share_log

GPM Metals Update of Walker Gossan Project

GPM Metals Update of Walker Gossan Project

Walker Gossan 项目的 GPM Metals 最新情况
newsfile ·  2023/11/06 20:00

Toronto, Ontario--(Newsfile Corp. - November 6, 2023) - GPM Metals Inc. (TSXV: GPM) (the "Company" or "GPM") provides an update to its Walker Gossan Project, Arnhem Land, Australia.

安大略省多伦多--(Newsfile Corp.-2023 年 11 月 6 日)- GPM Metals Inc.(多伦多证券交易所股票代码:GPM)(“公司” 或 “GPM”) 提供了其位于澳大利亚阿纳姆地的 Walker Gossan 项目的最新信息。

GPM is pleased to announce that it has recently completed an Airborne Gravity Gradiometry (AGG) Survey over the Walker Gossan Project.

GPM很高兴地宣布,它最近完成了对沃克·戈桑项目的机载重力梯度测量(AGG)调查。

The survey cost of $270,000 has been partially offset by a $100,000 grant under the Geophysics Collaboration Program conducted by the Northern Territory Department of Industry, Tourism and Trade. We thank the Northern Territory Government for their assistance.

北领地工业、旅游和贸易部开展的地球物理合作计划下的10万美元补助金部分抵消了27万美元的调查成本。我们感谢北领地政府的援助。

The survey results will be available in late November. GPM will engage its exploration team to undertake a comprehensive review of the survey data.

调查结果将于11月下旬公布。GPM将聘请其勘探团队对调查数据进行全面审查。

This survey will provide invaluable insights into targets within the approved tenement areas.

这项调查将为批准的物业单位区域内的目标提供宝贵的见解。

GPM Metals intends to continue with Exploration Programs for existing approved tenements EL385 and EL24305.

GPM Metals打算继续对现有批准的 EL385 和 EL24305 矿权进行勘探计划。

CONTACT INFORMATION

联系信息

For further information contact:
GPM Metals Inc.
Suite 1101 - 141 Adelaide Street West,
Toronto, Ontario M5H 3L5
Telephone : + 416 628-5904
Email: info@gpmmetals.com

欲了解更多信息,请联系:
GPM 金属公司
阿德莱德西街 1101-141 号套房,
安大略省多伦多 M5H 3L5
电话:+ 416 628-5904
电子邮件:info@gpmmetals.com

Forward-0Looking Statements

前瞻性陈述

This news release contains certain forward-looking information and statements within the meaning of applicable securities laws. The use of any of the words "expect", "anticipate", "continue", "estimate", "may", "might", "will", "project", "should", "believe", "plans", "intends" and similar expressions are intended to identify forward-looking information and/or statements. Forward-looking statements and/or information are based on a number of material factors, expectations and/or assumptions of GPM which have been used to develop such statements and/or information but which may prove to be incorrect. Although GPM believes that the expectations reflected in such forward-looking statements and/or information are reasonable, undue reliance should not be placed on forward-looking statements as GPM can give no assurance that such expectations will prove to be correct. In addition to other factors and assumptions which may be identified herein, assumptions have been made regarding, among other things: results from planned exploration and drilling activities; GPM's future plans for operational expenditures; the accuracy of the interpretations of exploration and drilling activity results; availability of financing to fund current and future plans and expenditures; the impact of increasing competition; the general stability of the economic and political environment in which GPM has property interests; the general continuance of current industry conditions; aboriginal matters; the timely receipt of any required regulatory approvals; the ability of GPM to obtain qualified staff, equipment and/or services in a timely and cost efficient manner; the ability of the operator of each project in which GPM has property interests to operate in a safe, efficient and/or effective manner and to fulfill its respective obligations and current plans; future commodity prices; currency, exchange and/or interest rates; and the regulatory framework regarding royalties, taxes and/or environmental matters in the jurisdictions in which GPM has property interests. The forward-looking information and statements included in this news release are not guarantees of future performance and should not be unduly relied upon. Such information and/or statements, including the assumptions made in respect thereof, involve known and unknown risks, uncertainties and other factors that may cause actual results and/or events to differ materially from those anticipated in such forward-looking information and/or statements including, without limitation: risks associated with the uncertainty of exploration results and estimates, currency fluctuations, the uncertainty of conducting operations under a foreign regime, exploration risk, the uncertainty of obtaining all applicable regulatory approvals, the availability of labour and/or equipment, the fluctuating prices of commodities, the availability of financing and GPM's dependence on its management personnel, other participants in the property areas and/or certain other risks detailed from time-to-time in GPM's public disclosure documents, (including, without limitation, those risks identified in this news release and GPM's current management's discussion and analysis). Furthermore, the forward-looking statements contained in this news release are made as at the date of this news release and the Company does not undertake any obligations to publicly update and/or revise any of the included forward-looking statements, whether as a result of additional information, future events and/or otherwise, except as may be required by applicable securities laws.

