share_log

Blackrock Silver Announces Silver Cloud Results; Tonopah West Resource Update Timeline

Blackrock Silver Announces Silver Cloud Results; Tonopah West Resource Update Timeline

貝萊德白銀公佈銀雲業績;Tonopah West資源更新時間表
newsfile ·  2023/09/26 18:00

Vancouver, British Columbia--(Newsfile Corp. - September 26, 2023) - Blackrock Silver Corp. (TSXV: BRC) (the "Company" or "Blackrock") reports assay results for its 100% controlled Silver Cloud project ("Silver Cloud") located in north-central Nevada along the Northern Nevada Rift trend.

溫哥華,不列顛哥倫比亞省-(新聞檔案公司-2023年9月26日)-貝萊德銀業公司(多倫多證券交易所股票代碼:BRC)(The公司“或”貝萊德“)報告其100%控制的Silver Cloud專案的化驗結果(”銀色雲“)位於內華達州中北部,沿著北內華達裂谷趨勢。

HIGHLIGHTS:

亮點:

  • Intercepts up to 2.24 g/t gold were encountered in banded epithermal quartz veins;

  • Multiple banded epithermal veins were encountered with drilling confirming the orientation and dip of the epithermal vein structure with a westerly dip; and

  • The mineral resource update for the Company's Tonopah West project located within the Walker Lane trend in west central Nevada remains on track for completion in October 2023.

  • 條帶狀低溫熱液石英脈的截留量高達2.24g/t;

  • 鑽探發現多條帶狀淺成熱液脈體,證實了淺成熱液脈狀構造的方位和傾角為西風傾角;

  • 本公司位於內華達州中西部Walker Lane Trend內的Tonopah West專案的礦產資源更新仍在按計劃於2023年10月完成。

The Company completed a core program centered on the Northwest Canyon epithermal vein intercept that encountered 1.52 metres grading 70 g/t gold and 600 g/t silver in its 2022 drill program (see January 17, 2023 news release). The 2023 drill program consisted of five core holes totalling 1,827 metres.

該公司完成了以西北峽谷淺成熱液靜脈截獲為核心的核心計劃,在2022年的鑽探計劃中遇到了1.52米品位70克/噸黃金和600克/噸銀(見2023年1月17日新聞稿)。2023年的鑽探計劃包括5個總長1,827米的取心孔。

The drilling showed the epithermal vein system has a strike with azimuth of 340 degrees and a dip of 60 degrees to the west. The vein structure shows a much shallower dip than originally thought and drillholes were not in the optimum location for the shallow westerly dip. Several permitted sites were not drilled as a result.

鑽探表明,淺成熱液脈繫有一條方位340度的走向,向西傾斜60度。礦脈結構顯示出比最初認為的要淺得多的傾角,鑽孔不在淺西風傾角的最佳位置。因此,有幾個被允許的地點沒有被鑽探。

Gold and minor silver mineralization was encountered in drillholes SBC23-025 and -026. These holes were 25-metre and 100-metre step-outs located north from the original high grade bonanza intercept. While the strike and dip of the vein is better understood, the orientation of the high-grade gold and silver is not. Table 1 shows assay results above 0.2 g/t gold.

在SBC23-025和-026鑽孔中發現了金礦化和少量銀礦化。這些洞是位於最初的高等級Bonanza攔截以北的25米和100米的臺階。雖然人們對礦脈的走向和傾角有了更好的瞭解,但高品位金銀的取向卻不是很清楚。表1顯示了高於0.2g/t金的分析結果。

Andrew Pollard, President and Chief Executive Officer of the Company, stated, "As we await completion of our updated mineral resource estimate for our flagship Tonopah West project, which remains on track for October, the results from our targeted follow-up campaign at Silver Cloud continue to refine our understanding of the geologic controls of the mineralized system at the Northwest Canyon target. Though we have a good understanding of the strike and orientation of the structure, we have not yet been able to replicate the grades seen in SBC-22-20. A review of the down-hole geochemical data is underway to better pinpoint where the high-grade system is localized."

