share_log

Newcore Gold Commissions Updated Preliminary Economic Assessment Study for the Enchi Gold Project, Ghana

Newcore Gold Commissions Updated Preliminary Economic Assessment Study for the Enchi Gold Project, Ghana

Newcore Gold Commissions更新了加納恩奇黃金項目的初步經濟評估研究
GlobeNewswire ·  2023/11/01 19:02

Completion Targeted for H1 2024

計劃於 2024 年上半年完成

VANCOUVER, British Columbia, Nov. 01, 2023 (GLOBE NEWSWIRE) -- Newcore Gold Ltd. ("Newcore" or the "Company") (TSX-V: NCAU, OTCQX: NCAUF) is pleased to announce it has engaged the independent engineering consultants Lycopodium, Micon International Limited and SEMS Exploration to prepare an updated National Instrument 43-101 ("NI 43-101") Preliminary Economic Assessment ("PEA") study for the Company's 100%-owned Enchi Gold Project ("Enchi" or the "Project") in Ghana. Newcore is targeting completion and announcement of the results of the study by the end of H1 2024.

不列顛哥倫比亞省溫哥華,2023 年 11 月 1 日(環球新聞專線)-- Newcore Gold Ltd.(“Newcore” 或 “公司”) 多倫多證券交易所股票代碼:NCAU,OTCQX:NCAUF)欣然宣佈,它已聘請獨立工程顧問Lycopodium、Micon International Limited和SEMS Exploration爲該公司在加納100%擁有的Enchi黃金項目(“Enchi” 或 “項目”)準備一份最新的國家儀器43-101(“NI 43-101”)初步經濟評估(“PEA”)研究報告。Newcore的目標是在2024年上半年底之前完成並公佈研究結果。

Luke Alexander, President & CEO of Newcore stated, "We believe updating our PEA is an important step in continuing to advance the development of our Enchi Gold Project in Ghana. The update will incorporate the current Mineral Resource Estimate that was announced earlier this year, updated cost estimates, as well as the significant metallurgical testwork that has been completed on the Project since the last economic study was completed in 2021.This low-cost de-risking work will continue to advance the development of our district-scale Enchi Gold Project, showcase its potential as an open pit, heap leach operation, while also providing an underpinning of value for Newcore Gold."

Newcore總裁兼首席執行官盧克·亞歷山大表示:“我們認爲,更新我們的PEA是繼續推進我們在加納的Enchi黃金項目發展的重要一步。該更新將納入今年早些時候公佈的當前礦產資源估算、更新的成本估算,以及自2021年上一次經濟研究完成以來該項目已經完成的重要冶金測試工作。這項低成本的去風險工作將繼續推進我們地區規模的恩奇黃金項目的發展,展示其作爲露天堆濾作業的潛力,同時也爲Newcore Gold提供價值基礎。”

Updated PEA Study

最新的 PEA 研究

Newcore has engaged the independent engineering consultants Lycopodium, Micon International Limited and SEMS Exploration to prepare an updated NI 43-101 PEA Technical Report for the Enchi Gold Project. The PEA will incorporate the Mineral Resource Estimate completed in 2023, as well as the significant metallurgical testwork completed since the last study in 2021. The study will be led by Lycopodium, who will conduct a process plant and infrastructure evaluation using their knowledge on operating Ghanaian gold projects. Micon is providing mine design and environmental services with mineral resource assessment supplied by SEMS Exploration. The combined study team has significant experience in successful development of not only PEA studies, but also subsequent studies and services including construction and operation.

