share_log

Sun Summit Options the JD Project in the Toodoggone Gold-Copper District of North-Central British Columbia

Sun Summit Options the JD Project in the Toodoggone Gold-Copper District of North-Central British Columbia

Sun Summit Options:位於不列顛哥倫比亞省中北部圖多貢金銅區的京東項目
newsfile ·  2023/11/10 01:00

Vancouver, British Columbia--(Newsfile Corp. - November 9, 2023) - Sun Summit Minerals Corp. (TSXV: SMN) (OTCQB: SMREF) is pleased to announce that it has signed a Letter of Intent dated November 8, 2023 to option the JD Project in the Toodoggone gold-copper district in north-central British Columbia.

不列顛哥倫比亞省溫哥華--(新聞檔案公司,2023年11月9日)——太陽峯礦業公司(多倫多證券交易所股票代碼:SMN)(OTCQB:SMREF)欣然宣佈,它已於2023年11月8日簽署了一份意向書,選擇不列顛哥倫比亞省中北部Toodoggone金銅區的京東項目。

Highlights

亮點

  • Strong high-grade gold and silver mineralization potential: The JD Project is locally characterized by high-grade epithermal gold and silver mineralization highlighted by previous drill intercepts of 35.7 m of 7.26 g/t Au including 1 m of 215.4 g/t Au (JD95-0471), and 22.0 m of 11.7 g/t Au including 4.0 m of 61.2 g/t Au (CZ97-0082).
  • Significant porphyry-related copper mineralization discovery potential: The JD Project contains numerous poorly tested porphyry-related copper targets (e.g., McClair, Moosehorn, Ferricrete) that warrant considerable exploration.
  • Prolific exploration jurisdiction in existing mining camp: The Toodoggone gold-copper mineral belt represents a historically significant mining camp which has seen a recent resurgence of activity, development of infrastructure, and advancement of projects.
  • Strategic transaction with shareholder benefit: The acquisition of the JD Project provides the Company and its shareholders with significant new discovery potential and ongoing value creation.
  • Diversified project portfolio: The Company will be focused on exploration and expansion of two projects in mining-friendly jurisdictions; the Buck and JD projects.
  • 強大的高品位金銀礦化潛力: 京東項目在當地的特點是高品位的超熱液金和銀礦化,之前的鑽探截獲突顯了這一點 35.7 m 的 7.26 g/t Au 包括 1 m 的 215.4 g/t Au (JD95-047)1),以及 22.0 m 的 11.7 g/t Au 包括 4.0 m 的 61.2 g/t Au (CZ97-0082)。
  • 與斑岩相關的顯著銅礦化發現潛力: 京東項目包含許多測試不佳的斑岩相關銅目標(例如麥克萊爾、Moosehorn、Ferricrete),值得進行大量勘探。
  • 現有采礦營地的豐富勘探管轄權: Toodogne金銅礦帶是一個具有重要歷史意義的採礦營地,最近該採礦營地的活動、基礎設施的發展和項目的進展都得到了回升。
  • 具有股東利益的戰略交易: 對京東項目的收購爲公司及其股東提供了巨大的新發現潛力和持續的價值創造。
  • 多元化的項目組合: 該公司將專注於在礦業友好型司法管轄區勘探和擴建兩個項目:Buck和JD項目。

Sharyn Alexander, Sun Summit's President, stated: "The acquisition of the JD Project represents an outstanding opportunity for Sun Summit and its shareholders. We are excited for the opportunity to expand and diversify the Company's project portfolio with the addition of a high-grade precious metals project in an emerging mining district in British Columbia. The JD Project is an underexplored land package in a favourable geological environment where previous drill results have yielded significant intercepts of near-surface high grade gold and silver mineralization. As data review and compilation progresses, additional historic exploration results from drilling and sampling will be shared with the market.

