share_log

Purepoint Uranium Announces Upcoming Hook Lake Drill Program

Purepoint Uranium Announces Upcoming Hook Lake Drill Program

Purepoint 鈾宣佈即將到來的胡克湖鑽探計劃
newsfile ·  2023/11/20 19:30

Toronto, Ontario--(Newsfile Corp. - November 20, 2023) - Purepoint Uranium Group Inc. (TSXV: PTU) (OTCQB: PTUUF) ("Purepoint" or the "Company") announced today the approval of the exploration program for the Hook Lake Project for the upcoming winter season. The Hook Lake Project is a joint venture between Cameco Corporation (39.5%), Orano Canada Inc. (39.5%), and Purepoint (21%) and drilling is scheduled to commence in January 2024. The Project lies on the southwestern edge of Canada's Athabasca Basin, Canada and is adjacent to, and on trend with, high-grade uranium discoveries including Fission Uranium's Triple R Deposit and NexGen's Arrow Deposit.

安大略省多倫多--(Newsfile Corp.,2023 年 11 月 20 日)-Purepoint 鈾業集團公司(多倫多證券交易所:PTU)(OTCQB:PTUUF) (“Purepoint” 或者 “公司”)今天宣佈批准即將到來的冬季胡克湖項目的勘探計劃。胡克湖項目是Cameco Corporation(39.5%)、加拿大奧蘭諾公司(39.5%)和Purepoint(21%)的合資企業,鑽探計劃於2024年1月開始。該項目位於加拿大阿薩巴斯卡盆地的西南邊緣,毗鄰裂變鈾的Triple R礦牀和NexGen的Arrow礦牀等高品位鈾礦牀,並呈現這一趨勢。

"This past winter's program ended on a very high note with a uranium intercept associated with boron that is reminiscent of our early discoveries at the Spitfire Deposit. As a matter of fact, hole CRT23-05 delivered the project's highest uranium grade outside of the Spitfire Deposit" said Scott Frostad, Vice President Exploration at Purepoint. "We are anxious to follow up on this radioactivity to determine whether we are coming into a prominent area of mineralization."

“去年冬天的計劃以非常高的音調結束,與硼相關的鈾截獲讓人想起我們在噴火戰鬥機礦牀的早期發現。Purepoint勘探副總裁斯科特·弗羅斯塔德說:“事實上,CRT23-05 洞在噴火礦牀之外提供了該項目最高的鈾品位。”“我們急於跟蹤這種放射性,以確定我們是否進入了重要的礦化區域。”

Highlights

亮點

  • Approximately 2,500 metres of diamond drilling are planned across 5 holes at the Carter Corridor.

  • The program will follow up on hole CRT23-05 which returned an assay of 0.08% U3O8 (671 ppm U) over 0.4 metres (319.1 to 319.5m) from a 15-metre graphitic shear zone (318 to 333m downhole depth) below the unconformity (283m).

  • In addition, the CRT23-05 mineralization was found to have a significant boron halo returning greater than 800 ppm B over 35 metres (305-340m).

  • The Carter corridor is a long lived, reactivated fault zone that lies between the Clearwater Domain granitic intrusive rocks to the west and runs parallel to the Patterson structural corridor to the immediate east.

  • The 25-kilometre strike length of the Carter structural/conductive corridor is almost entirely located within the Hook Lake JV project.

  • Drilling is expected to begin in January 2024.

  • Complete details of all Purepoint's exploration projects and next steps can be found on the company's website at .