Newcore已聘請獨立工程顧問Lycopodium、Micon International Limited和SEMS Exploration爲恩奇黃金項目編寫最新的NI 43-101 PEA技術報告。PEA將納入2023年完成的礦產資源估算,以及自2021年上次研究以來完成的重要冶金測試工作。該研究將由Lycopodium領導,他們將利用他們在運營加納黃金項目方面的知識進行加工廠和基礎設施評估。Micon 通過由 SEMS Exploration 提供的礦產資源評估提供礦山設計和環境服務。聯合研究團隊不僅在成功開發PEA研究方面擁有豐富的經驗,而且在包括施工和運營在內的後續研究和服務方面也擁有豐富的經驗。

Enchi Gold Project Mineral Resource Estimate

恩奇黃金項目礦產資源估算

The Enchi Gold Project hosts an Indicated Mineral Resource of 41.7 million tonnes grading 0.55 g/t Au containing 743,500 ounces gold and an Inferred Mineral Resource of 46.6 million tonnes grading 0.65 g/t Au containing 972,000 ounces (see Newcore news release dated March 7, 2023). Mineral resource estimation practices are in accordance with CIM Estimation of Mineral Resource and Mineral Reserve Best Practice Guidelines (November 29, 2019) and follow CIM Definition Standards for Mineral Resources and Mineral Reserves (May 10, 2014), that are incorporated by reference into National Instrument 43-101 ("NI 43-101"). The Mineral Resource Estimate is from the technical report titled "Mineral Resource Estimate for the Enchi Gold Project" with an effective date of January 25, 2023, which was prepared for Newcore by Todd McCracken, P. Geo, of BBA E&C Inc. and Simon Meadows Smith, P. Geo, of SEMS Exploration Services Ltd. in accordance with NI 43-101 Standards of Disclosure for Mineral Projects, and is available under the Company's profile on SEDAR at . Todd McCracken and Simon Meadows Smith are independent qualified persons ("QP") as defined by NI 43-101.

恩奇黃金項目擁有4170萬噸的指示礦產資源,品位爲0.55克/噸金,含有74.35萬盎司黃金,推斷礦產資源爲4,660萬噸,品位爲0.65克/噸金,含有97.2萬盎司(見2023年3月7日的Newcore新聞稿)。礦產資源估算做法符合CIM礦產資源和礦產儲量估算最佳實踐指南(2019年11月29日),並遵循CIM礦產資源和礦產儲量定義標準(2014年5月10日),該標準以引用方式納入國家儀器43-101(“NI 43-101”)。礦產資源估算來自標題爲 “恩奇黃金項目礦產資源估算” 的技術報告,該報告生效日期爲2023年1月25日,該報告由BBA E&C Inc.的Todd McCracken和SEMS勘探服務有限公司的P. Geo的西蒙·梅多斯·史密斯根據NI 43-101爲Newcore編寫 礦產項目披露標準,可在SEDAR上的公司簡介下查閱,網址爲。根據NI 43-101的定義,託德·麥克拉肯和西蒙·梅多斯·史密斯是獨立資格人士(“QP”)。

Qualified Person

合格人員

Mr. Gregory Smith, P. Geo, Vice President of Exploration at Newcore, is a Qualified Person as defined by NI 43-101, and has reviewed and approved the technical data and information contained in this news release.

Newcore勘探副總裁Gregory Smith先生是NI 43-101定義的合格人員,他已經審查並批准了本新聞稿中包含的技術數據和信息。

About Lycopodium

關於 Lycopodium

Lycopodium brings extensive studies and project delivery experience in gold mineral processing plants in West Africa, including Ghana. Over the past 25+ years they have participated or delivered over 30 greenfield projects in West Africa, and 13 within Ghana. Lycopodium have an established office in Accra and are currently participating in a similar greenfield gold project, located approximately 200 kilometres north of Newcore's Enchi Gold Project. Through their long-term and current project experience Lycopodium have developed extensive knowledge of Ghanian and West African suppliers and contractors, as well as local capital and operating costs. Lycopodium has a demonstrated track record for the development and delivery of value-optimised, fit-for-purpose, fast to ramp up and easy to operate mineral processing plant projects, delivered in a timely manner.

