share_log

Gold Springs Resource Continues to Expand the South Jumbo Deposit

Gold Springs Resource Continues to Expand the South Jumbo Deposit

Gold Springs Resource 繼續擴大南巨型礦牀
Accesswire ·  2023/10/23 21:25

VANCOUVER, BC / ACCESSWIRE / October 23, 2023 / Gold Springs Resource Corp. (the "Company" or "GRC") (TSX:GRC)(OTCQB:GRCAF) reports positive assay results from the South Jumbo Resource area of its Gold Springs project located in the USA, on the border of Nevada and Utah.

不列顛哥倫比亞省溫哥華/ACCESSWIRE/2023年10月23日/金泉資源公司(“公司”或“GRC”)(多倫多證券交易所代碼:GRC)(場外交易代碼:GRCAF)報告陽性化驗結果來自其位於美國內華達州和猶他州交界處的金泉專案的南巨人資源區。

Highlights include:

亮點包括

  • 1.93 g/t gold equivalent over 1.5 meters and
    0.58 g/t gold equivalent over 7.6 meters and
    1.24 g/t gold equivalent over 1.6 meters in hole E-22-023
  • 1.10 g/t gold equivalent over 6.1 meters and.
    0.96 g/t gold equivalent over 3.0 meters and
    0.57 g/t gold equivalent over 6.1 meters in hole E-22-022
  • 1.30 g/t gold equivalent over 1.5 meters in hole E-22-024
  • 1.93克/噸超過1.5米的黃金當量和
    7.6米以上0.58克/噸黃金當量和
    1.24克/噸E-22-023孔超過1.6米的黃金當量
  • 1.10克/噸相當於6.1米以上的黃金和。
    大於3.0米的0.96克/噸黃金當量和
    E-22-022孔超過6.1米的0.57克/噸黃金當量
  • 1.30克/噸E-22-024孔超過1.5米的黃金當量

Gold equivalent based on US$1,800/oz gold, US$25/oz silver and 50% for silver recovery.

黃金當量以1,800美元/盎司黃金、25美元/盎司白銀和50%的白銀回收計算。

Antonio Canton, President, and CEO, stated:

安東尼奧·坎頓,總裁,首席執行官,述明:

"We are pleased by these new positive results, which extend the gold mineralization encountered in hole E-22-020 (1.05 g/t AuEq over 4.6 meters and 0.74 g/t AuEq over 26 meters) and thus expand our South Jumbo deposit 200 meters further north where it remains open (see GRC's press release dated August 12, 2022).

我們對這些新的積極成果感到高興,這些成果擴大了E-22-020號孔(1.05克/噸AuEQ已結束4.6米0.74克/噸AuEQ已結束26米),從而擴大我們的南巨型礦藏再往北200米在那裡它仍然開放(見GRC日期為2022年8月12日的新聞稿)。

Add this 200 meters northward expansion of the Jumbo South deposit to the 425 meters southward expansion of the Jumbo North deposit in a higher-grade structural block, and we are convinced of the significant potential of the 5-kilometer-long Jumbo Trend to host a large gold deposit (see GRC press release dated October 16, 2023).

加上這一條向北擴展200米Jumbo South礦藏的向南擴展425米Jumbo North礦藏的更高等級的結構塊我們相信,5公里長的巨型趨勢蘊藏著大型金礦的巨大潛力(見GRC於2023年10月16日發佈的新聞稿)。

The South Jumbo and the North Jumbo resources, with 524,000 ounces of gold and 8,811,000 ounces of silver, already arethe two largest of our six existing M&I resources according to our latest resource estimate based on drilling up to 2021 and without results from 2022-2023 (see detailed table below and GRC's press release dated June 13, 2022, concerning our last mineral resource estimate).

南巨型和北巨型資源,以及52.4萬盎司黃金8,811,000盎司銀,已經是兩個最大的在我們現有的六個人中並購資源根據我們最新的資源估算基於到2021年的鑽探沒有2022-2023年的結果(見下表和GRC於2022年6月13日發佈的關於我們上次礦產資源評估的新聞稿)。

It's also worth bearing in mind, when analyzing Gold Springs' true potential, that the 5+ km Jumbo Trend covers less than 5% of our nearly 8000 ha large gold project."

同樣值得記住的是,在分析金泉的真正潛力時,這個 5千米以上的巨型趨勢覆蓋了我們近8000公頃的不到5%大型金礦專案。

South Jumbo

南巨無霸

The South Jumbo resource extends over 1,000 meters along strike based on drilling up to 2021 and is located at the southern end of the +5 kilometer-long Jumbo Trend which is defined by a very strong and well-developed CSAMT high resistivity anomaly.