公司首席執行官總裁兼首席執行官安德魯·波拉德表示:“在我們等待我們的旗艦專案Tonopah West專案的最新礦產資源評估完成之際,我們在Silver Cloud的有針對性的後續行動的結果繼續完善我們對西北峽谷目標礦化系統的地質控制的理解。儘管我們對該構造的走向和方向有很好的瞭解,但我們還無法複製SBC-22-20中看到的等級。我們正在審查井下地球化學數據,以更好地查明高品位系統的本地化位置。”

Table 1: 2023 assay results above a 0.2g/t gold cut off grade

表1:2023年測定結果超過0.2g/t黃金下限品位

Area Drillhole
ID
Hole
Type
Year
Drilled
From
(m)
To
(m)
Interval
(m)
Gold
g/t
Silver
g/t
NW Canyon SBC23-022 Core 2023 NSV
NW Canyon SBC23-023 Core 2023 NSV
NW Canyon SBC23-024 Core 2023 228.45 229.36 0.91 0.090 16.24
NW Canyon SBC23-025 Core 2023 271.27 272.49 1.22 2.150 81.77
NW Canyon SBC23-025 Core 2023 300.23 301.45 1.22 0.225 4.14
NW Canyon SBC23-026 Core 2023 282.25 283.77 1.52 0.274 0.53
NW Canyon SBC23-026 Core 2023 321.57 323.09 1.52 0.789 3.40
NW Canyon SBC23-026 Core 2023 410.57 412.94 2.38 0.747 13.62
Including 412.27 412.94 0.67 2.240 21.71
NW Canyon SBC23-026 Core 2023 416.66 422.45 5.79 0.683 18.73
NW Canyon SBC23-026 Core 2023 425.81 431.38 5.58 0.252 3.17
NSV = No Significant Results. True thickness is estimated at 30% to 50% of drillhole interval
面積 鑽孔
ID號
孔洞
類型

鑽透
從…
(M)

(M)
間隔
(M)
黃金
克/噸
白銀
克/噸
西北峽谷 SBC23-022 堆芯 2023年年 NSV
西北峽谷 SBC23-023 堆芯 2023年年 NSV
西北峽谷 SBC23-024 堆芯 2023年年 228.45 229.36 0.91 0.090 16.24
西北峽谷 SBC23-025 堆芯 2023年年 271.27 272.49 1.22 2.150 81.77
西北峽谷 SBC23-025 堆芯 2023年年 300.23 301.45 1.22 0.225 4.14
西北峽谷 SBC23-026 堆芯 2023年年 282.25 283.77 1.52 0.274 0.53
西北峽谷 SBC23-026 堆芯 2023年年 321.57 323.09 1.52 0.789 3.40
西北峽谷 SBC23-026 堆芯 2023年年 410.57 412.94 2.38 0.747 13.62
包括 412.27 412.94 0.67 2.240 21.71
西北峽谷 SBC23-026 堆芯 2023年年 416.66 422.45 5.79 0.683 18.73
西北峽谷 SBC23-026 堆芯 2023年年 425.81 431.38 5.58 0.252 3.17
NSV=無顯著結果。真實厚度估計為鑽孔間隔的30%至50%

Drillhole SBC23-022 was drilled up dip of the bonanza intercept in SBC22-020. The drillhole confirmed that gold and silver mineralization are within the lower portion of the Silver Cloud rhyolite. A review of the down-hole geochemical data is being undertaken to determine what may be localizing the precious metal mineralization within the rhyolite lithology.

SBC23-022井是在SBC22-020井的波納薩截止點上傾角鑽進的。鑽孔證實,金銀礦化位於銀雲流紋巖的下部。正在對井下地球化學數據進行審查,以確定是什麼可能定位了流紋巖巖性中的貴金屬礦化。

Drillhole SBC23-023 was a 25 metre off-set to the south of SBC22-020. As the orientation has a shallower dip to the west than previously thought, the drillhole passed over the top of the vein and was not a good test of the Northwest Canyon vein system.

SBC23-023號鑽孔位於SBC22-020以南25米處。由於該方向向西的傾角比之前想像的要淺,所以鑽孔越過了礦脈的頂部,不是對西北峽谷礦脈系統的良好測試。

Drillhole SBC23-024 was a 25 metre step out to the north of SBC22-020. The drillhole did not encounter the vein within the lower portion of the Silver Cloud rhyolite but did encounter low-grade gold mineralization.

