share_log

Sun Summit Plans Initial Mineral Resource Estimate at the Buck Project, Central BC

Sun Summit Plans Initial Mineral Resource Estimate at the Buck Project, Central BC

Sun Summit 計劃對不列顛哥倫比亞省中部的巴克項目進行初步礦產資源估算
newsfile ·  2023/10/24 19:00

Vancouver, British Columbia--(Newsfile Corp. - October 24, 2023) - Sun Summit Minerals Corp. (TSXV: SMN) (OTCQB: SMREF) is pleased to announce plans for an initial Mineral Resource Estimate to be completed covering the Buck Main zone of the Buck Project, located in central British Columbia.

溫哥華,不列顛哥倫比亞省-(Newsfile Corp.-2023年10月24日)-Sun Summit Minerals Corp.(TSXV:SMN)(OTCQB:SMREF)高興地宣佈,計劃完成對位於不列顛哥倫比亞省中部的Buck專案的Buck主區的初步礦產資源評估。

Highlights

亮點

  • Initial Mineral Resource Estimate: An initial Mineral Resource Estimate (MRE) is being planned for Buck Main, with expected completion in Q1 2024. Since 2020, 98 drill holes totalling over 34,500 metres have been completed within the Buck Main zone, with the potential to incorporate additional historic drilling.

  • Assay Results Pending: Remaining results from the most recent drill program will be reported once they are received and analyzed, and will be included in the planned MRE.

  • Unconstrained Mineralized Footprint: The known mineralized footprint demonstrates strong near-surface grade continuity and currently measures over 1.1 kilometres in strike length and 700 metres in width. Latest drill testing at Buck Main continues to intersect mineralization outside the known footprint, supporting the zone's further potential for expansion subsequent to completion of the MRE.

  • Ongoing Discovery Potential: In tandem with completion of the MRE, drilling and exploration will continue throughout the Buck Project area with multiple additional zones and target areas warranting exploration and drill testing. Successful delineation of additional mineralization outside of the MRE could trigger a future update or expansion to the initial MRE.

  • 礦產資源初步估測:Buck Main正在計劃進行初步礦產資源評估(MRE),預計將於2024年第一季度完成。自2020年以來,已在巴克主區內完成了98個鑽孔,總長超過34,500米,有可能納入更多的歷史性鑽探。

  • 化驗結果待定:最新鑽探計劃的剩餘結果將在收到和分析後報告,並將包括在計劃中的MRE中。

  • 不受約束的礦化足跡:已知的礦化足跡顯示出很強的近地表品位連續性,目前的走向長度超過1.1公里,寬度超過700米。Buck Main的最新鑽探測試繼續與已知足跡以外的礦化相交,支持該地區在MRE完成後進一步擴大的潛力。

  • 持續的發現潛力:隨著MRE的完成,鑽探和勘探將在整個巴克專案區繼續進行,有多個額外的區域和目標區域需要勘探和鑽探測試。成功地圈定MRE以外的其他礦化可能會引發對初始MRE的未來更新或擴展。

"We are excited to announce plans to commence an initial Mineral Resource Estimate on the Buck Main zone." stated Sharyn Alexander, Sun Summit's President. "The Buck Project is located in an exceptional jurisdiction with existing infrastructure, transparent permitting process, and district-scale exploration upside. Drill results at Buck Main continue to demonstrate significant potential with size and scale opportunities. Our technical team has systematically tested the system, defined by near-surface gold, silver and zinc mineralization, which remains open in all directions. As we continue our ongoing exploration throughout the project area, the completion of an initial MRE will be a significant milestone for the company and a major step in highlighting the project's current value proposition and ongoing growth potential."

我們很高興地宣佈,計劃開始對巴克主區進行初步礦產資源評估。“太陽峰會的總裁說。巴克專案位於一個特殊的司法管轄區,擁有現有的基礎設施、透明的許可流程和地區範圍的勘探。巴克美因河的鑽探結果繼續顯示出巨大的潛力,具有規模和規模機會。我們的技術團隊已經系統地測試了由近地表金銀鋅礦化定義的系統,該系統仍然全方位開放。隨著我們繼續在整個專案區進行勘探,初步MRE的完成將是公司的一個重要里程碑,也是突出專案當前價值主張和持續增長潛力的重要一步。

Buck Main Details

降價主要細節

Since 2020, Sun Summit has drilled 34,500 metres in 98 diamond drill holes at Buck Main testing the limits of the mineralized system (Figure 1). In addition, many historic drill holes have been completed on the project and could be included in the upcoming resource calculation.