太陽峯會總裁莎琳·亞歷山大表示:“收購京東項目對太陽峯會及其股東來說是一個絕佳的機會。我們很高興有機會在不列顛哥倫比亞省新興礦區增加一個高品位貴金屬項目,從而擴大公司的項目組合並實現多元化。在有利的地質環境中,JD項目是一塊未被充分開發的土地,先前的鑽探結果已經產生了大量的近地表高品位金銀礦化截留物。隨着數據審查和彙編的進展,鑽探和採樣的其他歷史勘探結果將與市場共享。

"The JD Project will augment our existing Buck Project, which will continue to see strategic advancement, including an upcoming initial Mineral Resource Estimate at Buck Main and ongoing drill target generation elsewhere on the project."

“京東項目將擴充我們現有的巴克項目,該項目將繼續取得戰略進展,包括Buck Main即將進行的初步礦產資源估算,以及該項目其他地方正在進行的鑽探目標制定。”

Project Overview

項目概述

The JD Project is located in the Toodoggone gold-copper mineral district in British Columbia, a historically significant mining camp that has seen considerable recent exploration and development activity (Figure 1). The project covers over 15,000 hectares, located adjacent to the north and east of Thesis Gold's Lawyers and Ranch properties, adjacent to the north of TGD Gold's Baker and Shasta properties.

京東項目位於不列顛哥倫比亞省的Toodogone金銅礦區,這是一個具有歷史意義的採礦營地,最近進行了大量的勘探和開發活動(圖 1)。該項目佔地超過15,000公頃,毗鄰Thesis Gold的律師和牧場物業的北部和東部,毗鄰TGD Gold的貝克和沙斯塔物業以北。


Figure 1. JD Project Location, Toodoggone Gold-Copper District, BC


圖 1。京東項目地點,不列顛哥倫比亞省 Toodoggone 金銅區

The JD project provides a unique opportunity to explore two mineralization types, epithermal-related gold-silver and porphyry-related copper-gold.

京東項目爲探索兩種礦化類型提供了難得的機會, 與表溫相關的金銀和與斑岩相關的銅金。

The epithermal-related systems, locally dispersed over a 3.8 km east-west trend, are poorly explored, and represent high-grade gold and silver mineralization potential. High-grade epithermal-related gold mineralization is highlighted by previous drilling, including: 77 m of 2.4 g/t Au including 12.6 m of 10.8 g/t Au (JD12-0037) and 35.7 m of 7.26 g/t Au including 1 m of 215.4 g/t Au (JD95-0471), in the Finn Zone; and 22.0 m of 11.7 g/t Au including 4.0 m of 61.2 g/t Au (CZ97-0082) in the Creek Zone.

與地熱相關的系統局部分佈在3.8千米的東西向趨勢中,勘探不足,具有高品位的金銀礦化潛力。先前的鑽探突顯了與表溫相關的高品位金礦化,包括: 77 m 的 2.4 g/t Au 包括 12.6 m 的 10.8 g/t Au (JD12-003)7) 和 35.7 m 含有 7.26 g/t Au,包括 1 m 215.4 g/t Au (JD95-047)1),在芬蘭區;以及 22.0 m 的 11.7 g/t Au 包括 4.0 m 的 61.2 g/t Au (CZ97-0082) 在 Creek Zone。

Porphyry-related mineralization and alteration was also discovered in previous drill holes east of the Finn Zone where five holes, spanning over 850 metres of strike length, were drilled. All holes intersected porphyry related alteration and one hole bottomed in 0.46% Cu over 1.4 m (JD-13-0258), indicating the potential for porphyry-related systems at lower elevations.

在芬蘭區以東的先前鑽孔中也發現了與斑岩相關的礦化和蝕變,在那裏鑽了五個鑽孔,走向長度超過850米。所有洞都與斑岩相關的變化和一個洞相交 在 1.4 米以內以 0.46% 的銅量觸底 (JD-13-0258),表明在較低海拔地區有可能出現與斑岩相關的系統。

The project area is also characterized by broad zones of multi-element soil anomalies, highlighting strong discovery potential across several targets in the project area.

