share_log

Colibri Completes 2,200m Drilling Program at "EP Project" in Caborca Gold Belt

Colibri Completes 2,200m Drilling Program at "EP Project" in Caborca Gold Belt

Colibri在卡博爾卡金礦帶的 “EP Project” 完成了2200米的鑽探計劃
newsfile ·  2023/10/11 00:08

Dieppe, New Brunswick--(Newsfile Corp. - October 10, 2023) - Colibri Resource Corporation (TSXV: CBI) (OTC PINK: CRUCF) ("Colibri" or the "Company") is pleased to report that it has completed its Phase 3 drilling campaign at selected targets on its 4766 Ha EP Project in the prolific Caborca Gold Belt of Sonora Mexico. The Company's team of drillers and geologists completed 2,200 metres of drilling in 17 holes. Gold assays are pending.

新不倫瑞克迪埃佩-(Newsfile Corp.-2023年10月10日)-Colibri Resources Corporation(多倫多證券交易所股票代碼:CBI)(場外交易代碼:CRUCF)(以下簡稱Colibri或公司)高興地報告,它已經完成了在4766公頃選定目標的第三階段鑽探活動。EP專案位於墨西哥索諾拉多產的卡博卡金礦帶。該公司的鑽探員和地質學家團隊在17個孔中完成了2200米的鑽探。黃金化驗正在進行中。

Targeted areas included:

目標區域包括:

1) West El Sahuaro which is a target that consists of a large gold in soil anomaly and is spatially associated with a northwest trending structure that was derived from mapping as well as IP resistivity interpretation. Recent interpretation of Plomo exploration data suggests that this northwest trending structure extends to the southeast and possibly controls the occurrence of gold mineralization on the Plomo property. (6 holes)

1)西El Sahuaro,這是一個由土壤異常中的大量金礦組成的目標,在空間上與通過填圖和激電解釋得出的北西向構造有關。最近對Plomo勘探數據的解釋表明,這一北西向構造向東南延伸,可能控制了Plomo金礦床上金礦化的產狀。(6個洞)

2) An area north of Main Zone testing for northwest trending fault zones located north of the Main Zone lenses and interpreted as a control on the occurrence of the north-northeast trending mineralization in the Main Zone. (6 holes)

2)主帶以北的北西向斷裂帶測試區域,位於主帶透鏡體以北,對主帶北-北東向礦化的產狀有控制作用。(6個洞)

3) An area to the south of Main Zone targeting a mapped northwest trending structure that is approximately coincident with a well-defined Soil Gas Hydrocarbon ("SGH") anomaly. (5 holes)

3)主帶以南的區域,目標是繪製的西北向構造,該構造與明確的土壤氣態烴(SGH)異常大致重合。(5個洞)

About El Sahuaro

關於El Sahuaro

El Sahuaro is characterized by north-northeast trending magnetic anomalies. Detailed structural mapping in the northeast part of the property indicates a dominant north-northwestern strike and easterly dip to foliation and veins. The structural orientations observed are consistent with north-northwest trending structures interpreted from magnetic intensity contrasts and an apparent dislocation and offset of the north-northeastern magnetic trend. The El Sahuaro area is underlain by Jurassic rhyolite and andesite and by Proterozoic (?) metasedimentary rocks. All holes drilled at El Sahuaro have intersected Au mineralization. Highlights of drilling at El Sahuaro include:

El Sahuaro具有北北東向磁異常的特徵。在該地產東北部的詳細構造制圖表明,主要是北西北走向和向東傾斜的葉理和礦脈。觀察到的構造方向與由磁場強度對比解釋的北北西向構造一致,並與北東向磁化趨勢的明顯錯位和錯動相一致。El Sahuaro地區下伏侏羅紀流紋巖、安山石和元古界(?)變質沉積巖。在El Sahuaro鑽探的所有孔都與金礦化相交。El Sahuaro的鑽探亮點包括:

  • 15 m at an average grade of 2.36 g/t Au
  • 22 m at an average grade of 0.17 g/t Au
  • 25 m at an average grade of 0.10 g/t Au
  • 3 m at an average grade of 0.92 g/t Au
  • 6 m at an average grade of 0.627 g/t Au
  • 2 m at an average grade of 1.943 g/t Au
  • 15米,平均品位2.36克/噸黃金
  • 22米,平均品位0.17克/噸金
  • 25米,平均品位為0.10克/噸黃金
  • 3米,平均品位0.92g/t Au
  • 6米,平均品位為0.627克/噸金
  • 2米,平均品位為1.943克/噸金

About Main Zone

關於主區

The Main Zone is interpreted as a series of north-northeasterly striking and moderately east dipping lenses occurring over an approximate known strike length of 250 m and previously drilled to a vertical depth of approximately 120 m.

