share_log

Blackrock Announces Updated Mineral Resource Estimate for the Tonopah West Project

Blackrock Announces Updated Mineral Resource Estimate for the Tonopah West Project

貝萊德宣佈Tonopah West項目的最新礦產資源估算
newsfile ·  2023/10/11 04:05

Reports 6.12 Million Tonnes Grading 508.5 G/T AgEq For 100.04 Million Ounces AgEq

報告612萬噸分級508.5 G/T AgEq為1.004億盎司AgEq

Vancouver, British Columbia--(Newsfile Corp. - October 10, 2023) - Blackrock Silver Corp. (TSXV: BRC) (OTCQX: BKRRF) (the "Company" or "Blackrock") is pleased to report the results for its updated mineral resource estimate (the "Updated MRE") for its 100% controlled Tonopah West project ("Tonopah West"), located in the Walker Lane trend of Western Nevada. Tonopah West is conveniently situated directly adjacent to the town of Tonopah in Western Nevada, with highway US 95 traversing the property, and the resource area lies exclusively within patented mining claims. All amounts herein are presented in United States Dollars unless otherwise stated.

溫哥華,不列顛哥倫比亞省-(新聞檔案公司-2023年10月10日)-貝萊德銀業公司(多倫多證券交易所股票代碼:BRC)(多倫多證券交易所股票代碼:BKRRF)(The公司“或”貝萊德“)高興地報告其最新礦產資源估算的結果(”已更新 MRE“)其100%控制的Tonopah West專案(“託諾帕西“),位於內華達州西部的Walker Lane Trend。Tonopah West地理位置便利,直接毗鄰內華達州西部的Tonopah鎮,駭維金屬加工US 95橫貫該礦產,資源區僅位於受專利保護的採礦主張範圍內。除非另有說明,否則所有金額均以美元表示。

HIGHLIGHTS:

亮點:

  • The Updated MRE contains a total of 0.57 million ounces ("Moz") of gold and 47.74Mozs of silver or 100.04Mozs of silver equivalent ("AgEq"), which is a 135% increase over the maiden resource estimate for Tonopah West (the "Maiden MRE") included in the technical report dated effective April 28, 2022;

  • At a 200 g/t AgEq cut-off, the average grade of the inferred mineral resource is 508.5 g/t AgEq, which is a 14% increase over the Maiden MRE;

  • The Updated MRE includes 6.12 million tonnes, which is a 106% increase over the Maiden MRE;

  • Blackrock's discovery costs are $0.29 per ounce of AgEq;

  • The Updated MRE is based on a structural re-interpretation of the Victor and DPB areas and incorporation of the new drill information from the Northwest Step Out target. The Updated MRE captures approximately 3-kilometres of strike along the Tonopah West vein system;

  • Silver and gold mineralization remains open to the northwest and internally between Victor and DPB, and DPB and the Northwest Step Out target, and at depth; and

  • Blackrock Silver to host investor webinar Wednesday, October 11, 2023 at 1:00 p.m. Pacific Time.

  • 最新的稀土元素總量為57萬盎司(“莫茲“)黃金和47.74Mozs白銀或100.04Mozs白銀當量(”AgEq),這比對Tonopah West的首次資源估計(Tonopah West)增加了135%處女作MRE“)列入日期為2022年4月28日的技術報告;

  • 以200g/t AgEq為下限,推斷出的礦產資源平均品位為508.5 g/t AgEq,比最早的平均品位提高了14%;

  • 最新的MRE包括612萬噸,比Maiden MRE增加106%;

  • 貝萊德的發現成本為每盎司AgEq 0.29美元;

  • 最新的MRE基於對維克託和DPB地區的結構性重新解釋,並納入了來自西北臺階目標的新鑽探資訊。最新的MRE捕獲了沿託諾帕西脈系統的大約3公里的走向;

  • 銀、金礦化在維克託和DPB之間的西北部和內部仍然開放,DPB和西北地區在深部跳出靶區;

