資企業10%的權益;
  • Snow Lake的權益將是合資企業90%的參股權益,在可行性研究完成之前,Snow Lake將爲所有支出的100%提供資金。
  • 在沙特福德鋰項目的可行性研究完成之前,ACME將保留10%的自由附帶權益,無需爲支出繳款。

ACME completed a Phase 1 drilling program earlier in 2023. Drilling and magnetic interpretation was successful in defining broad structural belts with multiple unexposed pegmatites and specific cross structural features in these broad belts that control pegmatite injection. Many regions within the project area remain of interest and require further evaluation and exploration.

ACME 於 2023 年初完成了第一階段的鑽探計劃。鑽探和磁學解釋成功地定義了寬闊的結構帶,其中包含多個未暴露的偉晶岩以及控制偉晶岩注入的寬帶中的特定交叉結構特徵。項目區域內的許多區域仍然值得關注,需要進一步評估和探索。

About Snow Lake Resources Ltd.

關於雪湖資源有限公司

Snow Lake is a Canadian lithium development company listed on Nasdaq (LTIM) with 2 hard rock lithium projects, the Thompson Brothers project and the Grass River project (together the "Snow Lake Lithium Project"), in the Snow Lake region of Northern Manitoba. Snow Lake is focused on advancing its 59,587 acre Snow Lake Lithium Project through subsequent phases of development and into production in order to supply the North American electric vehicle and energy storage markets.

Snow Lake是一家在納斯達克(LTIM)上市的加拿大鋰開發公司,擁有兩個硬巖鋰項目,即湯普森兄弟項目和格拉斯河項目(合稱”斯諾萊克鋰業項目“),位於曼尼托巴省北部的雪湖地區。Snow Lake專注於將其佔地59,587英畝的Snow Lake鋰項目通過後續開發階段推進並投入生產,以便爲北美的電動汽車和儲能市場提供產品。

SASKATCHEWAN UPDATE

薩斯喀徹溫省最新消息

ACME also announces that it will not proceed with its option to acquire a 100% interest in 13 mineral claims at Bailey Lake in the northeastern region of Saskatchewan, Canada due to the Company's focus on its Nevada projects, reallocation of capital and the current state of markets conditions. In addition, the Company will relinquish its ownership interest in five adjacent mineral claims, as they fall within an area of mutual interest under the option agreement.

ACME還宣佈,由於該公司專注於內華達州的項目、資本的重新分配和當前的市場狀況,它不會繼續選擇收購加拿大薩斯喀徹溫省東北部貝利湖13個礦產索賠的100%權益。此外,該公司將放棄其在五個相鄰礦產索賠中的所有權,因爲根據期權協議,這五個礦產權屬於共同利益領域。

About ACME Lithium Inc.

關於 ACME Lithium Inc.

Led by an experienced team, ACME Lithium is a mineral exploration Company focused on acquiring, exploring, and developing battery metal projects in Canada and the United States in partnership with leading technology and commodity companies.

ACME Lithium是一家礦產勘探公司,由經驗豐富的團隊領導,專注於與領先的技術和大宗商品公司合作,在加拿大和美國收購、勘探和開發電池金屬項目。

On behalf of the Board of Directors

代表董事會

Steve Hanson
Chief Executive Officer, President and Director
Telephone: (604) 564-9045
info@acmelithium.com

史蒂夫·漢森
首席執行官、總裁兼董事
電話:(604) 564-9045
info@acmelithium.com

For Investor Inquiries:
Anthony Simone
Simone Capital
Telephone: (416) 881-5154
asimone@simonecapital.ca