主帶被解釋為一系列北東北走向和適度向東傾斜的透鏡,發生在大約250米的已知走向長度上,之前鑽探到的垂直深度約為120米。

Mineralization exposed on surface and in historical mine workings consists of a north-northeast striking and moderately easterly dipping quartz vein that is discontinuously exposed over a strike length of approximately 120 m. The quartz vein pinches and swells along the strike length on surface reaching a maximum exposed thickness of approximately 1.5 m. Grab samples from surface exposures of the vein have returned assay values of 43.9 g/t Au and 40.1 g/t Au. Previous drilling has intersected similarly high-grade mineralization and includes 12.19 g/t Au over an intersection length of 3 m. Mineralization in both the hangingwall and footwall of the Main Zone vein includes multiple quartz vein intersections and low to locally moderate grade Au assay values in chlorite-carbonate-pyrite altered host rocks. Longer mineralized intercepts of veined and altered host rock at the Main Zone include:

出露在地表和歷史礦井中的礦化由一條北東東向的石英脈組成,該石英脈在走向長度約為120m的範圍內不連續出露。該石英脈在地表沿走向長度收縮和膨脹,最大暴露厚度約為1.5m。從出露的地表抓取樣品,測得化驗值分別為43.9g/t Au和40.1g/t Au。之前的鑽探也發現了類似的高品位礦化,在3米的交叉長度上含有12.19克/噸的金。主帶礦脈的上盤和下盤礦化包括多個石英脈交匯處和綠泥石-碳酸鹽-黃鐵礦蝕變容礦岩石中低-局部中等品位的金測定值。主區脈狀和蝕變主巖的較長礦化截獲包括:

  • 87 m at an average grade of 0.13 g/t Au including an interval of 8 m at 0.34 g/t Au
  • 86 m at an average grade of 0.17 g/t Au including an interval of 10 m at 0.55 g/t Au
  • 34.7 m at an average grade of 0.28 g/t Au including 5.65 m at 1.0 g/t Au
  • 29.0 m at an average grade of 0.47 g/t Au including 6.0 m at 0.97 g/t Au
  • 87米,平均品位為0.13克/噸金,間隔為8米,品位為0.34克/噸金
  • 86米,平均品位為0.17克/噸金,間隔10米,品位為0.55克/噸金
  • 34.7米,平均品位0.28克/噸金,其中5.65米,1.0克/噸金
  • 29.0米,平均品位為0.47克/噸金,其中6.0米,品位為0.97克/噸金

Planned Next Steps:

計劃的後續步驟:

The Company is currently planning exploration on the recently acquired Plomo property which includes an airborne (drone) high resolution magnetic survey, detailed geological and structural mapping over selected targets, and reconnaissance geological mapping and prospecting over the less explored parts of the property. The Company will be evaluating the Main Zone and West El Sahuaro drilling results including assay pending and will be prioritizing targets from across the EP project for drilling in Q1 2024.

本公司目前正計劃對最近收購的Plomo物業進行勘探,包括航空(無人機)高解析度磁力測量、選定目標的詳細地質和構造測繪,以及對該物業較少勘探部分的勘察地質測繪和勘探。公司將評估Main Zone和West El Sahuaro的鑽探結果,包括有待分析的結果,並將在2024年第一季度優先考慮EP專案的鑽探目標。

About the EP Gold Project

關於EP黃金專案


Illustration 1: Location of the Plomo & Evelyn properties within Caborca Gold Belt


圖1: Plomo&Evelyn酒店在Cborca金礦帶內的位置

The EP Gold Project is located within the Caborca Gold Belt ("CGB") of northwestern Sonora and is comprised of the Evelyn and the Plomo properties covering a total of 4,766 hectares ("Ha"). The northwest trending CGB is approximately 500 km in length and is characterized by a number of orogenic-type gold deposits, prospects, and occurrences including the > 15 million ounce La Herradura Mine, located 25 km west of EP, the > 2-million-ounce Noche Buena Mine located approximately 8 km southwest of EP, and the past producing Soledad-Dipolos Mine (> 3 Moz Au) located approximately 32 km to the northwest of EP (see attached Illustration 1).

EP黃金專案位於索諾拉西北部的Cborca金礦帶(“CGB”)內,由Evelyn和Plomo兩個物業組成,佔地總計4,766公頃(“哈”)。沿西北走向的CGB長約500公里,以多個造山型金礦床、遠景和礦點為特徵,包括位於EP以西25公里處的La Herradura礦>1,500萬盎司,位於EP西南約8公里處的>200萬盎司Noche Buena礦,以及位於EP西北約32公里處的過去生產的Soledad-Dipolos礦(>3Moz Au)(見附圖1)。

The Evelyn property was acquired by the Company in 2012 and the acquisition of the Plomo property was completed in March of 2023. On the Evelyn property, Colibri has completed comprehensive surface exploration including soil sampling, geological mapping and outcrop sampling, an airborne magnetic survey, and a property wide induced polarization survey. Since February 2020, Colibri has drilled a total of 12,333 metres (total of reverse circulation and core drilling) and is advancing mineralized zones at the Main Zone and El Sahuaro. On the Plomo property, the Company has compiled historical exploration data and has completed its first exploration program which included geological mapping and outcrop sampling at selected target areas on the property. The Company is continuing to advance its EP project-wide interpretation and exploration model and has identified 13 target areas with historical work that includes high grade grab samples from outcrop, high grade grab and channel samples from historical mine working, and drill intercepts that are both locally high grade and are consistent with grades being mined in the Caborca Gold Belt. The Company is prioritizing additional target areas on the EP property for drilling and is also planning further field work to evaluate and advance earlier stage targets and to comprehensively evaluate and explore the complete project area.