  • 貝萊德白銀將於2023年10月11日星期三下午1:00主持投資者網路研討會。太平洋時間。

Table 1: Tonopah West Updated 2023 Mineral Resource Estimate

表1:Tonopah West更新的2023年礦產資源估計

AgEq
cutoff g/t
(1)
Tonnes Silver
g/t
Gold
g/t
AgEq
g/t (2)
Ounces of Silver Ounces of Gold Ounce of Silver Equivalent(3) Classification(4)
200 6,119,000 242.6 2.90 508.5 47,738,000 570,000 100,038,000 Inferred
AgEq
截止g/t
(1)
公噸 白銀
克/噸
黃金
克/噸
AgEq
克/噸(2)
幾盎司白銀 盎司黃金 盎司銀當量(3) 分類(4)
200個 6,119,000人 242.6 2.90 508.5 47,738,000人 57萬 100,038,000 推論

1 AgEq cutoff grade is based a total mining, processing and G&A cost of $119/tonne.

1AgEq截止品位基於採礦、加工和並購的總成本為119美元/噸。

2 Silver Equivalent grade ratio used in this news of 84:1 is based on silver and gold prices of $22/ounce and $1,850/ounce, respectively, and recoveries for silver and gold of 87% and 95%, respectively. AgEq Factor= (Ag Price / Au Price) x (Ag Rec / Au Rec); g AgEq/t = g Ag/t + (g Au/t / AgEq Factor).

2本新聞所用的白銀等值品位比率為84:1,是基於白銀和黃金的價格分別為22美元/盎司和1,850美元/盎司,以及白銀和黃金的回收率分別為87%和95%。AgEq係數=(Ag價格/Au價格)x(Ag Rec/Au Rec);g AgEq/t=g Ag/t+(g Au/t/AgEq係數)。

3 Rounding as required by reporting guidelines may result in apparent discrepancies between tonnes, grade, and contained metal content.

3.按照報告指南的要求進行四捨五入可能會導致噸、品位和所含金屬含量之間的明顯差異。

4 Mineral resources are not mineral reserves and do not have demonstrated economic viability. There is no certainty that all or any part of the mineral resources estimated will be converted into mineral reserves. The quantity and grade of reported inferred mineral resources in this estimation are uncertain in nature and there has been insufficient exploration to define these inferred mineral resources as indicated mineral resources. It is uncertain if further exploration will result in upgrading them to the Indicated mineral resources category.

4.礦產資源不是礦產儲備,沒有證明的經濟可行性。目前尚不能確定估計的全部或部分礦產資源是否會轉化為礦產儲量。這一估計中報告的推斷礦產資源的數量和等級在性質上是不確定的,沒有足夠的勘探將這些推斷礦產資源界定為指示礦產資源。目前還不確定進一步勘探是否會導致將它們升級為指示的礦產資源類別。

The MRE was prepared in accordance with Canadian Institute of Mining, Metallurgy and Petroleum ("CIM") Definition Standards - For Mineral Resources and Mineral Reserves adopted May 19, 2014, and in accordance with National Instrument 43-101 - Standards of Disclosure for Mineral Projects ("NI 43-101"). The effective date of the new mineral resources estimated by RESPEC (formerly Mine Development Associates, "RESPEC") is October 6, 2023.

MRE是根據加拿大采礦、冶金和石油學會(“CIM“)定義標準--2014年5月19日通過的礦產資源和礦產儲量定義標準,並根據國家文書43-101--《礦產專案資訊披露標準》(“NI 43-101)。REPEC(原礦山開發協會)估計的新礦產資源的生效日期。重新分配“)是2023年10月6日。

Andrew Pollard, the Company's President and Chief Executive Officer, stated, "With delivery of our second mineral resource estimate at Tonopah West in just three years of our initial discovery, we are making great strides towards de-risking and reawakening one of the great American silver camps. Compared to the Maiden MRE, our mineral inventory has grown by 135% AgEq and discovery costs have plummeted to $0.29 per silver equivalent ounce. The addition of 25,000 metres of new drilling into the database, a re-interpretation of the underlying geologic model, and the modelling of the newly discovered NW Step Out target highlights the expansion potential of the project. This Updated MRE has seen the footprint of mineralization more than double from the Maiden MRE, with the vein corridor now stretching over 3 kilometers with the inclusion of the new NW Step Out target. There are no signs of the system stopping both along strike and at depth.

