share_log

Purepoint Uranium Announces Winter Program at Smart Lake JV Project

Purepoint Uranium Announces Winter Program at Smart Lake JV Project

Purepoint 鈾宣佈智慧湖合資項目冬季計劃
newsfile ·  2023/11/21 19:30

Toronto, Ontario--(Newsfile Corp. - November 21, 2023) - Purepoint Uranium Group Inc. (TSXV: PTU) (OTCQB: PTUUF) ("Purepoint" or the "Company") announced today the approval of the 2024 exploration program for the Smart Lake JV Project that is jointly owned by Cameco Corporation (73%) and Purepoint (27%). The Smart Lake Project is located approximately 18 km west-northwest of the Hook Lake Project and 60 km south-southwest of Orano's former Cluff Lake mine within the western Athabasca Basin, Saskatchewan, Canada. The 2024 exploration program is scheduled for Q1-2024 and will include transient electromagnetic (EM) surveys targeting the Groomes Lake conductor.

安大略省多倫多--(Newsfile Corp.,2023 年 11 月 21 日)-Purepoint 鈾業集團公司(多倫多證券交易所:PTU)(OTCQB:PTUUF) (“Purepoint” 或者 “公司”)今天宣佈批准2024年Smart Lake合資項目的勘探計劃,該項目由Cameco Corporation(73%)和Purepoint(27%)共同擁有。智能湖項目位於加拿大薩斯喀徹溫省阿薩巴斯卡盆地西北偏西約18公里處,奧蘭諾前克拉夫湖礦山西南偏南60公里處。2024 年的勘探計劃計劃在 Q1-2024 上進行,將包括針對格魯姆斯湖導體的瞬態電磁 (EM) 調查。

"In recent years, advancement of our western projects has focused primarily on our Hook Lake joint venture. With the recent exploration successes in the region and a heightened market sentiment around uranium, we are very excited to return to Smart Lake with our partner Cameco," said Chris Frostad, President and CEO at Purepoint.

“近年來,我們西方項目的發展主要集中在胡克湖合資企業上。Purepoint總裁兼首席執行官克里斯·弗羅斯塔德說,隨着該地區最近勘探的成功以及市場對鈾的情緒增強,我們很高興能與合作伙伴Cameco一起重返Smart Lake。

Highlights

亮點

  • The ground EM geophysical surveys will include approximately 15 km of Stepwise Moving Loop (SWML) and 24 km of Fixed Loop (FL) transient electromagnetics (TEM) that target the northern Groomes Lake conductor as follow up to previous airborne and ground geophysical results.

  • A DC resistivity/IP survey is planned to profile the Beatty River Fault, Groomes conductor, and eastern magnetic low and help identify sandstone structure and alteration.

  • The Groomes Lake conductor is considered a highly prospective uranium target and has not yet been drill tested.

  • Exploration at Smart Lake has firmly established the presence of graphitic shear zones that are locally hydrothermally altered and host to anomalous uranium mineralization. Numerous priority target areas, where EM conductors are cross-cut by east-west structures, are yet to be drill tested.

  • During the 2019 re-logging of Smart Lake drill core, it was immediately recognized that the rocks were similar to those encountered at our Hook Lake JV Project.

  • Geophysical surveys are expected to begin in Q1-2024.

  • Complete details of all Purepoint's exploration projects and next steps can be found on the company's website at .

  • 地面電磁地球物理勘測將包括大約 15 千米的逐級移動迴路 (SWML) 和 24 千米的固定迴路 (FL) 瞬態電磁學 (TEM),其目標是格魯姆斯湖北部的導體,作爲先前空中和地面地球物理結果的後續行動。

  • 計劃進行直流電阻率/IP 調查,以剖析比蒂河斷層、Groomes導體和東方磁低點,並幫助識別砂岩結構和變化。

  • Groomes Lake導體被認爲是極具前景的鈾目標,尚未經過鑽探測試。

  • Smart Lake的勘探已牢固地證實了石墨剪切帶的存在,這些區域經過局部熱液變化並存在異常的鈾礦化。許多優先目標區域,電磁導體被東西向結構橫切割,尚待鑽探測試。

  • 在2019年重新記錄Smart Lake鑽芯時,人們立即意識到這些岩石與我們在胡克湖合資項目中遇到的岩石相似。

  • 地球物理調查預計將在 Q1-2024 中開始。

  • Purepoint所有勘探項目和後續步驟的完整詳細信息可以在該公司的網站上找到,網址爲。

Smart Lake Project

智慧湖項目

Purepoint, as operator, holds a 27% ownership of the Smart Lake project in joint venture with Cameco Corp.

作爲運營商,Purepoint持有與Cameco Corp合資的Smart Lake項目27%的所有權

The Smart Lake property includes two claims with a total area of 9,860 hectares situated in the southwestern portion of the Athabasca Basin, approximately 60 km south of the former Cluff Lake mine and 18 km west-northwest of Purepoint's Hook Lake JV Project.

Smart Lake財產包括兩項索賠,總面積爲9,860公頃,位於阿薩巴斯卡盆地的西南部,位於前克拉夫湖礦以南約60公里處,Purepoint的胡克湖合資項目西北偏西18公里處。

Depth to the unconformity, where it occurs, is relatively shallow at less than 350 metres.

發生不合格物的地方的深度相對較淺,不到350米。

Aeromagnetic and electromagnetic patterns at Smart Lake reflect an extension of the patterns underlying the Shea Creek deposits (Indicated resource of 68M lbs at 1.50% U3O8; UEC PR Jan 2023) 55 km north of the property. Exploration by Purepoint has firmly established the presence of anomalous uranium and hydrothermal alteration. Numerous priority target areas, where EM conductors are cross-cut by east-west structures, are yet to be drill tested.