本公司於2012年收購伊夫林物業,並於2023年3月完成對Plomo物業的收購。在伊夫林油田,Colibri已經完成了全面的地表勘探,包括土壤採樣、地質填圖和露頭採樣、航空磁力測量和全物業激發極化測量。自2020年2月以來,Colibri共鑽了12,333米(反迴圈和岩心鑽探總計),並正在推進主區和El Sahuaro的礦化區。關於Plomo礦產,本公司已編制歷史勘探數據,並已完成其第一個勘探計劃,其中包括在該礦產選定的目標區域進行地質測繪和露頭取樣。公司正在繼續推進其EP專案範圍的解釋和勘探模式,並已確定了13個具有歷史工作的目標區,包括露頭的高品位抓取樣本、歷史採礦工作中的高品位抓取和渠道樣本,以及既具有當地高品位又與Cborca金礦帶開採的品位一致的鑽探截距。該公司正在優先考慮EP物業上的更多目標區域進行鑽探,並計劃進一步開展實地工作,以評估和推進早期目標,並對整個專案區進行全面評估和勘探。


Illustration 2: EP Gold Project Priority target areas and outcrop & trench grab samples


插圖2:EP黃金專案優先目標區域和露頭和壕溝抓鬥樣本

QUALIFIED PERSON

有資格的人

Jamie Lavigne, P. Geo and a Director for Colibri is a Qualified Person as defined in NI 43-101 and has reviewed and approved the technical information in this press release.

Jamie Lavigne,P.Geo和Colibri的董事是NI 43-101中定義的合格人員,並已審查和批准了本新聞稿中的技術資訊。

ABOUT COLIBRI RESOURCE CORPORATION:

Colibri資源公司簡介:

Colibri is a Canadian-based mineral exploration company listed on the TSX-V (CBI) and is focused on acquiring and exploring prospective gold & silver properties in Mexico. The Company holds six high potential precious metal projects, all of which have planned near term exploration programs.

Colibri是一家總部位於加拿大的礦產勘探公司,在多倫多證券交易所(TSX-V)上市,專注於收購和勘探墨西哥潛在的金銀礦藏。該公司擁有六個高潛力貴金屬專案,所有這些專案都已規劃了近期勘探計劃。

For more information about all Company projects please visit: .

有關公司所有專案的更多資訊,請訪問:。

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

多倫多證券交易所風險交易所及其監管服務提供商(該術語在多倫多證券交易所的政策中定義)均不對本新聞稿的充分性或準確性承擔責任。

Notice Regarding Forward-Looking Statements:

關於前瞻性陳述的通知:

This news release contains "forward-looking statements". Statements in this press release which are not purely historical are forward-looking statements and include any statements regarding beliefs, plans, expectations or intentions regarding the future. Actual results could differ from those projected in any forward-looking statements due to numerous factors. These forward-looking statements are made as of the date of this news release, and the Company assumes no obligation to update the forward-looking statements, or to update the reasons why actual results could differ from those projected in the forward-looking statements. Although the Company believes that the plans, expectations and intentions contained in this press release are reasonable, there can be no assurance that they will prove to be accurate.

本新聞稿包含“前瞻性陳述”。本新聞稿中非純粹歷史性的陳述為前瞻性陳述,包括有關對未來的信念、計劃、期望或意圖的任何陳述。由於許多因素,實際結果可能與任何前瞻性陳述中預測的結果不同。這些前瞻性陳述是在本新聞稿發佈之日作出的,公司沒有義務更新前瞻性陳述,也沒有義務更新實際結果可能與前瞻性陳述中預測的結果不同的原因。儘管本公司相信本新聞稿中包含的計劃、預期和意圖是合理的,但不能保證它們將被證明是準確的。

For information contact: Ian McGavney, President/CEO and Director, Tel: (506) 383-4274, ianmcgavney@colibriresource.com

總裁兼董事首席執行官兼首席執行官伊恩·麥加夫尼電話:(506)383-4274,電子郵件:ianmcgavney@colibriresource ce.com

To view the source version of this press release, please visit

要查看本新聞稿的源版本,請訪問

譯文內容由第三人軟體翻譯。


以上內容僅用作資訊或教育之目的,不構成與富途相關的任何投資建議。富途竭力但無法保證上述全部內容的真實性、準確性和原創性。
    搶先評論