該項目區域還具有以下特點: 多元素土壤異常的廣闊區域,突顯了該項目區域多個目標的強大發現潛力。

Option Terms

期權條款

To exercise the option, Sun Summit must make payments and issue post-consolidated shares to the optionors and incur expenditures on the Project over six years as follows:

要行使期權,Sun Summit必須向期權持有人付款併發行合併後的股票,並在六年內承擔該項目的支出,如下所示:

  • Payments of $1,175,000, consisting of $175,000 in installments in the first year, and $200,000 on each of the first through fifth anniversaries of signing of the formal agreement;
  • Issuing 8,000,000 (post 3:1 consolidation) shares to the optionors, consisting of 2,000,000 shares issued upon TSX Venture Exchange approval of the option, and 1,000,000 shares on each of the first through sixth anniversaries of signing of the formal agreement; and
  • Incurring $22,500,000 in exploration expenditures, starting at $2,500,000 in the first year, and increasing by $500,000 each year until which $5,000,000 being spent in the sixth year.
  • 1,175,000美元的付款,包括第一年的17.5萬美元分期付款,以及正式協議簽署一至五週年每20萬美元的款項;
  • 向期權持有人發行8,000,000股(3:1 合併後),包括在多倫多證券交易所風險交易所批准該期權後發行的2,000,000股股票,以及在正式協議簽署一至六週年之際發行的每股1,000,000股;以及
  • 產生2250萬美元的勘探支出,第一年起價爲250萬美元,每年增加50萬美元,直到第六年支出500萬美元。

Upon exercise of the option, Sun Summit will grant Net Smelter Return (NSR) royalties on the Property to the optionors as follows:

行使期權後,Sun Summit將按以下方式向期權人發放該物業的淨冶煉廠回報(NSR)特許權使用費:

  • a 2.0% NSR royalty on the JD claims, which can be reduced by 50% to a 1.0% NSR royalty by the payment of $7,500,000 no later than the receipt of production financing or $10,000,000 upon commercial production being achieved;
  • a 1.0% NSR royalty on the Belle claims; and
  • a 1.0% NSR royalty on any interest acquired by Sun Summit in an area of interest north of the Project.
  • 京東索賠的2.0%的NSR特許權使用費,通過在收到製作融資之前支付750萬美元或在實現商業生產後支付1,000,000美元,可以將其減少50%至1.0%的NSR特許權使用費;
  • Belle 索賠的 NSR 特許權使用費爲 1.0%;以及
  • 對於Sun Summit在項目以北的利益區域收購的任何權益,應繳納1.0%的NSR特許權使用費。

The Belle claims are also subject to a 2.0% NSR royalty in favour of a third party, which royalty obligation will be assumed by Sun Summit and can be reduced by 50% to a 1.0% NSR royalty by the payment of $2,000,000 to the third party.

Belle索賠還需繳納2.0%的NSR特許權使用費,該特許權使用費將由Sun Summit承擔,通過向第三方支付2,000,000美元,可以將該特許權使用費減少50%至1.0%。

If the option is exercised, Sun Summit will make, until the commencement of any commercial production, advance royalty payments of $250,000 to the optionors on each anniversary of such exercise. Such payments will be credited against any royalty payments due to the optionors after the commencement of commercial production. Upon the commencement of commercial production from the Property, Sun Summit will make a payment of $1,000,000 to the optionors.

如果行使期權,Sun Summit將在行使期權的每個週年紀念日向期權人預付25萬美元的特許權使用費,直到任何商業生產開始爲止。此類付款將記入開始商業生產後應付給期權人的任何特許權使用費中。該物業開始商業化生產後,Sun Summit將向期權持有人支付100萬美元。

Subject to Exchange approval, Sun Summit intends to pay a finder's fee to Dr. Christopher Leslie of up to $303,750 and 200,000 post-consolidated shares over two years in consideration of his efforts in the Company being granted its option to acquire the JD Project.