Lycopodium在包括加納在內的西非的黃金礦物加工廠帶來了豐富的研究和項目交付經驗。在過去的25年中,他們在西非參與或交付了30多個綠地項目,在加納參與或交付了13個綠地項目。Lycopodium在阿克拉設有辦事處,目前正在參與一個類似的綠地黃金項目,該項目位於Newcore的Enchi黃金項目以北約200公里處。通過長期和當前的項目經驗,Lycopodium對加納和西非的供應商和承包商以及當地資本和運營成本有了廣泛的了解。Lycopodium在開發和交付價值優化、符合用途、快速增長和易於操作的礦物加工廠項目方面有着良好的記錄,這些項目及時交付。

About Micon International Limited

關於美康國際有限公司

Micon International Limited is an independent firm of senior geologists, mining engineers, and metallurgists headquartered in Toronto, Ontario, Canada. Micon also maintains a fully integrated office in Norwich, United Kingdom, as well as retaining full-time consultants based in other locations within the UK and France. Micon's professional staff have extensive experience in the mining industry with both mining companies and leading consultancy firms. Since 1988, Micon has offered a broad range of consulting services to clients involved in the mineral industry. The firm maintains a substantial practice in the geological assessment of prospective properties, the independent estimation of mineral resources and mineral reserves, the compilation and review of feasibility studies, the economic evaluation of mineral properties, due diligence reviews, and the monitoring of mineral developments on behalf of financing institutions. Micon's practice is worldwide and includes precious and base metals, energy minerals, and a wide variety of industrial and specialty minerals.

Micon International Limited是一家由高級地質學家、採礦工程師和冶金學家組成的獨立公司,總部位於加拿大安大略省多倫多。美康還在英國諾里奇設有一個完全整合的辦公室,並在英國和法國的其他地方保留全職顧問。Micon 的專業員工在礦業公司和領先的諮詢公司都有豐富的採礦業經驗。自 1988 年以來,Micon 一直爲參與礦業的客戶提供廣泛的諮詢服務。該公司在潛在物業的地質評估、礦產資源和礦產儲量的獨立估算、可行性研究的彙編和審查、礦產的經濟評估、盡職調查審查以及代表金融機構監測礦產開發方面擁有豐富的經驗。Micon 的業務遍及全球,包括貴金屬和基本金屬、能源礦物以及各種工業和特種礦物。

About SEMS Exploration

關於 SEMS 探索

SEMS Exploration is the leading full-services mineral exploration and mining consultancy company in West Africa. Since 2002, SEMS Exploration has provided independent geological consultancy and in-country support services to the mineral exploration and mining industry of West Africa. During this time, SEMS Exploration has established a reputation for dedicated, high quality work for a wide range of clients from major mining companies to junior exploration companies and private investors. SEMS Exploration provides a full range of geological, mining engineering and environmental services; from grassroots reconnaissance through mineral resource estimations, project management and mine design.

SEMS Exploration是西非領先的提供全方位服務的礦產勘探和採礦諮詢公司。自2002年以來,SEMS Exploration爲西非的礦產勘探和採礦業提供獨立的地質諮詢和國內支持服務。在此期間,SEMS Exploration因爲從大型礦業公司到初級勘探公司和私人投資者的各種客戶提供專注、高質量的工作而樹立了聲譽。SEMS Exploration提供全方位的地質、採礦工程和環境服務;從基層勘察到礦產資源估算、項目管理和礦山設計。

About Newcore Gold Ltd.

關於 Newcore Gold Ltd

Newcore Gold is advancing its Enchi Gold Project located in Ghana, Africa's largest gold producer (1). The Project currently hosts an Indicated Mineral Resource of 743,500 ounces of gold at 0.55 g/t and an Inferred Mineral Resource of 972,000 ounces of gold at 0.65 g/t (2). Newcore Gold offers investors a unique combination of top-tier leadership, who are aligned with shareholders through their 20% equity ownership, and prime district scale exploration opportunities. Enchi's 216 km2 land package covers 40 kilometres of Ghana's prolific Bibiani Shear Zone, a gold belt which hosts several 5 million-ounce gold deposits, including the Chirano mine 50 kilometers to the north. Newcore's vision is to build a responsive, creative and powerful gold enterprise that maximizes returns for shareholders.