南巨無霸資源延伸超過1000米以鑽井為基礎的沿線走向,直到2021年,位於+5公里長的Jumbo趨勢它是由非常強烈和發育良好的CSAMT高電阻率異常來定義的。

The drill holes E-22-020 through E-22-024 extend this gold-bearing system 200 meters to the north and include the higher-grade material of 1.05 g/t gold equivalent over 4.6 meters and 0.74 g/t gold equivalent over 26 meters in hole E-22-020 and 1.1 g/t gold equivalent over 6.1 meters found in hole E-22-022.

E-22-020至E-22-024號鑽孔將這個含金系統向北延伸200米E-22-020孔含金當量1.05克/噸,26米含金當量0.74克/噸,E-22-022孔含金1.1克/噸,金當量6.1米以上。

Future drilling will focus on continuing to expand the gold mineralization to the north.

未來鑽探的重點將是繼續向北擴大金礦化。

Summary of drill intercepts

鑽探截獲摘要

Hole ID

From
(m)

To
(m)

Thickness (m)

Au
g/t

Ag
g/t

AuEq
g/t

E-22-021

137.2

141.7

4.5

0.44

6.2

0.48

and

169.2

173.7

4.5

0.51

4.5

0.54

and

181.4

189

7.6

0.34

6.2

0.38

and

211.8

214.9

3.1

0.71

1.6

0.72

E-22-022

134.1

140.2

6.1

1.07

3.9

1.10

and

202.7

205.7

3

0.93

4.4

0.96

and

213.4

219.5

6.1

0.55

3

0.57

E-22-023

166.1

167.6

1.5

1.92

1.8

1.93

and

196.6

204.2

7.6

0.57

1.5

0.58

and

256

257.6

1.6

1.22

2.2

1.24

E-22-024

163.1

164.6

1.5

1.29

2

1.30

孔ID

從…
(M)


(M)

厚度(米)

Au
克/噸


克/噸

AUEQ
克/噸

E-22-021

137.2

141.7

4.5

0.44

6.2

0.48

169.2

173.7

4.5

0.51

4.5

0.54

181.4

189

7.6

0.34

6.2

0.38

211.8

214.9

3.1

0.71

1.6

0.72

E-22-022

134.1

140.2

6.1

1.07

3.9

1.10

202.7

205.7

3.3.

0.93

4.4

0.96

213.4

219.5

6.1

0.55

3.3.

0.57

E-22-023

166.1

167.6

1.5

1.92

1.8

1.93

196.6

204.2

7.6

0.57

1.5

0.58

256

257.6

1.6

1.22

2.2

1.24

E-22-024

163.1

164.6

1.5

1.29

2.

1.30

True thickness is estimated to be 60-100% of reported length. Gold equivalent based on US$1,800/oz gold, US$25/oz silver, and 50% for silver recovery.

真實厚度估計為報告長度的60%-100%。黃金當量以1,800美元/盎司黃金、25美元/盎司白銀和50%的白銀回收計算。

Drill Hole Table

鑽孔表

Hole ID

Target

Easting UTM
NAD 27 Z11

Northing

Elevation
(m)

Azimuth

Inclination

TD
(m)

E-22-021

South Jumbo

760629

4196881

1923

320

-45

225.6

E-22-022

South Jumbo

760598

4196925

1977

320

-45

259.1

E-22-023

South Jumbo

760594

4196967

1983

320

-45

272.8

E-22-024

South Jumbo

760495

4196900

1983

90

-45

213.4

孔ID

目標

東距UTM
NAD 27 Z11

北距

高程
(M)

方位角

傾角

白破疫苗
(M)

E-22-021

南巨無霸

760629

4196881

1923年

320

-45

225.6

E-22-022

南巨無霸

760598

4196925

一九七七年

320

-45

259.1

E-22-023

南巨無霸

760594

4196967

一九八三年

320

-45

272.8

E-22-024

南巨無霸

760495

4196900

一九八三年

90

-45

213.4

South and North Jumbo Resources
based on drilling to 2021 and without results from 2022-2023

南北巨型資源
基於到2021年的鑽探和2022-2023年的無結果

Mineral Resource Estimate NI 43-101 Technical Report - Gold Springs Project, Utah-Nevada, USA"
dated July 11, 2022, with an effective date of June 13, 2022

礦產資源評估NI 43-101技術報告-美國猶他州-內華達州金泉專案
日期為2022年7月11日,生效日期為2022年6月13日


Category


Deposit

$1,800 Pit Constrained - 0.25 g/t gold cutoff

Tonnes (1000s)

