  • 0.69% U3O8 over 1.5 m within 0.17% U3O8 over 14.2 m at 166.9 m drill hole depth in AK23-92 (Pod 5)
  • 0.69%U3.3.O8.0.17%U內超過1.5萬3.3.O8.AK23-92(吊艙5)在166.9米鑽孔深度下超過14.2m
  • 0.53% U3O8 over 0.5 m within 0.11% U3O8 over 8.5 m at 192.5 m drill hole depth in AK23-92 (Pod 4):
  • 0.53%U3.3.O8.在0.11%U內超過0.5米3.3.O8.在AK23-92(吊艙4)中,在192.5米鑽孔深度下超過8.5m:
  • Assays from 20 remaining drill holes on 2023's program, including those with the highest radioactivity results, are pending
  • 2023年S計劃剩餘的20個鑽孔的分析正在進行中,其中包括那些放射性結果最高的鑽孔
  • Uranium mineralization, alteration, and structure all remain open at depth with no signs of fading
  • 鈾礦化、蝕變和構造在深層都保持開放,沒有褪色的跡象。

Toronto, Ontario--(Newsfile Corp. - October 30, 2023) - Baselode Energy Corp. (TSXV: FIND) (OTCQB: BSENF) ("Baselode" or the "Company") is pleased to announce additional uranium ("U3O8") assays from 5 drill holes of the 7,512 metre diamond drilling program (the "Program") completed within the ACKIO uranium prospect ("ACKIO") on the Hook project ("Hook" or the "Project"). Assays from the remaining 20 drill holes cover shallow mineralization in Pods 1 and 7, and exploration drillholes outside of the known ACKIO footprint.

安大略省多倫多-(Newsfile Corp.-2023年10月30日)-Baselode Energy Corp.(多倫多證券交易所股票代碼:FIND)(OTCQB:BSENF)(“基準碼“或”公司“)很高興地宣佈增加鈾(”使用3.3.O8.“)從7512米長的鑽石鑽探計劃的5個鑽孔進行分析(”計劃“)在ACKIO鈾礦勘探範圍內完成(”ACKIO“)在Hook專案上(”“或”專案其餘20個鑽孔的化驗結果包括1號艙和7號艙的淺層礦化,以及已知的ACKIO足跡以外的勘探鑽孔。

"Uranium mineralization, alteration, and structure all remain open at depth with no signs of fading. Our previous news release (September 20, 2023, AK23-88: 0.32% U3O8 over 16.5 m at 184.0 m) highlighted new mineralization in Pod 4 discovered at depth that remains open, providing a high-priority drill target to follow up in 2024. Encouragingly, the results from AK23-92 suggest Pods 4 and 7 occur on the same east-dipping structure, extending from the overburden contact approximately 30 m beneath the surface and remaining open below 200 m. We are currently assessing if there is sufficient continuity of mineralization to link the two pods. Baselode is fully funded for an aggressive 2024 exploration program following the completion of our recent $10.7 M financing," said James Sykes, CEO, President and Director of Baselode.

鈾礦化、蝕變和構造在深層都保持開放,沒有褪色的跡象。我們之前的新聞稿(2023年9月20日,AK23-88:0.32%U3.3.O8.超過16.5m,184.0米)突出了在仍處於開放狀態的4號吊艙中發現的新礦化,為2024年的後續行動提供了一個高度優先的鑽探目標。令人鼓舞的是,AK23-92的結果表明,第4和第7豆莢位於同一東傾構造上,從地表下約30米的覆巖接觸處延伸,並在200米以下保持開放狀態。我們目前正在評估是否有足夠的礦化連續性來連接這兩個豆莢。在我們最近完成了1070萬美元的融資後,Baselode為2024年積極的勘探計劃提供了全部資金,“Baselode首席執行官、總裁和董事首席執行官詹姆斯·賽克斯表示。

ACKIO Drill Program Details
36 drill holes for 7,512 metres ("m") were completed during the Program. ACKIO consisted of 30 drill holes for 6,193 m, Mirror consisted of 5 drill holes for 1,145 m, and 1 drill hole for 174 m was completed on a regional exploration target.