Newcore Gold正在推進其位於非洲最大的黃金生產商加納的Enchi Gold項目 1)。該項目目前擁有0.55克/噸的74.35萬盎司黃金的指示礦產資源和0.65克/噸的推斷礦產資源爲97.2萬盎司黃金 2)。Newcore Gold爲投資者提供了獨特的組合,包括頂級領導層(他們通過20%的股權與股東保持一致)和主要區域規模的勘探機會。恩奇的 216 公里2 一攬子陸地覆蓋了加納多產的比比亞尼剪切帶的40公里,該金帶擁有數個500萬盎司的金礦,包括向北50公里的奇拉諾礦。Newcore的願景是建立一個反應靈敏、富有創造力和強大的黃金企業,爲股東帶來最大回報。

On Behalf of the Board of Directors of Newcore Gold Ltd.

代表 Newcore Gold Ltd 董事會

Luke Alexander
President, CEO & Director

盧克·亞歷山
總裁、首席執行官兼董事

For further information, please contact:

欲了解更多信息,請聯繫:

Mal Karwowska | Vice President, Corporate Development and Investor Relations
+1 604 484 4399
info@newcoregold.com

Mal Karwowska | 企業發展和投資者關係副總裁
+1 604 484 4399
info@newcoregold.com

(1) Source: Production volumes for 2022 as sourced from the World Gold Council
(2) Notes for Mineral Resource Estimate:

(1) 資料來源:2022年產量來自世界黃金協會
(2) 礦產資源估算注意事項:

1. Canadian Institute of Mining Metallurgy and Petroleum ("CIM") definition standards were followed for the resource estimate.

1。加拿大礦業、冶金和石油研究所 資源估算遵循了 (“CIM”) 的定義標準。

2. The 2023 resource models used ordinary kriging (OK) grade estimation within a three-dimensional block model with mineralized zones defined by wireframed solids and constrained by pits shell for Sewum, Boin and Nyam. Kwakyekrom and Tokosea used Inverse Distance squared (ID2).

2。2023 年資源模型在三維區塊模型中使用普通克里金 (OK) 等級估算,礦化區由線框固體定義,Sewum、Boin 和 Nyam 受坑殼約束。Kwakyekrom 和 Tokosea 使用了反向距離平方 (ID2)。

3. Open pit cut-off grades varied from 0.14 g/t to 0.25 g/t Au based on mining and processing costs as well as the recoveries in different weathered material.

3。露天礦的截止等級從 0.14 g/t 到 0.25 g/t 不等,具體取決於採礦和加工成本以及不同風化材料的回收率。

4. Heap leach cut-off grade varied from 0.14 g/t to 0.19 g/t in the pit shell and 1.50 g/t for underground based on mining costs, metallurgical recovery, milling costs and G&A costs.

4。根據採礦成本、冶金回收、研磨成本和G&A成本,坑殼中的堆濾臨界等級從0.14克/噸到0.19克/噸不等,地下層的截止等級從1.50克/噸不等。

5. CIL cut off grade varied from 0.25 g/t to 0.27 g/t in a pit shell and 1.50 g/t for underground based on mining costs, metallurgical recovery, milling costs and G&A costs.

5。根據採礦成本、冶金回收、制粉成本和G&A成本,礦殼中的CIL截止等級從0.25 g/t到0.27 g/t不等,地下采礦的截止等級從1.50 g/t不等。

6. A US$1,650/ounce gold price was used to determine the cut-off grade.

6。每盎司1,650美元的黃金價格被用來確定臨界等級。

7. Metallurgical recoveries have been applied to five individual deposits and in each case three material types (oxide, transition, and fresh rock).