投資者查詢:
安東尼西蒙尼
西蒙妮資本
電話:(416) 881-5154
asimone@simonecapital.ca

Neither the CSE nor its regulations service providers accept responsibility for the adequacy or accuracy of this news release. This news release contains certain statements which may constitute forward-looking information within the meaning of applicable securities laws ("forward-looking statements"). Forward-looking statements are statements that are not historical facts and are generally, but not always, identified by the words "expects," "plans," "anticipates," "believes," "intends," "estimates," "projects," "potential" and similar expressions, or that events or conditions "will," "would," "may," "could" or "should" occur and in this news release include but are not limited to the attributes of, timing for and expected benefits to be derived from exploration, drilling or development at ACME's project properties. Information inferred from the interpretation of drilling, sampling and other technical results may also be deemed to be forward-looking statements, as it constitutes a prediction of what might be found to be present when and if a project is actually developed. ACME's project location adjacent to or nearby lithium projects does not guarantee exploration success or that mineral resources or reserves will be defined on ACME's properties. Exploration, development, and activities conducted by regional companies provide assistance and additional data for exploration work being completed by ACME. These forward-looking statements are subject to a variety of risks and uncertainties which could cause actual events or results to differ materially from those reflected in the forward-looking statements, including, without limitation: risks related to fluctuations in metal prices; uncertainties related to raising sufficient financing to fund the planned work in a timely manner and on acceptable terms; changes in planned work resulting from weather, logistical, technical or other factors; the possibility that results of work will not fulfill expectations and realize the perceived potential of the Company's properties; risk of accidents, equipment breakdowns and labour disputes or other unanticipated difficulties or interruptions; the possibility of cost overruns or unanticipated expenses in the work program; the risk of environmental contamination or damage resulting from the Company's operations and other risks and uncertainties. Any forward-looking statement speaks only as of the date it is made and, except as may be required by applicable securities laws, the Company disclaims any intent or obligation to update any forward-looking statement, whether as a result of new information, future events or results or otherwise. Unless otherwise indicated, the market and industry data contained herein is based upon information from industry and other publications and the knowledge and experience of management. While we believe that this data is reliable, market and industry data is subject to variations and cannot be verified with complete certainty due to limits on the availability and reliability of raw data, the voluntary nature of the data gathering process and other limitations and uncertainties inherent in any statistical survey. We have not independently verified any of the data from third-party sources referred to in this news release or ascertained the underlying assumptions relied upon by such sources. All technical and scientific disclosure pertaining to our mineral property interests in this news release have been reviewed by a Qualified Person, meaning an individual who is an engineer or geoscientist with at least five years of experience in mineral exploration, mine development or operation or mineral project assessment, or any combination of these; has experience relevant to the subject matter of the mineral project and the technical report; and is a member or licensee in good standing of a professional association.

CSE及其監管服務提供商均不對本新聞稿的充分性或準確性承擔責任。本新聞稿包含某些陳述,這些陳述可能構成適用證券法所指的前瞻性信息(“前瞻性陳述”)。前瞻性陳述是非歷史事實的陳述,通常但並非總是以 “期望”、“計劃”、“預期”、“相信”、“打算”、“估計”、“項目”、“潛在” 和類似的表達方式來識別,或者事件或條件 “將”、“可能” 或 “應該” 發生,在本新聞稿中,包括但不限於 ACME項目物業的勘探、鑽探或開發的特性、時機和預期收益。從對鑽探、取樣和其他技術結果的解釋中推斷出的信息也可以被視爲前瞻性陳述,因爲它構成了對項目實際開發時間和是否可能出現的內容的預測。ACME的項目位置與鋰項目相鄰或附近,並不能保證勘探成功,也不能保證礦產資源或儲量將在ACME的財產上確定。區域公司開展的勘探、開發和活動爲ACME正在完成的勘探工作提供了援助和其他數據。這些前瞻性陳述受到各種風險和不確定性的影響,這些風險和不確定性可能導致實際事件或結果與前瞻性陳述中反映的事件或結果存在重大差異,包括但不限於:與金屬價格波動相關的風險;與及時和按可接受的條件籌集足夠資金以資助計劃工作相關的不確定性;天氣、後勤、技術或其他因素導致的計劃工作的變化;工作結果無法達到預期的可能性;以及意識到公司財產的預期潛力;發生事故、設備故障和勞資糾紛或其他意想不到的困難或中斷的風險;工作計劃中可能出現成本超支或意外開支;公司運營造成的環境污染或損害的風險以及其他風險和不確定性。任何前瞻性陳述僅代表其發表之日,除非適用的證券法另有要求,否則公司不打算或沒有義務更新任何前瞻性陳述,無論是由於新信息、未來事件或業績還是其他原因。除非另有說明,否則此處包含的市場和行業數據基於來自行業和其他出版物的信息以及管理知識和經驗。儘管我們認爲這些數據是可靠的,但由於原始數據的可用性和可靠性受到限制、數據收集過程的自願性質以及任何統計調查固有的其他限制和不確定性,市場和行業數據可能會有所不同,無法完全確切地進行驗證。我們尚未獨立驗證本新聞稿中提及的來自第三方來源的任何數據,也沒有確定這些來源所依據的基本假設。本新聞稿中與我們的礦產權益有關的所有技術和科學披露均經過合格人員的審查,即工程師或地球科學家,在礦產勘探、礦山開發或運營或礦產項目評估或礦產項目評估或其中任何組合方面擁有至少五年的經驗;具有與礦產項目主題和技術報告相關的經驗;並且是專業協會信譽良好的成員或被許可人的個人。

To view the source version of this press release, please visit

要查看本新聞稿的源版本,請訪問

譯文內容由第三人軟體翻譯。


以上內容僅用作資訊或教育之目的,不構成與富途相關的任何投資建議。富途竭力但無法保證上述全部內容的真實性、準確性和原創性。
    搶先評論