share_log

RETRANSMISSION: Blackrock Announces Filing of Tonopah West Project Technical Report

RETRANSMISSION: Blackrock Announces Filing of Tonopah West Project Technical Report

轉播:貝萊德宣佈提交 Tonopah West 項目技術報告
newsfile ·  2023/11/09 19:00

Vancouver, British Columbia--(Newsfile Corp. - November 9, 2023) - Blackrock Silver Corp. (TSXV: BRC) (the "Company" or "Blackrock") is pleased to announce that it has filed on SEDAR+ an independent technical report and updated mineral resource estimate (the "Updated MRE") titled "Technical Report for Updated Estimate of Mineral Resources, Tonopah West Silver-Gold Project, Nye and Esmeralda Counties, Nevada, USA" effective October 6, 2023 and dated November 8, 2023 (the "Technical Report") for the Tonopah West silver-gold project. The Technical Report was prepared in accordance with the Canadian Institute of Mining, Metallurgy and Petroleum Definition Standards for Mineral Resources and Mineral Reserves adopted May 19, 2014, and in accordance with National Instrument 43-101 - Standards of Disclosure for Mineral Projects and supports the disclosure made by the Company in its October 10, 2023 news release announcing the updated MRE. There are no material differences in the Technical Report from the information disclosed in the October 10, 2023 news release.

不列顛哥倫比亞省溫哥華--(Newsfile Corp.,2023 年 11 月 9 日)-貝萊德白銀公司(TSXV:BRC)(the”公司“或”貝萊德“)很高興地宣佈,它已向SEDAR+提交了一份獨立的技術報告和最新的礦產資源估算(”已更新 MRE“) 標題爲 “美國內華達州奈縣和埃斯梅拉達縣託諾帕西銀金項目礦產資源最新估算技術報告”,自 2023 年 10 月 6 日起生效,日期爲 2023 年 11 月 8 日(技術報告“) 用於 Tonopah West 銀金項目。該技術報告是根據加拿大礦業、冶金和石油學會於2014年5月19日通過的《礦產資源和礦產儲量定義標準》以及國家儀器43-101編寫的- 礦產項目披露標準 並支持該公司在2023年10月10日發佈更新後的MRE的新聞稿中披露的內容。技術報告與2023年10月10日新聞稿中披露的信息沒有實質性差異。

HIGHLIGHTS:

亮點:

  • The Updated MRE contains a total of 0.57 million ounces ("Moz") of gold and 47.74Mozs of silver or 100.04Mozs of silver equivalent ("AgEq"), which is a 135% increase over the maiden resource estimate for Tonopah West (the "Maiden MRE") included in the technical report dated effective April 28, 2022;
  • At a 200 g/t AgEq cut-off, the average grade of the inferred mineral resource is 508.5 g/t AgEq, which is a 14% increase over the Maiden MRE;
  • The Updated MRE includes 6.12 million tonnes, which is a 106% increase over the Maiden MRE;
  • Blackrock's discovery costs are $0.29 per ounce of AgEq;
  • The Updated MRE is based on a structural re-interpretation of the Victor and DPB areas and incorporation of the new drill information from the Northwest Step Out target. The Updated MRE captures approximately 3-kilometres of strike along the Tonopah West vein system; and
  • Silver and gold mineralization remains open to the northwest and internally between Victor and DPB, and DPB and the Northwest Step Out target, and at depth.
  • 更新後的 MRE 總共包含 57 萬盎司(”Moz“) 黃金和 47.74Mozs 的白銀或 100.04Mozs 的白銀當量 (”AgeQ“),比託諾帕·韋斯特的首次資源估計增加了135%(”Maiden MRE“) 包含在2022年4月28日生效的技術報告中;
  • 按200 g/t AgeQ的臨界值計算,推斷出的礦產資源的平均品位爲508.5 g/t AgeQ,比首次MRE提高了14%;
  • 更新的地雷風險評估包括612萬噸,比首次MRE增加了106%;
  • 貝萊德的發現成本爲每盎司AgeQ0.29美元;
  • 更新後的MRE基於對Victor和DPB區域的結構重新解釋,並納入了來自Northwest Step Out目標的新鑽探信息。更新後的 MRE 記錄了託諾帕西部礦脈系統沿線大約 3 公里的襲擊;以及
  • 銀和金礦化仍然向西北和維克托和DPB、DPB和Northwest Step Out目標之間的內部以及深度開放。