自2020年以來,Sun Summit在Buck Main的98個鑽石鑽孔中鑽了34,500米,測試了礦化系統的極限(圖1)。此外,該專案的許多歷史鑽孔已經完成,可能會包括在即將到來的資源計算中。


Figure 1. Drilling at Buck Main with select highlight intervals


圖1.選擇突出顯示間隔時在Buck Main鑽取

The known mineralized footprint currently measures over 1.1 kilometres in strike length, 700 metres in width, with mineralization open in all directions (Figure 2). Recent drill results highlight the significant expansion potential along the northern and western extent of known mineralization as well as strong depth potential where previous drilling is sparse (see October 18, 2023, news release).

目前已知的礦化足跡走向長度超過1.1公里,寬度超過700米,礦化在所有方向上都是開放的(圖2)。最近的鑽探結果突出了沿已知礦化的北部和西部地區的顯著擴張潛力,以及先前鑽探稀少的地區的強大深度潛力(見2023年10月18日的新聞稿)。

The planned initial MRE on Buck Main will be calculated in accordance with the Canadian Institute of Mining, Metallurgy and Petroleum (CIM) Definition ‎Standards incorporated by reference in National Instrument 43-101. Completion of the initial MRE is expected by Q1 2024.

Buck Main上計劃的初始MRE將根據加拿大采礦、冶金和石油學會(CIM)定義的‎標準計算,國家儀器43-101中引用了該標準。初步的MRE預計將於2024年第一季度完成。


Figure 2. The growth of the mineralized envelope at Buck Main over the course of three years of intermittent drill programs


圖2.在三年的間歇性鑽探計劃中,Buck Main礦化包層的增長情況

The MRE at Buck Main will draw primarily on results from 2020 to 2023 drilling where significant intercepts of broad, near-surface, bulk tonnage-style disseminated gold-silver-zinc mineralization have been previously reported. Examples of this style of mineralization include:

Buck Main的MRE將主要參考2020至2023年的鑽探結果,其中重大截獲 廣泛的、近地表的、大噸位式的浸染型金銀鋅礦化以前就有過報道。。這種類型的礦化的例子包括:

  • 0.96 g/t Au, 5.1 g/t Ag, 0.2% Zn over 44 m (BK20-001)
  • 0.89 g/t Au, 10.7 g/t Ag, 1.26% Zn over 40.5 m (BK20-012)
  • 1.07 g/t Au, 5.5 g/t Ag, 0.65% Zn over 109 m (BK21-017)
  • 0.67 g/t Au, 4.4 g/t Ag, 0.46% Zn over 187 m (BK21-032)
  • 1.02 g/t Au, 10.8 g/t Ag, 1.17% Zn over 54 m (BK21-032)
  • 0.71 g/t Au, 5.6 g/t Ag, 0.62% Zn over 187 m (BK21-033)
  • 0.68 g/t Au, 4.8 g/t Ag, 0.46% Zn over 175.3 m (BK21-038)
  • 0.77 g/t Au, 2.6 g/t Ag, 0.27% Zn over 67.6 m (BK22-067)
  • 0.83 g/t Au, 9.2 g/t Ag, 0.21% Zn over 54.6 m (BK22-077)
  • 0.96克/噸金,5.1克/噸銀,0.2%鋅,超過44米(BK20-001)
  • 金0.89克/噸,銀10.7克/噸,鋅1.26%,40.5米(BK20-012)
  • 1.07g/t Au,5.5g/t Ag,0.65%鋅,超過109米(BK21-017)
  • 187米內含0.67克/噸金、4.4克/噸銀、0.46%鋅(BK21-032)
  • 金1.02克/噸,銀10.8克/噸,鋅1.17%(BK21-032)
  • 187米內含0.71克/噸金、5.6克/噸銀、0.62%鋅(BK21-033)
  • 175.3米以上含金0.68g/t,銀4.8g/t,鋅0.46%
  • 67.6米內含0.77克/噸金、2.6克/噸銀、0.27%鋅(BK22-067)
  • 金0.83g/t,銀9.2g/t,鋅0.21%,超過54.6米(BK22-077)