經交易所批准,Sun Summit打算在兩年內向克里斯托弗·萊斯利博士支付最高303,750美元的發現費和20萬股合併後的股份,以考慮他在公司的努力獲得了收購京東項目的選擇權。

Share Consolidation

股票合併

Prior to the issuance of any shares pursuant to the option, Sun Summit must complete a three into one share consolidation. Sun Summit currently has 105,601,688 common shares issued and outstanding and, if the consolidation is completed, it will have 35,200,563 common shares issued and outstanding. The exercise price of outstanding incentive stock options to purchase 5,795,000 (1,931,667 post-consolidation) common shares and warrants to purchase 32,280,102 (10,760,034 post-consolidation) common shares will be increased accordingly to reflect the share consolidation. No fractional shares will be issued in the share consolidation. Instead, all resulting fractional shares of less than one-half will be rounded down to the nearest whole number, and of one-half or greater will be rounded up to the nearest whole number.

在根據期權發行任何股票之前,Sun Summit必須完成三合一的股票合併。Sun Summit目前已發行和流通的普通股爲105,601,688股,如果合併完成,它將發行和流通35,200,563股普通股。購買5,795,000股(合併後1,931,667股)普通股的已發行激勵性股票期權和購買32,280,102股(合併後10,760,034股)普通股的認股權證的行使價將相應提高,以反映股票整合。股票合併中不會發行任何零碎股票。取而代之的是,所有小於二分之一的分數份額將向下舍入到最接近的整數,二分之一或以上的分數份額將向上舍入到最接近的整數。

The Company does not intend to change its name in connection with the consolidation, although its CUSIP number and ISIN will change.

儘管其CUSIP號碼和ISIN將更改,但該公司不打算因合併而更改其名稱。

Live Video Webinar

直播視頻網絡研討會

Sun Summit Minerals invites shareholders and other interested parties to attend a video webinar to be held Thursday, November 16, 2023 at 1:00 pm PT / 4:00 pm ET.

Sun Summit Minerals邀請股東和其他利益相關方參加將於太平洋時間2023年11月16日星期四下午1點/美國東部時間下午4點舉行的視頻網絡研討會。

Sharyn Alexander, President, will provide a brief update and overview on the JD Project in the Toodoggone gold-copper district of northern-central British Colombia, as well as the Company's growth strategy and upcoming milestones. A question and answer session will allow all attendees to ask questions directly to management about current and future catalysts.

總裁莎琳·亞歷山大將簡要介紹位於不列顛哥倫比亞省中北部Toodogone金銅區的京東項目的最新情況和概述,以及該公司的增長戰略和即將到來的里程碑。問答環節將允許所有與會者直接就當前和未來的催化劑向管理層提問。

Those interested in getting an update or learning more about Sun Summit Minerals should register for the event using the URL link provided. Alternatively, email Sun Summit's Corporate Communications team to register for the event.

那些有興趣獲取最新消息或進一步了解Sun Summit Minerals的人應使用提供的網址鏈接註冊參加該活動。或者,向Sun Summit的企業傳播團隊發送電子郵件以註冊該活動。

For more information and to register:

欲了解更多信息並註冊:

National Instrument 43-101 Disclosure

美國國家儀器 43-101 披露

This news release has been approved by Sun Summit's Technical Advisor, Dr. Christopher Leslie, P. Geo., a "Qualified Person" as defined in National Instrument 43-101, Standards of Disclosure for Mineral Projects of the Canadian Securities Administrators.

本新聞稿已獲得 Sun Summit 的技術顧問 Christopher Leslie, P. Geo. 博士的批准,他是《國家儀器 43-101》中定義的 “合格人士” 礦產項目披露標準 加拿大證券管理局的。

Data disclosed in this news release relating to sampling and drilling results is historical in nature. Neither the Company nor a qualified person has verified this data and therefore investors should not rely on such data. Mineralization hosted on adjacent, nearby, or geologically similar properties is not necessarily indicative of mineralization hosted on the JD Project.