  • 計劃在卡特走廊的 5 個洞中鑽探大約 2,500 米的鑽石。

  • 該項目將對 CRT23-05 井進行後續研究,該孔從不合格區域(283m)下方的 15 米石墨剪切帶(318 至 333 米)處,在 0.4 米(319.1 至 319.5 米)處返回了 0.08% 的 U3O8(671 ppm U)的檢測。

  • 此外,還發現 CRT23-05 礦化具有明顯的硼暈,在 35 米(305-340 米)內返回的硼暈超過 800 ppm B。

  • 卡特走廊是一個壽命長、重新激活的斷層帶,位於西邊的克利爾沃特域花崗岩侵入岩之間,與緊鄰的帕特森結構走廊平行。

  • 卡特結構/導電走廊長度爲25千米,幾乎完全位於胡克湖合資項目內。

  • 鑽探預計將於2024年1月開始。

  • Purepoint所有勘探項目和後續步驟的完整詳細信息可以在該公司的網站上找到,網址爲。

A current National Instrument 43-101 compliant technical report on the flagship Hook Lake Joint Venture project can be found at - "Technical Report on the Hook Lake Project, Northern Saskatchewan, Canada April 19, 2022."

有關胡克湖合資企業旗艦項目的最新符合國家儀器43-101標準的技術報告,可在以下網址找到:“2022年4月19日加拿大北薩斯喀徹溫省胡克湖項目技術報告”。

Hook Lake - The Carter Corridor

胡克湖-卡特走廊

The Hook Lake JV Project is owned jointly by Cameco Corp. (39.5%), Orano Canada Inc. (39.5%) and Purepoint Uranium Group Inc. (21%) as operator and consists of nine claims totaling 28,598 hectares situated in the southwestern Athabasca Basin. The Hook Lake JV Project is considered one of the highest quality uranium exploration projects in the Athabasca Basin due to its location along the prospective Patterson Lake trend and the relatively shallow depth to the unconformity.

胡克湖合資項目由Cameco Corp.(39.5%)、加拿大奧蘭諾公司(39.5%)和運營商Purepoint鈾業集團有限公司(21%)共同擁有,包括位於阿薩巴斯卡盆地西南部共計28,598公頃的九個主權。胡克湖合資項目被認爲是阿薩巴斯卡盆地最高質量的鈾勘探項目之一,因爲該項目位於潛在的帕特森湖趨勢沿線,而且不合規深度相對較淺。

The Patterson Lake area was recently flown by an airborne gravity survey (Boulanger, Kiss and Tschirhart, 2019) that was funded by the Targeted Geoscience Initiative (TGI), a collaborative federal geoscience program. The gravity results show the southern portion of the Carter corridor as being associated with the same gravity high response as the Triple R and Arrow uranium deposits. The gravity low response west of the Carter corridor reflects the geologically younger, Clearwater Domain intrusions. The TGI researchers (Potter et al., 2020) consider the Clearwater Domain intrusions as being high-heat-producers that warmed and circulated hydrothermal fluids over the structural corridors. Prolonged interaction of oxidized uranium-bearing fluids with basement rocks via reactivated faults is thought to have formed the high-grade uranium deposits.

最近對帕特森湖地區進行了空中重力測量(Boulanger、Kiss和Tschirhart,2019年),該調查由聯邦地球科學合作計劃定向地球科學計劃(TGI)資助。重力結果顯示,卡特走廊的南部與Triple R和Arrow鈾礦牀具有相同的重力高響應。卡特走廊以西的低重力響應反映了地質學上更年輕的克利爾沃特域入侵。TGI研究人員(Potter等人,2020年)認爲克利爾沃特域的入侵是產生高溫的物體,它使熱液在結構走廊上升和循環。人們認爲,氧化的含鈾液體通過重新激活的斷層與基底岩石長期相互作用形成了高品位鈾礦牀。

Earlier this year, Purepoint drilled 2,710 metres in six holes to test the Carter Corridor. As this was our first pass drilling, the main conductive trend was tested using 800 metre step-outs towards the north to identify the most prospective geology.

今年早些時候,Purepoint在六個洞中鑽了2710米,以測試卡特走廊。由於這是我們首次通過鑽探,因此測試了主要的導電趨勢,向北走了800米,以確定最具前景的地質情況。

Drill hole CRT23-05 intersected a sheared/faulted chlorite-altered, graphitic diorite gneiss over 15 metres before encountering 5 metres of intense clay alteration. The graphitic shear returned an assay of 0.08% U3O8 (671 ppm U) over 0.4 metres (319.1 to 319.5m).