SBC23-024號鑽孔位於SBC22-020以北25米處。鑽孔沒有遇到銀雲流紋巖下部的脈體,但確實遇到了低品位的金礦化。

Drillholes SBC23-025 and SBC23-026 were re-oriented as the vein strike was better understood from the previous drillholes. Drillhole SBC23-025 was a 100 metre step out and the inclination was steepened to correct for the new postulation of the vein orientation. The drillhole encountered the vein at 271 metres down the hole and returned 1.22 metres grading 2.15 g/t gold.

重新定位了SBC23-025和SBC23-026兩個鑽孔,因為以前的鑽孔更好地瞭解了礦脈走向。SBC23-025是一個100米的臺階,傾斜被陡峭,以糾正新的假設的礦脈方向。鑽孔在井下271米處遇到礦脈,返回1.22米處,黃金品位為2.15克/噸。

Drillhole SBC23-026 was re-oriented with a shallower angle to pierce the westerly dipping vein. The core hole encountered the banded vein at 41 metres and returned up to 2.24 g/t gold.

對SBC23-026井進行了較淺角度的重新定向,以刺穿西傾礦脈。取心井在41米處遇到了帶狀礦脈,並返回了2.24克/噸的黃金。

Table 2: Drillhole collar location data for the 2023 Silver Cloud drill campaign

表2:2023年銀雲演練活動的鑽孔卡箍位置數據

Drillhole ID NAD27_E NAD27_N Elevation
(m)
Total
Depth
(m)
Azimuth Inclination
SBC23-022 530145 4544147 1675 274.321 271 -69
SBC23-023 530145 4544147 1675 369.418 263 -65
SBC23-024 5300149 4544149 1675 369.723 281 -75
SBC23-025 5030129 4544199 1683 367.894 273 -75
SBC23-026 530227 4544244 1462 445.618 270 -55
鑽孔ID NAD27_E NAD27_N 高程
(M)
總計
水深
(M)
方位角 傾角
SBC23-022 530145 4544147 1675 274.321 271 -69
SBC23-023 530145 4544147 1675 369.418 二百六十三 -65
SBC23-024 5300149 4544149 1675 369.723 281 -75
SBC23-025 5030129 4544199 1683 367.894 273 -75
SBC23-026 530227 4544244 1462 445.618 270 -55

Quality Assurance/ Quality Control

品質保證/質量控制

All sampling is conducted under the supervision of the Company's project geologists, and a strict chain of custody from the project to the sample preparation facility is implemented and monitored. The core samples are hauled from the project site to a secure and fenced facility in Battle Mountain, Nevada, where they are loaded onto American Assay Laboratory's (AAL) flat-bed truck and delivered to AAL's facility in Sparks, Nevada, which is an ISO 9001 and 17025 certified and accredited laboratory. A sample submittal sheet is delivered to AAL personnel who organize and process the sample intervals pursuant to the Company's instructions.

所有采樣都在公司專案地質師的監督下進行,並實施和監控從專案到樣品製備設施的嚴格監管鏈。核心樣品從專案現場被運送到內華達州巴特山的一個安全和有圍欄的設施,在那裡它們被裝載到美國化驗實驗室的平板卡車上,並運往美國化驗實驗室在內華達州斯帕克斯的設施,該實驗室是一家ISO9001和17025認證和認可的實驗室。AAL人員根據公司的指示組織和處理樣本間隔時間,並向其提供樣本提交表。

The core and QA/QC samples are crushed and pulverized, then the pulverized material is digested and analyzed for Au using fire assay fusion and an Induced Coupled Plasma (ICP) finish on a 30-gram assay split (FA-PB30-ICP). Silver is determined using five-acid digestion and ICP analysis (ICP-5AM48). Over limits for gold and silver are determined using a gravimetric finish (GRAVAu30 and GRAVAg30). Data verification of the assay and analytical results are completed to ensure accurate and verifiable results. Blackrock personnel insert a blind prep blank, lab blank or a certified standard approximately every 15th to 20th sample.