Table 1: Tonopah West Updated 2023 Mineral Resource Estimate

表 1:託諾帕·韋斯特更新的 2023 年礦產資源估算

AgEq
cutoff
g/t
(1)
Tonnes Silver
g/t
Gold
g/t
AgEq
g/t (2)
Ounces of
Silver
Ounces of
Gold
Ounce of
Silver
Equivalent
(3)
Classification (4)
200 6,119,000 242.6 2.90 508.5 47,738,000 570,000 100,038,000 Inferred
AgeQ
斷開器
g/t
(1)

g/t
黃金
g/t
AgeQ
g/t (2)
盎司
盎司
黃金
盎司

等效
(3)
分類 (4)
200 6,119,000 242.6 2.90 508.5 47,738,000 570,000 100,038,000 推斷

1 AgEq cutoff grade is based a total mining, processing and G&A cost of $119/tonne.
2 Silver Equivalent grade ratio used in this news is based on silver and gold prices of $22/ounce and $1,850/ounce, respectively, and recoveries for silver and gold of 87% and 95%, respectively. AgEq Factor= (Ag Price / Au Price) x (Ag Rec / Au Rec); g AgEq/t = g Ag/t + (g Au/t / AgEq Factor).
3 Rounding as required by reporting guidelines may result in apparent discrepancies between tonnes, grade, and contained metal content.
4 Mineral resources are not mineral reserves and do not have demonstrated economic viability. There is no certainty that all or any part of the mineral resources estimated will be converted into mineral reserves. The quantity and grade of reported inferred mineral resources in this estimation are uncertain in nature and there has been insufficient exploration to define these inferred mineral resources as indicated mineral resources. It is uncertain if further exploration will result in upgrading them to the Indicated mineral resources category.

1 AgeQ 截止等級基於每噸119美元的採礦、加工和併購總成本。
2 本新聞中使用的白銀等價分級比率基於白銀和黃金價格分別爲22美元/盎司和1,850美元/盎司,白銀和黃金的回收率分別爲87%和95%。AgeQ Factor=(Ag Price/Au Price)x(Ag Rec/Au Rec);g AgeQ/t = g ag/t +(g Au/t/AgeQ 係數)。
3 報告指南要求的四捨五入可能會導致噸數、等級和所含金屬含量之間存在明顯差異。
4 礦產資源不是礦產儲量,沒有顯示出經濟可行性。無法確定估計的全部或部分礦產資源是否會轉化爲礦產儲量。本估算中報告的推斷礦產資源的數量和等級本質上是不確定的,而且勘探不足以將這些推斷的礦產資源定義爲指示的礦產資源。目前尚不確定進一步勘探是否會導致將其升級爲指定礦產資源類別。

Table 2: Tonopah West Cut-off Grade Sensitivity From The Updated 2023 Mineral Resource Estimate

表 2:根據最新的 2023 年礦產資源估算得出的託諾帕西部截止品位靈敏度

All TP West Mineralization at Various Cutoff Grades
Cutoff
Grade

g AgEq/t
Tonnes Ave. AgEq
Grade

g AgEq/t
Ave. Ag
Grade

g Ag/t
Ave. Au
Grade
g Au/t
Contained oz
Ag
Contained oz
Au
Contained oz
AgEq
200 6,119,000 508.5 242.6 2.9 47,738,000 570,000 100,038,000
210 5,840,000 523.0 249.0 3.0 46,762,000 560,000 98,200,000
220 5,511,000 541.4 256.8 3.1 45,507,000 549,000 95,926,000
230 5,240,000 557.7 263.9 3.2 44,456,000 539,000 93,964,000
240 5,015,000 572.2 270.3 3.3 43,578,000 530,000 92,266,000
250 4,807,000 586.4 276.5 3.4 42,728,000 522,000 90,625,000
275 4,340,000 621.3 291.6 3.6 40,689,000 501,000 86,686,000
300 3,928,000 656.3 307.0 3.8 38,771,000 480,000 82,886,000
400 2,827,000 777.5 358.1 4.6 32,548,000 415,000 70,659,000
所有 TP West 礦化區均處於不同的截止等級
切斷
等級