ACKIO Drill計劃詳細資訊
7,512米的36個鑽孔(“MACKIO包括6,193米的30個鑽孔,Mirror包括5個1,145米的鑽孔,1個174米的鑽孔在區域勘探目標上完成。

Drill holes AK23-92 and AK23-94 confirmed mineralization is open at the edges of Pods 4 and 5. Mineralization was intersected between 150 m and 190 m true vertical depth, growing some of the deeper mineralized Pods at ACKIO. Highlight results from AK23-92 indicate multiple uranium intersections from Pod 4 could connect with Pod 7, creating a continuous zone of mineralization that would extend from the overburden contact at approximately 40 m beneath the surface down 200 m beneath the surface and still open at depth.

AK23-92和AK23-94鑽孔證實礦化在4號和5號礦艙邊緣開放。礦化在實際垂直深度150米至190米之間相交,在ACKIO發育了一些更深的礦化豆莢。AK23-92的突出結果表明,4號艙的多個鈾交叉點可以與7號艙相連,形成一個連續的礦化帶,該礦化帶將從地表下約40米處的覆巖接觸處延伸到地表下200米以下,並在深處仍然開放。

Drill holes AK23-100 and AK23-101 were drilled within the edge and centre of Pod 2, respectively. Mineralization was intersected between 100 m and 140 m true vertical depth. Mineralization in AK23-100 confirmed the northern edge of Pod 2 is still open, and AK23-101 confirmed previously modelled mineralization within the centre of Pod 2 for the purpose of future resource estimation.

AK23-100和AK23-101孔分別在吊艙2的邊緣和中心鑽進。礦化的真實垂直深度在100米至140米之間。AK23-100中的礦化證實豆莢2的北緣仍然開放,AK23-101確認了之前為未來資源評估目的而類比的豆莢2中心內的礦化。

Geochemical U3O8 assay results from drill holes AK23-92 to AK23-94 and AK23-100 to AK23-101 were provided by Saskatchewan Research Council's Geoanalytical Laboratory ("SRC") in Saskatoon, Saskatchewan. The assay methodology includes SRCs "U3O8 Wt% Assay" analysis package where an aliquot of sample pulp is digested in a concentration of HCL:HNO3. The digested volume is then made up with deionized water for analysis by ICP-OES. Uranium assay results from the remaining twenty drill holes will be released after being compiled, thoroughly quality checked, and interpreted by the technical team.

地化利用3.3.O8.AK23-92至AK23-94和AK23-100至AK23-101鑽孔的化驗結果由薩斯喀徹溫省研究委員會的地質分析實驗室提供(“SRC在薩斯喀徹溫省的薩斯卡通)。3.3.O8.Wt%分析“分析包,其中等量的樣品紙漿在濃度為HCl:HNO的溶液中消化3.3.。消化後的體積用去離子水補充,用電感耦合等離子體發射光譜儀進行分析。其餘20個鑽孔的鈾分析結果將在匯編、全面質量檢查和技術團隊解釋後公佈。

ACKIO is 30 km southeast of well-established infrastructure, including an all-season road and powerline between Cameco Corp.'s (TSX: CCO) and Orano's McArthur River mine and Key Lake uranium mill joint ventures. ACKIO is 70 km northeast of the Key Lake mill. The Program was helicopter-supported to lessen any ground-induced environmental impacts within the project area.