公司首席執行官兼首席執行官總裁安德魯·波拉德表示,隨著我們在最初發現的短短三年內在Tonopah West進行的第二次礦產資源評估,我們正在朝著降低風險和重新喚醒美國偉大的銀營之一的方向邁進一大步。與Maiden MRE相比,我們的礦物庫存增加了135%AgEq,發現成本暴跌至每銀當量盎司0.29美元。在資料庫中增加了25,000米的新鑽探,重新解釋了底層地質模型,並對新發現的西北向臺階目標進行了建模,突出了該專案的擴展潛力。這次更新的MRE的礦化足跡是Maiden MRE的兩倍多,礦脈走廊現在延伸超過3公里,包括新的NW向跳出目標。沒有跡象表明,該系統在罷工和深度上都停止了。

"Tonopah West is unparalleled within the industry as I see it, given its exceptional, safe jurisdiction, incredible infrastructure, high-grade precious metal-only resource, excellent metallurgy and district scale exploration upside. Moreover, the entire resource is on private lands (patented claims) potentially providing for a streamlined permitting process.

在我看來,Tonopah West在業內是無與倫比的,因為它擁有特殊的、安全的司法管轄權、令人難以置信的基礎設施、高品位的僅含貴金屬的資源、出色的冶金和地區規模的勘探優勢。此外,所有資源都位於私人土地上(專利主張),可能會提供一個簡化的許可過程。

"Over 160 years since Nevada earned its moniker as the Silver State, and nearly a century since commercial production shut down, most had assumed the history books had long since closed on this once-renowned district. This resource marks a pivotal step toward the resurgence of this illustrious mining camp, proving that the final chapters of the 'Queen of the Silver Camps' are yet to be written."

“160多年前,內華達州贏得了”白銀之州“的稱號,近一個世紀以來,商業生產停產,大多數人以為這個曾經著名的地區早已成為歷史。這一資源標誌著朝著這個著名採礦營地的復興邁出了關鍵的一步,證明瞭‘白銀營地女王’的最後篇章還沒有寫出來。”

The Updated MRE is presented with block diluted grades. The AgEq block model grades are based on $22 per ounce of silver, $1,850 per ounce of gold, and 87% and 95% recoveries for silver and gold, respectively.

最新的MRE以塊稀釋等級呈現。AgEq區塊模型等級基於白銀每盎司22美元,黃金每盎司1,850美元,白銀和黃金的回收率分別為87%和95%。

The resource is reported using a cut-off grade which was calculated from estimated mining costs and metallurgical recoveries. Table 2 shows assumed mining, processing, and G&A cost for each mining method.

該資源的報告使用了根據估計的採礦成本和冶金回收率計算的邊際品位。表2顯示了每種採礦方法的假設採礦、加工和G&A成本。

Table 2: Tonopah West mining, processing and G&A costs at the listed gold and silver price

表2:按列出的金銀價格計算的Tonopah West採礦、加工和並購成本

Parameters Used USD Units
UG Mining 83 $/t Mined
Processing 22 $/t Processed
G&A 14 $/t Processed
Refining 0.50 $/oz Ag Produced
Silver Price 22 $/ounce
Gold Price 1850 $/ounce
Total 119 $/t Processed
Effective AgEq Cut off 200 g/t Ag
使用的參數 美元 單位
UG挖掘 83 $/t礦藏
正在處理中 22 $/t已處理
G&A 14. $/t已處理
煉油 0.50 每盎司銀生產成本
銀價 22 美元/盎司
金價 1850年 美元/盎司
總計 119 $/t已處理
有效AgEq截止日期 200個 克/噸銀

Kappes and Cassidy (KCA) completed twelve bottle-roll tests on vein composites. Silver returned recoveries from 81% to 94% with an average recovery of 87%. Gold recoveries from the twelve composites were between 90% to 98% with and average recovery of 95%. Based on the KCA data, a recovery of 87% was used in the calculation of the resource cut off grade.

