share_log

Max Resource Secures 12 New Mineral Tenures at Its Cesar Project and Buys Back Royalty Interests

Max Resource Secures 12 New Mineral Tenures at Its Cesar Project and Buys Back Royalty Interests

Max Resource在其塞薩爾項目獲得12份新的礦產期權,並回購特許權使用費
newsfile ·  2023/11/08 08:34

Vancouver, British Columbia--(Newsfile Corp. - November 7, 2023) - MAX RESOURCE CORP. (TSXV: MAX) (OTC Pink: MXROF) (FSE: M1D2) ("Max" or the "Company") is pleased to report that it has secured twelve (12) additional applications for mining concessions covering over 132 square kilometres. The Companies wholly owned Cesar Copper Project in northeastern Colombia now spans over 120-km (previously 90-km) along strike in NNE/SSW direction (refer to Figure 1).

不列顛哥倫比亞省溫哥華--(新聞文件公司-2023 年 11 月 7 日)- MAX 資源公司 多倫多證券交易所股票代碼:MAX)(場外交易股票代碼:MXROF)(FSE:M1D2)(“Max” 或 “公司”)欣然報告說,它已獲得另外十二(12)份覆蓋超過132平方公里的採礦特許權申請。該公司在哥倫比亞東北部的全資擁有的塞薩爾銅業項目現在沿着NNE/SSW方向的罷工跨度超過120千米(以前爲90千米)(參見圖1)。

In addition, Max has acquired the underlying royalties associated with 19 mining concessions and 31 mining concession applications of the Cesar Project.

此外,Max還收購了與Cesar項目的19個採礦特許權和31份採礦特許權申請相關的基礎特許權使用費。

"We continue to strategically increase our land position in the Cesar basin as a result of our field crew's successes in locating new copper and silver outcrops. The technical team continues to develop our geological and mineralization models as new geological and geophysical data is acquired," commented Brett Matich, CEO of Max.

“由於我們的現場工作人員成功地找到了新的銅和銀露頭,我們繼續戰略性地增加我們在塞薩爾盆地的陸地位置。隨着新的地質和地球物理數據的獲取,技術團隊將繼續開發我們的地質和礦化模型。” Max首席執行官佈雷特·馬蒂奇評論道。

"Acquiring the underlying royalties on 19 of the 20 mining concessions and 31 applications significantly enhances the value of the Cesar Project. In addition, the 12 new mining concession applications significantly expand the footprint by 15%. Our 10,000-line-km airborne magnetic and radiometric survey is nearing completion as the Company continues to unlock the value of the Cesar basin," he concluded.

“收購20個採礦特許權中的19個和31份申請的基礎特許權使用費可以顯著提高Cesar項目的價值。此外,12份新的採礦特許權申請將佔地面積顯著擴大了15%。隨着公司繼續釋放塞薩爾盆地的價值,我們的10,000行千米的空中磁學和輻射測量已接近完成,” 他總結道。

Max Acquires Underlying Royalty

Max 收購標的版稅

Max has executed a Share Exchange Agreement ("Agreement") pursuant to acquiring all the issued and outstanding shares of Bay Street Mineral Corp. ("Bay Street") an arms length Canadian Corporation in exchange for 14,000,000 common shares ("Shares") in the capital of Max. In determining the purchase price for the Royalty purchase, Max obtained an independent valuation report.

根據收購加拿大獨立公司Bay Street Mineral Corp.(“Bay Street”)的所有已發行和流通股份,以換取Max資本中的1400萬股普通股(“股份”),Max簽署了股票交換協議(“協議”)。在確定特許權使用費收購的購買價格時,Max獲得了一份獨立的估值報告。

Bay Street holds an underlying 3% net smelter royalty ("Royalty") to December 31, 2021, over 19 mining concessions covering 184-km2 and 31 mining concession applications covering 796-km2 of the Company's wholly owned Cesar Copper Silver Project.

截至2021年12月31日,Bay Street持有3%的淨冶煉廠特許權使用費(“特許權使用費”),涵蓋184平方公里的19個採礦特許權和31份採礦特許權申請,涵蓋該公司全資擁有的塞薩爾銅銀項目796平方公里。

The Shares issued in exchange for the Royalty purchase will be subject to escrow and to be released over a 36-month period. The acquisition of the Royalty remains subject to TSXV approval.