巖芯和QA/QC樣品被粉碎和粉碎,然後粉碎的材料被消化,並使用火試金融合和30克分析分離器(FA-PB30-ICP)上的誘導耦合等離子體(ICP)完成Au的分析。銀的測定採用五酸消化-電感耦合等離子體分析(ICP-5AM48)。金和銀的超限是用重量法測定的(GRAVAu30和GRAVAg30)。完成了化驗和分析結果的數據驗證,以確保結果準確和可驗證。貝萊德人員大約每隔15分鐘插入一次盲性準備空白、實驗室空白或認證標準這是至20這是樣本。

Blackrock's exploration activities at Silver Cloud are conducted and supervised by Mr. William Howald, Executive Chairman of Blackrock. Mr. William Howald, AIPG Certified Professional Geologist #11041, is a Qualified Person as defined under National Instrument 43-101 - Standards of Disclosure for Mineral Projects. He has reviewed and approved the contents of this news release.

貝萊德在Silver Cloud的勘探活動由貝萊德執行主席William Howald先生領導和監督。威廉·豪沃德先生,AIPG#11041認證專業地質學家,是美國國家儀器43-101定義的合格人員-《礦產專案資訊披露標準》。他已經審查並批准了本新聞稿的內容。

About Blackrock Silver Corp.

貝萊德銀業公司簡介

Backed by gold and silver ounces in the ground, Blackrock is a junior precious metal focused exploration company driven to add shareholder value via the drill bit. With 2.97 million tonnes grading 446 g/t silver equivalent1 at its Tonopah West project, and a new bonanza-grade gold discovery at Silver Cloud, the Company has a proven track record of exploration success. In addition to its gold and silver project portfolio, the Company is credited with a lithium discovery, the Tonopah North project, which is under option to a major lithium exploration group. Anchored by a seasoned Board, the Company is focused on its 100% controlled Nevada portfolio of properties consisting of low-sulphidation, epithermal gold and silver mineralization located along the established Northern Nevada Rift in north-central Nevada and the Walker Lane trend in western Nevada.

以地下的金銀盎司為後盾,貝萊德是一家專注於貴金屬的初級勘探公司,旨在通過鑽頭為股東增加價值。297萬噸分級446g/t銀當量1在其Tonopah West專案以及在Silver Cloud發現的新的富礦級別金礦中,該公司擁有公認的勘探成功記錄。除了黃金和白銀專案組合,該公司還發現了鋰,即Tonopah North專案,該專案是一家主要的鋰勘探集團的選擇權。在經驗豐富的董事會的支持下,公司專注於其100%控制的內華達州資產組合,包括位於內華達州中北部已建立的北內華達裂谷和內華達州西部Walker Lane Trend沿線的低硫化、低溫熱液金銀礦化。

For further information, please contact:

如需更多資訊,請聯繫:

Andrew Pollard, President & CEO
Blackrock Silver Corp.
Phone: 604 817-6044
Email: andrew@blackrocksilver.com

總裁首席執行官安德魯·波拉德
貝萊德銀業公司
電話:604817-6044
電子郵件:andrew@Blackrocksilver.com

Forward Looking Statements

前瞻性陳述

This news release contains "forward-looking statements" within the meaning of Canadian securities legislation. Such forward-looking statements concern, without limitation, timing and expectations for completion of the updated mineral resource estimate on the Company's Tonopah West project; timing and expectations for the Company's exploration and drilling programs, estimates of mineralization from drilling, geological information projected from sampling results and the potential quantities and grades of the target zones. Such forward-looking statements or information are based on a number of assumptions, which may prove to be incorrect. Assumptions have been made regarding, among other things: conditions in general economic and financial markets; accuracy of assay results; geological interpretations from drilling results, timing and amount of capital expenditures; performance of available laboratory and other related services; future operating costs; and the historical basis for current estimates of potential quantities and grades of target zones. The actual results could differ materially from those anticipated in these forward-looking statements as a result of risk factors, including the timing and content of work programs; results of exploration activities and development of mineral properties; the interpretation and uncertainties of drilling results and other geological data; receipt, maintenance and security of permits and mineral property titles; environmental and other regulatory risks; project costs overruns or unanticipated costs and expenses; availability of funds; failure to delineate potential quantities and grades of the target zones based on historical data, and general market and industry conditions. Forward-looking statements are based on the expectations and opinions of the Company's management on the date the statements are made. The assumptions used in the preparation of such statements, although considered reasonable at the time of preparation, may prove to be imprecise and, as such, readers are cautioned not to place undue reliance on these forward-looking statements, which speak only as of the date the statements were made. The Company undertakes no obligation to update or revise any forward-looking statements included in this news release if these beliefs, estimates and opinions or other circumstances should change, except as otherwise required by applicable law.