Kappes和Cassidy(KCA)完成了12個關於靜脈複合材料的瓶裝測試。白銀的回收率從81%上升到94%,平均回收率為87%。金的回收率在90%~98%之間,平均回收率為95%。根據KCA的數據,在計算資源邊際品位時使用了87%的回收率。

Table 3: Tonopah West 2023 Updated Resource Estimate by Area

表3:Tonopah West 2023年按地區更新的資源估計

Area AgEq cutoff g/t (1) Tonnes Silver
g/t
Gold
g/t
AgEq
g/t (2)
Ounces of Silver Ounces of Gold Ounces of Silver Equivalent(3) Classification(4)
Victor 200 2,193,000 262.2 3.11 547.4 18,484,000 219,000 38,589,000 Inferred
DP 200 1,592,000 194.8 2.63 435.9 9,970,000 134,000 22,305,000 Inferred
Bermuda 200 1,360,000 298.8 3.53 623.4 13,063,000 154,000 27,250,000 Inferred
NW Step Out 200 976,000 198.3 1.97 379.2 6,220,000 62,000 11,894,000 Inferred
TOTAL 6,119,000 242.6 2.90 508.5 47,738,000 570,000 100,038,000 Inferred
面積 AgEq截止g/t(1) 公噸 白銀
克/噸
黃金
克/噸
AgEq
克/噸(2)
幾盎司白銀 盎司黃金 盎司銀當量(3) 分類(4)
維克多 200個 2,193,000人 262.2 3.11 547.4 18,484,000人 21.9萬人 38,589,000 推論
DP 200個 1592,000 194.8 2.63 435.9 997萬 134,000人 22,305,000 推論
百慕大群島 200個 136萬 298.8 3.53 623.4 13,063,000 154,000人 27,250,000 推論
向西北邁進一步 200個 976,000 198.3 1.97 379.2 6,220,000 62,000 11,894,000人 推論
共計 6,119,000人 242.6 2.90 508.5 47,738,000人 57萬 100,038,000 推論

1 AgEq cutoff grade is based a total mining, processing and G&A cost of $119/tonne.

1AgEq截止品位基於採礦、加工和並購的總成本為119美元/噸。

2 Silver Equivalent grade ratio used in this news of 84:1 is based on silver and gold prices of $22/ounce and $1,850/ounce, respectively, and recoveries for silver and gold of 87% and 95%, respectively. AgEq Factor= (Ag Price / Au Price) x (Ag Rec / Au Rec); g AgEq/t = g Ag/t + (g Au/t / AgEq Factor).

2.這則84:1的新聞中使用的白銀等值品位比率是基於白銀和黃金的價格分別為22美元/盎司和1,850美元/盎司,以及白銀和黃金的回收率分別為87%和95%。AgEq係數=(Ag價格/Au價格)x(Ag Rec/Au Rec);g AgEq/t=g Ag/t+(g Au/t/AgEq係數)。

3Rounding as required by reporting guidelines may result in apparent discrepancies between tonnes, grade, and contained metal content.

3.按照報告指南的要求進行四捨五入可能會導致噸、品位和所含金屬含量之間的明顯差異。

4 Mineral resources are not mineral reserves and do not have demonstrated economic viability. There is no certainty that all or any part of the mineral resources estimated will be converted into mineral reserves. The quantity and grade of reported Inferred mineral resources in this estimation are uncertain in nature and there has been insufficient exploration to define these Inferred mineral resources as Indicated mineral resources. It is uncertain if further exploration will result in upgrading them to the Indicated mineral resources category.

4.礦產資源不是礦產儲備,沒有證明的經濟可行性。目前尚不能確定估計的全部或部分礦產資源是否會轉化為礦產儲量。這一估計中報告的推斷礦產資源的數量和等級在性質上是不確定的,沒有足夠的勘探將這些推斷礦產資源界定為指示礦產資源。目前還不確定進一步勘探是否會導致將它們升級為指示的礦產資源類別。

Blackrock completed a total of 198 drillholes (125,208 metres) between June 16, 2020 and December 15, 2022 from the surface drillhole. This drilling underpins the Updated MRE. A total of $28.75 million was expended since acquiring the option on Tonopah West on April 1, 2020 to September 30, 2023, exclusive of option payments, holdings costs, and corporate G&A, which equates to a discovery cost of $0.29 per ounce of AgEq.