Zones of significant high-grade gold-silver-zinc mineralization has also been intersected in multiple holes across the Buck Main area. Examples of high-grade intercepts include:

重要的高品位金銀鋅礦化帶也在巴克主區的多個孔中相交。。高級攔截的例子包括:

  • 49.6 g/t Au, 10.8 g/t Ag, 0.06% Zn over 1.5 m (BK20-012)
  • 246 g/t Au, 66.7 g/t Ag, 0.02% Zn over 0.5 m (BK21-020)
  • 41.9 g/t Au, 9.5 g/t Ag, 0.12% Zn over 1.0 m (BK21-024)
  • 33.4 g/t Au, 17.4 g/t Ag, 0.15% Zn over 1.0 m (BK21-026)
  • 31.3 g/t Au, 37.0 g/t Ag, 3.68% Zn over 1.0 m (BK21-035)
  • 26.5 g/t Au, 199.0 g/t Ag, 0.14% Zn over 1.0 m (BK22-069)
  • 38.0 g/t Au, 137.0 g/t Ag, 5.9% Zn over 1.1 m (BK22-083)
  • 1.5米以上含金49.6克,銀10.8克,鋅0.06%(BK20-012)
  • 金246克/噸,銀66.7克/噸,鋅0.02%,超過0.5米(BK21-020)
  • 金41.9克/噸,銀9.5克/噸,鋅0.12%(BK21-024)
  • 金33.4克/噸,銀17.4克/噸,鋅0.15%,超過1.0米(BK21-026)
  • 1.0m以上含Au 31.3 g/t,Ag 37.0 g/t,鋅3.68%(BK21-035)
  • 金26.5g/t,銀199.0 g/t,鋅0.14%(BK22-069)
  • 金38.0g/t,銀137.0 g/t,鋅5.9%,超過1.1m(BK22-083)

Note: Drill intercepts are measured downhole and are not true widths.

注:鑽井截距是在井下測量的,並不是真正的寬度。

National Instrument 43-101 Disclosure

National Instrument 43-101披露

This news release has been approved by Sun Summit's Vice President Exploration, Ken MacDonald, P. Geo., a "Qualified Person" as defined in National Instrument 43-101, Standards of Disclosure for Mineral Projects of the Canadian Securities Administrators. He has also verified the data disclosed, including sampling, analytical and test data, underlying the technical information in this news release.

本新聞稿已由太陽峰會副總裁總裁勘探、肯·麥克唐納、P.Geo批准,他是National Instrument 43-101中定義的“合格人員”,《礦產專案資訊披露標準》加拿大證券管理人。他還核實了披露的數據,包括採樣、分析和測試數據,這些數據是本新聞稿中技術資訊的基礎。

Community Engagement

社區參與

Sun Summit is engaging with First Nations on whose territory the Buck Project is located and is discussing their interests and identifying contract and work opportunities, as well as opportunities to support community initiatives. The Company looks forward to continuing to work with local and regional First Nations as the project continues.

太陽峰會正在與巴克專案所在領土上的原住民進行接觸,並正在討論他們的利益,確定合同和工作機會,以及支持社區倡議的機會。隨著專案的繼續,該公司期待著繼續與當地和地區的第一民族合作。

About the Buck Project

關於巴克專案

The Buck Project is situated in a historic mining district near Houston, B.C., with excellent nearby infrastructure that allows for year-round, road-accessible exploration.

巴克專案位於不列顛哥倫比亞省休斯敦附近的一個歷史悠久的礦區,附近有一流的基礎設施,可以全年進行公路勘探。

The project is host to the Buck Main intermediate-sulfidation epithermal-related gold-silver-zinc system. Most of the mineralization drilled to date at Buck Main consists of long, continuous zones of disseminated and breccia-hosted, bulk tonnage-style gold-silver-zinc. Vein-hosted, high-grade mineralization has also been intersected near the center of Buck Main.

該專案是巴克主要的中間-硫化-低溫熱液相關的金-銀-鋅系統的所在地。到目前為止,在Buck Main鑽探的大部分礦化由長而連續的浸染帶和角礫巖賦存的大噸位金銀鋅組成。礦脈賦存的高品位礦化也在Buck Main中心附近相交。

Exploration at the Buck Project is focused on investigating the lateral and vertical extent of gold-silver-zinc mineralization at the Buck Main system, and to define additional drill targets across the entire land package through systematic exploration programs.