爲換取特許權使用費而發行的股票將接受託管,並將在36個月內發行。特許權使用費的收購仍有待多倫多證券交易所的批准。

Background

背景

The Cesar Copper Silver Project comprises of three districts: AM, Conejo and URU. Collectively the three contiguous districts stretch over 120-km of strike in NNE/SSW direction (refer to Figure 1).

塞薩爾銅銀項目由三個地區組成:AM、Conejo和URU。這三個相鄰的地區總共朝NNE/SSW方向延伸了超過120千米的罷工(參見圖 1)。

This region provides access to major infrastructure from oil & gas and mining operations, includes Cerrejón, the largest coal mine in South America, held by global miner Glencore. Max's 20 mining concessions collectively span over 188-km2.

該地區提供石油和天然氣以及採礦業務的主要基礎設施,包括由全球礦業公司嘉能可控股的南美最大的煤礦塞雷約恩。Max 的 20 個採礦特許權總面積超過 188 平方公里。

In 2022, Max executed a 2-year co-operation agreement with Endeavour Silver Corp. (TSX: EDR) (NYSE: EXK), which assists to expand its wholly owned mineral tenures, Endeavour will hold an underlying 0.5% NSR as from March 18, 2022.

2022年,Max與奮進銀業公司(多倫多證券交易所股票代碼:EDR)(紐約證券交易所代碼:EXK)簽訂了爲期兩年的合作協議,該公司協助擴大其全資礦產期限,奮進號將從2022年3月18日起持有0.5%的標的NSR。

AM District

上午區

Starting in the far north of the Jurassic basin, classic stacked red bed outcrops with extensive lateral continuity have been rock sampled over many kilometres within the AM District. Highlight values of 34.4% copper and 305 g/t silver have been documented in the sedimentary red bed sequences.

從侏羅紀盆地的最北端開始,在 AM 地區數公里內對具有廣泛橫向連續性的經典堆疊式紅牀露頭進行了岩石採樣。沉積紅牀序列中記錄了34.4%的銅和305克/噸銀的亮點值。

The Company confirmed that stratiform mineralization continues at depth with two scout drill holes completed earlier this year (Max News Release dated April 4, 2023). In addition, Colombian field crews continue to discover and sample new mineralized outcrops including at the recently identified AM-7 target (Max News Release dated May 25, 2023 and Max News Release dated June 22, 2023).

該公司證實,地層礦化仍在深度上繼續,今年早些時候完成了兩個偵察鑽孔(2023年4月4日發佈的最大新聞稿)。此外,哥倫比亞的實地工作人員繼續發現和採樣新的礦化露頭,包括最近確定的AM-7目標(2023年5月25日的Max新聞稿和2023年6月22日的Max新聞稿)。

Conejo District

科內霍區

Midway south, the Conejo District is the most recent to be recognized and is characterized by structurally controlled mineralization hosted in intermediate and felsic volcanic rocks. Numerous mineralized outcrops have been discovered over 3.7-km at the primary target in the district with surface samples averaging 4.9% copper (2% cut-off). No drilling has been conducted at Conejo, but it has emerged as an area of focus for the Company.

在中南部,科內霍區是最近被認可的地區,其特點是存在於中間火山岩和長英質火山岩中的結構受控礦化。在該地區的主要目標處發現了超過3.7公里的許多礦化露頭,地表樣本銅的平均值爲4.9%(邊界值爲2%)。Conejo尚未進行任何鑽探,但這已成爲該公司的重點領域。

URU District

烏魯區

Mineralization within the URU District is hosted in intermediate volcanic rocks and is structurally controlled, similar to deposits in the Central African Copper Belt. At URU-C, a 9.0m of 7.0% copper and 115 g/t silver surface discovery was confirmed at depth by drill hole URU-12, which intersected 10.6m of 3.4% copper and 48 g/t silver. At the URU-CE target, 750m to the east, 19.0m of 1.3% copper discovered in outcrop was confirmed by drill hole URU-9, which intersected a broad zone of copper oxide returning 33.0m of 0.3% copper from 4.0m, including 16.5m of 0.5% copper (Max News Release date January 24, 2023). (Note: all drill intersections are down holes widths, not true width, which remains unknown at this time).