g Ageq/t
Ave。AgeQ
等級

g Ageq/t
Ave。Ag
等級

g ag/t
大道。Au
等級
g au/t
所含盎司
Ag
所含盎司
Au
所含盎司
AgeQ
200 6,119,000 508.5 242.6 2.9 47,738,000 570,000 100,038,000
210 5,840,000 523.0 249.0 3.0 46,762,000 560,000 98,200,000
220 5,511,000 541.4 256.8 3.1 45,507,000 549,000 95,926,000
230 5,240,000 557.7 263.9 3.2 44,456,000 539,000 93,964,000
240 5,015,000 572.2 270.3 3.3 43,578,000 530,000 92,266,000
250 4,807,000 586.4 276.5 3.4 42,728,000 522,000 90,625,000
275 4,340,000 621.3 291.6 3.6 40,689,000 501,000 86,686,000
300 3,928,000 656.3 307.0 3.8 38,771,000 480,000 82,886,000
400 2,827,000 777.5 358.1 4.6 32,548,000 415,000 70,659,000
  1. The project mineral resources are shown in bold and are comprised of all model blocks with grades greater than or equal to a 200 g AgEq/tonne cutoff grade.
  2. Tabulations at higher cutoffs than used to define the mineral resources represent subsets of the mineral resource.
  3. Mineral resources that are not mineral reserves do not have demonstrated economic viability.
  4. Rounding as required by reporting guidelines may result in apparent discrepancies between tons, grade, and contained metal content.
  1. 項目礦產資源以粗體顯示,由所有品位大於或等於 200 g Ageq/tonne 臨界品位的模型區塊組成。
  2. 臨界值高於用於定義礦產資源的表格代表礦產資源的子集。
  3. 非礦產儲量的礦產資源沒有顯示出經濟可行性。
  4. 報告指南要求的四捨五入可能會導致噸、品位和所含金屬含量之間存在明顯差異。

The Technical Report is available for download under the Company's profile on SEDAR+ (). A copy of the Technical Report is also located on the Company's website.

該技術報告可在SEDAR+()的公司簡介下下載。該技術報告的副本也位於公司的網站上。

The Updated MRE was prepared under the supervision of Mr. Jeffrey Bickel, CPG, an employee of RESPEC (formerly Mine Development Associates), and he has reviewed and approved the technical contents relating to the Updated MRE and the Technical Report in this news release.

更新的地雷風險評估是在CPG的傑弗裏·比克爾先生的監督下編寫的,他是RESPEC(前身爲礦業開發協會)的員工,他已經審查並批准了本新聞稿中與更新後的MRE和技術報告相關的技術內容。

About Blackrock Silver Corp.

關於貝萊德白銀公司

Backed by gold and silver ounces in the ground, Blackrock is a junior precious metal focused exploration company driven to add shareholder value via the drill bit. With 6.12 million tonnes grading 508.5 g/t silver equivalent at its Tonopah West project, and a new bonanza-grade gold discovery at its Silver Cloud project, the Company has a proven track record of exploration success. In addition to its gold and silver project portfolio, the Company is credited with a lithium discovery, the Tonopah North project, which is under option to a major lithium exploration group. Anchored by a seasoned Board of Directors, the Company is focused on its 100% controlled Nevada portfolio of properties consisting of low-sulphidation, epithermal gold and silver mineralization located along the established Northern Nevada Rift in north-central Nevada and the Walker Lane trend in western Nevada.

在地下黃金和白銀盎司的支持下,貝萊德是一家專注於貴金屬的初級勘探公司,致力於通過鑽頭增加股東價值。該公司在託諾帕西部項目中發現了612萬噸品位爲508.5克/噸的銀當量,並在其Silver Cloud項目中發現了新的bonanza級金礦,在勘探成功方面有着良好的記錄。除了黃金和白銀項目組合外,該公司還發現了一項鋰電項目,即託諾帕北部項目,該項目由一家大型鋰勘探集團選擇。該公司由經驗豐富的董事會主持,專注於其 100% 控制的內華達州房地產投資組合,包括位於內華達州中北部成熟的內華達裂谷和內華達州西部的沃克巷趨勢沿線的低硫化、超熱液金和銀礦化。