7。冶金回收已應用於五個單獨的礦牀,每種礦牀採用了三種材料類型(氧化物、過渡巖和新鮮岩石)。

8. A density of 2.19 g/cm3 for oxide, 2.45 g/cm3 for transition, and 2.72 g/cm3 for fresh rock was applied.

8。應用的氧化物密度爲2.19 g/cm3,過渡的密度爲2.45 g/cm3,新鮮岩石的密度爲2.72 g/cm3。

9. Optimization pit slope angles varied based on the rock types.

9。優化坑坡角度因岩石類型而異。

10. Reasonable mining shapes constrain the mineral resource in close proximity to the pit shell.

10。合理的採礦形狀將礦產資源限制在靠近礦殼的地方。

11. Mineral Resources that are not mineral reserves do not have economic viability. Numbers may not add due to rounding.

11。非礦產儲量的礦產資源沒有經濟可行性。由於四捨五入,數字可能不相加。

12. The Mineral Resource Estimate is from the technical report titled "Mineral Resource Estimate for the Enchi Gold Project" with an effective date of January 25, 2023, which was prepared for Newcore by Todd McCracken, P. Geo, of BBA E&C Inc. and Simon Meadows Smith, P. Geo, of SEMS Exploration Services Ltd. in accordance with National Instrument 43-101 Standards of Disclosure for Mineral Projects and is available under Newcore's SEDAR profile at . Todd McCracken and Simon Meadows Smith are independent qualified persons ("QP") as defined by National Instrument 43-101.

12。礦產資源估算來自標題爲 “恩奇黃金項目礦產資源估算” 的技術報告,該報告生效日期爲2023年1月25日,該報告由BBA E&C Inc.的託德·麥克拉克肯和SEMS勘探服務有限公司的P. Geo的西蒙·梅多斯·史密斯根據國家儀器43-101爲Newcore編寫 礦產項目披露標準 並可在 Newcore 的 SEDAR 個人資料下找到,網址爲。根據國家儀器43-101的定義,託德·麥克拉肯和西蒙·梅多斯·史密斯是獨立資格人士(“QP”)。

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

多倫多證券交易所風險投資交易所及其監管服務提供商(該術語在多倫多證券交易所風險投資交易所的政策中定義)均不對本新聞稿的充分性或準確性承擔責任。

Cautionary Note Regarding Forward-Looking Statements

關於前瞻性陳述的警示說明

This news release includes statements that contain "forward-looking information" within the meaning of the applicable Canadian securities legislation ("forward-looking statements"). All statements, other than statements of historical fact, are forward-looking statements and are based on expectations, estimates and projections as at the date of this news release. Any statement that involves discussion with respect to predictions, expectations, beliefs, plans, projections, objectives, assumptions, future events or performance (often, but not always using phrases such as "plans", "expects", "is expected", "budget", "scheduled", "estimates", "forecasts", "intends", "anticipates", or "believes" or variations (including negative variations) of such words and phrases, or state that certain actions, events or results "may", "could", "would", "might" or "will" be taken, occur or be achieved) are not statements of historical fact and may be forward-looking statements. In this news release, forward-looking statements relate, among other things, to: statements about the estimation of mineral resources; timing and completion of an updated PEA; results of metallurgical testwork, results of drilling, magnitude or quality of mineral deposits; anticipated advancement of mineral properties or programs; and future exploration prospects.

本新聞稿包括包含適用的加拿大證券立法所指的 “前瞻性信息” 的聲明(“前瞻性陳述”)。除歷史事實陳述外,所有陳述均爲前瞻性陳述,基於截至本新聞稿發佈之日的預期、估計和預測。任何涉及對預測、期望、信念、計劃、預測、目標、假設、未來事件或績效進行討論的陳述(通常但並非總是使用諸如 “計劃”、“期望”、“預期”、“預算”、“計劃”、“估計”、“預測”、“打算”、“預期”、“預期” 或 “相信” 或此類單詞和短語的變體(包括負面變體)之類的短語,或者聲明某些行動、事件或結果(“可能”、“可能”、“將”、“可能” 或 “將” 採取、發生或實現)不是對歷史事實的陳述也可能是前瞻性陳述。在本新聞稿中,前瞻性陳述除其他外涉及:關於礦產資源估算的陳述;更新的PEA的時間和完成;冶金測試結果、鑽探結果、礦牀的大小或質量;礦產特性或計劃的預期進展;以及未來的勘探前景。