Gold

Silver

g/t

Troy oz

g/t

Troy oz

Measured

South Jumbo

6,457

0.55

114,558

5.99

1,243,721

Indicated

South Jumbo

5,657

0.55

100,007

4.67

848,739

Measured

North Jumbo

15,752

0.47

240,037

10.88

5,509,666

Indicated

North Jumbo

5,509

0.39

69,433

6.82

1,208,618

Total Measured & Indicated

524,035

8,810,744

Inferred

South Jumbo

2,929

0.38

35,474

2.99

281,905

Inferred

North Jumbo

1,725

0.38

20,864

4.51

250,229


類別


存款

1,800美元礦坑限制-0.25克/噸黃金下限

公噸(1000s)

黃金

白銀

克/噸

特洛伊·奧茲

克/噸

特洛伊·奧茲

測量的

南巨無霸

6457

0.55

114,558

5.99

1243,721

已指示

南巨無霸

5657

0.55

100,007

4.67

848,739

測量的

北巨無霸

15,752

0.47

240,037

10.88

5,509,666

已指示

北巨無霸

5,509

0.39

69,433

6.82

1208618

總測量值和指示值

524,035

8810,744

推論

南巨無霸

2929

0.38

35,474

2.99

281,905

推論

北巨無霸

1,725

0.38

20,864

4.51

250,229

Qualified Person

有資格的人

Randall Moore, VP of Gold Springs Resource Corp., is the Company's designated Qualified Person for this news release within the meaning of National Instrument 43-101 Standards of Disclosure for Mineral Projects. He has approved the scientific or technical information in this release and has verified the data disclosed in this release for its geological reasonableness, checked all the inputs and verified the analytical data through an analysis of the blanks and standards submitted with the drill-chip samples.

金泉資源公司副總裁蘭德爾·莫耳爾是該公司根據國家儀器43-101礦產專案披露標準指定的本新聞稿的合格人員。他批准了本新聞稿中的科學或技術資訊,並核實了本新聞稿中披露的數據的地質合理性,檢查了所有輸入,並通過對隨鑽片樣品提交的空白和標準進行分析,驗證了分析數據。

Quality Assurance and Quality Control

品質保證和質量控制

Approximately 7 kg of RC chips were sent to the laboratory for each 1.52 meters drill interval. Standards and blanks are submitted into the sample stream at the rate of 15% for QA/QC purposes. In addition, the laboratory also includes duplicates of samples, standards and blanks. The results of these check assays are reviewed prior to the release of data. All RC sample assays are also reviewed for their geological context and checked against the drill logs.

每隔1.52米的鑽井間隔,大約有7公斤RC晶片被送到實驗室。出於品質保證/質量控制的目的,標準和空白以15%的比率提交到樣品流中。此外,實驗室還包括樣品、標準和空白的複製品。在數據發佈之前,對這些檢查分析的結果進行審查。還審查了所有RC樣品分析的地質背景,並對照鑽井日誌進行了核對。

Assay Method

化驗方法

Assays were performed in Reno, Nevada by ALS Geochemical, an ISO 9001:2000 certified and independent laboratory. Gold was analyzed by fire assay of a 30-gram sample with an AAS finish with samples assaying greater than 5 g/t re-assayed using a 30-gram sample and a gravity finish. Silver is analyzed by a four-acid leach ICP method.

化驗是在內華達州里諾由ALS地球化公司進行的,該公司是一家獲得ISO 9001:2000認證的獨立實驗室。用火焰分析法對30克重的樣品進行金的分析,用30克的樣品和重力塗層對大於5克/噸的樣品進行重新分析。銀的分析採用四酸浸出電感耦合等離子體法。

About Gold Springs Resource Corp.

關於金泉資源公司

Gold Springs Resource Corp. (TSX: GRC and OTCQB: GRCAF) is focused on the exploration and expansion of the gold and silver resources of its Gold Springs project located on the border of Nevada and Utah, USA. The project is situated in the prolific Great Basin of Western USA, one of the best mining jurisdictions in the world.