從2020年6月16日到2022年12月15日,貝萊德從地面鑽孔總共完成了198個鑽孔(125,208米)。這次鑽探為最新的MRE奠定了基礎。自2020年4月1日至2023年9月30日在Tonopah West收購期權以來,總共支出了2,875萬美元,不包括期權付款、持有成本和公司並購,這相當於每盎司AgEq的發現成本為0.29美元。

Table 4: Drill footage from June 2020 to December 2022

表4:2020年6月至2022年12月的演練片段

Type Feet metres
Precollar 81,670.0 24,893.0
Core 128,266.2 39,095.5
RC 200,850.0 61,219.1
Total Completed 410,786.2 125,207.6
類型
Precolar 81,670.0 24,893.0
堆芯 128,266.2 39,095.5
RC 200,850.0 61,219.1
已完成總數 410,786.2 125,207.6

During 2023, the Company focussed its efforts on reviewing all drillhole and exploration data as well as incorporating the Northwest Step Out area in to the geologic and resource model. This review concluded that the Tonopah West mineralization is closely associated with the arcuate margin of the Tonopah Caldera. As a result of this finding, the geologic model was revised to better capture the new structural understanding of the distribution and orientation of the Tonopah West vein system. This new interpretation included re-logging and re-modelling the existing drill data and incorporating historic underground information. Silver and gold mineralization and continuity have now been established over a three-kilometre strike. The vein system is open to the west-northwest and internally with undrilled areas between Victor and DPB, and DPB and Northwest Step Out.

在2023年期間,該公司集中精力審查所有鑽孔和勘探數據,並將西北臺階區納入地質和資源模型。總結認為,託諾帕西礦化與託諾帕火山口弧形邊緣密切相關。作為這一髮現的結果,對地質模型進行了修改,以更好地捕捉對Tonopah West礦脈系統的分佈和方向的新的結構理解。這一新的解釋包括重新錄井和重新類比現有的鑽探數據,並納入歷史的地下資訊。銀和金的礦化和連續性現已建立在三公里的走向上。礦脈系統向西北偏西方向開放,內部有維克託和DPB之間的未鑽探區域,DPB和Northwest走出。

The new model is based on drillholes which are oriented between 90 to 50-degree inclinations from the surface with up to three drillholes at different inclinations completed from the same drill pad. Drillholes are spaced approximately every 50 to 100-metres along sections with 50-metre distance between sections in the DPB area. At Victor, drillholes are spaced between approximately 25 to 50 metres apart along sections with the sections 50 to 100-metres apart. The Northwest Step Out area is one kilometre northwest of the DPB resource. Drillholes are spaced between 100 to 150 metres apart. The Northwest Step Out represents a new area not previously included in the May 2022 maiden resource.

新的模型是基於從地面傾斜90到50度的鑽孔,在同一個鑽臺上完成最多三個不同傾角的鑽孔。在DPB區域內,沿區段大約每隔50至100米間隔鑽孔,區段之間的距離為50米。在維克託,各段之間的鑽孔間隔約為25至50米,各段之間的間隔為50至100米。西北臺階區位於DPB資源西北一公里處。鑽孔的間距在100到150米之間。西北臺階代表了一個新的地區,以前沒有包括在2022年5月的處女地資源中。

The Updated MRE encompasses the Victor, DPB, Bermuda and the Northwest Step Out areas. The Victor area is approximately 500-metres by 250-metres while the DPB area is 800-metres by 800-metres. The Bermuda area is a high-grade vein within the DPB area, and the Northwest Step Out represents a new extension of the vein zones to west-northwest. RESPEC was supplied with 3-dimensional vein shapes. Silver and gold mineral resources were modelled and estimated as follows:

最新的MRE包括維克多、DPB、百慕大和西北階梯地區。維克託地區約為500米乘250米,而DPB地區為800米乘800米。百慕大地區是DPB地區內的一個高品位礦脈,而西北臺階代表了脈帶向西北偏西的新延伸。Respec提供了三維靜脈形狀。對銀和金礦產資源進行了類比和估算,如下:

  • Evaluate the drill data statistically;
  • Create tightly constrained low-, medium- and high-grade mineral-domain polygons for both silver and gold on sets of cross sections spaced at 50-metre intervals;
  • Use the mineral-domain polygons as a basis to create three-dimensional solids;
  • Code a block model to the silver and gold domains for each of the two deposit areas using the mineral-domain solids;
  • Analyze the modelled mineralization geostatistically to aid in the establishment of estimation and classification parameters; and
  • Interpolate grades into models comprised of 1.5(east-west) x 1.5(north-south) x 1.5(vertical)-metre blocks using the silver and gold mineral domains to explicitly constrain the grade estimations.
  • 對鑽探數據進行統計評價;
  • 在間隔50米的一組橫截面上為銀和金創建受嚴格約束的低、中、高品位礦物域多邊形;
  • 以礦物域多邊形為基礎創建三維實體;
  • 使用礦物域固體為兩個礦床區域中的每一個的銀域和金域編碼區塊模型;
  • 對建模的礦化進行地質統計學分析,以幫助建立估計和分類參數;以及
  • 使用銀礦和金礦域將品位嵌入到由1.5(東西)x 1.5(南北)x 1.5(垂直)米區塊組成的模型中,以明確限制品位估計。

Drillhole assay samples were composited within the mineralized domains into 1.5-metre length composites. High-grade capping was completed on composite data and established using a statistical analysis for silver and gold. Silver was capped at 1,800 g/t, and gold was capped at 20 g/t.

鑽孔分析樣品在礦化區域內復合成1.5米長的複合材料。高級封頂是在綜合數據上完成的,並通過對銀和金的統計分析建立起來。白銀的上限為1800克/噸,黃金的上限為20克/噸。

Specific gravity test work was completed for 92 core samples. Results indicate an average density of 2.49 grams/cm for vein material and 2.36 grams/cm for wall rock.

完成了92個岩心樣品的比重測試工作。結果表明,礦脈材料的平均密度為2.49克/釐米,圍巖的平均密度為2.36克/釐米。

RESPEC utilized Inverse Distance Cubed (ID3) interpolation for the estimation to obtain a localizing effect in the mid- and high-grade domains, and an Inverse Distance Squared (ID2) in the low-grade domains where mineralization is more diffuse. All estimates are based on a block dimension of 1.5-metre by 1.5-metre by 1.5-metre blocks.

REPEC使用反距離立方米體(ID3.)用於估計的內插,以在中高級域中獲得局部化效果,以及反距離平方米(ID2.)在礦化較分散的低品位區域。所有估算均以1.5米乘1.5米乘1.5米的區塊尺寸為基礎。

The original deposit had been depleted by historical mining in the Victor area. Approximately 200,000 tonnes of material were removed from the Victor resource estimate. In the DPB area, no historical mining records were documented.

原來的礦藏已經被維克多地區的歷史採礦耗盡了。大約200,000噸材料被從維克託資源估計中移走。在DPB地區,沒有記錄任何歷史採礦記錄。

A cut off for the reported resource of 200 g/t AgEq was selected based an assumed mining costs for underground methods along with processing and G&A costs. At a 200 g/t AgEq cut off, the average grade of the inferred resource is 508.5 g/t AgEq.

所報告資源的下限為200克/噸AgEq,是根據地下方法的採礦成本以及加工和G&A成本確定的。在200g/t AgEq下限時,推斷資源的平均品位為508.5 g/t AgEq。

A technical report is being prepared on the Updated MRE in accordance with NI 431-101 (the "Technical Report") and will be available on the Company's website and on SEDAR+ within 45 days of the date of this news release.

現正根據NI 431-101(以下簡稱“報告”)就最新修訂的維修工程擬備技術報告。技術報告“),並將在本新聞稿發佈之日起45天內在公司網站和SEDAR+上公佈。

The Updated MRE was prepared under the supervision of Mr. Jeffrey Bickel, CPG, an employee of RESPEC, and he has reviewed and approved the technical contents relating to the Updated MRE in this news release.

最新MRE是在REPEC僱員Jeffrey Bickel先生的監督下編制的,他已審閱並批准了本新聞稿中與最新MRE相關的技術內容。

Blackrock's exploration activities at Tonopah West are conducted and supervised by Mr. William Howald, Executive Chairman of Blackrock. Mr. William Howald, AIPG Certified Professional Geologist #11041, is a Qualified Person as defined under NI 43-101. He has reviewed and approved the contents of this news release.