For further information, please contact:

欲了解更多信息,請聯繫:

Andrew Pollard, President & Chief Executive Officer
Blackrock Silver Corp.
Phone: 604 817-6044
Email: andrew@blackrocksilver.com

安德魯·波拉德,總裁兼首席執行官
貝萊德白銀公司
電話:604 817-6044
電子郵件:andrew@blackrocksilver.com

Forward Looking Statements
This news release contains "forward-looking statements" within the meaning of Canadian securities legislation. Such forward-looking statements concern, without limitation: estimates of mineral resource quantities and qualities; estimates of mineralization from drilling; geological information projected from sampling results; and the potential quantities and grades of the target zones. Such forward-looking statements or information are based on a number of assumptions, which may prove to be incorrect. Assumptions have been made regarding, among other things: conditions in general economic and financial markets; accuracy of assay results; geological interpretations from drilling results, timing and amount of capital expenditures; performance of available laboratory and other related services; future operating costs; and the historical basis for current estimates of potential quantities and grades of target zones. The actual results could differ materially from those anticipated in these forward-looking statements as a result of risk factors, including the ability of the Company to make payments related to the lease option to purchase the Tonopah West project; the timing and content of work programs; results of exploration activities and development of mineral properties; the interpretation and uncertainties of drilling results and other geological data; receipt, maintenance and security of permits and mineral property titles; environmental and other regulatory risks; project costs overruns or unanticipated costs and expenses; availability of funds; failure to delineate potential quantities and grades of the target zones based on historical data; and general market and industry conditions. Forward-looking statements are based on the expectations and opinions of the Company's management on the date the statements are made. The assumptions used in the preparation of such statements, although considered reasonable at the time of preparation, may prove to be imprecise and, as such, readers are cautioned not to place undue reliance on these forward-looking statements, which speak only as of the date the statements were made. The Company undertakes no obligation to update or revise any forward-looking statements included in this news release if these beliefs, estimates and opinions or other circumstances should change, except as otherwise required by applicable law.

前瞻性陳述
本新聞稿包含加拿大證券立法所指的 “前瞻性陳述”。此類前瞻性陳述涉及但不限於:對礦產資源數量和質量的估計;對鑽探礦化的估計;根據抽樣結果預測的地質信息;以及目標區域的潛在數量和品位。此類前瞻性陳述或信息基於許多假設,這些假設可能被證明是不正確的。除其他外,已經對以下方面做出了假設:總體經濟和金融市場的狀況;化驗結果的地質解釋、資本支出的時間和金額;可用實驗室和其他相關服務的業績;未來的運營成本;以及當前估計目標區域潛在數量和等級的歷史基礎。由於風險因素,實際結果可能與這些前瞻性陳述中的預期存在重大差異,包括公司支付與購買託諾帕西部項目的租賃期權相關的付款能力;工作計劃的時間和內容;勘探活動和礦產開發的結果;鑽探結果和其他地質數據的解釋和不確定性;許可證和礦產所有權的接受、維護和安全;環境和其他監管風險;項目成本超支或意想不到的成本和支出;資金的可用性;未能根據歷史數據劃定目標區域的潛在數量和等級;以及總體市場和行業狀況。前瞻性陳述基於公司管理層在陳述發表之日的預期和觀點。編制此類陳述時使用的假設雖然在準備時被認爲是合理的,但可能被證明是不準確的,因此,提醒讀者不要過分依賴這些前瞻性陳述,這些陳述僅代表陳述發表之日。除非適用法律另有要求,否則如果這些信念、估計和觀點或其他情況發生變化,公司沒有義務更新或修改本新聞稿中包含的任何前瞻性陳述。

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

多倫多證券交易所風險投資交易所及其監管服務提供商(該術語在多倫多證券交易所風險投資交易所的政策中定義)均不對本新聞稿的充分性或準確性承擔責任。

To view the source version of this press release, please visit

要查看本新聞稿的源版本,請訪問

譯文內容由第三人軟體翻譯。


以上內容僅用作資訊或教育之目的,不構成與富途相關的任何投資建議。富途竭力但無法保證上述全部內容的真實性、準確性和原創性。
    搶先評論