本新聞稿包含加拿大證券法所指的“前瞻性陳述”。這些前瞻性表述涉及但不限於完成公司Tonopah West專案最新礦產資源估計的時間和預期;公司勘探和鑽探計劃的時間和預期;鑽探礦化的估計;採樣結果預測的地質資訊以及目標區的潛在數量和品位。此類前瞻性陳述或資訊基於一些假設,而這些假設可能被證明是不正確的。已就(其中包括):一般經濟和金融市場狀況;化驗結果的準確性;鑽探結果的地質解釋、資本支出的時間和金額;現有實驗室和其他相關服務的表現;未來運營成本;目標區潛在數量和等級的當前估計的歷史基礎等作出假設。由於風險因素,實際結果可能與前瞻性表述中預期的大不相同,這些風險因素包括:工作計劃的時間和內容;勘探活動和礦產開發的結果;鑽探結果和其他地質數據的解釋和不確定性;許可證和礦產所有權的接收、維護和安全;環境和其他監管風險;專案成本超領或意外的成本和支出;資金的可用性;未能根據歷史數據、一般市場和行業條件劃定目標區的潛在數量和等級。前瞻性陳述是基於公司管理層在陳述發表之日的期望和意見。編制這些陳述時使用的假設雖然在編制時被認為是合理的,但可能被證明是不準確的,因此,提醒讀者不要過度依賴這些前瞻性陳述,因為它們只反映了陳述作出之日的情況。除非適用法律另有要求,否則如果這些信念、估計和意見或其他情況發生變化,公司不承擔更新或修改本新聞稿中包含的任何前瞻性陳述的義務。

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

多倫多證券交易所風險交易所及其監管服務提供商(該術語在多倫多證券交易所的政策中定義)均不對本新聞稿的充分性或準確性承擔責任。


1 Technical information relating to the Tonopah West project is based on and derived from the NI 43-101 report prepared for Blackrock entitled "Technical Report and Estimate of Mineral Resources for the Tonopah West Silver-Gold Project, Nye and Esmeralda Counties, Nevada, USA" effective April 28, 2022 authored by Michael S. Lindholm, C.P.G. and Jeffrey Bickel, C.P.G. (the "Technical Report"). The Technical Report outlines 2.97million tonnes at a block diluted grade of 208 grams per tonne (g/t) silver (Ag) and 2.5g/t gold (Au) for a total inferred mineral resource of 19,902,000 ounces Ag and 238,000 ounces Au, or 446 g/t silver equivalent (AgEq) for 42.6million oz AgEq. AgEq equivalent grade is based on silver and gold prices of US$20/ounce and US$1750/ounce, respectively, and recoveries for silver and gold of 87%and 95%

1與Tonopah West專案有關的技術資訊基於NI 43-101為貝萊德準備的題為《美國內華達州奈縣和埃斯梅拉達縣Tonopah West銀金專案礦產資源的技術報告和估計》的報告,該報告於2022年4月28日生效,作者為C.P.G.Michael S.Lindholm和Jeffrey Bickel。技術報告《技術報告》概述了297萬噸銀(銀)和2.5g/t金(Au)的區塊稀釋品位,總推斷礦產資源為19,90.2萬盎司銀和23.8萬盎司金,或4260萬盎司AgEq的446g/t銀當量。AgEq當量品位是基於白銀和黃金的價格分別為20美元/盎司和1750美元/盎司,白銀和黃金的回收率為87%和95%。

To view the source version of this press release, please visit

要查看本新聞稿的源版本,請訪問

譯文內容由第三人軟體翻譯。


以上內容僅用作資訊或教育之目的,不構成與富途相關的任何投資建議。富途竭力但無法保證上述全部內容的真實性、準確性和原創性。
    搶先評論