金泉資源公司(多倫多證券交易所股票代碼:GRC和場外交易市場代碼:GRCAF)專注於勘探和擴大其位於美國內華達州和猶他州交界處的金泉專案的金銀資源。該專案位於美國西部多產的大盆地,是世界上最好的採礦管轄區之一。

Gold Springs Resource Corp. Contact:

金泉資源公司聯繫人:

Antonio Canton, President and CEO
acanton@goldspringsresource.com

安東尼奧·坎頓、總裁和首席執行官
郵箱:acanton@goldspringsresource ce.com

Forward-Looking Statements

前瞻性陳述

Certain statements contained herein constitute "forward-looking information" under applicable Canadian securities laws ("forward-looking statements"). Forward-looking statements look into the future and provide an opinion as to the effect of certain events and trends on the business. Forward-looking statements herein may include words such as "creating", "believe", "would", "continue", "will", "promising", "should", and similar expressions and includes the statement relating to the significant potential of the Jumbo Trend. These forward-looking statements are based on current expectations and entail various risks and uncertainties. Actual results may materially differ from expectations if known and unknown risks or uncertainties affect our business or if our estimates or assumptions prove inaccurate. Factors that could cause results or events to differ materially from current expectations expressed or implied by the forward-looking statements, include, but are not limited to, risks of the mineral exploration industry which may affect the advancement of the Gold Springs project, including possible variations in mineral resources, grade, recovery rates, metal prices, capital and operating costs, and the application of taxes; availability of sufficient financing to fund planned or further required work in a timely manner and on acceptable terms; availability of equipment and qualified personnel, failure of equipment or processes to operate as anticipated, changes in project parameters, including water requirements for operations, as plans continue to be refined; regulatory, environmental and other risks of the mining industry more fully described in the Company's Annual Information Form and continuous disclosure documents, which are available on SEDAR+ at . The assumptions made in developing the forward-looking statements include: the accuracy of current resource estimates and the interpretation of drill, metallurgical testing and other exploration results; the continuing support for mining by local governments in Nevada and Utah; the availability of equipment and qualified personnel to advance the Gold Springs project; execution of the Company's existing plans and further exploration and development programs for Gold Springs, which may change due to changes in the views of the Company or if new information arises which makes it prudent to change such plans or programs.Readers are cautioned not to place undue reliance on the forward-looking statements contained in this press release. Except as required by law, the Company assumes no obligation to update or revise any forward-looking statement, whether as a result of new information, future events or any other reason. Unless otherwise indicated, forward-looking statements in this press release describe the Company's expectations as of the date hereof.

根據適用的加拿大證券法,本文中包含的某些陳述構成“前瞻性資訊”(“前瞻性陳述”)。前瞻性陳述展望未來,並就某些事件和趨勢對業務的影響提供意見。本文中的前瞻性表述可能包括“創造”、“相信”、“將”、“繼續”、“將”、“承諾”、“應該”以及類似的表述,幷包括與巨型趨勢的巨大潛力有關的表述。這些前瞻性陳述是基於當前的預期,存在各種風險和不確定性。如果已知和未知的風險或不確定性影響我們的業務,或者如果我們的估計或假設被證明是不準確的,實際結果可能與預期大不相同。可能導致結果或事件與前瞻性陳述明示或暗示的當前預期大不相同的因素包括但不限於:礦產勘探行業可能影響金泉專案進展的風險,包括礦產資源、品位、回收率、金屬價格、資本和運營成本以及稅收的適用方面的可能變化;是否有足夠的資金及時和可接受地為計劃的或進一步需要的工作提供資金;設備和合格人員的可獲得性;設備或進程未能按預期運行;隨著計劃的繼續完善,專案參數的變化,包括業務的用水需求;採礦業的監管、環境和其他風險在公司的年度資訊表格和持續披露檔案中得到了更全面的描述,這些檔案可在SEDAR+上查閱:。在編制前瞻性陳述時所做的假設包括:當前資源估計的準確性以及對鑽探、冶金測試和其他勘探結果的解釋;內華達州和猶他州地方政府對採礦的持續支持;推進Gold Springs專案的設備和合格人員的可用性;公司現有計劃以及對Gold Springs的進一步勘探和開發計劃的執行情況,這些計劃可能會因公司觀點的變化或如果出現新的資訊而發生變化,因此改變此類計劃或計劃是謹慎的。提醒讀者不要過度依賴本新聞稿中包含的前瞻性陳述。除法律另有規定外,公司不承擔因新資訊、未來事件或任何其他原因而更新或修改任何前瞻性陳述的義務。除非另有說明,否則本新聞稿中的前瞻性陳述描述了該公司截至本新聞稿發佈之日的預期。

SOURCE: Gold Springs Resources Corporation

資料來源:金泉資源公司


View source version on accesswire.com:
在Accesswire.com上查看源代碼版本:

譯文內容由第三人軟體翻譯。


以上內容僅用作資訊或教育之目的,不構成與富途相關的任何投資建議。富途竭力但無法保證上述全部內容的真實性、準確性和原創性。
    搶先評論