本新聞稿中披露的與採樣和鑽探結果有關的數據本質上是歷史數據。公司和合格人員均未驗證這些數據,因此投資者不應依賴此類數據。位於鄰近、附近或地質相似地質上的礦化不一定表示京東項目存在礦化。

Community Engagement

社區參與

Sun Summit is engaging with First Nations on whose territory our projects are located and is discussing their interests and identifying contract and work opportunities, as well as opportunities to support community initiatives. The Company looks forward to continuing to work with local and regional First Nations as project work continues.

Sun Summit 正在與我們的項目所在的原住民接觸,並正在討論他們的利益,確定合同和工作機會,以及支持社區舉措的機會。隨着項目工作的繼續,該公司期待繼續與當地和地區的原住民合作。

About Sun Summit

關於太陽峯會

Sun Summit Minerals (TSXV: SMN) (OTCQB: SMREF) is a mineral exploration company focused on expanding its gold, silver, and zinc discovery at its flagship Buck Project located in north-central British Columbia.

Sun Summit Minerals(多倫多證券交易所股票代碼:SMN)(場外交易代碼:SMREF)是一家礦產勘探公司,專注於擴大其位於不列顛哥倫比亞省中北部的旗艦巴克項目的金、銀和鋅的發現。

Sun Summit is committed to environmental and social responsibility, with a focus on accountable development and building respectful and beneficial relationships with Indigenous and local communities.

Sun Summit 致力於履行環境和社會責任,重點是負責任的發展以及與土著和當地社區建立相互尊重和有益的關係。

Further details are available at .

更多詳情請見。

References

參考文獻

  1. JD95-047 data: Krause, R.G. (1996), 1995 Geological Report on the JD Gold Silver Property, Toodoggone River Area, Omineca Mining Division, British Columbia, Assessment Report Indexing System, Report 24284,
  2. CZ97-008 data: Hawkins, P.A. (1998), Exploration report on the Creek Zone, Toodoggone River Area, BC., for Antares Mining and Exploration Corporation and AGC Americas Gold Corp, (private report); reported in Assessment Report Indexing System, Report 25757,
  3. Thesis Gold Inc., website .
  4. Lawyers M,I&I: Thesis Gold Inc., website () and NI 43-101 technical report titled: Preliminary Economic Assessment Lawyers Gold-Silver Project Stikine Terrane, BC. Dated December 22, 2022 with an effective date of September 9, 2022 available under Thesis' SEDAR+ profile at .
  5. TDG Gold Corp., website () and NI43-101 technical report titled: The Toodoggone Portfolio and the 2023 Resource Estimate for the Shasta Deposit. Dated June 14, 2023 with an effective date of February 11, 2023, available under TDG's SEDAR+ profile at .
  6. Centerra Gold website, Centerra Gold Inc. 2022 Year-End Mineral Reserve and Resources Summary as of December 31, 2022, .
  7. JD12-003 data: McBride, S. (2013), 2012 Geological, geochemical and diamond drilling report on the JD Property, Assessment Report Indexing System, Report 33556,
  8. JD13-025 data: McBride, S. and Leslie, C. (2014), 2013 Geological, geophysical and diamond drilling report on the JD Property, Assessment Report Indexing System, Report 34762,
  1. JD95-047 數據:R.G. Krause(1996),《1995 年不列顛哥倫比亞省奧米內卡礦業部圖多貢河地區京東金銀地質報告》,評估報告索引系統,第 24284 號報告,
  2. CZ97-008 數據:賓夕法尼亞州霍金斯(1998 年),安塔雷斯礦業與勘探公司和 AGC 美洲黃金公司的不列顛哥倫比亞省圖多貢河地區溪區勘探報告,(私人報告);報告載於評估報告索引系統,第 25757 號報告,
  3. Thesis Gold Inc.,網站。
  4. Lawyers M、I&I:Thesis Gold Inc.,網站 () 和標題爲:《初步經濟評估律師金銀項目》,不列顛哥倫比亞省Stikine Terrane的NI 43-101技術報告日期爲2022年12月22日,生效日期爲2022年9月9日,可在Thesis的SEDAR+個人資料下查閱,網址爲。
  5. TDG Gold Corp.,網站 () 和 NI43-101 技術報告,標題爲:Toodoggone投資組合和沙斯塔礦牀2023年資源估算。日期爲 2023 年 6 月 14 日,生效日期爲 2023 年 2 月 11 日,可在 TDG 的 SEDAR+ 個人資料中查閱,網址爲。
  6. Centerra Gold網站,截至2022年12月31日的Centerra Gold Inc.2022年年終礦產儲量和資源摘要。
  7. JD12-003 數據:McBride,S.(2013),《2012年京東地產地質學、地球化學和鑽石鑽探報告》,評估報告索引系統,33556號報告,
  8. JD13-025 數據:S. McBride 和 C. Leslie,C.(2014),《2013年京東地產地質學、地球物理和鑽石鑽探報告》,評估報告索引系統,第34762號報告,