貝萊德在託諾帕西部的勘探活動由貝萊德執行主席威廉·豪沃德先生領導和監督。威廉·豪沃德先生,AIPG認證專業地質學家#11041,是NI 43-101定義的合格人員。他已經審查並批准了本新聞稿的內容。

All sampling is conducted under the supervision of the Company's project geologists, and a strict chain of custody from the project to the sample preparation facility is implemented and monitored. The reverse circulation samples are hauled from the project site to a secure and fenced facility in Tonopah, Nevada, where they are loaded onto American Assay Laboratory's (AAL) flat-bed truck and delivered to AAL's facility in Sparks, Nevada. A sample submittal sheet is delivered to AAL personnel who organize and process the sample intervals pursuant to the Company's instructions.

所有采樣都在公司專案地質師的監督下進行,並實施和監控從專案到樣品製備設施的嚴格監管鏈。反向迴圈樣品從專案現場被運送到內華達州託諾帕市的一個安全和有柵欄的設施,在那裡它們被裝載到美國化驗實驗室(AAL)的平板卡車上,並運往AAL在內華達州斯帕克斯的設施。AAL人員根據公司的指示組織和處理樣本間隔時間,並向其提供樣本提交表。

The core, reverse circulation, and QA/QC samples are crushed and pulverized, then the pulverized material is digested and analyzed for Au using fire assay fusion and an Induced Coupled Plasma (ICP) finish on a 30-gram assay split. Silver is determined using five-acid digestion and ICP analysis. Over limits for gold and silver are determined using a gravimetric finish. Data verification of the assay and analytical results are completed to ensure accurate and verifiable results.

堆芯、反迴圈和QA/QC樣品被粉碎和粉碎,然後粉碎的材料被消化,並使用火試金融合和30克分析裂解的誘導耦合等離子體(ICP)完成Au的分析。銀的測定採用五酸消解和電感耦合等離子體發射光譜儀。金和銀的超限是用重量法測定的。完成了化驗和分析結果的數據驗證,以確保結果準確和可驗證。

Mr. Bickel has reviewed the sampling, assaying, and security procedures used at Tonopah West and it is his opinion that they follow industry standard procedures, and are adequate for the estimation of the Updated MRE and for use in preparing the Technical Report.

Bickel先生審查了Tonopah West使用的採樣、分析和安全程式,他認為這些程式遵循行業標準程式,足以估計最新的MRE並用於編制技術報告。

Mr. Bickel completed audits of the database, performed a site visit, and reviewed quality assurance and quality control data. After performing his review, he considers the assay data to be adequate for the estimation of the Updated MRE and for use in preparing the Technical Report.

比克爾先生完成了對資料庫的審計,進行了現場訪問,並審查了品質保證和質量控制數據。在進行審查後,他認為化驗數據足以估計最新的MRE,並可用於編寫技術報告。

Investor Webinar

投資者網路研討會

Blackrock Silver will host an investor webinar on Wednesday, October 11, 2023 at 1:00 p.m. Pacific Time.

貝萊德白銀將於2023年10月11日(星期三)下午1:00主持投資者網路研討會。太平洋時間。

To Register:

要註冊:

About Blackrock Silver Corp.

貝萊德銀業公司簡介

Blackrock is a junior precious metals focused exploration company that is on a quest to make an economic discovery. Anchored by a seasoned Board of Directors, the Company is focused on its Nevada portfolio of properties consisting of low-sulphidation epithermal gold & silver projects located along the established Northern Nevada Rift in north-central Nevada and the Walker Lane trend in western Nevada. Its flagship Tonopah West project hosts an inferred mineral resource of 6.12 million tonnes grading at 508.5 g/t AgEq for 100.04 million oz AgEq.

貝萊德是一家專注於貴金屬的初級勘探公司,正在尋求一項經濟發現。在經驗豐富的董事會的支持下,公司專注於內華達州的物業組合,包括位於內華達州中北部已建立的北內華達裂谷和內華達州西部沃克巷趨勢沿線的低硫化低溫熱液金銀專案。其旗艦專案Tonopah West專案擁有6,12萬噸的推斷礦產資源,品位為508.5 g/t AgEq/1000.4百萬盎司AgEq。

For further information, please contact:

如需更多資訊,請聯繫:

Andrew Pollard, President & CEO
Blackrock Silver Corp.
Phone: 604 817-6044
Email: andrew@blackrocksilver.com