Smart Lake 的航磁和電磁模式反映了該物業以北 55 公里處的 Shea Creek 礦牀(標稱資源量爲 6800 萬磅,U3O8 含量爲 1.50%;UEC PR 2023 年 1 月)底層模式的延伸。Purepoint的勘探已牢固地證實了異常鈾和熱液蝕變的存在。許多優先目標區域,電磁導體被東西向結構橫切割,尚待鑽探測試。

Like the Kianna fault at Shea Creek, known uranium mineralization at the Smart Lake project is associated with the intersection of the east-west Arthur Fault and north-south-striking fluid/chemical traps including the Shearwater conductor and chloritized mafic orthogneiss. The occurrence of low-grade uranium mineralization along the Arthur Fault away from Shearwater conductor underscore the need to target east-west structures both at the intersection with conductive anomalies and at magnetically interpreted lithological contacts.

與Shea Creek的基安娜斷層一樣,Smart Lake項目中已知的鈾礦化與東西向的亞瑟斷層和南北衝擊流體/化學陷阱的交匯點有關,包括希爾沃特導體和氯化鎂鐵質正生物。亞瑟斷層沿線遠離希爾沃特導體的低品位鈾礦化突出表明,既要瞄準具有導電異常的交叉點,也要瞄準磁解析巖性接觸點的東西向結構。

Additional east-west striking faults (Groomes Lake and Cristobal) have been interpreted from examination of airborne magnetic and electromagnetic surveys. These faults are spatially related to strong EM conductors identified in both airborne and ground-based geophysical surveys.

通過對機載磁和電磁測量的檢查,已經解釋了其他東西向撞擊斷層(Groomes Lake 和 Cristobal)。這些斷層在空間上與在機載和地面地球物理調查中發現的強電磁導體有關。

About Purepoint
Purepoint Uranium Group Inc. (TSXV: PTU) (OTCQB: PTUUF) actively operates an exploration pipeline of 9 advanced projects in Canada's Athabasca Basin. In addition to its flagship joint venture project at Hook Lake with partners Cameco and Orano and a second joint venture with Cameco at Smart Lake, Purepoint also holds seven, 100% owned projects with proven uranium rich targets. With an aggressive exploration program underway on multiple projects, Purepoint is emerging as the preeminent uranium explorer in the world's richest uranium district.

關於 Purepoint
Purepoint Uranium Group Inc.(多倫多證券交易所股票代碼:PTUU)(OTCQB:PTUUF)在加拿大阿薩巴斯卡盆地積極運營由9個高級項目組成的勘探管道。除了與合作伙伴Cameco和Orano在胡克湖的旗艦合資項目以及與Cameco在Smart Lake的第二家合資項目外,Purepoint還擁有七個 100% 持股的項目,這些項目已證實富鈾目標。隨着多個項目的積極勘探計劃正在進行中,Purepoint正在成爲世界上最富有的鈾礦區的卓越鈾勘探商。

Scott Frostad, P.Geo., Purepoint's Vice President, Exploration, is the Qualified Person responsible for technical content of this release.

Purepoint 勘探副總裁 P.Geo. Scott Frostad 是負責本版本技術內容的合格人員。

For more information, please contact:
Chris Frostad, President & CEO
Phone: (416) 603-8368
Email: cfrostad@purepoint.ca

欲了解更多信息,請聯繫:
克里斯·弗羅斯塔德,總裁兼首席執行官
電話:(416) 603-8368
電子郵件:cfrostad@purepoint.ca

For additional information please visit our website at , our X feed: @PurepointU3O8 or our LinkedIn page @Purepoint-Uranium.

欲了解更多信息,請訪問我們的網站,即我們的 X feed:@PurepointU3O8 或我們的 LinkedIn 頁面 @Purepoint-Uranium。

Neither the Exchange nor its Regulation Services Provider (as that term is defined in the policies of the Exchange) accepts responsibility for the adequacy or accuracy of this Press release.

交易所及其監管服務提供商(該術語在交易所政策中定義)均不對本新聞稿的充分性或準確性承擔責任。

Disclosure regarding forward-looking statements

有關前瞻性陳述的披露

This press release contains projections and forward-looking information that involve various risks and uncertainties regarding future events. Such forward-looking information can include without limitation statements based on current expectations involving a number of risks and uncertainties and are not guarantees of future performance of the Company. These risks and uncertainties could cause actual results and the Company's plans and objectives to differ materially from those expressed in the forward-looking information. Actual results and future events could differ materially from those anticipated in such information. These and all subsequent written and oral forward-looking information are based on estimates and opinions of management on the dates they are made and expressly qualified in their entirety by this notice.

本新聞稿包含涉及未來事件的各種風險和不確定性的預測和前瞻性信息。此類前瞻性信息可以包括但不限於基於當前預期的陳述,涉及許多風險和不確定性,不能保證公司的未來表現。這些風險和不確定性可能導致實際業績以及公司的計劃和目標與前瞻性信息中表達的結果存在重大差異。實際結果和未來事件可能與此類信息中的預期存在重大差異。這些以及隨後的所有書面和口頭前瞻性信息均基於管理層對這些信息發佈之日的估計和意見,本通知對這些信息進行了明確的全面保留。

To view the source version of this press release, please visit

要查看本新聞稿的源版本,請訪問

譯文內容由第三人軟體翻譯。


以上內容僅用作資訊或教育之目的,不構成與富途相關的任何投資建議。富途竭力但無法保證上述全部內容的真實性、準確性和原創性。
    搶先評論