Buck專案的勘探重點是調查Buck主系統的金-銀-鋅礦化的橫向和垂直範圍,並通過系統的勘探計劃在整個陸地上確定額外的鑽探目標。

About Sun Summit

關於Sun Summit

Sun Summit Minerals (TSXV: SMN) (OTCQB: SMREF) is a mineral exploration company focused on expanding its gold, silver, and zinc discovery at its flagship Buck Project located in north-central British Columbia.

Sun Summit Minerals(多倫多證券交易所股票代碼:SMN)(OTCQB:SMREF)是一家礦產勘探公司,專注於擴大其位於不列顛哥倫比亞省中北部的旗艦Buck專案的金、銀和鋅發現。

Sun Summit is committed to environmental and social responsibility, with a focus on accountable development and building respectful and beneficial relationships with Indigenous and local communities.

太陽峰會致力於環境和社會責任,重點是負責任的發展,並與土著和當地社區建立相互尊重和有益的關係。

Further details are available at .

有關更多詳細資訊,請訪問。

Link to Figures

鏈接到數位

Figure 1:

圖1:

Figure 2:

圖2:

For further information, contact:

欲瞭解更多資訊,請聯繫:

Sharyn Alexander
President
info@sunsummitminerals.com

莎琳·亞歷山大
總裁
郵箱:info@sunsum mitminals.com

Matthew Benedetto
Simone Capital
mbenedetto@simonecapital.ca
Tel. 416-817-1226

馬修·貝尼代託
西蒙尼資本
郵箱:mbenderto@simonecapital.ca
電話。416-817-1226

Forward-Looking Information

前瞻性資訊

Statements contained in this news release that are not historical facts may be forward-looking statements, which involve risks, uncertainties and other factors that could cause actual results to differ materially from those expressed or implied by such forward-looking statements. Factors that could cause such differences, without limiting the generality of the following, include: risks inherent in exploration activities; the impact of exploration competition; unexpected geological or hydrological conditions; changes in government regulations and policies, including trade laws and policies; failure to obtain necessary permits and approvals from government authorities; volatility and sensitivity to market prices; volatility and sensitivity to capital market fluctuations; the ability to raise funds through private or public equity financings; environmental and safety risks including increased regulatory burdens; weather and other natural phenomena; and other exploration, development, operating, financial market and regulatory risks. Except as required by applicable securities laws and regulation, Sun Summit disclaims any intention or obligation to update or revise any forward-looking statement, whether as a result of new information, future events or otherwise, except as required by applicable securities laws.

本新聞稿中包含的非歷史事實的陳述可能是前瞻性陳述,涉及風險、不確定因素和其他因素,可能導致實際結果與這些前瞻性陳述明示或暗示的結果大不相同。在不限制下列一般性的情況下,可能造成這種差異的因素包括:勘探活動中固有的風險;勘探競爭的影響;意想不到的地質或水文條件;政府規章和政策,包括貿易法律和政策的變化;未能獲得政府主管部門的必要許可和批准;對市場價格的波動性和敏感性;對資本市場波動的波動性和敏感度;通過私募或公共股權融資籌集資金的能力;環境和安全風險,包括增加的監管負擔;天氣和其他自然現象;以及其他勘探、開發、運營、金融市場和監管風險。除非適用的證券法律和法規要求,否則Sun Summit沒有任何更新或修改任何前瞻性陳述的意圖或義務,無論是由於新資訊、未來事件或其他原因,除非適用的證券法要求。

Neither the TSX Venture Exchange nor the Investment Industry Regulatory Organization of Canada accepts responsibility for the adequacy or accuracy of this release.

多倫多證券交易所風險交易所和加拿大投資行業監管組織都不對本新聞稿的充分性或準確性承擔責任。

To view the source version of this press release, please visit

要查看本新聞稿的源版本,請訪問

譯文內容由第三人軟體翻譯。


以上內容僅用作資訊或教育之目的,不構成與富途相關的任何投資建議。富途竭力但無法保證上述全部內容的真實性、準確性和原創性。
    搶先評論