Link to Figures

鏈接到數字

Figure 1:

圖 1:

For further information, contact:

欲了解更多信息,請聯繫:

Sharyn Alexander
President
info@sunsummitminerals.com

莎琳·亞歷山大
主席
info@sunsummitminerals.com

Matthew Benedetto
Simone Capital
mbenedetto@simonecapital.ca

馬修·貝內代託
西蒙妮資本
mbenedetto@simonecapital.ca

Tel. 416-817-1226

電話 416-817-1226

Forward Looking Information

前瞻性信息

Statements contained in this news release that are not historical facts may be forward-looking statements, which involve risks, uncertainties and other factors that could cause actual results to differ materially from those expressed or implied by such forward-looking statements. Factors that could cause such differences, without limiting the generality of the following, include: risks inherent in exploration activities; the impact of exploration competition; unexpected geological or hydrological conditions; changes in government regulations and policies, including trade laws and policies; failure to obtain necessary permits and approvals from government authorities; volatility and sensitivity to market prices; volatility and sensitivity to capital market fluctuations; the ability to raise funds through private or public equity financings; environmental and safety risks including increased regulatory burdens; weather and other natural phenomena; and other exploration, development, operating, financial market and regulatory risks. Except as required by applicable securities laws and regulation, Sun Summit disclaims any intention or obligation to update or revise any forward-looking statement, whether as a result of new information, future events or otherwise, except as required by applicable securities laws.

本新聞稿中包含的非歷史事實的陳述可能是前瞻性陳述,涉及風險、不確定性和其他因素,可能導致實際業績與此類前瞻性陳述所表達或暗示的結果存在重大差異。在不限制下述內容普遍性的前提下,可能造成這種差異的因素包括:勘探活動固有的風險;勘探競爭的影響;意想不到的地質或水文狀況;包括貿易法和政策在內的政府規章和政策的變化;未能獲得政府當局的必要許可和批准;波動性和對資本市場波動的敏感性;通過私募或公共股權融資籌集資金的能力;環境和安全風險,包括增加的監管負擔;天氣和其他自然現象;以及其他勘探、開發、運營、金融市場和監管風險。除非適用的證券法律法規要求,否則除非適用的證券法要求,否則Sun Summit不打算或有義務更新或修改任何前瞻性陳述,無論是由於新信息、未來事件還是其他原因。

Neither the TSX Venture Exchange nor the Investment Industry Regulatory Organization of Canada accepts responsibility for the adequacy or accuracy of this release.

多倫多證券交易所風險交易所和加拿大投資行業監管組織均不對本新聞稿的充分性或準確性承擔責任。

To view the source version of this press release, please visit

要查看本新聞稿的源版本,請訪問

譯文內容由第三人軟體翻譯。


以上內容僅用作資訊或教育之目的,不構成與富途相關的任何投資建議。富途竭力但無法保證上述全部內容的真實性、準確性和原創性。
    搶先評論