總裁首席執行官安德魯·波拉德
貝萊德銀業公司
電話:604817-6044
電子郵件:andrew@Blackrocksilver.com

Forward-Looking Statements

前瞻性陳述

This news release contains "forward-looking statements" within the meaning of Canadian securities legislation. Such forward-looking statements concern, without limitation: the Company's strategic plans; estimates of mineral resource quantities and qualities; the timing of filing of the NI 43-101 technical report on the Updated MRE; timing and expectations for the Company's exploration and drilling programs; estimates of mineralization from drilling; geological information projected from sampling results; and the potential quantities and grades of the target zones. Such forward-looking statements or information are based on a number of assumptions, which may prove to be incorrect. Assumptions have been made regarding, among other things: conditions in general economic and financial markets; accuracy of assay results; geological interpretations from drilling results, timing and amount of capital expenditures; performance of available laboratory and other related services; future operating costs; and the historical basis for current estimates of potential quantities and grades of target zones. The actual results could differ materially from those anticipated in these forward-looking statements as a result of risk factors, including the ability of the Company to make payments related to the lease option to purchase Tonopah West; the timing and content of work programs; results of exploration activities and development of mineral properties; the interpretation and uncertainties of drilling results and other geological data; receipt, maintenance and security of permits and mineral property titles; environmental and other regulatory risks; project costs overruns or unanticipated costs and expenses; availability of funds; failure to delineate potential quantities and grades of the target zones based on historical data; and general market and industry conditions. Forward-looking statements are based on the expectations and opinions of the Company's management on the date the statements are made. The assumptions used in the preparation of such statements, although considered reasonable at the time of preparation, may prove to be imprecise and, as such, readers are cautioned not to place undue reliance on these forward-looking statements, which speak only as of the date the statements were made. The Company undertakes no obligation to update or revise any forward-looking statements included in this news release if these beliefs, estimates and opinions or other circumstances should change, except as otherwise required by applicable law.

本新聞稿包含加拿大證券法所指的“前瞻性陳述”。該等前瞻性表述涉及但不限於:公司的戰略計劃;對礦產資源數量和質量的估計;提交關於最新MRE的NI 43-101技術報告的時間;對公司勘探和鑽探計劃的時間和預期;對鑽探的礦化估計;從採樣結果預測的地質資訊;以及目標區的潛在數量和等級。此類前瞻性陳述或資訊基於一些假設,而這些假設可能被證明是不正確的。已就(其中包括):一般經濟和金融市場狀況;化驗結果的準確性;鑽探結果的地質解釋、資本支出的時間和金額;現有實驗室和其他相關服務的表現;未來運營成本;目標區潛在數量和等級的當前估計的歷史基礎等作出假設。由於風險因素,實際結果可能與這些前瞻性表述中預期的大不相同,這些風險因素包括:公司支付與購買Tonopah West的租賃選擇權有關的款項的能力;工作計劃的時間和內容;勘探活動和礦產開發的結果;鑽探結果和其他地質數據的解釋和不確定性;許可證和礦產所有權的接收、維護和安全;環境和其他監管風險;專案成本超領或意外的成本和支出;資金的可用性;未能根據歷史數據描述目標地區的潛在數量和等級;以及總體市場和行業狀況。前瞻性陳述是基於公司管理層在陳述發表之日的期望和意見。編制這些陳述時使用的假設雖然在編制時被認為是合理的,但可能被證明是不準確的,因此,提醒讀者不要過度依賴這些前瞻性陳述,因為它們只反映了陳述作出之日的情況。除非適用法律另有要求,否則如果這些信念、估計和意見或其他情況發生變化,公司不承擔更新或修改本新聞稿中包含的任何前瞻性陳述的義務。

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

多倫多證券交易所創業板交易所及其監管服務提供商(該術語在多倫多證券交易所的政策中定義)均不對本新聞稿的充分性或準確性承擔責任。

To view the source version of this press release, please visit

要查看本新聞稿的源版本,請訪問

譯文內容由第三人軟體翻譯。


以上內容僅用作資訊或教育之目的,不構成與富途相關的任何投資建議。富途竭力但無法保證上述全部內容的真實性、準確性和原創性。
    搶先評論