These forward-looking statements, and any assumptions upon which they are based, are made in good faith and reflect our current judgment regarding the direction of our business. The assumptions underlying the forward-looking statements are based on information currently available to Newcore. Although the forward-looking statements contained in this news release are based upon what management of Newcore believes, or believed at the time, to be reasonable assumptions, Newcore cannot assure its shareholders that actual results will be consistent with such forward-looking statements, as there may be other factors that cause results not to be as anticipated, estimated or intended. Forward-looking information also involves known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements of the Company to be materially different from any future results, performance or achievements expressed or implied by the forward-looking information. Such factors include, among others: risks related to the speculative nature of the Company's business; the Company's formative stage of development; the Company's financial position; possible variations in mineralization, grade or recovery rates; actual results of current exploration activities; fluctuations in general macroeconomic conditions; fluctuations in securities markets; fluctuations in spot and forward prices of gold and other commodities; fluctuations in currency markets (such as the Canadian dollar to United States dollar exchange rate); change in national and local government, legislation, taxation, controls, regulations and political or economic developments; risks and hazards associated with the business of mineral exploration, development and mining (including environmental hazards, unusual or unexpected geological formations); the presence of laws and regulations that may impose restrictions on mining; employee relations; relationships with and claims by local communities; the speculative nature of mineral exploration and development (including the risks of obtaining necessary licenses, permits and approvals from government authorities); and title to properties.

這些前瞻性陳述及其所依據的任何假設都是本着誠意做出的,反映了我們目前對業務方向的判斷。前瞻性陳述所依據的假設基於Newcore目前可獲得的信息。儘管本新聞稿中包含的前瞻性陳述基於Newcore管理層當時認爲或認爲的合理假設,但Newcore無法向其股東保證實際業績將與此類前瞻性陳述一致,因爲可能還有其他因素導致業績與預期、估計或預期不符。前瞻性信息還涉及已知和未知的風險、不確定性和其他因素,這些因素可能導致公司的實際業績、業績或成就與前瞻性信息所表達或暗示的任何未來業績、業績或成就存在重大差異。除其他外,這些因素包括:與公司業務的投機性質相關的風險;公司的發展階段;公司的財務狀況;礦化、品位或回收率可能發生的變化;當前勘探活動的實際結果;總體宏觀經濟狀況的波動;證券市場的波動;黃金和其他大宗商品的現貨和遠期價格波動;貨幣市場的波動(例如加元兌美元的匯率);變化在國家和地方政府、立法、稅收、管制、監管以及政治或經濟發展;與礦產勘探、開發和採礦業務相關的風險和危險(包括環境危害、異常或意外的地質構造);是否存在可能限制採礦的法律和法規;員工關係;與當地社區的關係和主張;礦產勘探和開發的投機性質(包括獲得必要執照、許可證的風險和政府當局的批准);以及財產所有權。

Forward-looking statements contained herein are made as of the date of this news release and the Company disclaims any obligation to update any forward-looking statements, whether as a result of new information, future events or results, except as may be required by applicable securities laws. There can be no assurance that forward-looking information will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on forward-looking information.

此處包含的前瞻性陳述自本新聞稿發佈之日起作出,除非適用的證券法要求,否則公司不承擔任何更新任何前瞻性陳述的義務,無論是由於新信息、未來事件還是業績。無法保證前瞻性信息會被證明是準確的,因爲實際結果和未來事件可能與此類陳述中的預期存在重大差異。因此,讀者不應過分依賴前瞻性信息。


譯文內容由第三人軟體翻譯。


以上內容僅用作資訊或教育之目的,不構成與富途相關的任何投資建議。富途竭力但無法保證上述全部內容的真實性、準確性和原創性。
    搶先評論