鑽孔 CRT23-05 與剪切/斷層的亞氯酸鹽變異石墨狀閃長巖片麻岩相交超過 15 米,然後遇到 5 米的劇烈粘土變化。石墨剪切在0.4米(319.1至319.5米)上返回了0.08%的U3O8(671 ppm U)的檢測結果。

About Purepoint

關於 Purepoint

Purepoint Uranium Group Inc. (TSXV: PTU) (OTCQB: PTUUF) actively operates an exploration pipeline of 9 advanced projects in Canada's Athabasca Basin. In addition to its flagship joint venture project at Hook Lake with partners Cameco and Orano and a second joint venture with Cameco at Smart Lake, Purepoint also holds seven, 100% owned projects with proven uranium rich targets. With an aggressive exploration program underway on multiple projects, Purepoint is emerging as the preeminent uranium explorer in the world's richest uranium district.

Purepoint Uranium Group Inc.(多倫多證券交易所股票代碼:PTUU)(OTCQB:PTUUF)在加拿大阿薩巴斯卡盆地積極運營由9個高級項目組成的勘探管道。除了與合作伙伴Cameco和Orano在胡克湖的旗艦合資項目以及與Cameco在Smart Lake的第二家合資項目外,Purepoint還擁有七個 100% 持股的項目,這些項目已證實富鈾目標。隨着多個項目的積極勘探計劃正在進行中,Purepoint正在成爲世界上最富有的鈾礦區的卓越鈾勘探商。

Scott Frostad, P.Geo., Purepoint's Vice President, Exploration, is the Qualified Person responsible for technical content of this release.

Purepoint 勘探副總裁 P.Geo. Scott Frostad 是負責本版本技術內容的合格人員。

For more information, please contact:
Chris Frostad, President & CEO
Phone: (416) 603-8368
Email: cfrostad@purepoint.ca

欲了解更多信息,請聯繫:
克里斯·弗羅斯塔德,總裁兼首席執行官
電話:(416) 603-8368
電子郵件:cfrostad@purepoint.ca

For additional information please visit our website at , our X feed: @PurepointU3O8 or our LinkedIn page @Purepoint-Uranium.

欲了解更多信息,請訪問我們的網站,即我們的 X feed:@PurepointU3O8 或我們的 LinkedIn 頁面 @Purepoint-Uranium。

Neither the Exchange nor its Regulation Services Provider (as that term is defined in the policies of the Exchange) accepts responsibility for the adequacy or accuracy of this Press release.

交易所及其監管服務提供商(該術語在交易所政策中定義)均不對本新聞稿的充分性或準確性承擔責任。

Disclosure regarding forward-looking statements

有關前瞻性陳述的披露

This press release contains projections and forward-looking information that involve various risks and uncertainties regarding future events. Such forward-looking information can include without limitation statements based on current expectations involving a number of risks and uncertainties and are not guarantees of future performance of the Company. These risks and uncertainties could cause actual results and the Company's plans and objectives to differ materially from those expressed in the forward-looking information. Actual results and future events could differ materially from those anticipated in such information. These and all subsequent written and oral forward-looking information are based on estimates and opinions of management on the dates they are made and expressly qualified in their entirety by this notice.

本新聞稿包含涉及未來事件的各種風險和不確定性的預測和前瞻性信息。此類前瞻性信息可以包括但不限於基於當前預期的陳述,涉及許多風險和不確定性,不能保證公司的未來表現。這些風險和不確定性可能導致實際業績以及公司的計劃和目標與前瞻性信息中表達的結果存在重大差異。實際結果和未來事件可能與此類信息中的預期存在重大差異。這些以及隨後的所有書面和口頭前瞻性信息均基於管理層對這些信息發佈之日的估計和意見,本通知對這些信息進行了明確的全面保留。

To view the source version of this press release, please visit

要查看本新聞稿的源版本,請訪問

譯文內容由第三人軟體翻譯。


以上內容僅用作資訊或教育之目的,不構成與富途相關的任何投資建議。富途竭力但無法保證上述全部內容的真實性、準確性和原創性。
    搶先評論