ACKIO位於完善的基礎設施東南30公里處,包括Cameco Corp.的S(多倫多證券交易所股票代碼:CCO)和奧拉諾的麥克阿瑟河礦和Key Lake鈾廠合資企業之間的全季道路和輸電線。ACKIO位於Key Lake鋼廠東北70公里處。該專案由直升機支持,以減輕專案區域內任何地面引起的環境影響。

NOTES:

備註:

  1. All reported drill hole lengths do not represent true thicknesses which have yet to be determined.
  1. 所有報告的鑽孔長度都不代表尚未確定的真實厚度。

About Baselode Energy Corp.
Baselode controls 100% of approximately 264,172 hectares for exploration in the Athabasca Basin area, northern Saskatchewan, Canada. The land package is free of any option agreements or underlying royalties.

關於Baselode Energy Corp.
Baselode公司100%控制著加拿大薩斯喀徹溫省北部阿薩巴斯卡盆地地區約264,172公頃的勘探面積。該土地套餐沒有任何期權協定或基礎特許權使用費。

The Company discovered the ACKIO near-surface, uranium prospect in September 2021. ACKIO measures greater than 375 m along strike, greater than 150 m wide, comprised of at least 9 separate uranium Pods, with mineralization starting as shallow as 28 m and 32 m beneath the surface in Pods 1 and 7, respectively, and down to approximately 300 m depth beneath the surface with the bulk of mineralization occurring in the upper 120 m. ACKIO remains open at depth, and to the north, south and east.

該公司於2021年9月發現了ACKIO近地表鈾礦遠景。ACKIO沿走向測量大於375米,寬度大於150米,由至少9個獨立的鈾盒組成,礦化開始分別在地表以下28米和32米,並向下至地表以下約300米深,大部分礦化發生在上面120米處。ACKIO在深部以及向北、向南和向東保持開放。

Baselode's Athabasca 2.0 exploration thesis focuses on discovering near-surface, basement-hosted, high-grade uranium orebodies outside the Athabasca Basin. The exploration thesis is further complemented by the Company's preferred use of innovative and well-understood geophysical methods to map deep structural controls to identify shallow targets for diamond drilling.

Baselode的Athabasca 2.0勘探論文專注於在Athabasca盆地外發現近地表、地下室託管的高品位鈾礦體。此外,公司優先使用創新和廣為人知的地球物理方法繪製深部構造控制圖,以識別鑽石鑽探的淺部目標,進一步補充了勘探論文。

QP Statement
The technical information contained in this news release has been reviewed and approved by Cameron MacKay, P.Geo., Vice-President, Exploration & Development for Baselode Energy Corp., who is considered to be a Qualified Person as defined in "National Instrument 43-101, Standards of Disclosure for Mineral Projects."

QP報表
本新聞稿中包含的技術資訊已由Baselode Energy Corp.勘探開發副總裁卡梅隆·麥凱審閱並批准,他被認為是“國家儀器43-101,礦產專案披露標準”中定義的合格人員。

For further information, please contact:

如需更多資訊,請聯繫:

Baselode Energy Corp.
FIND on the TSXV
info@baselode.com

Baselode Energy Corp.
在TSXV上查找
郵箱:Info@baselode.com

James Sykes, CEO, President and Director
jsykes@oregroup.ca
306-221-8717

總裁和董事首席執行官詹姆斯·賽克斯
郵箱:jsykes@oregroup.ca
306-221-8717

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the TSX Venture Exchange policies) accepts responsibility for the adequacy or accuracy of this release.

多倫多證券交易所風險交易所及其監管服務提供商(該術語在多倫多證券交易所風險交易所政策中定義)均不對本新聞稿的充分性或準確性承擔責任。

Certain information in this press release may contain forward-looking statements. This information is based on current expectations that are subject to significant risks and uncertainties that are difficult to predict. Actual results might differ materially from results suggested in any forward-looking statements. Baselode Energy Corp. assumes no obligation to update the forward-looking statements, or to update the reasons why actual results could differ from those reflected in the forward looking-statements unless and until required by securities laws applicable to Baselode Energy Corp. Additional information identifying risks and uncertainties is contained in the Company's filings with Canadian securities regulators, which filings are available under Baselode Energy Corp. profile at .