本新闻稿包含适用证券法所指的某些前瞻性信息和陈述。使用 “期望”、“预期”、“继续”、“估计”、“可能”、“可能”、“将”、“项目”、“应该”、“相信”、“计划”、“打算” 和类似表述中的任何词语均旨在识别前瞻性信息和/或陈述。前瞻性陈述和/或信息基于GPM的许多重要因素、预期和/或假设,这些因素用于制定此类陈述和/或信息,但可能被证明是不正确的。尽管GPM认为此类前瞻性陈述和/或信息中反映的预期是合理的,但不应过分依赖前瞻性陈述,因为GPM无法保证此类预期会被证明是正确的。除了本文可能确定的其他因素和假设外,还对以下方面做出了假设:计划勘探和钻探活动的结果;GPM未来的业务支出计划;对勘探和钻探活动结果解释的准确性;为当前和未来计划和支出提供资金的资金的可得性;竞争加剧的影响;GPM拥有财产利益的经济和政治环境的总体稳定性;当前的行业状况;原住民事务;及时收到任何必要的监管批准;GPM及时和具有成本效益的方式获得合格员工、设备和/或服务的能力;GPM拥有财产权益的每个项目的运营商以安全、高效和/或有效的方式运营并履行其各自义务和当前计划的能力;未来的商品价格;货币、汇率和/或利率;以及有关特许权使用费、税收和/或环境的监管框架重要的是GPM 拥有财产权益的司法管辖区。本新闻稿中包含的前瞻性信息和陈述不能保证未来的表现,不应过度依赖。此类信息和/或陈述,包括就此作出的假设,涉及已知和未知的风险、不确定性和其他因素,可能导致实际结果和/或事件与此类前瞻性信息和/或陈述中的预期存在重大差异,包括但不限于:与勘探结果和估计的不确定性相关的风险、货币波动、在外国制度下开展业务的不确定性、勘探风险、获得所有适用监管的不确定性批准、劳动力和/或设备的可用性、大宗商品价格的波动、融资的可得性以及GPM对管理人员、房地产领域其他参与者的依赖和/或GPM公开披露文件中不时详述的某些其他风险(包括但不限于本新闻稿和GPM现任管理层的讨论和分析中确定的风险)。此外,本新闻稿中包含的前瞻性陈述是截至本新闻稿发布之日作出的,除非适用的证券法另有要求,否则公司不承担任何义务公开更新和/或修改所包含的任何前瞻性陈述,无论这些陈述是由于其他信息、未来事件和/或其他原因造成的。

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy and / or accuracy of this release

多伦多证券交易所风险交易所及其监管服务提供商(该术语在多伦多证券交易所风险交易所的政策中定义)均不对本新闻稿的充分性和/或准确性承担责任

To view the source version of this press release, please visit

要查看本新闻稿的源版本,请访问

译文内容由第三方软件翻译。


以上内容仅用作资讯或教育之目的,不构成与富途相关的任何投资建议。富途竭力但不能保证上述全部内容的真实性、准确性和原创性。
    抢沙发