烏魯區內的礦化位於中間火山岩中,受結構控制,類似於中非銅帶的礦牀。在 URU-C,鑽孔與 10.6 米 3.4% 的銅和 48 克/噸的銀相交,證實了在深度發現了 9.0 米的銅和 115 克/噸的銀表面。URU-12在向東 750 米處的 URU-CE 目標,URU-9 鑽孔證實了在露頭髮現的 1.3% 的銅中有 190 萬枚,該鑽孔穿過了寬闊的氧化銅區域,從 400 米處返回 0.3% 的銅,包括 16.5 萬根 0.5% 的銅(最大新聞發佈日期爲 2023 年 1 月 24 日)。(注意:所有鑽孔交叉點均爲井下寬度,而不是真實寬度,目前尚不清楚)。

CESAR Target Evaluation

CESAR 目標評估

Max has identified and is evaluating 22 targets along the Cesar 90-km-long belt for potential drill testing. The Company is focused on expanding, refining, and prioritizing these targets in preparation for a drill program. Initial efforts have been concentrated on those targets with the greatest size potential with work that includes the following field activities:

Max已經確定並正在評估塞薩爾90公里長的皮帶沿線的22個目標,以進行潛在的鑽探測試。該公司專注於擴大、完善這些目標並確定其優先順序,爲鑽探計劃做準備。初步努力集中在規模潛力最大的目標上,其工作包括以下實地活動:

  • Systematic chip and channel sampling of the mineralized outcrops.
  • Detailed geological and structural mapping of each showing.
  • Target scale prospecting and soil sampling.
  • Airborne Magnetic/Radiometric Surveys.
  • 對礦化露頭進行系統的芯片和通道採樣。
  • 每個展覽的詳細地質和結構圖。
  • 目標規模勘探和土壤採樣。
  • 機載磁學/輻射測量法。

Regional Exploration

區域探索

Max has demonstrated that the Cesar basin is fertile for copper-silver mineralization over a large area; however, only a fraction of the basin has been explored. As a result, Max has dedicated on of its geological teams to regional exploration with the goal of discovering additional copper-silver prospects over 1,000 sq-km.

馬克斯已經證明,塞薩爾盆地非常適合在大面積上進行銅銀礦化;但是,只勘探了該盆地的一小部分。因此,Max將其地質團隊專門用於區域勘探,目標是發現超過1,000平方公里的更多銅銀前景。

Qualified Person

合格人員

The Company's disclosure of a technical or scientific nature in this news release was reviewed and approved by Tim Henneberry, P.Geo (British Columbia), a member of the Max Resource advisory board, who serves as a qualified person under the definition of National Instrument 43-101.

該公司在本新聞稿中披露的技術或科學性質已由Max Resource顧問委員會成員Tim Henneberry, P.Geo(不列顛哥倫比亞省)審查和批准,他是National Instrument 43-101定義下的合格人士。

About Max Resource Corp.

關於馬克斯資源公司

Max Resource Corp. (TSXV: MAX) is a mineral exploration company advancing the newly discovered district-scale Cesar copper-silver project. The wholly owned Cesar project sits along the Colombian portion of the world's largest producing copper belt (Andean belt), with world class infrastructure and the presence of global majors (Glencore and Chevron). In addition, Max controls the RT Gold project (100% earn-in) in Peru, encompassing a bulk tonnage primary gold porphyry zone, and 3-km to the NW, a gold bearing massive sulphide zone. Historic drilling in 2001, returned values ranging 3.1 to 118.1 g/t gold over core lengths ranging from 2.2 to 36.0m.

Max Resource Corp.(多倫多證券交易所股票代碼:MAX)是一家礦產勘探公司,正在推進新發現的地區規模的塞薩爾銅銀項目。全資擁有的塞薩爾項目位於世界上最大的產銅帶(安第斯帶)的哥倫比亞部分沿線,擁有世界一流的基礎設施和全球巨頭(嘉能可和雪佛龍)的存在。此外,Max控制着秘魯的RT Gold項目(100% 的收益),該項目包括散裝噸位的原始金斑岩區,以及距西北3公里處的含金塊狀硫化物區。2001年的歷史性鑽探返回了3.1至118.1克/噸的黃金價值,岩心長度從2.2米到36.0米不等。

Max is proactive, with the corporate goal of transitioning the Cesar basin towards the mining of copper, the key metal for Colombia's transition to clean energy. The safety of our people and the communities where we operate is most important. We conduct exploration in a manner which supports protection of ecosystems through responsible environmental stewardship.