本新聞稿中的某些資訊可能包含前瞻性陳述。這些資訊是基於當前的預期,這些預期受到難以預測的重大風險和不確定性的影響。實際結果可能與任何前瞻性陳述中建議的結果大不相同。Baselode Energy Corp.沒有義務更新前瞻性陳述,也沒有義務更新實際結果可能與前瞻性陳述中反映的結果不同的原因,除非和直到適用於Baselode Energy Corp.的證券法要求。識別風險和不確定性的其他資訊包含在公司提交給加拿大證券監管機構的檔案中,這些檔案可在Baselode Energy Corp.的檔案中查閱,網址為:。

This news release does not constitute an offer to sell or a solicitation of an offer to buy any of the securities in the United States. The securities have not been and will not be registered under the United States Securities Act of 1933, as amended (the "U.S. Securities Act") or any state securities laws and may not be offered or sold within the United States or to, or for the account or benefit of, U.S. Persons unless registered under the U.S. Securities Act and applicable state securities laws, unless an exemption from such registration is available.

本新聞稿不構成在美國出售或邀請購買任何證券的要約。這些證券沒有也不會根據修訂後的《1933年美國證券法》(下稱《美國證券法》)或任何州證券法進行註冊,除非根據《美國證券法》和適用的州證券法進行註冊,否則不得在美國境內或向美國個人或為美國個人的賬戶或利益進行發行或銷售,除非獲得此類註冊的豁免。

FIGURE 1 - Surface projections of modeled ACKIO uranium mineralization, drill hole collar locations and traces for AK23-81 to AK23-91

圖1-AK23-81至AK23-91地區類比ACKIO鈾礦化的地表投影、鑽孔接箍位置和軌跡

TABLE 1 – Drill collar details, continuous composite elevated radioactivity results, and uranium assay results (U3O8) from drill holes AK23-92 to AK23-94, AK23-100 to AK23-101

表1.鑽孔AK23-92至AK23-94、AK23-100至AK23-101的鑽箍細節、連續復合放射性升高結果和鈾分析結果(U3O8)

DDH

Target Area

Location

East

North

Elevation

Az.

Dip

EOH

Radioactivity (>300 cps)

Assay Results (>0.05 wt% U3O8)

AK23-92

ACKIO

Pod 5 - Edge

526173

6372895

465

264

-65

225

704 cps over 13.85 m at 166.95 m

0.17% over 14.15 m at 166.85 m

includes

N/A

0.69% over 1.5 m at 171.5 m

643 cps over 0.9 m at 183.25 m

0.16% over 0.5 m at 183.5 m

350 cps over 0.1 m at 187.75 m

Results below cutoff grade

Pod 4 - Edge

646 cps over 16.1 m at 190.9 m

0.11% over 8.5 m at 192.5 m & 0.14% over 3.5 m at 203.5 m

includes

6,705 cps over 0.15 m at 191.25 m

N/A*

and includes

5,000 cps over 0.15 m at 195.85 m

0.53% over 0.5 m at 195.5 m

300 cps over 0.15 m at 209.35 m

Results below cutoff grade

AK23-93

ACKIO

Pod 4 - Centre

526173

6372895

465

270

-75

213

300 cps over 0.4 m at 177.5 m

Results below cutoff grade

AK23-94

ACKIO

Pod 5 - Edge

526173

6372895

465

278

-72

222

575 cps over 0.2 m at 166.25 m

0.19% over 0.5 m at 166.0 m

Pod 4 - Edge

No significant results

0.07% over 0.5 m at 179.0 m

AK23-100

ACKIO

Pod 2 - Edge

526078

6372984

464

81

-59

177

488 cps over 4.9 m at 131.5 m

0.21% over 3.5 m at 133.0 m

AK23-101

ACKIO

Pod 2 - Centre

526078

6372984

464

103

-60

171

300 cps over 0.15 m at 113.65 m

Results below cutoff grade

548 cps over 3.7 m at 118.9 m

0.22% over 3.5 m at 119.0 m

350 cps over 0.65 m at 137.35 m & 300 cps over 0.2 m at 139.8 m & 365 cps over 0.5 m at 142.25 m

0.07% over 6.0 m at 137.0 m

519 cps over 5.1 m at 151.6 m

0.28% over 5.6 m at 151.5 m

5 DDH

1,008

5 DDH

4 DDH

DDH

目標區域

位置

高程

AZ.

浸漬

EOH

放射性(>300 cps)

檢測結果(>0.05wt%U3.3.O8.)

AK23-92

ACKIO

Pod 5-Edge

526173

6372895

四百六十五

二百六十四

-65

225

166.95米時超過13.85米的704cps

166.85米,14.15米以上0.17%

包括

不適用

171.5米,1.5米以上0.69%

183.25米時,0.9米以上的速度為643cps

183.5米,0.5米以上0.16%

187.75米時超過0.1米的350cps

結果低於分界線等級

Pod 4-Edge

190.9米,16.1米以上646cps

192.5米以上8.5米以上0.11%及203.5米3.5米以上0.14%

包括

6,705 cps超過0.15米,191.25米

不適用*

幷包括

195.85米時,0.15米以上5,000 cps

195.5米,0.5米以上0.53%

在209.35米時超過0.15米的300cps

結果低於分界線等級

AK23-93

ACKIO

Pod 4-中心

526173

6372895

四百六十五

270

-75

213

177.5米時超過0.4米的300cps

結果低於分界線等級

AK23-94

ACKIO

Pod 5-Edge

526173

6372895

四百六十五

二百七十八

-72

222

166.25米時,0.2米以上的速度為575cps

166.0米,0.5米以上0.19%

Pod 4-Edge

沒有顯著的結果

179.0米,0.5米以上0.07%

AK23-100

ACKIO

Pod 2-邊緣

526078

6372984

四百六十四

八十一

-59

177

488 cps超過4.9米,在131.5米處

133.0米,3.5米以上0.21%

AK23-101

ACKIO

Pod 2-中心

526078

6372984

四百六十四

103

-60

一百七十一

在113.65米時超過0.15米的300cps

結果低於分界線等級

118.9米,3.7米以上548cps

119.0米,3.5米以上0.22%

137.35米時超過0.65米的350cps和139.8米時的300cps以及142.25米時的365cps

在137.0米處,6米以上為0.07%

519cps超過5.1米,在151.6米處

151.5米,5.6米以上0.28%

5 DDH

1008

5 DDH

4個DDH

NOTES: East and North units are metres using NAD83 datum, UTM Zone 13N
Elevation is recorded as "metres above sea level"
Az. = Azimuth, EOH = End of hole (measured in metres)
Composite radioactivity results use 300 cps cut-off and do not contain greater than 2.0 m consecutive dilution
Composite U3O8 results use 0.05% U3O8 cut-off and do not contain greater than 2.0 m consecutive dilution (i.e., dilution is <0.05% U3O8)
"includes/and includes" are composite U3O8 results using 0.50% U3O8 cut-off and do not contain greater than 2.0 m consecutive dilution (i.e., dilution is <0.50% U3O8)
*insuficient material remaining for geochemical preparation and assay analysis following QEMSCAN study

注:東單位和北單位使用NAD83基準面,UTM區域13N
海拔記錄為“海拔高度米”。
AZ.=方位角,EOH=孔底(以米為單位)
綜合放射性結果使用300cps的截止值,並且不包含超過2.0m的連續稀釋
合成U3O8結果使用0.05%U3O8截止值,且不包含超過2.0m的連續稀釋(即,稀釋“包含/和包含是使用0.50%U3O8截止值的合成U3O8結果,且不包含超過2.0m的連續稀釋(即,稀釋*QEMSCAN研究後用於地球化學準備和化驗分析的材料不足