馬克斯積極主動,公司目標是將塞薩爾盆地轉向銅礦開採,銅礦是哥倫比亞向清潔能源過渡的關鍵金屬。我們的員工和我們運營所在社區的安全是最重要的。我們以支持通過負責任的環境管理保護生態系統的方式進行勘探。

Source: NI 43:101 Geological Report RT Gold Project for Max Resource Corp. by Luis Rodrigo Peralta, Mar. 8, 2023. NI 43:101 Geological Report Rio Tabaconas Gold Project for Golden Alliance Resources Corp. by George Sivertz, Oct.3, 2011.

資料來源:路易斯·羅德里戈·佩拉爾塔的 NI 43:101 地質報告《Max Resource Corp. RT Gold Project》,2023年3月8日。喬治·西弗茨的《NI 43:101 地質報告》黃金聯盟資源公司的里約塔巴科納斯黃金項目,2011 年 10 月 3 日。

For more information visit:

欲了解更多信息,請訪問:

For additional information contact:

欲了解更多信息,請聯繫:

Tim McNulty E: info@maxresource.com T: (604) 290-8100
Rahim Lakha E. rahim@bluesailcapital.com
Brett Matich T: (604) 484 1230

Tim McNulty E:info@maxresource.com T: (604) 290-8100
Rahim Lakha E. rahim@bluesailcapital.com
Brett Matich T:(604) 484 1230

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

多倫多證券交易所風險投資交易所及其監管服務提供商(該術語在多倫多證券交易所風險交易所的政策中定義)均不對本新聞稿的充分性或準確性承擔責任。

Except for statements of historic fact, this news release contains certain "forward-looking information" within the meaning of applicable securities law.

除歷史事實陳述外,本新聞稿包含適用證券法所指的某些 “前瞻性信息”。

Forward-looking information is frequently characterized by words such as "plan", "expect", "project", "intend", "believe", "anticipate", "estimate" and other similar words, or statements that certain events or conditions "may" or "will" occur. Forward-looking statements are based on the opinions and estimates at the date the statements are made and are subject to a variety of risks and uncertainties and other factors that could cause actual events or results to differ materially from those anticipated in the forward-looking statements including, but not limited to delays or uncertainties with regulatory approvals, including that of the TSXV. There are uncertainties inherent in forward-looking information, including factors beyond the Company's control. There are no assurances that the commercialization plans for Max Resources Corp. described in this news release will come into effect on the terms or time frame described herein.

前瞻性信息通常以 “計劃”、“期望”、“項目”、“打算”、“相信”、“預測”、“估計” 等詞語爲特徵,或某些事件或條件 “可能” 或 “將” 發生的陳述。前瞻性陳述基於陳述發表之日的觀點和估計,受各種風險和不確定性以及其他因素的影響,這些因素可能導致實際事件或結果與前瞻性陳述中的預期存在重大差異,包括但不限於監管機構批准(包括多倫多證券交易所的批准)的延遲或不確定性。前瞻性信息固有的不確定性,包括公司無法控制的因素。無法保證本新聞稿中描述的Max Resources Corp. 的商業化計劃將按照此處描述的條款或時間框架生效。

The Company undertakes no obligation to update forward-looking information if circumstances or management's estimates or opinions should change except as required by law. The reader is cautioned not to place undue reliance on forward-looking statements. Additional information identifying risks and uncertainties that could affect financial results is contained in the Company's filings with Canadian securities regulators, which filings are available at .

除非法律要求,否則如果情況或管理層的估計或意見發生變化,公司沒有義務更新前瞻性信息。提醒讀者不要過分依賴前瞻性陳述。確定可能影響財務業績的風險和不確定性的其他信息載於公司向加拿大證券監管機構提交的文件中,這些文件可在以下網址查閱

To view the source version of this press release, please visit

要查看本新聞稿的源版本,請訪問

譯文內容由第三人軟體翻譯。


以上內容僅用作資訊或教育之目的,不構成與富途相關的任何投資建議。富途竭力但無法保證上述全部內容的真實性、準確性和原創性。
    搶先評論